Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Orbital science”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

322 records · Page 2

SMM parallel battery operation in orbit

A parallel battery system for the SMM spacecraft is described. The battery system performance as a function of lifetime over orbit was evaluated. The following equipment performance specifications were examined during a typical orbit: battery current and discharges, voltage limitations, battery temperature variations, and current sensor performance. Tabulated battery performance data is also included.

Broderick, R.

Coding Performance of the Probe-Orbiter-Earth Communication Link

The coding performance of the Probe-Orbiter-Earth communication link is analyzed and compared for several cases. It is assumed that the coding system consists of a convolutional code at the Probe, a quantizer and another convolutional code at the Orbiter, and two cascaded Viterbi decoders or a combined decoder on the ground.

D Divsalar

Ni-cd Battery Life Expectancy in Geosynchronous Orbit

The feasibility of using nickel cadmium batteries as an alternate if flight qualified NiH2 batteries are not available is explored. Battery life expectancy data being a key element of power system design, an attempt is made to review the literature, life test data and in orbit performance data to develop an up to date estimate of life expectancy for NiCd batteries in a geosynchronous orbit.

Broderick, R. J.

Horseshoe Asteroids and Quasi-satellites in Earth-like Orbits

Newly found asteroid 2003 YN107 is the first and only known current quasi-satellite (QS) of the Earth. Asteroid 2002 AA29 is in a horseshoe orbit (HS) but has periods of QS behavior. Both asteroids closely follow Earth s orbit. 2002 AA29 has inclination i is approximately 11 degrees while for 2003 YN107 i<5 degrees, making the most Earth-like orbit known. 2003 YN107, 2002 AA29, and other Earth-resonant objects in less Earthlike orbits, form an important new class of co-orbital bodies with interesting dynamics and are the best targets for sample return missions to asteroids.

M Connors

Spacecraft Disposal Rosetta Stone: Parametric Tool for Orbital Lifetime, Disposal, and Cost Assessment

This Technical Memorandum documents a simplified, parametric method for evaluating spacecraft orbital lifetime, disposal compliance, and disposal-related cost impacts during early mission formulation and preliminary design. The method captures the dominant drivers of orbital decay—effective ballistic coefficient, operating altitude, and solar-cycle variability—using conservative bounding assumptions. Solar maximum conditions are used to bound achievable mission lifetime, while solar minimum conditions are used to bound disposal timelines and compliance with orbital debris requirements. A single tabulated dataset provides orbital lifetime under both solar-cycle extremes together with representative disposal ΔV required to ensure compliant disposal, enabling rapid assessment of disposal feasibility, cost sensitivity, and system-level impacts prior to committing to higher-fidelity analyses.

Orbital debris mitigation

Orbiting Solar Observatory Battery and Power Design

The OSO-1 represents a recent vintage satellite, or more recent design satellite. A summary of the battery design used on OSO-1 is presented. The temperature effects on voltage and charging-discharging of the battery system are discussed.

F E Ford

In Flight Performance of a Six Ampere-hour Nickel-cadmium Battery in Low Earth Orbit

Flight data for 17,000 orbital cycles are reviewed and summarized. The nickel cadmium battery system operated without failure or abnormality. Battery trend analysis used in determining the feasibility of extending mission life is discussed. The life test data for 20% depth of discharge indicates design life requirements would be reached even at a deeper depth of discharge.

Mcdermott, J. K.

In-Orbit Earth Radiation Budget Satellite (ERBS) Battery Switch

A viewgraph presentation outlines the Earth Radiation Budget Satellite (ERBS) power system and battery history. ERBS spacecraft and battery cell failures are listed with the reasons for failure. The battery management decision and stabilization of the batteries is discussed. Present battery operations are shown to be successful.

Ahmad, Anisa

RCA SATCOM Battery in Orbit Performance Update and Accelerated Life Test Results

No significant degradation of nickel cadmium battery performance in SATCOM F1 and F2 after almost 8 and 7-3/4 years in orbit was shown. Battery minimum discharge voltage data are presented for these spacecraft. In addition, 2 groups of nickel cadmium cells which are representative of those in orbit are undergoing real time eclipse-reduced suntime cycling in the laboratory. These groups of cells, which are being cycled at a maximum of 53% and 62% depth of discharge (based on actual capacity), have completed 14 and 15 eclipse seasons, respectively. Data for these groups of cells are presented and are compared with the in-orbit battery data.

Gaston, S. J.

Battery Study for the Shuttle Orbiter EAPU Upgrade

The use of Electric Auxiliary Power Unit (EAPU) in commercial, and military aviation, and in commercial electric automobiles, is reviewed. The specifications of the battery to be used in the space shuttle are reviewed, and the possible vendors discussed. The testing activity and the reliability and the safety features are presented.

Otzinger, Burton

Electric Propulsion Orbital Platform

This paper describes the Electric Propulsion Orbital Platform (EPOP), of which the primary objective is to provide an instrumented platform for testing electric propulsion devices in space. It is anticipated that the first flight, EPOP-1, will take place on the Shuttle-deployed Wake Shield Facility in 1996, and will be designed around a commercial 1.8 kW arcjet system which will be operated on gaseous hydrogen propellant. Specific subsystems are described, including the arcjet system, the propellant and power systems, and the diagnostics systems.

V. J. Friedly

Improved Treatment of Global Positioning System Force Parameters in Precise Orbit Determination Applications

Data collected from a worldwide 1992 experiment have been processed at JPL to determine precise orbits for the satellites of the Global Positioning System (GPS). A filtering technique has been tested to improve modeling of solar-radiation pressure force parameters for GPS satellites. The new approach improves orbit quality for eclipsing satellites by a factor of two, with typical results in the 25- to 50-cm range. The resultant GPS-based estimates for geocentric coordinates of the tracking sites, which include the three DSN sites, are accurate to 2 to 8 cm, roughly equivalent to 3 to 10 nrad of angular measure.

