Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “National Laboratory”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

INL ART AGR-5/6/7 PIE at Oak Ridge National Laboratory

Idaho National Laboratory (INL) Advanced Reactor Technologies (ART) is currently supporting a tristructural isotropic (TRISO) fuel development and qualification program, which includes fuel fabrication, test irradiations, and post-irradiation examination (PIE) and safety testing to assess fuel performance during normal irradiation and under potential accident conditions. PIE fuel work from the final test irradiation (Advanced Gas Reactor [AGR]-5/6/7) is expected to commence at INL in early 2021, but the PIE preparations work began in FY2016. The work scope in this statement of work includes Oak Ridge National Laboratory (ORNL) providing project management and technical support to PIE-related activities; technical input to the moisture/air-ingress furnace design, fabrication, and equipment qualification; and technical support for development of equipment and techniques for planned PIE evolutions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

INL ART AGR-5/6/7 PIE at Oak Ridge National Laboratory

Idaho National Laboratory (INL) Advanced Reactor Technologies (ART) is currently supporting a tristructural isotropic (TRISO) fuel development and qualification program, which includes fuel fabrication, test irradiations, and post-irradiation examination (PIE) and safety testing to assess fuel performance during normal irradiation and under potential accident conditions. PIE fuel work from the final test irradiation (Advanced Gas Reactor [AGR]-5/6/7) is expected to commence at INL in early 2021, but the PIE preparations work began in FY2016. The work scope in this statement of work includes Oak Ridge National Laboratory (ORNL) providing project management and technical support to PIE-related activities; technical input to the moisture/air-ingress furnace design, fabrication, and equipment qualification; and technical support for development of equipment and techniques for planned PIE evolutions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Challenges and Strategies for Testing Automation Practices at Sandia National Laboratories

Sandia National Laboratories is a premier United States national security laboratory which develops science-based technologies in areas such as nuclear deterrence, energy production, and climate change. Computing plays a key role in its diverse missions, and within that environment, Research Software Engineers (RSEs) and other scientific software developers utilize testing automation to ensure quality and maintainability of their work. We conducted a Participatory Action Research study to explore the challenges and strategies for testing automation through the lens of academic literature. Through the experiences collected and comparison with open literature, we identify these challenges in testing automation and then present strategies for mitigation grounded in evidence-based practice and experience reports that other, similar institutions can assess for their automation needs.

97 MATHEMATICS AND COMPUTING↗

Cross-Section Comparison for Pu-238 Production in the Advanced Test Reactor at Idaho National Laboratory

Qualification of Advanced Test Reactor (ATR) positions for Pu-238 production has been ongoing at Idaho National Laboratory (INL). The ATR qualifications have stretched over multiple years during which new techniques have been developed and made available for ATR experiment neutronic analysis. As part of the transition to newer codes, new cross-section libraries have been evaluated for use in the Pu-238 production experiment analysis. A comparative study was done using the MCNP ORGIEN Activation Analysis (MOAA) tool between ENDF/B-VII.0 and ENDF/B-VIII.0 cross sections to capture the impact of the change in cross-sections on the analysis needed to qualify Pu-238 production targets. All comparisons were done assuming the ATR GEN-I targets were located in the south flux trap of the ATR. Finally, an overview of how this qualification and potential irradiation fits into Pu-238 is discussed.

