Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “National Priorities List”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Testing Novel CR-39 Detector Deployment System for Identification of Subsurface Fractures, Soda Springs, ID

The Environmental Protection Agency (EPA) has teamed with Battelle Energy Alliance, LLC (BEA) at Idaho National Laboratory (INL) to facilitate further testing of geologic-fracture-identification methodology at a field site near the Monsanto Superfund Site located in Soda Springs, Idaho. INL has the necessary testing and technological expertise to perform this work. Battelle Memorial Institute (BMI) has engaged INL to perform this work through a Work for Others (WFO) Agreement. This study continues a multi-year collaborative effort between INL and EPA to test the efficacy of using field deployed Cr-39 radon in soil portals. This research enables identification of active fractures capable of transporting contaminants at sites where fractures are suspected pathways into the subsurface. Current state of the art methods for mapping fracture networks are exceedingly expensive and notoriously inaccurate. The proposed WFO will evaluate the applicability of using cheap, readily available, passive radon detectors to identify conductive geologic structures (i.e. fractures, and fracture networks) in the subsurface that control the transport of contaminants at fracture-dominated sites. The proposed WFO utilizes proven off-the-shelf technology in the form of CR-39 radon detectors, which have been widely deployed to detect radon levels in homes and businesses. In an existing collaborative EPA/INL study outside of this workscope, CR-39 detectors are being utilized to determine the location of active transport fractures in a fractured granitic upland adjacent to a landfill site at the Fort Devens, MA that EPA-designated as National Priorities List (NPL) site. The innovative concept of using an easily deployed port that allows the CR-39 to measure the Rn-222 in the soil or alluvium above the fractured rock, while restricting atmospheric Rn-222 and soil sourced Ra from contaminating the detector is unique to INL and EPA approach previously developed. By deploying a series of these inexpensive detector-casing combinations statistical samples of the Rn-222 flux can be measured, elucidating the most communicative fractures (i.e. fractures that are actively transporting water and gasses). The Rn-222 measurements can then be used as an input to create a more accurate conceptual model to be used for transport modeling and related cleanup activities. If the team’s approach is demonstrated to be applicable to a wide variety of rock types and soil conditions it might potentially offer significant cost saving without a reduction in data quality at Monsanto Superfund and other sites underlain by fracture-dominated bedrock.

58 GEOSCIENCES↗

Monticello Mill Tailings Site, Operable Unit lll, Annual Groundwater Report, May 2015 Through April 2016

This report provides the annual analysis of water quality restoration progress, cumulative through April 2016, for Operable Unit (OU) III, surface water and groundwater, of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) Monticello Mill Tailings Site (MMTS). The MMTS is a Comprehensive Environmental Response, Compensation, and Liability Act National Priorities List site located in and near the city of Monticello, San Juan County, Utah. MMTS comprises the 110-acre site of a former uranium- and vanadium-ore-processing mill (mill site) and 1700 acres of surrounding private and municipal property. Milling operations generated 2.5 million cubic yards of waste (tailings) from 1942 to 1960. The tailings were impounded at four locations on the mill site. Inorganic constituents in the tailings drained from the impoundments to contaminate local surface water (Montezuma Creek) and groundwater in the underlying alluvial aquifer. Mill tailings dispersed by wind and water also contaminated properties surrounding and downstream of the mill site. Remedial actions to remove and isolate radiologically contaminated soil, sediment, and debris from the former mill site, Operable Unit I (OU I), and surrounding properties (OU II) were completed in 1999 with the encapsulation of the wastes in an engineered repository located on DOE property 1 mile south of the former mill site. This effectively removed the primary source of groundwater contamination; however, contamination of groundwater and surface water remains within OU III at levels that exceed water quality protection standards. Uranium is the primary contaminant of concern (COC). LM implemented monitored natural attenuation with institutional controls as the OU III remedy in 2004. Because groundwater restoration proceeded more slowly than expected and did not meet performance criteria established in the OU III Record of Decision (June 2004), LM implemented a contingency action in 2009 by an Explanation of Significant Difference to include a pump-and­ treat system using a single extraction well and treatment by zero-valent iron (ex situ treatment system). The contingency action was optimized in 2015 with the installation of8 extraction wells and 16 monitoring wells in a focused area of the aquifer, the area of attainment (AOA). Contaminated water is treated by solar evaporation at an existing facility at the LM repository.