Y Vigue

Moon Base Transportation - Deliveries to the Lunar Surface

Development of the Moon Base will enable a home away from home for astronauts who will live and work at humanity’s first lunar outpost. In this effort, NASA’s Moon Transportation Office is responsible for enabling the transformational missions required to deliver habitats, supplies, science payloads, and all other elements needed to cultivate a permanent presence on the Lunar Surface. The Mission Concept (MC) is characterized through evaluation of an end-to-end architecture that can successfully deliver a generalized heavy large-volume payload, in excess of 4000 kg, to a precision landing and touchdown on the lunar surface. The mission architecture utilizes a single launch configuration of a Lunar Lander (LL) with a unique propellant system. The LL has an integral orbital transfer capability and features jettisonable elements. The design circumvents the need for prop transfer on orbit and multiple launch configurations. The launch vehicle (LV) for this work will assume the capability to deliver a payload in excess of 40,000 kg to orbit, affording multiple LV solutions. Considerations for the LL and payload deployment from the fairing are assumed to be handled through compliance with a launch providers’ Interface Requirements Document (IRD). The MC will span from launch at Kennedy Space Center (KSC) to terminal descent and touchdown on the lunar surface, requiring a total ΔV on the order of 6 km/s beyond what is required to get the vehicle stack to a 200 km circular Low Earth Orbit (LEO). Major mission phases include: launch and launch vehicle separation, transfer operations, pre-landing navigation, and lunar descent and touchdown. A Concept of Operations (ConOps) is used as the primary design driver for defining architecture of the vehicles necessary to achieve final payload delivery. Numerous ground rules and assumptions will be provided for each phase of the mission. Concept designs for the LL is presented. An emphasis of the design maximizes a feasible path for maturation, manufacturing, and operation. A self-imposed practical consideration for this effort is the incorporation of legacy designed hardware to minimize expensive, time-intensive, and high-risk hardware development cycles. The propulsion system of the LL adopts a conventional storable bipropellant configuration of monomethyl hydrazine (MMH) and mixed oxides of nitrogen (MON3). This effort will showcase a unique propellant delivery system to minimize the reliance on propellant management devices (PMDs) during descent. Numerous key constraints have been considered, across the multiple segments of the mission. These include the unique aspects of center of gravity (CG) management, thruster plume effects including self-impingement, propulsion system hardware limitations, navigation during multiple mission phases, and landing gear geometry for uneven terrain. These constraints shape the trades necessary for precision landing of heavy cargo and ensure compatibility with broader Moon Base Transportation concepts. The resulting insights inform future transportation strategies for the Moon and beyond; directly contributing to the development of cargo‑delivery standards that will support the long‑term buildup of a sustainable, continuously inhabited Moon Base.

Lunar Habitat

Failure Modes of Reduced-Order Orbit Determination Filters and Their Remedies

Ways in which failure can occur in reduced-order, orbit determination filter, error covariance calculations are discussed. In the context of this article, reduced-order filters denote nonoptimal filters which include fixed levels of uncertainty in some parameters of the measurement models or in the spacecraft dynamical model which are not explicitly estimated in the filter equations. Failure is defined as an increase in the orbit determination covariance with the addition of data or as an unreasonable growth in the covariance with time, i.e., nonasymptotic behavior of the covariance. Some simple, known cases of failure are discussed along with their traditional remedies. In addition, more modern remedies are discussed which are currently under development at the Jet Propulsion Laboratory. The article first describes the known problems of reduced-order filters when they are employed for orbit determination, and their traditional remedies. Then, having defined these, the relevancy and desirability of the more modern remedies are made apparent.

D J Scheeres

The In-Orbit Battery Reconditioning Experience On Board the Orion 1 Spacecraft

The Orion 1 spacecraft is a three-axis stabilized geostationary earth orbiting commercial communications satellite which was launched on November 29, 1994 aboard an Atlas II launch vehicle. The power subsystem is a dual bus, dual battery semi-regulated system with one 78 Ampere-hour nickel-hydrogen battery per bus. The batteries were built and tested by Eagle Picher Industries, Inc., of Joplin, MO and were integrated into the spacecraft by its manufacturer, Matra Marconi Space UK Ltd. This paper presents the results obtained during the first four in-orbit reconditioning cycles and compares the battery performance to ground test data. In addition, the on-station battery management strategy and implementation constraints are described. Battery performance has been nominal throughout each reconditioning cycle and subsequent eclipse season.

Hoover, S. A.

In-Orbit Earth Radiation Budget Satellite (ERBS) Battery Switch

This presentation reviews the history of the Earth Radiation Budget Satellite (ERBS) and the problems which were experienced with the batteries. After two cells shorted on the first Battery, the decision was made to take battery 1 of line in late 1992. This left the second battery supporting all loads. The second battery began to experience problems in 1998 into 1999. The decision was made to bring the first battery on line and take the second battery off line. The steps to switching the batteries are reviewed, and the results are discussed.

Ahmad, Anisa

Orbiting Astronomical Observatory Battery and Power System Design

The battery design of OAO-C (OAO-3) is given and consists of three-20 ampere hour 22 series connected cells in the battery. There are three batteries per spacecraft. The packaging configuration is described. The charging-discharging operations and the voltage potential of the battery system are discussed. Graphs are presented for the voltage limits (battery voltage versus temperature) and end of dark voltages (battery voltage versus ampere-hours discharged) of the battery system used on OAO-3. Data tables are also presented which give a summary of the battery performance and a comparison of OAO-3 with OAO A-2.

F E Ford