Beacon Monitor Operations Experiment: Technology for Low Cost Operations
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
The objectives of this phase of the study were (1) to assess the 10 year operating cost trends of the local service airlines operating in the 1965 through 1974 period, (2) to glean from these trends the technological and operational parameters which were impacted most significantly by the transition to newer pure jet, short haul transports, and effected by changing fuel prices and cost of living indices, and (3) to develop, construct, and evaluate an operating cost forecasting model which would incorporate those factors which best predicted airline total operating cost behavior over that 10-year period.
The hourly operating cost of equipment provides an assessment of its operational efficiency, in monetary terms. Often, enterprises need to assess product quality. By the proposed method, without complex cost/benefit calculations, the proportion of the cost corresponding to each piece of equipment in a production system may be calculated simply on the basis of the labor intensity of machining and the operational efficiency OEE of the equipment. It is also useful for managers and workers to know the cost of an hour of downtime for particular equipment and to understand the losses in the shop and the enterprise as a whole. Such awareness assists in loss prevention.
The ATA formulas for direct operating cost were developed for the purpose of comparing different aircraft, existing or not, on the same route or the same aircraft on different routes. Such characteristics of the airline as crew pay, maintenance procedures, and depreciation schedules are kept constant. In air transportation systems analysis the 1967 ATA formula is usually used with appropriate exceptions or modifications, such as: different maintenance labor rate, total maintenance multiplied by a factor, maintenance burden deleted, different depreciation schedule, or different spares percentages.
The Space Operations Management Office Organizations will be described along with the responsibilities assigne to this office. The roles for the government and for the contractor will be discussed. This paper will describe the changes, approaches and anticipated benefits of this new approach to operations.
Glovebox glove pressure decay leak testing and analysis of the data can greatly improve glovebox safety, minimize Transuranic (TRU) glove waste, and minimize operational cost. It is well known, the weakest point of containment on a glovebox is the glove. Mitigating unplanned openings in gloves is critical to minimizing operational and safety costs in glovebox operations. Mitigating unplanned glove openings due to glove failures will be discussed in this paper. The lack of an engineered solution to determine a gloves operational life in nuclear operations, has lead to use of theoretical and manual subjective methods to determine the life and safety of a glovebox glove. Whether the glove is inspected visually prior to use, or gloves are changed regularly to theoretically avoid failure, both the operators PPE and the room are being exposed to contamination, or un-necessary amounts of TRU glove waste are being generated. Millions of dollars yearly in operational costs are spent on glove failures due to loss of production, incident analysis, regulatory audits, clean up, and paperwork. In a nuclear application, a glove failure could contaminate an operator and laboratory, shut down the operation for weeks, potentially create a regulatory audit, and potentially create a media frenzy; the damages to the organization can be astronomical. Elimination of glove failures is possible by tracking glove material degradation and setting limits to allow glove change when it becomes necessary, prior to glove failure. Analytical pressure decay leak testing allows the detection of material degradation, and in turn the ability to limit operational glove failures. A German based company called MK Versuchsanlagen, e.K., has developed an advanced Glove Integrity Testing System. The system, with its use of proprietary RFID and special software technology, is unique in its capabilities. The system is capable to perform highly accurate regular glove testing on any size glovebox line in minimal time. The system records and can analyze a tremendous amount of system data that in turn can determine, for example, a safe glove change time prior to a glove material failure. This paper will show how an advanced Glove Integrity Testing System can detect glove material degradation and help determine a safe change point prior to glove failure. Pressure decay curves of new gloves and recorded effects of accelerated aging on the glove over time will be shown. The use of this technology in nuclear facilities can greatly improve glovebox operational safety, minimize glovebox glove TRU waste, and save organizations tremendous costs in downtime, clean up, documentation, and potential regulatory review. (authors)
The factors affecting commercial aircraft operating and delay costs were used to develop an airline operating cost model which includes a method for estimating the labor and material costs of individual airframe maintenance systems. The model permits estimates of aircraft related costs, i.e., aircraft service, landing fees, flight attendants, and control fees. A method for estimating the costs of certain types of airline delay is also described.