07 ISOTOPE AND RADIATION SOURCES↗

2018 LDRD Annual Report (Argonne National Laboratory)

Argonne National Laboratory’s Laboratory Directed Research and Development (LDRD) program encourages the development of novel technical concepts, enhances the Laboratory’s research and development (R&D) capabilities, and enables pursuit of strategic laboratory goals. Argonne’s LDRD projects are proposal based and peer reviewed, supporting ideas that require advanced exploration so they can be sufficiently developed to pursue support through normal programmatic channels. Among the aims of the projects supported by the LDRD program are the establishment of engineering proofs of principle, assessment of design feasibility for prospective facilities, development of instrumentation or computational methods or systems, and discoveries in fundamental science and exploratory development. All LDRD projects have demonstrable ties to one or more of the science, energy, environment, and national security missions of the U.S. Department of Energy (DOE) and its National Nuclear Security Administration (NNSA), and many are also relevant to the missions of other federal agencies that sponsor work at Argonne. A natural consequence of the more “applied” type projects is their concurrent relevance to industry. The LDRD program is managed in overarching portfolios, each containing multiple projects each fiscal year. The LDRD Prime portfolio is further divided into strategic focus areas aligned with Argonne’s strategic plan. The largest component of Argonne’s program is LDRD Prime, which emphasizes R&D explicitly aligned with Laboratory major initiatives in support of Argonne’s strategic plan. The choice of Focus Areas under the LDRD Prime component reflects the major initiatives; the state of development of relevant technical fields; the potential value of advancing those fields to DOE/NNSA and the nation; and the compatibility of the fields with existing facilities, capabilities, and staff expertise at Argonne. Focus Areas with projects that ended in FY18 are: Advanced Computing, Biological and Environmental Science Capability Development, Energy Manufacturing Science and Engineering, Hard X-ray Sciences, Materials and Chemistry, Securing Energy and Critical Resources, and The Universe as Our Laboratory (ULab).

99 GENERAL AND MISCELLANEOUS↗

Climate Vulnerability Assessment and Resilience Planning for Idaho National Laboratory

Idaho National Laboratory’s (INL’s) mission is to discover, demonstrate, and secure innovative nuclear energy solutions, other clean energy options, and critical infrastructure. This INL’s Climate Vulnerability Assessment and Resilience Plan (VARP) was developed to enable and sustain that mission while ensuring the viability of operations considering expected climate change impacts. The VARP was developed according to the narrative requirements from the “Vulnerability Assessment and Resilience Planning Guidance, Version 1.2” document issued in February 2022. A prescribed process was used to identify mission-critical systems and components, determine historical and expected climate impacts, and develop resilient solutions. Experts from across INL, including operations staff, researchers, and climate scientists supplied input to the process. Analyses of climate modeling sources revealed that under scenarios of higher and lower greenhouse gas emissions (Representative Concentration Pathway (RCP) 4.5 and RCP 8.5), INL anticipates an increase in climate hazards, including drought, heat waves, wildfire, and precipitation. Increased frequency and duration of climatic hazards forecasts high impacts on certain mission-critical asset and infrastructure types. Utilizing the VARP Risk Assessment Tool, projected high climate hazard impacts across multiple asset and infrastructure types at the INL include energy generation and distribution systems, Site buildings, specialized or mission-critical equipment, and transportation and fleet infrastructure. Some of these mission-critical asset and infrastructure types maintain high adaptive capacity to climatic changes; however, others may need additional adaptive capacity to withstand increased frequency and duration of climate hazards. INL identified close to 300 resilient solutions that were consolidated into 11 solution categories to be tracked in the Department of Energy Sustainability Dashboard. The identified solutions are a starting point for future project development and analysis. These data are intended to inform decision makers on climate issues and potential solutions across INL and associated communities. The VARP is not intended to be a budget tool or project decision document on its own, but rather one of many tools used by decision makers to establish resilient priorities. This initial document provides the framework and foundation to resilient solutions. In the coming years, each solution needs to be fully developed, costed, and prioritized based on mission-critical risk and funding priorities.

54 ENVIRONMENTAL SCIENCES↗

Process Improvement For Pu-238 Production at Idaho National Laboratory

Idaho National Laboratory (INL) has supported the production of Pu-238 for future NASA deep space missions since 2017. Over this time, INL has worked to improve the qualification process of Pu-238 production targets as well as improve processes related to the shipping, storage, irradiation, and storage of Pu-238 production targets. Qualification of Pu-238 production targets began with flux measurements and scoping analysis to provide fundamental data to confirm the impacts on the operation of the Advanced Test Reactor (ATR), Fig1. Later, initial production targets were irradiated in ATR’s I-7 position, and then the South Flux Trap (SFT). A modified target design was then implemented which would use the full length of the ATR core and increase Pu-238 production. While working to improve and streamline the qualification of the Pu-238 production targets, INL worked to improve multiple operational aspects of the Pu-238 production process. These changes include updating procedures to streamline operations, supporting modification of shipping containers to contain five rather than one production target, reviewing target receipt procedures and changing work flow to provide flexibility in target receipt, and designing and fabricating support equipment for the storage and internal transfer of production targets

