Advanced Stirling Convertor (ASC-E2) Performance Testing at NASA Glenn Research Center

The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) has been supporting development of the Advanced Stirling Radioisotope Generator (ASRG) since 2006. A key element of the ASRG Project is providing life, reliability, and performance testing of the Advanced Stirling Convertor (ASC). For this purpose, four pairs of ASCs capable of operating to 850 C and designated with the model number ASC-E2, were delivered by Sunpower of Athens, OH, to GRC in 2010. The ASC-E2s underwent a series of tests that included workmanship vibration testing, performance mapping, and extended operation. Workmanship vibration testing was performed following fabrication of each convertor to verify proper hardware build. Performance mapping consisted of operating each convertor at various conditions representing the range expected during a mission. Included were conditions representing beginning-of-mission (BOM), end-of-mission (EOM), and fueling. This same series of tests was performed by Sunpower prior to ASC-E2 delivery. The data generated during the GRC test were compared to performance before delivery. Extended operation consisted of a 500-hour period of operation with conditions maintained at the BOM point. This was performed to demonstrate steady convertor performance following performance mapping. Following this initial 500-hour period, the ASC-E2s will continue extended operation, controller development and special durability testing, during which the goal is to accumulate tens of thousands of hours of operation. Data collected during extended operation will support reliability analysis. Performance data from these tests is summarized in this paper.

Oriti, Salvatore↗

Advanced Stirling Convertor (ASC-E2) Performance Testing at NASA Glenn Research Center

The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) has been supporting development of the Advanced Stirling Radioisotope Generator (ASRG) since 2006. A key element of the ASRG Project is providing life, reliability, and performance testing of the Advanced Stirling Convertor (ASC). For this purpose, four pairs of ASCs capable of operating to 850 C and designated with the model number ASC-E2, were delivered by Sunpower of Athens, Ohio, to GRC in 2010. The ASC-E2s underwent a series of tests that included workmanship vibration testing, performance mapping, and extended operation. Workmanship vibration testing was performed following fabrication of each convertor to verify proper hardware build. Performance mapping consisted of operating each convertor at various conditions representing the range expected during a mission. Included were conditions representing beginning-of-mission (BOM), end-of-mission (EOM), and fueling. This same series of tests was performed by Sunpower prior to ASC-E2 delivery. The data generated during the GRC test were compared to performance before delivery. Extended operation consisted of a 500-hr period of operation with conditions maintained at the BOM point. This was performed to demonstrate steady convertor performance following performance mapping. Following this initial 500-hr period, the ASC-E2s will continue extended operation, controller development and special durability testing, during which the goal is to accumulate tens of thousands of hours of operation. Data collected during extended operation will support reliability analysis. Performance data from these tests is summarized in this paper.

Oriti, Salvatore↗

On-Orbit Constraints Test - Performing Pre-Flight Tests with Flight Hardware, Astronauts and Ground Support Equipment to Assure On-Orbit Success

On-Orbit Constraints Test (OOCT's) refers to mating flight hardware together on the ground before they will be mated on-orbit. The concept seems simple but it can be difficult to perform operations like this on the ground when the flight hardware is being designed to be mated on-orbit in a zero-g and/or vacuum environment of space. Also some of the items are manufactured years apart so how are mating tasks performed on these components if one piece is on-orbit before its mating piece is planned to be built. Both the Internal Vehicular Activity (IVA) and Extra-Vehicular Activity (EVA) OOCT's performed at Kennedy Space Center will be presented in this paper. Details include how OOCT's should mimic on-orbit operational scenarios, a series of photographs will be shown that were taken during OOCT's performed on International Space Station (ISS) flight elements, lessons learned as a result of the OOCT's will be presented and the paper will conclude with possible applications to Moon and Mars Surface operations planned for the Constellation Program.

