Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “November 2011”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Comparison of Two High-Performance Energy Efficient Homes: Annual Performance Report, December 1, 2010–November 30, 2011

Beginning in 2008, two pairs of energy-saver houses were built at Wolf Creek in Oak Ridge, TN. These houses were designed to maximize energy efficiency using new ultra-high-efficiency components emerging from ORNL s Cooperative Research and Development Agreement (CRADA) partners and others. The first two houses contained 3713 square feet of conditioned area and were designated as WC1 and WC2; the second pair consisted of 2721 square feet conditioned area with crawlspace foundation and they re called WC3 and WC4. This report is focused on the annual energy performance of WC3 and WC4, and how they compare against a previously benchmarked maximum energy efficient house of a similar footprint. WC3 and WC4 are both about 55-60% more efficient than traditional new construction. Each house showcases a different envelope system: WC3 is built with advanced framing featured cellulose insulation partially mixed with phase change materials (PCM); and WC4 house has cladding composed of an exterior insulation and finish system (EIFS). The previously benchmarked house was one of three built at the Campbell Creek subdivision in Knoxville, TN. This house (CC3) was designed as a transformation of a builder house (CC1) with the most advanced energy-efficiency features, including solar electricity and hot water, which market conditions are likely to permit within the 2012 2015 period. The builder house itself was representative of a standard, IECC 2006 code-certified, all-electric house built by the builder to sell around 2005 2008.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Radiological Monitoring Results for Groundwater Samples Associated with the Industrial Wastewater Reuse Permit for the Materials and Fuels Complex Industrial Waste Ditch and Pond: November 1, 2011-October 31, 2012

This report summarizes radiological monitoring performed on samples from specific groundwater monitoring wells associated with the Industrial Wastewater Reuse Permit for the Materials and Fuels Complex Industrial Waste Ditch and Industrial Waste Pond WRU-I-0160-01, Modification 1 (formerly LA-000160-01). The radiological monitoring was performed to fulfill Department of Energy requirements under the Atomic Energy Act.

99 GENERAL AND MISCELLANEOUS↗

Remediation of Uranium Impacted Sediments in a Watercourse - 12486

In 2009, remediation was initiated for a non-operational fuel cycle facility previously used for government contract work. Between 2009 and the spring of 2011, remediation efforts were focused on demolition of contaminated buildings and removal of contaminated soil. In the late spring of 2011, the last phase of remediation commenced involving the removal of contaminated sediments from portions of a 1,200 meter long gaining stream. Planning and preparation for remediation of the stream began in 2009 with submittal of permit applications to undertake construction activities in a wetland area. The permitting process was lengthy and involved securing permits from multiple agencies. However, early and frequent communication with stakeholders played an integral role in efficiently obtaining the permit approvals. Frequent communication with stakeholders throughout the planning and remediation process also proved to be a key factor in timely completion of the project. The remediation of the stream involved the use of temporary bladder berms to divert surface water flow, water diversion piping, a sediment vacuum removal system, excavation of sediments using small front-end loaders, sediment dewatering, and waste packaging, transportation and disposal. Many safeguards were employed to protect several species of concern in the work area, water management during project activities, challenges encountered during the project, methods of Final Status Survey, and stream restoration. The planning and permitting effort for the Site Brook remediation began in May 2009 and permits were approved and in place by February 2011. The remediation and restoration of the Site Brook began in April 2011 and was completed in November 2011. The remediation of the Site Brook involved the use of temporary bladder berms to divert surface water flow, water diversion piping, a sediment vacuum removal system, excavation of sediments using small front-end loaders, sediment dewatering, and waste packaging, transportation, disposal, FSS, and restoration. Early and frequent communications with stakeholders proved to be a key factor in timely completion of the project. Challenges encountered during the remediation effort were overcome by proper planning and having preparedness procedures in place prior to executing the work. With the remediation and restoration successfully completed, the only remaining task is to monitor/maintain the restoration for 10 years. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Port Granby Project Overview - 13208