54 ENVIRONMENTAL SCIENCES↗

Monticello Mill Tailings Site Operable Unit III Annual Groundwater Report May 2014 Through April 2015, October 2015

This report provides the annual analysis of water quality restoration progress, cumulative through April 2015, for Operable Unit (OU) III, surface water and groundwater, of the U.S. Department of Energy (DOE) Office of Legacy Management Monticello Mill Tailings Site (MMTS). The MMTS is a Comprehensive Environmental Response, Compensation, and Liability Act National Priorities List site located in and near the city of Monticello, San Juan County, Utah. MMTS comprises the 110-acre site of a former uranium- and vanadium-ore-processing mill (mill site) and 1,700 acres of surrounding private and municipal property. Milling operations generated 2.5 million cubic yards of waste (tailings) from 1942 to 1960. The tailings were impounded at four locations on the mill site. Inorganic constituents in the tailings drained from the impoundments to contaminate local surface water (Montezuma Creek) and groundwater in the underlying alluvial aquifer. Mill tailings dispersed by wind and water also contaminated properties surrounding and downstream of the mill site. Remedial actions to remove and isolate radiologically contaminated soil, sediment, and debris from the former mill site (OU I) and surrounding properties (OU II) were completed in 1999 with the encapsulation of the wastes in an engineered repository located on DOE property 1 mile south of the former mill site. Contamination of groundwater and surface water remains within OU III at levels that exceed water quality protection standards. Uranium is the primary contaminant of concern. LM implemented monitored natural attenuation with institutional controls as the OU III remedy in 2004. Because groundwater restoration proceeded more slowly than expected and did not meet performance criteria established in the OU III Record of Decision (June 2004), LM implemented a contingency action in 2009 by an Explanation of Significant Difference to include a pump-and-treat system using a single extraction well and treatment by zero-valent iron (ex-situ treatment system). The contingency action was optimized in 2015 with the installation of 8 extraction wells and 16 monitoring wells in a focused area of the aquifer (area of attainment). Contaminated water is treated by solar evaporation at an existing onsite LM facility. Environmental monitoring at OU III consists of twice-yearly (April and October) collection and analysis of hydrologic and water-quality data from an established network of observation wells, seeps, and surface water locations. The scope of monitoring was expanded in 2009 for the ex situ treatment system and in 2015 for the remedy optimization system. Operation and monitoring of the ex situ treatment system was discontinued in 2014 with the start-up of the remedy optimization system. No data anomalies for OU III water quality trending or restoration progress are identified for the May 2014 through April 2015 reporting period. Although some regions of the aquifer demonstrate decreasing concentration trends, such trending is not evident for the bulk of the aquifer and a prolonged restoration period is indicated. The groundwater contingency remedy optimization system captures significant contaminant mass (primarily uranium) from the area of attainment; however, because that system only became operational in 2015, a long-term forecast of restoration progress is premature.

54 ENVIRONMENTAL SCIENCES↗

Closeout of Department of Energy Grant – DE-FG02-91CH10493

A Federal Facility Interagency Agreement (lAG), dated February 28,1992, was executed by the State of New York, U.S. Environmental Protection Agency (EPA), and the U.S. Department of Energy (DOE) to address contamination of operations at the Brookhaven National Laboratory (BNL) National Priorities List (NPL) site (site). Section XXXII of the IAG permits New York State to recover expenses for providing administrative and technical services pertaining to the site. The initial mechanism for recovery of State expenses was a DOE grant, identified as DE-FG02-91CH10493, which was established on September 30, 1991. Due to administrative requirements at DOE, the grant was no longer extended and was terminated on May 31, 2020. A Memorandum of Agreement (MOA) was executed on June 1, 2020, to facilitate reimbursement of State expenses moving forward. The grant contained closeout requirements, which included the submission of a report summarizing activities performed by the State of New York. The following sections present the site history and activities performed by New York State as well as the findings and conclusions.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Revegetation Monitoring Report for Fiscal Year 2022