07 ISOTOPE AND RADIATION SOURCES↗

Process Improvements For Pu-238 Production at Idaho National Laboratory

Idaho National Laboratory (INL) has supported the production of Pu-238 for future NASA deep space missions since 2017. Over this time, INL has worked to improve the qualification process of Pu-238 production targets as well as improve processes related to the shipping, storage, irradiation, and storage of Pu-238 production targets. Qualification of Pu-238 production targets began with flux measurements and scoping analysis to provide fundamental data to confirm the impacts on the operation of the Advanced Test Reactor (ATR), Fig1. Later, initial production targets were irradiated in ATR’s I-7 position, and then the South Flux Trap (SFT). A modified target design was then implemented which would use the full length of the ATR core and increase Pu-238 production. While working to improve and streamline the qualification of the Pu-238 production targets, INL worked to improve multiple operational aspects of the Pu-238 production process. These changes include updating procedures to streamline operations, supporting modification of shipping containers to contain five rather than one production target, reviewing target receipt procedures and changing work flow to provide flexibility in target receipt, and designing and fabricating support equipment for the storage and internal transfer of production targets.

07 ISOTOPE AND RADIATION SOURCES↗

Picosecond Synchronization System for the Distribution of Photon Pairs Through a Fiber Link Between Fermilab and Argonne National Laboratories

Here we demonstrate a three-node quantum network for C-band photon pairs using 2 pairs of 59 km of deployed fiber between Fermi and Argonne National Laboratories. The C-band pairs are directed to nodes using a standard telecommunication switch and the detection system is synchronized to picosecond scale timing resolution using a coexisting O-or L-band optical clock distribution system. We measure a reduction of coincidence to-accidental ratio (CAR) of the C-band pairs from 51 ± 2 to 5.3 ± 0.4 due to Raman scattering of the O-band clock pulses. Despite this reduction, the CAR is nevertheless suitable for quantum networks.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

INL ART AGR-5/6/7 PIE at Oak Ridge National Laboratory

The Idaho National Laboratory (INL) Advanced Reactor Technologies (ART) is currently supporting a tristructural isotropic (TRISO) fuel development and qualification program, which includes fuel fabrication, test irradiations, and post-irradiation examination (PIE) and safety testing to assess fuel performance during normal irradiation and under accident conditions. PIE work on fuel from the last in the series of test irradiations, Advanced Gas Reactor (AGR)-5/6/7, will begin at Idaho National Laboratory (INL) in approximately September 2020, but because of the complexity of the experiment preparations for the PIE are going to begin in FY2016. The work scope in this memorandum purchase order (MPO) includes Oak Ridge National Laboratory (ORNL) providing project management and technical support to PIE-related activities, providing technical input to the moisture furnace design, providing technical support for development of equipment and techniques for planned PIE evolutions, and contributing general expertise to this effort.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

National Laboratories for Environmental Management and Stewardship (NNLEMS) National Lab Capabilities in Unmanned Aerial Systems (UAS) (Revision 1)

The Network of National Laboratories for Environmental Management and Stewardship (NNLEMS) formed an Unoccupied Aircraft Systems (UAS) topical team in spring 2025 for the purpose of documenting the capabilities of the National Laboratories relevant to the goals and needs of the Department of Energy (DOE) Office of Legacy Management (LM). The team was comprised of representatives from eight National Laboratories (Table 1), thereby bringing diverse skillsets from across the DOE complex. Recognizing that LM has extensive experience working with UAS contractors and using data collected from UAS, the topical team focused on the National Laboratories’ unique capabilities and types of scientific investigations that are not yet commercially available or easily contracted as services.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Standard Operating Procedure for the Inadvertent Discovery of Native American Human Remains and Associated Funerary Objects, Sacred Objects, or Objects of Cultural Patrimony at Los Alamos National Laboratory