The Port Granby Project is an integral part of the Port Hope Area Initiative (PHAI), and is located approximately 14 kilometres west of the Municipality of Port Hope in the adjacent Municipality of Clarington, Ontario. The principal objective of the project is the excavation and relocation of low-level radioactive waste (LLRW) and marginally contaminated soils, which were deposited at the Port Granby Waste Management Facility (PGWMF) by Eldorado Nuclear Limited during the period 1955 to 1988, to a new, highly engineered above-ground Long-term Waste Management Facility (LTWMF) to be constructed on a nearby site. The Environmental Assessment for the Project was approved in 2009 August and the required Waste Nuclear Substance License was received in 2011 November. Once the detailed engineering design was completed, in 2011 March, the Port Granby Project was divided into three major contracts for construction implementation purposes. The first of these contracts was completed in late 2012 and the second is planned to start in early 2013. The contracting process for the third major contract is also expected to be completed during 2013. This paper provides an overview of the Port Granby Project as well as discussion on the status of the Project, including the regulatory approvals process, the approach to contracting the construction works and an update of work recently completed and soon to get underway. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Maui LiDAR

Light Detection and Ranging (LiDAR) data for the Maui study area in South Maui, collected by Watershed Sciences, Inc. (WS) on October 29th, 2011 and from November 7th, 2011 to November 10th, 2011.

15 GEOTHERMAL ENERGY↗

The Near-Earth Encounter of Asteroid 308635 (2005 YU55): Thermal IR Observations

The near-Earth approach (0.00217 AU, or 0.845 lunar distances) of the C-type asteroid 308635 (2005 YU55) in November 2011 presented a rare opportunity for detailed observations of a low-albedo NEA in this size range. As part of a multi-telescope campaign to measure visible and infrared spectra and photometry, we obtained mid-infrared (approx. 8 to 22 micron) photometry and spectroscopy of 2005 YU55 using Michelle on the Gemini North telescope on UT November 9 and 10,2011. An extensive radar campaign together with optical light-curves established the rotation state of YU55. In addition, the radar imaging resulted in a shape model for the asteroid, detection of numerous boulders on its surface, and a preliminary estimate of its equatorial diameter at 380 +/- 20 m. In a preliminary analysis, applying the radar and lightcurve-derived parameters to a rough-surface thermophysical model fit to the Gemini/Michelle thermal emission photometry results in a thermal inertia range of approximately 500 to 1500 J/sq m/0.5s/K, with the low-thermal-inertia solution corresponding to the small end of the radar size range and vice versa. Updates to these results will be presented and modeling of the thermal contribution to the measured near-infrared spectra from Palomar/Triplespec and IRTF/SpeX will also be discussed.

Lim, Lucy F.↗

Small Particles in Cirrus (SPartICus) and Storm Peak Lab Validation Experiment (StormVEx) Science Final Technical Report

The Small Particles in Cirrus (SPartICus) campaign took place from January through June, 2011 and the Storm Peak Lab Cloud Property Validation Experiment (StormVEx) took place from November, 2011 through April, 2012. The PI of this project, Dr. Gerald Mace, had the privilege to be the lead on both of these campaigns. The essence of the project that we report on here was to conduct preliminary work that was necessary to bring the field data sets to a point where they could be used for their intended science purposes

54 ENVIRONMENTAL SCIENCES↗

CALiPER Exploratory Study Retail Replacement Lamps – 2011

In 2010, CALiPER conducted a study on LED replacement lamps found in retail stores. The results were less than satisfactory, and many products were classified as being unlikely to meet consumer expectations. In November 2011, CALiPER purchased a new sample of products for a follow-up study, with the intent of characterizing the progress of this essential market segment.