This report describes the monitoring of areas revegetated by various contractors on the Hanford Site. Revegetation sites include those revegetated by the River Corridor Closure Contractor and CH2M Hill Plateau Remediation Company that were transitioned to Mission Support Alliance (MSA) in 2017. These sites, along with sites revegetated by MSA between 2017 and 2020, were transitioned to Hanford Mission Integration Solutions (HMIS) in 2021. HMIS performs revegetation monitoring activities for these transitioned sites and for sites revegetated by HMIS and other contractors in subsequent years to determine revegetation site success. This report contains data collected in 2022 documenting the recovery of revegetation areas associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites and restoration of lands disturbed by ongoing mission activities at the Hanford Site in Richland, Washington. It contains vegetation monitoring data for 53 sites selected to be representative sites for areas planted between the years of fiscal year (FY) 2007 and FY 2022.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Revegetation Monitoring Report for Fiscal Year 2021

This report describes the monitoring of areas revegetated by the River Corridor Closure Contractor (RCCC) and CH2M Hill Plateau Remediation Company (CHPRC) that were transitioned to Mission Support Alliance (MSA) in 2017. These sites, along with sites revegetated by MSA between 2017 and 2020, were transitioned to Hanford Mission Integration Solutions (HMIS) in 2021. Site monitoring is a continuance of efforts performed by the RCCC from fiscal year (FY) 2007 through FY 2020. This report contains data collected in 2021 documenting the recovery of revegetation areas associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites and restoration of lands disturbed by ongoing Site mission activities at the Hanford Site in Richland, Washington. It contains vegetation monitoring data for 52 sites selected to be representative sites for areas planted between the years of FY 2007 and FY 2021.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Revegetation Monitoring Report for Fiscal Year 2020

This report describes the monitoring of areas revegetated by the River Corridor Closure Contractor (RCCC) and CH2M Hill Plateau Remediation Company (CHPRC) that were transitioned to and monitored by Mission Support Alliance (MSA) in 2020, along with sites revegetated by MSA. Site monitoring is a continuance of efforts performed by the RCCC from fiscal year (FY) 2007 through FY 2020. This report contains data collected in 2020 documenting the recovery of revegetation areas associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites and restoration of lands disturbed by ongoing Site mission activities at the Hanford Site in Richland, Washington. It contains vegetation monitoring data for 41 sites selected to be representative sites for areas planted between the years of FY 2007 and FY 2020.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Revegetation Monitoring Report for Fiscal Year 2019

This report describes the monitoring of areas revegetated by the River Corridor Closure Contractor (RCCC) and CH2M Hill Plateau Remediation Company (CHPRC) that were transitioned to and monitored by Mission Support Alliance (MSA) in 2019, along with sites revegetated by MSA. Site monitoring is a continuance of efforts performed by the RCCC from fiscal year (FY) 2004 through FY 2019. This report contains data collected in 2019 documenting the recovery of revegetation areas associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites and restoration of lands disturbed by ongoing site mission activities at the Hanford Site in Richland, Washington. It contains vegetation monitoring data for 55 sites selected to be representative sites for areas planted between the years of FY 2004 through FY 2019. Two revegetation site monitoring efforts occurred in 2019. The first effort was traditional revegetation monitoring, which analyzes the plant composition of representative revegetated sites for 5 years after they were planted. This monitoring is summarized in Section 3.0. The second effort evaluated the long-term trends of revegetated sites that were past their fifth year of growth. This monitoring is a continuation on the long-term trend monitoring that occurred in 2018 and is summarized in Section 4.0.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Revegetation Monitoring Report for Fiscal Year 2018

This report describes the monitoring of areas revegetated by the River Corridor Closure Contractor (RCCC) and CH2M Hill Plateau Remediation Company (CHPRC) that were transitioned to and monitored by Mission Support Alliance (MSA) in 2018, along with sites revegetated by MSA. Site monitoring is a continuance of efforts performed by the RCCC from Fiscal Year (FY) 2012 through FY 2018. This report contains data collected in 2018 documenting the recovery of revegetation areas associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites and restoration of lands disturbed by ongoing site mission activites at the Hanford Site in Richland, Washington. It contains vegetation monitoring data for 40 sites selected to be representative sites for areas planted between the years of FY 2012 through FY 2018. Two revegetation site monitoring efforts occurred in 2018. The first effort was traditional revegetation monitoring, which analyzes the plant composition of representative revegetated sites for 5 years after they were planted. This monitoring is summarized in Section 3.0. The second effort evaluated the long-term trends of revegetated sites that were past their fifth year of growth. This monitoring is summarized in Section 4.0.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Revegetation Monitoring Report for Fiscal Year 2017