Los Alamos National Laboratory (LANL or Laboratory) is one of several national laboratories that support the mission of the United States Department of Energy (DOE), National Nuclear Security Administration (NNSA), Los Alamos Field Office (Field Office). It is located in Los Alamos and Santa Fe Counties, New Mexico. LANL occupies approximately 40 square miles of land owned by the U.S. Government and under the administrative control of DOE/NNSA. Cultural resources management at LANL is the responsibility of the Field Office’s Cultural Resources Program Manager, with the assistance and facilitation of the LANL Environmental Stewardship Group (ES) Cultural Resources Programs (archaeology and historic buildings), which are part of the LANL Environmental Protection and Compliance (EPC) Division. LANL, which is primarily located on the Pajarito Plateau, is extremely rich in cultural resources. Nearly 2,000 archaeological sites have been recorded at LANL, based on the systematic archaeological survey of ~90% of LANL lands. Most of the known sites (~ 85%) date from the Ancestral Pueblo Late Coalition and Classic Periods of around AD 1150 to 1600. The remaining sites date to the Archaic Period (ca. 5500 BC to 600 AD), the Late Developmental and Early Coalition Periods (ca. 900 to 1200), and the Homestead Period (ca. 1890 to 1942).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

AGR-3/4 PIE at Oak Ridge National Laboratory

The Idaho National Laboratory (INL) Advanced Reactor Technologies (ART) is currently supporting a tristructural isotropic (TRISO) fuel development and qualification program, which includes fuel fabrication, test irradiations, and post-irradiation examination (PIE) and safety testing to assess fuel performance during normal irradiation and under accident conditions. PIE work on fuel from the third and fourth test irradiations, Advanced Gas Reactor-3/4 (AGR-3/4), began at INL in April 2015. The work scope in this memorandum purchase order (MPO) includes Oak Ridge National Laboratory (ORNL) providing technical input, preparations for PIE testing and analysis, and contributing general expertise to this effort.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

AGR-2 PIE at Oak Ridge National Laboratory

The Idaho National Laboratory (INL) Advanced Reactor Technologies (ART) is currently supporting a fuel development and qualification program, which includes fuel fabrication, test irradiations, and post-irradiation examination (PIE) and safety testing to assess fuel performance during normal irradiation and under potential accident conditions. PIE work on fuel from the second test irradiation, Advanced Gas Reactor-2 (AGR-2), began at INL in July 2014. This work scope includes Oak Ridge National Laboratory (ORNL) providing technical input, performing PIE testing and analysis, and contributing expertise to this effort.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

2019 Results for Avian Monitoring at the Technical Area 36 Minie Site, Technical Area 39 Point 6, and Technical Area 16 Burn Ground at the Los Alamos National Laboratory

Los Alamos National Laboratory biologists in the Environmental Compliance and Protection Division at Los Alamos National Laboratory (LANL) initiated a multi-year program in 2013 to monitor avifauna (birds) at two open detonation sites and one open burn site on LANL property. Monitoring results from these efforts were compared among years to monitor trends. The objectives of this study were to 1) determine whether LANL operations impact bird species richness, diversity, or abundance 2) evaluate trends in species abundance by feeding guild, and 3) examine occupancy and nest success of secondary-cavity nesting birds using nestboxes. LANL biologists completed the seventh year of this effort in 2019. Three bird point count surveys were completed at each of the treatment sites at the Technical Area (TA) 36 Minie site, the TA-39 point 6, and the TA-16 burn ground between May and July 2019. A total of 853 birds representing 53 species were recorded at the three treatment sites and compared to their associated controls. Occupancy and nest success data from nestboxes at treatment sites were compared with the overall avian nestbox monitoring network. In 2019 the species richness and diversity at the treatment sites were not statistically different from their associated controls. Rarefaction and extrapolation plots for all years through 2018 suggest that over time the species diversity was statistically different between treatments and controls, although the diversity was higher at the treatment sites than the control sites. Avian abundance showed more variability but treatment and controls were trending together year to year. The mean number of granivores, insectivores, and omnivores varies from year to year, but there is not a significant trend at any of the treatment sites. The dominant feeding guild at the treatment sites continues to be insectivores. The overall results from 2019 continue to indicate that operations at the three treatment sites are not negatively affecting bird populations. This long-term monitoring will continue to monitor for any changes over time.