Haddad, Michael E.↗

Cyclic performance tests of Sn/MWCNT composite lithium ion battery anodes at different temperatures

In this study tin-multi walled carbon nanotube (Sn-MWCNT) lithium ion battery anodes were produced and their electrochemical galvanostatic charge/discharge tests were conducted at various (25 °C, 35 °C, 50 °C) temperatures to determine the cyclic behaviors of anode at different temperatures. Anodes were produced via vacuum filtration and DC magnetron sputtering technique. Tin was sputtered onto buckypapers to form composite structure of anodes. SEM analysis was conducted to determine morphology of buckypapers and Sn-MWCNT composite anodes. Structural and phase analyses were conducted via X-ray diffraction and Raman Spectroscopy technique. CR2016 coin cells were assembled for electrochemical tests. Cyclic voltammetry test were carried out to determine the reversibility of reactions between anodes and reference electrode between 0.01-2.0 V potential window. Galvanostatic charge/discharge tests were performed to determine cycle performance of anodes at different temperatures.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

SAS4A/SASSYS-1 Validation with EBR-II Tests Performed During the SHRT Testing Program

The EBR-II sodium-cooled fast reactor supported a wide range of fast reactor research activities. The final fifteen years of operations at EBR-II were used for experiments and tests to demonstrate the importance of passive safety in liquid metal reactors and the capability of such systems to provide strong passive responses during off-normal conditions. The Shutdown Heat Removal Test program at EBR-II provided test data supporting the validation of computer codes for design, licensing, and operation of LMRs, among other objectives. The program included nearly sixty tests, most of which were protected and unprotected loss of flow and loss of heat sink tests run at various initial powers and flow rates. This report documents the results of modeling and simulation of tests from the Shutdown Heat Removal Test program to support validation of Argonne’s SAS4A/SASSYS-1 fast reactor safety analysis code. SHRT-17 was a protected loss of flow test where a loss of electrical power to all sodium coolant pumps was simulated to demonstrate the effectiveness of natural circulation cooling characteristics. SHRT-45R was an unprotected loss of flow test where the control rod scram function of the plant protection system was disabled to demonstrate the effectiveness of EBR-II’s passive reactivity feedbacks. BOP-301 and BOP-302R were unprotected loss of heat sink tests that demonstrated how reactivity feedback effects driven by changes to the core inlet temperature can shut down the fission process. This validation activity leverages modeling and simulation efforts that originated under an International Atomic Energy Agency Coordinated Research Project for benchmark analysis of the EBR-II Shutdown Heat Removal Tests. The SAS4A/SASSYS-1 models originally developed for the CRP have been modernized to utilize new code features and modeling practices. Differences between the predicted and measured test data were explored and the causes of these differences were identified as being due to modeling approximations, uncertainty in transient component behavior, and instrumentation uncertainties. Overall, it was concluded that for SHRT-17, SHRT-45R, BOP-301, and BOP-302R there was good agreement between the flow, power, and temperature predictions and the measured data.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SAS4A/SASSYS-1 Validation with EBR-II Tests Performed During the SHRT Testing Program (Rev. 2)

The EBR-II sodium-cooled fast reactor supported a wide range of fast reactor research activities. The final fifteen years of operations at EBR-II were used for experiments and tests to demonstrate the importance of passive safety in liquid metal reactors and the capability of such systems to provide strong passive responses during off-normal conditions. The Shutdown Heat Removal Test program at EBR-II provided test data supporting the validation of computer codes for design, licensing, and operation of LMRs, among other objectives. The program included nearly sixty tests, most of which were protected and unprotected loss of flow and loss of heat sink tests run at various initial powers and flow rates. This report documents the results of modeling and simulation of tests from the Shutdown Heat Removal Test program to support validation of Argonne’s SAS4A/SASSYS-1 fast reactor safety analysis code. SHRT-17 and SHRT-6 were protected loss of flow tests where a loss of electrical power to all sodium coolant pumps was simulated to demonstrate the effectiveness of natural circulation cooling characteristics. SHRT-45R, SHRT-39, and SHRT-43R were unprotected loss of flow tests where the control rod scram function of the plant protection system was disabled to demonstrate the effectiveness of EBR-II’s passive reactivity feedbacks. BOP-301 and BOP-302R were unprotected loss of heat sink tests that demonstrated how reactivity feedback effects driven by changes to the core inlet temperature can shut down the fission process. PICT-5/6 demonstrated how core power could be increased and decreased via changes in the intermediate sodium and feedwater flow rates. This validation activity leverages modeling and simulation efforts that originated under an International Atomic Energy Agency Coordinated Research Project for benchmark analysis of the EBR-II Shutdown Heat Removal Tests. The SAS4A/SASSYS-1 models originally developed for the CRP have been modernized to utilize new code features and modeling practices. Differences between the predicted and measured test data were explored and the causes of these differences were identified as being due to modeling approximations, uncertainty in transient component behavior, and instrumentation uncertainties. Overall, it was concluded that for all tests simulated there was good agreement between the flow, power, and temperature predictions and the measured data.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Performance testing of the Galileo attitude control system