This report describes the monitoring of areas revegetated by the River Corridor Closure Contractor (RCCC) and CH2M Hill Plateau Remediation Company (CHPRC) that were monitored by Mission Support Alliance (MSA) in 2017. Site monitoring is a continuance of efforts performed by the RCCC from FY2008 through FY2017. This report contains data collected in 2017 documenting the success status of revegetation areas associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites at the Hanford Site in Richland, Washington. It contains vegetation monitoring data for 40 sites selected to be representative sites for areas planted between the years of FY2008 through FY2017.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Revegetation Monitoring Report for Fiscal Year 2016

This report describes the monitoring of areas revegetated by the River Corridor Closure Contractor (RCCC) and monitored by Mission Support Alliance in 2016. Site monitoring is a continuance of efforts performed by RCCC (2008 through 2015). The report contains data documenting the success status of revegetation areas associated with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) cleanup of National Priorities List waste sites at the Hanford Site in Richland, Washington. It contains vegetation monitoring data for seventeen sites selected to be representative sites for larger areas planted between the years of 2008 through 2015.

54 ENVIRONMENTAL SCIENCES↗

FEASIBILITY STUDY REPORT FOR THE 200-ZP-1 GROUNDWATER OPERABLE UNIT

The Hanford Site, managed by the U.S. Department of Energy (DOE), encompasses approximately 1,517 km{sup 2} (586 mi{sup 2}) in the Columbia Basin of south-central Washington State. In 1989, the U.S. Environmental Protection Agency (EPA) placed the 100, 200, 300, and 1100 Areas of the Hanford Site on the 40 Code of Federal Regulations (CFR) 300, 'National Oil and Hazardous Substances Pollution Contingency Plan' National Contingency Plan [NCPD], Appendix B, 'National Priorities List' (NPL), pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The 200 Areas NPL sites consist of the 200 West and 200 East Areas (Figure 1-1). The 200 Areas contain waste management facilities, inactive irradiated fuel reprocessing facilities, and the 200 North Area (formerly used for interim storage and staging of irradiated fuel). Several waste sites in the 600 Area, located near the 200 Areas, also are included in the 200 Areas NPL site. The 200 Areas NPL site is in a region referred to as the 'Central Plateau' and consists of approximately 700 waste sites, excluding sites assigned to the tank farm waste management areas (WMAs). The 200-ZP-1 Groundwater Operable Unit (OU) consists of the groundwater located under the northern portion of the 200 West Area. Waste sources that contributed to the 200-ZP-1 OU included cribs and trenches that received liquid and/or solid waste in the past from the Z Plant and T Plant aggregate areas, WMA-T, WMA-TX/TY, and the State-Approved Land Disposal Site (SALDS). This feasibility study (FS) for the 200-ZP-1 Groundwater OU was prepared in accordance with the requirements of CERCLA decision documents. These decision documents are part of the Administrative Record for the selection of remedial actions for each waste site and present the selected remedial actions that are chosen in accordance with CERCLA, as amended by the Superfund Amendments and Reauthorization Act of 1986, and to the extent practicable, the NCP. This FS conforms to the conditions set forth in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 2003) and amendments, signed by the Washington State Department of Ecology (Ecology), EPA, and DOE Richland Operations Office (RL). This also includes Tri-Party Agreement Milestone M-015-00C for completing all 200 Area non-tank farm OU pre-Record of Decision (ROD) documents on or before December 31, 2011. This FS supports the final remedy selection for the 200-ZP-1 OU, as described in the Remedial Investigation/Feasibility Study Work Plan for the 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI/FS work plan) (DOE/RL-2003-55), as agreed upon by RL and EPA. Tri-Party Agreement Milestone M-015-48B required Draft A of the 200-ZP-1 OU FS and proposed plan to be transmitted to EPA by September 30, 2007. As agreed to with EPA in the 200 Area Unit Managers Meeting Groundwater Operable Unit Status (FH-0503130), the baseline risk assessment (BRA) was delayed from inclusion in the remedial investigation (RI) report and is completed and documented in this FS. The Remedial Investigation Report for 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI report) (DOE/RL-2006-24) included an evaluation of human health and ecological risks and hazards. The RI report identified the radiological and chemical contaminants of potential concern (COPCs) that represent the primary risks to human health and the environment. The complete risk assessment in this FS incorporates additional analytical data from the unconfined aquifer that were obtained during or after preparation of the RI report, particularly for carbon tetrachloride and technetium-99. This FS also includes the initial results from an ongoing study of technetium-99 contamination near WMA-T, the sampling of new wells near the 216-W-LC laundry waste crib and T Plant, updated Hanford vadose zone fate and transport modeling, and groundwater particle-tracking analysis. The purpose of this FS is to develop and evaluate alternatives for remediation of the groundwater in the 200-ZP-1 OU. The alternatives considered provide a range of potential response actions (i.e., no action; institutional controls and monitored natural attenuation [MNA]; and pump-and-treat with MNA, flow-path control, and institutional controls) that are appropriate to address site-specific conditions. The alternatives are evaluated against seven of the nine CERCLA evaluation criteria defined in Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA (EPA/540/G-891004). The remaining two CERCLA criteria will be formally assessed during the public comment period. The FS evaluation serves as the basis for identifying a remedy to mitigate potential risks to human health and the environment. A preferred alternative (or alternatives) will be presented to the public for review and comment in the proposed plan.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Environmental Management Waste Management Facility Waste Lot Profile 155.5 for K-1015-A Laundry Pit, East Tennessee Technology Park Oak Ridge, Tennessee