Explore the source record for details and available documents.
Traditionally, launch vehicle cost has been evaluated based on $/Kg to orbit. This metric is calculated based on assumptions not typically met by a specific mission. These assumptions include the specified orbit whether Low Earth Orbit (LEO), Geostationary Earth Orbit (GEO), or both. The metric also assumes the payload utilizes the full lift mass of the launch vehicle, which is rarely true even with secondary payloads.1,2,3 Other approaches for cost metrics have been evaluated including unit cost of the launch vehicle and an approach to consider the full program production and operations costs.4 Unit cost considers the variable cost of the vehicle and the definition of variable costs are discussed. The full program production and operation costs include both the variable costs and the manufacturing base. This metric also distinguishes operations costs from production costs, including pre-flight operational testing. Operations costs also consider the costs of flight operations, including control center operation and maintenance. Each of these 3 cost metrics show different sensitivities to various aspects of launch vehicle cost drivers. The comparison of these metrics provides the strengths and weaknesses of each yielding an assessment useful for cost metric selection for launch vehicle programs.
A review was made of the factors affecting commercial aircraft operating and delay costs. From this work, an airline operating cost model was developed which includes a method for estimating the labor and material costs of individual airframe maintenance systems. The model, similar in some respects to the standard Air Transport Association of America (ATA) Direct Operating Cost Model, permits estimates of aircraft-related costs not now included in the standard ATA model (e.g., aircraft service, landing fees, flight attendants, and control fees). A study of the cost of aircraft delay was also made and a method for estimating the cost of certain types of airline delay is described.
This study investigates the operational cost competitiveness of battery electric vehicles (BEVs) in the United States, considering regional climates, energy prices, and driving patterns. By comparing BEVs with plug-in hybrid electric vehicles (PHEVs), hybrid electric vehicles (HEVs), and the alternative use of BEVs and conventional vehicles (Convs), the analysis incorporates thermal dynamometer tests, real-world vehicle miles traveled (VMT), and state-specific energy prices. Using detailed simulations, the study evaluates energy consumption across varying temperatures and driving distances. The findings reveal that, while BEVs remain cost-effective for short trips in moderate climates, PHEVs are more economical for long-range trips and cold environments, due to the excessive cost of using external direct current fast chargers (DCFCs) and reduced BEV efficiency at low temperatures. HEVs are identified as the most cost-efficient option in regions like New England, characterized by high residential electricity prices. These insights are critical for shaping vehicle electrification strategies, particularly under diverse regional and seasonal conditions, and for advancing policies on alternative energy and fuels.
The application of new aerodynamic, structural, and propulsion technologies to a specified baseline commuter aircraft is studied. The assessment models can be used on a desktop calculator and include a sizing program, operating cost program, and passenger ride qualities model. Evaluation is done with a step-by-step approach and is applied to range, number and type of engines, structure, wing selection, and configuration. A 40 percent direct operating cost saving is anticipated compared to current well established commuter aircraft.
Typical investment and operating costs for geothermal power plants employing binary cycle technology and utilizing the heat energy in liquid-dominated reservoirs are discussed. These costs are developed as a function of reservoir temperature. The factors involved in optimizing plant design are discussed. A relationship between the value of electrical energy and the value of the heat energy in the reservoir is suggested.