Performance testing plans, procedures, and initial results for the Galileo Attitude and Articulation Control Subsystem are described. The objectives of performance testing include test bed comparisons, examining the interactions between spacecraft dynamics and controllers, and verifying the ability to tune control algorithms in flight to meet specific performance requirements. Two primary test beds are described. One, the Integration Test Laboratory, drives actual flight hardware components and support equipment with a real time computer simulation of spacecraft dynamics. The other, the Functional Simulator, is a nonreal time computer simulation with high fidelity spacecraft dynamics, including flexible appendages, fuel slosh, and simulated hardware components. Initial Functional Simulator results are presented which illustrate spacecraft response to open loop spin-up and turn commands. A closed loop sun acquisition turn is also demonstrated. Future tests for verifying performance of attitude determination, spacecraft control, and scan platform pointing functions are outlined.

Bell, C. E.↗

Model-Scale Aerodynamic Performance Testing of Proposed Modifications to the NASA Langley Low Speed Aeroacoustic Wind Tunnel

Tests were performed on a 1/20th-scale model of the Low Speed Aeroacoustic Wind Tunnel to determine the performance effects of insertion of acoustic baffles in the tunnel inlet, replacement of the existing collector with a new collector design in the open jet test section, and addition of flow splitters to the acoustic baffle section downstream of the test section. As expected, the inlet baffles caused a reduction in facility performance. About half of the performance loss was recovered by addition the flow splitters to the downstream baffles. All collectors tested reduced facility performance. However, test chamber recirculation flow was reduced by the new collector designs and shielding of some of the microphones was reduced owing to the smaller size of the new collector. Overall performance loss in the facility is expected to be a 5 percent top flow speed reduction, but the facility will meet OSHA limits for external noise levels and recirculation in the test section will be reduced.

Booth, Earl R., Jr.↗

Performance Test and Validation Evaluation for the Neutron Slab Counter

This Performance Testing and Validation Evaluation (PTVE) reviews and analyzes the data collected with the Neutron Slab Counter (NSC) according to the Performance Test and Validation Plan (PTVP, UCOR-4443) and reported in the NSC Performance Test and Validation Report (PTVR, NDA-13-0622). The NSC was designed for quantitative Nondestructive Assay (NDA) measurements of compressor volutes from the K25/K27 Buildings. The NSC PTVP (UCOR-4443) prescribed a methodology and set of field measurements to determine the NSC system efficiency, calibrate the system, perform verification measurements, define the components of the system's total measurement uncertainty, and perform a calibration confirmation measurement. All of the required measurements of the NSC PTVP (UCOR-4443) were completed according to the Calibration of NDA Equipment Procedure (PROC-DE-0714) and the Quantitative Measurements Using the Neutron Slab Counter Procedure (PROC-DE-0723). Following the completion of this PTVE, if the data quality objectives (DQO) of the NSC PTVP (UCOR-4443) are met, a commissioning report will be prepared which specifies the limits of use of the NSC.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Examples Performance Testing Templates

The purpose of this Performance Testing Program Plan is to identify the process and phased approach that will be implemented at Site XYZ . The purpose of the testing program at Site XYZ is specifically designed to evaluate the effectiveness of systems that are employed at this site. This plan defines tasks to be accomplished to ensure that performance testing is conducted as effectively and efficiently as possible.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

DSN system performance test software

The system performance test software is currently being modified to include additional capabilities and enhancements. Additional software programs are currently being developed for the Command Store and Forward System and the Automatic Total Recall System. The test executive is the main program. It controls the input and output of the individual test programs by routing data blocks and operator directives to those programs. It also processes data block dump requests from the operator.