In 1989, the Oak Ridge Reservation (ORR), which includes the East Tennessee Technology Park (ETTP), was placed on the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) National Priorities List. The Federal Facility Agreement (FFA) (DOE 1992), effective January 1, 1992, now governs environmental restoration activities conducted under CERCLA at the ORR. Following signing of the FFA, U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (EPA), and the state of Tennessee signed the Oak Ridge Accelerated Cleanup Plan Agreement on June 18, 2003. The purpose of this agreement is to define a streamlined decision-making process to facilitate the accelerated implementation of cleanup, to resolve ORR milestone issues, and to establish future actions necessary to complete the accelerated cleanup plan by the end of fiscal year 2008. While the FFA continues to serve as the overall regulatory framework for remediation, the Accelerated Cleanup Plan Agreement supplements existing requirements to streamline the decision-making process. The disposal of the K-1015 Laundry Pit waste will be executed in accordance with the 'Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone, 2, East Tennessee Technology Park, Oak Ridge, Tennessee' (DOB/ORAH-2161&D2) and the 'Waste Handling Plan for the Consolidated Soil and Waste Sites with Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee' (DOE/OR/01-2328&D1). This waste lot consists of a total of approximately 50 cubic yards of waste that will be disposed at the Environmental Management Waste Management Facility (EMWMF) as non-containerized waste. This material will be sent to the EMWMF in dump trucks. This profile is for the K-1015-A Laundry Pit and includes debris (e.g., concrete, metal rebar, pipe), incidental soil, plastic and wood, and secondary waste (such as plastic sheeting, hay bales and other erosion control materials, wooden pallets, contaminated equipment, decontamination materials, etc.).

09 BIOMASS FUELS↗

Environmental Management Waste Management Facility Proxy Waste Lot Profile 6.999 for Building K-25 West Wing, East Tennessee Technology Park, Oak Ridge, Tennessee

