SPC-3184 Rev 7 MARVEL Reactor Structures Build to Print Fabrication Specification

Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core and under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of the MARVEL Primary Coolant System (PCS), Fuel and Core System (FCS), and Reactor Sub-Structure Assemblies, including the Upper Confinement Structure.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-71123 Rev 1 MARVEL Control Drum Actuator Torsional Spring

Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This specification defines the requirements for the procurement and factory acceptance testing of the MARVEL control drum actuator torsional spring. The purpose of this specification is to define the requirements to procure the MARVEL control drum actuator torsional spring component and witness a torsional spring rate Factory Acceptance Test (FAT) at the subcontractor’s facility with the contractor present. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-3178 Rev 5 Beryllium Oxide Procurement Specification

TREAT microreactor Experiment Cell (T-REXC). This facility will provide a test bed for microreactor developers to perform demonstration projects and critical experiments in an expedited manner. In addition to other systems, structures, and components (SSCs), T-REXC will provide beryllium oxide (BeO) reflector components that T-REXC users can incorporate into their equipment installation. This specification details supplier requirements associated with these BeO components.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Mechanical Test Results and Microstructural Characterization of the Harvested and Baseline Archival Zion RPV Materials

The decommissioning of the Zion Units 1 and 2 Nuclear Generating Station in Zion, Illinois, presented a unique opportunity for developing a better understanding of materials degradation and other issues associated with extending the lifetime of existing nuclear power plants (NPPs) beyond 60 years of service. In support of extended service and current operations of the US nuclear reactor fleet, the Oak Ridge National Laboratory (ORNL), through the Department of Energy (DOE), Office of Nuclear Energy, Light Water Reactor Sustainability (LWRS) Program, coordinated with Zion Solutions, LLC, a subsidiary of Energy Solutions (ES), the selective procurement of materials, structures, and components, from the decommissioned reactors including multiple segments of the Zion Unit 1 Reactor Pressure Vessel (RPV).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

SPC-2772 Rev 2 General Build to Print Fabrication Specification for Nuclear Use Items

This specification is for use with Safety Significant structures, systems, and components. The scope is for build to print fabrication including, but not limited to, machining, forming, welding, cutting, assembling, etc. Specific scope and associated requirements will be identified in drawings and/or additional procurement documents. ASME B31 fabrication is not included in the scope of this specification. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Epithermal and Fast Neutron Radiography Facility HFIR Futures – Enhanced Capabilities Series (Vol. 8)

The Sustaining and Enhancing Nuclear Science Initiative at Oak Ridge National Laboratory (ORNL) was created to explore potential enhancements to scientific capabilities in the High Flux Isotope Reactor as part of a reactor pressure vessel replacement project. One proposed scientific enhancement included creation of an epithermal and fast neutron radiography station on the HB-3 beam tube with the capability to image highly radioactive specimens such as irradiated nuclear fuel rods, isotope production targets, or spallation neutron target materials. This document summarizes findings and recommendations from a working group of ORNL staff tasked with conceptualizing such a facility and includes a background of similar instruments at other research facilities, technical specifications, and an estimate of procurement cost and schedule.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SPC-70792 Rev 0 MARVEL Primary Coolant Management Subsystem Tubing Specification

This specification covers the requirements and details for the selection, fabrication, testing, cleaning, marking, shipping, inspection and installation of the Inert Gas System, and Primary Coolant Management System. This applies to tubing from the upper confinement patch panel to the upper plenum, including NaK and argon fill tubing, valves, and hangers. These systems consist of the necessary straight lengths, elbows, reducers, fittings, tube connections, instrument taps, and valves called for by applicable drawings. All components shall be procured as ASME Section III Class 1.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Rescue of Unique Liquid IP-2 Portable Tanks at Savannah River Site – 25078

Westinghouse Savannah River Company, the SRS Management and Operations Contractor at the time, procured six large IP-2 portable tanks capable of transporting liquids in 2003 to support the layup of the F Canyon at SRS. F Canyon was one of two full-scale hardened radiochemical separations facilities built at SRS in the 1950s as part of the initial construction of the Site. F Canyon and H Canyon provided actinide separations capabilities for SRS through the end of the Cold War. Following the end of the Cold War era, the decision was eventually made that only one of these radiochemical separations facilities at SRS would still be needed moving forward. As H Canyon was considered better suited for ongoing SRS missions, F Canyon was placed into a layup state in the first decade of the 21st Century, with F Area deactivation completing in 2006. This process resulted in the creation of excess, radioactively contaminated solutions, which required disposition. These solutions included contaminated organic solutions as well as DU-bearing aqueous solutions. The six portable tanks were procured to support the transportation of these solutions.