Martin, M.↗

Solar-heating system-performance tests

Report describes comprehensive performance tests of complete solar powered space and hot water heating system to verify its suitability for field installation in small single family dwellings.

Source record↗

LARGO hot water system thermal performance test report

The thermal performance tests and results on the LARGO Solar Hot Water System under natural environmental conditions is presented. Some objectives of these evaluations are to determine the amount of energy collected, the amount of energy delivered to the household as contributed by solar power supplied to operate the system and auxiliary power to maintain tank temperature at proper level, overall system efficiency and to determine temperature distribution within the tank. The Solar Hot Water system is termed a Dump-type because of the draining system for freeze protection. The solar collector is a single glazed flat plate. An 82-gallon domestic water heater is provided as the energy storage vessel. Water is circulated through the collector and water heater by a 5.3 GPM capacity pump, and control of the pump motor is achieved by a differential temperature controller.

Source record↗

Shuttle communication systems compatibility and performance tests

The compatibility and performance of the Shuttle communications system must be certified prior to operational missions. For this purpose, NASA has established the Electronics Systems Test Laboratory (ESTL) at the Johnson Space Center. This paper discusses the Shuttle communications system compatibility and performance testing being performed in the ESTL. The ESTL system verification test philosophy, including capabilities, procedures, and unique testing equipment are summarized. Summaries of the significant results of compatibility and performance tests of the Orbiter/Space-flight Tracking and Data Network, Orbiter/Air Force Remote Tracking Station, Orbiter/Tracking and Data Relay Satellite System and Orbiter/Shuttle Launch Support System interfaces are presented. The ESTL's unique ability to locate potential communication problems and participate in the resolution of these problems are discussed in detail.

Bromley, L. K.↗

System performance testing of the DSN radio science system, Mark 3-78

System performance tests are required to evaluate system performance following initial system implementation and subsequent modification, and to validate system performance prior to actual operational usage. Non-real-time end-to-end Radio Science system performance tests are described that are based on the comparison of open-loop radio science data to equivalent closed-loop radio metric data, as well as an abbreviated Radio Science real-time system performance test that validates critical Radio Science System elements at the Deep Space Station prior to actual operational usage.

Berman, A. L.↗

Performance Testing in the Secure Transport of Nuclear, Radiological, and other High-Risk Materials

A long established methodology for determining the effectiveness of an overall physical protection system (PPS) is through a healthy and robust performance testing program. Performance tests are vital because they provide essential information used in the determination of asset risk and the analysis of protection effectiveness. By establishing and verifying detection, assessment, response, interruption, and neutralization data, one can determine baseline protection effectiveness and consider upgrade scenarios and improving effectiveness. Performance testing also addresses the needs of multiple stakeholders, including the vulnerability assessment teams, site/facility personnel, and safety, and provides management with an independent, objective assessment of overall physical protection systems.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Integrated Advanced Microwave Sounding Unit-A (AMSU-A). Performance Verification Report: Initial Comprehensive Performance Test Report, P/N 1331200-2-IT, S/N 105/A2

This is the Performance Verification Report, Initial Comprehensive Performance Test Report, P/N 1331200-2-IT, S/N 105/A2, for the Integrated Advanced Microwave Sounding Unit-A (AMSU-A). The specification establishes the requirements for the Comprehensive Performance Test (CPT) and Limited Performance Test (LPT) of the Advanced Microwave Sounding, Unit-A2 (AMSU-A2), referred to herein as the unit. The unit is defined on Drawing 1331200. 1.2 Test procedure sequence. The sequence in which the several phases of this test procedure shall take place is shown in Figure 1, but the sequence can be in any order.

Platt, R.↗