caliper↗

Non-Nuclear Testing of Compact Reactor Technologies at NASA MSFC

Safe, reliable, compact, autonomous, long-life fission systems have numerous potential applications, both terrestrially and in space. Technologies and facilities developed in support of these systems could be useful to a variety of concepts. At moderate power levels, fission systems can be designed to operate for decades without the need for refueling. In addition, fast neutron damage to cladding and structural materials can be maintained at an acceptable level. Nuclear design codes have advanced to the stage where high confidence in the behavior and performance of a system can be achieved prior to initial testing. To help ensure reactor affordability, an optimal strategy must be devised for development and qualification. That strategy typically involves a combination of non-nuclear and nuclear testing. Non-nuclear testing is particularly useful for concepts in which nuclear operating characteristics are well understood and nuclear effects such as burnup and radiation damage are not likely to be significant. To be mass efficient, a SFPS must operate at higher coolant temperatures and use different types of power conversion than typical terrestrial reactors. The primary reason is the difficulty in rejecting excess heat to space. Although many options exist, NASA s current reference SFPS uses a fast spectrum, pumped-NaK cooled reactor coupled to a Stirling power conversion subsystem. The reference system uses technology with significant terrestrial heritage while still providing excellent performance. In addition, technologies from the SFPS system could be applicable to compact terrestrial systems. Recent non-nuclear testing at NASA s Early Flight Fission Test Facility (EFF-TF) has helped assess the viability of the reference SFPS and evaluate methods for system integration. In July, 2011 an Annular Linear Induction Pump (ALIP) provided by Idaho National Laboratory was tested at the EFF-TF to assess performance and verify suitability for use in a10 kWe technology demonstration unit (TDU). In November, 2011 testing of a 37-pin core simulator (designed in conjunction with Los Alamos National Laboratory) for use with the TDU will occur. Previous testing at the EFFTF has included the thermal and mechanical coupling of a pumped NaK loop to Stirling engines (provided by GRC). Testing related to heat pipe cooled systems, gas cooled systems, heat exchangers, and other technologies has also been performed. Integrated TDU testing will begin at GRC in 2013. Thermal simulators developed at the EFF-TF are capable of operating over the temperature and power range typically of interest to compact reactors. Small and large diameter simulators have been developed, and simulators (coupled with the facility) are able to closely match the axial and radial power profile of all potential systems of interest. A photograph of the TDU core simulator during assembly is provided in Figure 2.

Houts, Michael G.↗

WIPP Subsidence Monument Leveling Survey 2011

Sections 2 through 7 of this report define the result of the 2011 leveling survey through the subsidence monuments at the WIPP site. Approximately 15 miles of leveling was completed through nine vertical control loops. The 2011 survey includes the determination of elevation on each of the 48 existing subsidence monuments and the WIPP baseline survey, and 14 of the National Geodetic Survey’s (NGS) vertical control points. The field observations were completed during September through November 2011 by the Washington TRU Solutions (WTS) Mine Engineering Surveyors.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Methodology Paper for Upper Cretaceous Sandstone Characterization

The Southeast Regional Carbon Sequestration Partnership’s (SECARB’s) Anthropogenic Test is a demonstration of the deployment of CO 2 capture, transport, geologic storage and monitoring technologies. The capture component of the test takes place at the James M. Barry Electric Generating Plant in Bucks, Alabama. The capture facility utilizes post-combustion amine capture technology licensed from Mitsubishi Heavy Industries America to process flue gas from a coal-fired power unit at Plant Barry. The amount of CO 2 captured using this process is equivalent to the emissions produced when generating 25 megawatts (MW) of electricity. CO 2 captured at the plant is transported by pipeline for underground storage in a saline geologic formation within the Citronelle Dome. This project is one of the first and the largest fully-integrated commercial prototype coal-fired carbon capture and storage projects in the USA. This demonstration is currently in the injection phase, with the capture unit reaching full operational capacity in June of 2011. The project constructed a twelve mile long, 4-inch diameter pipeline to the injection site starting in July 2011. Drilled in January 2011, a deep characterization well provided geologic data confirming that the test site represented an attractive location for safe, long-term storage of CO 2 . Two Class V Experimental Injection Well underground injection control (UIC) permits were issued in November 2011 and subsequently the project’s injection wells were installed. A robust monitoring, verification and accounting (MVA) plan has been developed to monitor and track the CO 2 plume and the associated pressure field. In association with this field demonstration, the project team is also tasked with the continued characterization of this region’s potential storage reservoirs and cap rock formations. This document serves as the SECARB Phase III work product 1.1.a “Methodology Paper for Upper Cretaceous Sandstone Characterization.” This product will summarize the Project Team’s plans for the Phase III assessment of the Upper Cretaceous Sandstone Reservoir’s CO 2 storage capacity.

54 ENVIRONMENTAL SCIENCES↗