In 1989, the Oak Ridge Reservation (ORR), which includes the East Tennessee Technology Park (ETTP), was placed on the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) National Priorities List. The Federal Facility Agreement (FFA) (DOE 1992), effective January 1, 1992, now governs environmental restoration activities conducted under CERCLA at the ORR. Following signing of the FFA, U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (EPA), and the state of Tennessee signed the Oak Ridge Accelerated Cleanup Plan Agreement on June 18, 2002. The purpose of this agreement is to define a streamlined decision-making process to facilitate the accelerated implementation of cleanup, resolve ORR milestone issues, and establish future actions necessary to complete the accelerated cleanup plan by the end of fiscal year 2008. While the FFA continues to serve as the overall regulatory framework for remediation, the Accelerated Cleanup Plan Agreement supplements existing requirements to streamline the decision-making process. Decontamination and decommissioning (D&D) activities of Bldg. K-25, the original gaseous diffusion facility, is being conducted by Bechtel Jacobs Company LLC (BJC) on behalf of the DOE. The planned CERCLA action covering disposal of building structure and remaining components from the K-25 building is scheduled as a non-time-critical CERCLA action as part of DOE's continuous risk reduction strategy for ETTP. The K-25 building is proposed for D&D because of its poor physical condition and the expense of surveillance and maintenance activities. The K-25/K-27 D&D Project proposes to dispose of the commingled waste listed below from the K-25 west side building structure and remaining components and process gas equipment and piping at the Environmental Management Waste Management Facility (EMWMF) under waste disposal proxy lot (WPXL) 6.999: (1) Building structure (e.g. concrete floors [excluding basement slab], roofing, structural steel supports, interior walls, and exterior walls) and support system components including the recirculation cooling water (RCW); electrical; communication; fire protection; ventilation; process coolant; process lube oil; utilities such as steam, water and drain lines; (2) Process Piping; (3) Seal Exhaust Headers; (4) Seal Exhaust Traps; (5) Process Valves; (6) Differential Blind Multipliers (DBM)/Partial Blind Multipliers (PBM); and (7) Aftercoolers (also known as Intercell coolers). Converters and compressors while components of the process gas system, are not included in this commingled waste lot. On January 6, 2009, a meeting was held with EPA, TDEC, DOE and the team for the sole purpose of finalizing the objectives, format, and content of WPXL 6.999. The objective of WPXL 6.999 was to provide a crosswalk to the building structure and the PGE components profiles. This was accomplished by providing tables with references to the specific section of the individual profiles for each of the WLs. There are two building profiles and eight PGE profiles. All of the waste identified in the individual profiles will be commingled, shipped, and disposed exclusively under WPXL 6.999. The individual profiles were provided to the EPA and Tennessee Department of Environment and Conservation (TDEC) for information purposes only. This summary WPXL 6.999 will be submitted to EPA, TDEC, and DOE for review and approval. The format agreed upon by the regulators and DOE form the basis for WPXL 6.999. The agreed format is found on pages v and vi of the CONTENTS section of this profile. The disposal of this waste will be executed in accordance with the Action Memorandum for the Decontamination and Decommissioning of the K-25 and K-27 Buildings, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2002), Removal Action Work Plan for the K-25 and K-27 Buildings, Process Equipment Removal and Demolition, K-25/K-27 Project, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2008a); Waste Handling Plan for Demolition of the K-25 and K-27 Building Structures and Remaining Components Located at the East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2005); and Waste Handling Plan for Building K-25 West Wing Process Equipment and Piping at the East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2008b).

54 ENVIRONMENTAL SCIENCES↗

2008 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report

The purpose of this report is to document the status of revegetation projects and natural resources mitigation efforts that have been conducted for remediated waste sites and other activities associated with the Comprehensive Environmental Response, Compensation, and Liability Act cleanup of National Priorities List waste sites at Hanford. This report documents the results of revegetation and mitigation monitoring conducted in 2008 and includes 22 revegetation/restoration projects, one revegetation/mitigation project, and two bat habitat mitigation projects.

54 ENVIRONMENTAL SCIENCES↗

An Overview of In-Stu Treatability Studies at Marshall Space Flight Center, Huntsville, Alabama