One of NASA's primary missions is to reduce the cost of access to space while simultaneously increasing safety. A key component, and one of the least understood, is the recurring operations and support cost for reusable launch systems. In order to predict these costs, NASA, under the leadership of the Independent Program Assessment Office (IPAO), has commissioned the development of a Launch Systems Operations Cost Model (LSOCM). LSOCM is a tool to predict the operations & support (O&S) cost of new and modified reusable (and partially reusable) launch systems. The requirements are to predict the non-recurring cost for the ground infrastructure and the recurring cost of maintaining that infrastructure, performing vehicle logistics, and performing the O&S actions to return the vehicle to flight. In addition, the model must estimate the time required to cycle the vehicle through all of the ground processing activities. The current version of LSOCM is an amalgamation of existing tools, leveraging our understanding of shuttle operations cost with a means of predicting how the maintenance burden will change as the vehicle becomes more aircraft like. The use of the Conceptual Operations Manpower Estimating Tool/Operations Cost Model (COMET/OCM) provides a solid point of departure based on shuttle and expendable launch vehicle (ELV) experience. The incorporation of the Reliability and Maintainability Analysis Tool (RMAT) as expressed by a set of response surface model equations gives a method for estimating how changing launch system characteristics affects cost and cycle time as compared to today's shuttle system. Plans are being made to improve the model. The development team will be spending the next few months devising a structured methodology that will enable verified and validated algorithms to give accurate cost estimates. To assist in this endeavor the LSOCM team is part of an Agency wide effort to combine resources with other cost and operations professionals to support models, databases, and operations assessments.
In 2008 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organization to find ways to reduce the costs of International Space station (ISS) console operations in the Mission Control Center (MCC). Each MOD organization was asked to identify projects that would help them attain a goal of a 30% reduction in operating costs by 2012. The MOD Operations and Planning organization responded to this challenge by launching several software automation projects that would allow them to greatly improve ISS console operations and reduce staffing and operating costs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the plan of eliminating two full time ISS console support positions by 2012. This will account for an overall 10 EP reduction in staffing for the Operations and Planning organization. These automation projects focused on utilizing software to automate many administrative and often repetitive tasks involved with processing ISS planning and daily operations information. This information was exchanged between the ground flight control teams in Houston and around the globe, as well as with the ISS astronaut crew. These tasks ranged from managing mission plan changes from around the globe, to uploading and downloading information to and from the ISS crew, to even more complex tasks that required multiple decision points to process the data, track approvals and deliver it to the correct recipient across network and security boundaries. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture between several planning tools; as well as a engaging a previously research level technology (TRL 2-3) developed by Ames Research Center (ARC) that utilized an intelligent agent based system to manage and automate file traffic flow, archiving f data, and generating console logs. This technology called OCAMS (OCA (Orbital Communication System) Management System), is now considered TRL level 9 and is in daily use in the Mission Control Center in support of ISS operations. These solutions have not only allowed for improved efficiency on console; but since many of the previously manual data transfers are now automated, many of the human error prone steps have been removed, and the quality of the planning products has improved tremendously. This has also allowed our Planning Flight Controllers more time to focus on the abstract areas of the job, (like the complexities of planning a mission for 6 international crew members with a global planning team), instead of being burdened with the administrative tasks that took significant time each console shift to process. The resulting automation solutions have allowed the Operations and Planning organization to realize significant cost savings for the ISS program through 2020 and many of these solutions could be a viable
This viewgraph presentation reviews the role of Goddard Mission Services Evolution Center (GMSEC) in reducing development and operation costs in handling the massive data from NASA missions. The goals of GMSEC systems architecture development are to (1) Simplify integration and development, (2)Facilitate technology infusion over time, (3) Support evolving operational concepts, and (4) All for mix of heritage, COTS and new components. First 3 missions (i.e., Tropical Rainforest Measuring Mission (TRMM), Small Explorer (SMEX) missions - SWAS, TRACE, SAMPEX, and ST5 3-Satellite Constellation System) each selected a different telemetry and command system. These results show that GMSEC's message-bus component-based framework architecture is well proven and provides significant benefits over traditional flight and ground data system designs. The missions benefit through increased set of product options, enhanced automation, lower cost and new mission-enabling operations concept options .
Explore the source record for details and available documents.
The Earth Observing System (EOS) Microwave Limb Sounder (MLS) is a complex instrument with a front end computer and 32 subsystem computers. MLS is one of four instruments on NASA's EOS Aura spacecraft With almost 8 years in orbit, MLS has a few lessons learned which can be applied during the design phase of future instruments to effect better longevity, more robust operations and a significant cost benefit during operations phase.