Fee, Nathaniel C. [Savannah River Nuclear Solution↗

Office of Nuclear Verification FY 2023 Quarterly Report TSVT Q1

This project encompasses the continued development and training of a U.S. operational team, the Test Site Verification Team (TSVT), supporting verification of nuclear testing activities. TSVT builds on decades of U.S. nuclear testing history and nuclear explosion monitoring experience. The Team maintains readiness to deploy internationally on short notice to provide field-based support of verification of declared or undeclared nuclear testing and associated activities, as well as follow-on activities including monitoring and capability disablement and dismantlement, as established by negotiated agreement or treaty. The roles and structure of the TSVT are integrated with other NA-243 deployable verification teams and the interagency. FY23 TSVT activities focus on continued capability buildup within the team, including Team trainings and exercises with a focus on missions in confined spaces (e.g., tunnels, mines, other underground facilities), increased familiarity with foreign nuclear weapons testing programs, demonstration of Team capacity to deploy, train, and practice sustained OPSEC in non-western locations, establishment of sustainable storage and maintenance of equipment, specification and procurement of additional equipment to support field observations, further evolution of concepts of operation documents (CONOPs), and mission coordination with Headquarters and associated Stakeholders. Activities will culminate with a full-scale domestic team exercise at the end of FY23 focusing on underground activities signatures/observations and safety including advanced outdoor safety and familiarity in working around explosive test environments. In addition, we will be further articulating approaches and capacity relevant to the identification of nuclear tests, as well as monitoring of nuclear testing activities and/or dismantlement of nuclear test sites and anticipate developing additional equipment requests in support of this evolution. The TSVT Team Leads will also coordinate with its Senior Advisor, the TSVT Logistics and Readiness (L&R) Training Lead, and NNSA Headquarters to draft a five-year TSVT training and exercise plan, that strategically and incrementally builds capacity and expertise in key areas of significance for the continuum of nuclear and nuclear-related testing activities that fall within the team’s mission space.

42 ENGINEERING↗

SPC-70486 Rev 0 Stirling Engine Prototype Performance Specification

Idaho National Laboratory (INL) is developing a small microreactor to produce electrical power utilizing a small nuclear core and Stirling engines under the Microreactor Application Research Validation and Evaluation (MARVEL) program. The purpose of this performance specification is to define requirements to build and test the Stirling Engine prototype, including interfacing with Kinnetech in the development/test of the engines. This specification includes prototyping components only and are not for use in the reactor. Prototype testing is a preliminary test to be conducted with conceptual equipment from which a final design will be developed. The results of the testing defined herein will not be used as a qualification test. The Stirling Engines have an engine controller module (QEC). Currently, the QEC doesn’t have a means to stop the engine. An analog controlled engine braking system must be developed and tested with the engine prototype. Any conflict between this specification and any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Potential Supply Chain and Cost Reduction Strategies for Advanced Nuclear Reactors

This milestone represents a level of effort to provide recommendations for a supply chain plan and establish relationships between advanced reactor companies and large companies in the oil & gas and chemical industries. It represents a starting point to develop the plan with options, general equipment lists, and rough associated cost estimates of major equipment and the associated systems needed. This effort will provide an opportunity to leverage the experience that oil & gas and chemicals companies possess in large capital equipment procurement, modularization, acquisition and installation. Potential supply chain solutions will be discussed and preliminary options for worldwide manufacturers will be elucidated. The goal of this effort will be to leverage the years of accumulated experience in the oil & gas and chemical industries in the area of capital equipment acquisition to understand the potential supply chain options and to reduce potential acquisition costs by optimizing the supply chain options for advanced nuclear reactor modularization, manufacturing and acquisition.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Operational and Mission Highlights A Monthly Summary of Top Achievements: September 2022

Associate Laboratory Director for Plutonium Infrastructure Mark Anthony and a procurement team visited three glovebox fabricators the week of Aug. 23, 2022, to discuss equipment procurement options and assess the vendors’ production capability, factory conditions, and safety records. The team determined that all three fabricators can produce complex gloveboxes and meet Nuclear Quality Assurance-1 standards.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Technical Guidance for Creation of 237 NP Irradiation Target Fabrication Packages

This document describes the process used to document the fabrication of irradiation targets that may be inserted into either the High Flux Isotope Reactor (HFIR) at Oak Ridge National Laboratory (ORNL), or the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL). The targets are being irradiated to produce 238 Pu (5.48Mev alpha decay, T1/2 = 87.7 y) used in the fabrication of radioisotope thermoelectric generators (RTGs). RTGs powered by 238 Pu are an established power source technology for National Aeronautics and Space Administration space missions where solar power is not viable. The documentation included in fabrication files demonstrates full traceability of all materials, components, and assemblies used to build 237 Np targets. To accomplish this, all documentation (e.g., certified material test reports, weld reports, leak test reports) will be maintained and reviewed throughout materials procurement, component fabrication, and target assembly.