Marshall Space Flight Center (MSFC) is located in Huntsville, Alabama (north-central Alabama), on approximately 1,840 acres near the center of the U.S. Army's Redstone Arsenal (RSA). MSFC is the National Aeronautics and Space Administration's (NASA's) principal propulsion development center. Its scientists, engineers, and support personnel play a major role in the National Space Transportation System by managing space shuttle mission activities, including the microgravity laboratory. In addition, MSFC will be a significant contributor to several of NASA's future programs, including the Reusable Launch Vehicle (X-33), International Space Station, and Advanced X-ray Astrophysics Facility, as well as research on a variety of space science applications. MSFC has been used to develop, test and manufacture space vehicles and components since 1960, when civilian rocketry and missile activities were transferred from RSA to MSFC. In 1994, MSFC was placed on the National Priority List for the management of hazardous waste sites, under the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). One requirement of the CERCLA program is to evaluate the nature and extent of environmental contamination resulting from identified CERCLA sites, assess the public health and environmental risks associated with the identified contamination, and identify potential remedial actions. A CERCLA remedial investigation (RI) for the groundwater system has identified at least five major plumes of chlorinated volatile organic compounds (CVOCs) in the groundwater beneath the facility. These plumes are believed to be the result of former management practices at 14 main facility locations (termed "source areas") where CVOCs were released to the subsurface. Trichloroethene (TCE) is the predominant CVOC and is common to all the plumes. Perchloroethene (PCE) also exists in two of the plumes. In addition to TCE and PCE, carbon tetrachloride and 1,1,2,2-tetrachloroethane are contained in one of the plumes. The CVOCs are believed to exist as dense non-aqueous phase liquids (DNAPLs) beneath many of the source areas.

McElroy, Bill↗

A Novel Method for Remediation of PCBs in Weathered Coatings

Polychlorinated biphenyls (PCBs) are a group of synthetic aromatic compounds with the general formula C 12H1oCl that were historically used in industrial paints, caulking material and adhesives, as their properties enhanced structural integrity, reduced flammability and boosted antifungal properties. Although the United States Environmental Protection Agency (USEPA) has banned the manufacture of PCBs since 1979, they have been found in at least 500 of the 1,598 National Priorities List (Superfund) sites identified by the USEPA. Prior to the USEPA's ban on PCB production, PCBs were commonly used as additives in paints and asphalt-based adhesives that were subsequently applied to a variety of structures. Government facilities constructed as early as 1930 utilized PCB-containing binders or PCB-containing paints, which are now leaching into the environment and posing ecological and worker health concerns. To date, no definitive in situ, non-destructive method is available for the removal of PCBs found in weathered coatings or on painted structures/equipment. The research described in this paper involves the laboratory development and field-scale deployment of a new and innovative solution for the removal and destruction of PCBs found in painted structures or within the binding or caulking material on structures. The technology incorporates a Bimetallic Treatment System (BTS) that extracts and degrades only the PCBs found on the facilities, leaving the structure virtually unaltered.

Brooks, Kathleen B.↗

The Ability of AMSTAR Dechlorination Solution to Remove and Degrade PCBs from Contaminated Surfaces

Polychlorinated biphenyls (PCBs) are a group of synthetic aromatic compounds with the general formula C12H(10-x)Cl(-x) that were historically used in industrial paints, caulking material and adhesives, as their properties enhanced structural integrity, reduced flammability and boosted antifungal properties. Although the United States Environmental Protection Agency (USEPA) has banned the manufacture of PCBs since 1979, they have been found in at least 500 of the 1,598 National Priorities List (Superfund) sites identified by the USEPA. Prior to the US EPA's ban on PCB production, PCBs were commonly used as additives in paints and asphalt-based adhesives that were subsequently applied to a variety of structures. Government facilities constructed as early as 1930 utilized PCB-containing binders or PCB-containing paints, which are now leaching into the environment and posing ecological and worker health concerns. In 2006, a commercially available product known as AMSTAR Dechlorination Solution was tested at NASA's Kennedy Space Center for its ability to remove and degrade PCBs from structural materials. This evaluation was requested by the Environmental Security Technology Certification Program (ESTCP) evaluating the ability of NASA's Bimetallic Treatment System (BTS) to remove and degrade PCBs from structural materials. The results of the laboratory testing are to be used to determine if a side-by-side field-scale test comparing BTS to AMSTAR was warranted. A recommended sampling and analysis testing program was submitted to ESTCP that included triplicate screening of AMSTAR's PCB dechlorination capabilities on a variety of surfaces including glass, bare metal, and painted metal coupons. The test procedures, analytical techniques and results obtained are presented in this interim report to ESTCP.

Quinn, Jacqueline E.↗