07 ISOTOPE AND RADIATION SOURCES↗

An Initial Evaluation of the Elevated-Temperature Cyclic Properties of Optimized 316H Stainless Steel Fabricated by Powder Metallurgy Hot Isostatic Pressing

Powder metallurgy hot isostatic pressing (PM-HIP) is a mature advanced manufacturing technology, which can consolidate metallic powder under high temperature and pressure to generate near-net shape components. This process can lower production costs and reduce component lead times for nuclear reactor construction and can be readily deployed in the near term for microreactor components because of their smaller size. The purpose of this work is to continue the evaluation of elevated-temperature cyclic material properties for PM-HIP 316H stainless steel. Prior scoping results have shown that the commercially procured PM-HIP stainless-steel materials have reduced creep-fatigue performance compared to wrought 316 stainless steels. To better understand how PM-HIP processed material properties compare to traditional manufacturing methods, additional billets of PM-HIP 316H stainless steel were procured and tested. This testing is necessary to understand how elevated-temperature properties are influenced by the PM-HIP process and what data are needed for incorporating PM HIP 316H into the American Society of Mechanical Engineers Boiler Pressure Vessel Code, Section III, Division 5 for high temperature reactor construction. Specifically, an additional PM-HIP 316H stainless steel billet with lower oxygen and nitrogen concentrations was fabricated by the Nuclear Advanced Manufacturing Research Centre of the United Kingdom and tested to understand if elevated-temperature cyclic properties can be improved. The creep-fatigue resistance of the material from this new billet did not show appreciable improvement compared to prior testing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

DOME Reactor Testing User Guide

DOME User Guide History DOME User Guide Introduction User Engagement Lifecycle for DOME Phase 1 – Front End Engineering and Experiment Design (FEEED) Phase 2 – Detailed Design & Long Lead Procurement Phase 3 – Fabrication, Training, & Delivery Phase 4 – Installation & Testing Phase 5 – Removal & Disposal Next steps

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

MARVEL Lessons Learned – 2026 Edition Fabrication, Fuel Procurement, Quality Assurance, and Safety Basis

The Microreactor Applications Research Validation and Evaluation (MARVEL) project is intended to be among the first U.S. advanced reactor demonstrations in four decades. By virtue of being sponsored directly by the U.S. Department of Energy (DOE), the reactor is expected to benefit the broader nuclear community by exercising design processes, safety reviews, and supply chains. This project is committed to publicly documenting key lessons learned along the way toward demonstration. Building on a 2025 report that focused on lessons learned from guard vessel fabrication and Primary Coolant Apparatus Test (PCAT) testing (Abou-Jaoude et al. 2025), this 2026 edition captures findings spanning structural fabrication, quality assurance (QA), reactivity control system (RCS) assembly, fuel fabrication and shipment, safety basis development, balance-of-plant design, and overall reactor design.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Corrosion Testing of Refractory in Contact with Molten Glasses Designed for Waste Vitrification

It is known that the predictive life of the refractory ceramic liner of nuclear waste glass melters is conservative, as demonstrated by performance of these materials such as in the Defense Waste Processing Facility (DWPF). The motivation for this task is to maximize the useful life of the melters that will be operated at the Waste Treatment and Immobilization Plant (WTP), which will in turn minimize procurement and disposal costs and melter outage times, as well as to identify maximum loadings in the waste glass of those species that corrode melter components. This task was initiated jointly with Pacific Northwest National Laboratory (PNNL) with the objective to develop a methodology and model to enable more accurate prediction of refractory service life under prototypic conditions from laboratory-scale material corrosion tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Methods and system for siting advanced nuclear reactors and evaluating energy policy concerns

There is a growing sociopolitical desire to develop cleaner energy sources in the United States and maintain energy security. Regardless of politics, many coal-fired electric plants have already been shut down and many utilities are vowing to retire their current coal-fired assets within the next two decades. Replacement power assets require consideration of appropriate siting. A geographic information system (GIS)-based multicriteria decision analysis approach is useful to assist utility and energy companies, as well as policymakers, to evaluate potential areas for siting new plants in the contiguous United States. A GIS-based framework is simply a database of location information that allows for mapping, querying, modeling, and analyzing data based on location. The spatial output can be structured to be visual, allowing for easier analysis of location data. The need to site additional power assets, including renewable resources and clean power sources, such as nuclear, led to the development of the Oak Ridge Siting Analysis for power Generation Expansion (OR-SAGE) tool discussed in this paper. The tool takes inputs such as population growth, water availability, environmental indicators, and tectonic and geological hazards to provide an in-depth visual analysis for siting options. Energy companies and other stakeholders can use OR-SAGE to procure feedback quickly and effectively on land suitability based on technology specific inputs. Policymakers can use OR-SAGE to analyze the impacts of future energy technology decisions, while balancing competing resource use. Overall, this paper discusses the recent use of OR-SAGE for these purposes and plans for future development.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