54 ENVIRONMENTAL SCIENCES↗

2024 Annual Site Environmental Report for Sandia National Laboratories, Livermore, California

Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly-owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration. The National Nuclear Security Administration’s Sandia Field Office administers the Prime Contract and oversees contractor operations at Sandia National Laboratories, California. Activities at this multi-program engineering and science laboratory support the nuclear weapons stockpile program, energy and environmental research, homeland security, micro- and nanotechnologies, and basic science and engineering research. The U.S. Department of Energy’s National Nuclear Security Administration and its management and operating contractor are committed to fulfilling regulatory obligations, safeguarding the environment, assessing sustainability practices, and ensuring the validity and accuracy of the monitoring data presented in this annual site environmental report (ASER). This report provides a summary of environmental monitoring and compliance activities that occurred at Sandia National Laboratories, California, during calendar year 2024, unless noted otherwise. General site and environmental program information is also included. This report was prepared in accordance with DOE Order 231.1B, Admin Change 1, Environment, Safety and Health Reporting.

54 ENVIRONMENTAL SCIENCES↗

Recent Radioactive Material Package Testing Experiences at Oak Ridge National Laboratory

Oak Ridge National Laboratory (ORNL) was a pioneer in the testing of radioactive material shipping packages and has been performing such tests for over 50 years. Currently, except for Type B thermal tests, testing is performed at the purpose-built Packaging Research Facility that is located at the National Transportation Research Center - a U.S. Department of Energy User Facility. Packages used for the transportation of Type B quantities of radioactive materials must be capable of meeting normal conditions of transportation (NCT) requirements and hypothetical accident conditions (HAC) requirements as defined in Title 10 Code of Federal Regulations (CFR) Part 71. Evaluation of package designs to these criteria typically involves a combination of analysis and physical testing. Required physical tests include free drop, crush, puncture, penetration, compression, vibration, water spray, water immersion, and thermal. The Oak Ridge National Laboratory (ORNL) Packaging Evaluation Facility (PEF) at the National Transportation Research Center (NTRC) provides an inclusive testing capability for a wide variety of packages needed for shipment of radioactive materials. Since PATRAM 2019, ORNL has performed several sets of tests including testing of two designs of the Defense Program Package (DPP-3 and DPP-1) and several Special Form Capsules. This paper provides an overview of the testing performed as well as a summary of advancements made to the ORNL package testing program during that time.

Martinez, Oscar↗

2024 Results for Avian Monitoring at the Technical Area 36 Minie Site, Technical Area 39 Point 6, Technical Area 16 Burn Ground, and DARHT at Los Alamos National Laboratory

Los Alamos National Laboratory (LANL) biological subject matter experts in the Environmental Protection and Compliance Division initiated a multi-year program in 2013 to monitor avifauna (birds) at two open detonation sites and one open burn site on LANL property. Additional monitoring began in 2017 at a third firing site, the Dual-Axis Radiographic Hydrodynamic Test (DARHT) Facility. In this annual report, we compare monitoring results from these efforts among years to identify and evaluate firing and open burn site impacts on the local bird community. The objectives of this study are • to determine whether LANL operations impact bird abundance, species richness, or diversity; • to examine occupancy and nest success of secondary-cavity nesting birds that use nest boxes; and • to examine chemical concentrations (such as radionuclides, inorganic elements, and/or organic compounds) in nonviable eggs and deceased nestlings that are collected opportunistically with the upper-level bounds of background concentrations, when available. During May through July 2024, LANL biologists completed multiple avian point count surveys at each of the following treatment sites: • Technical Area (TA) 36 Minie Site, • TA-39 Point 6, • TA-16 Burn Ground, and • DARHT. We recorded a total of 1,088 birds that represented 65 species at the four treatment sites and compared these results with data from their associated control sites. In 2024, abundance and species richness at treatment and control sites continued to trend similarly from year to year, with minor random deviations expected from bird communities. Species richness at firing sites differed little from the previous year’s values. Two new bird species were observed at the firing sites—cedar waxwing (Bombycilla cedrorum) and pinyon jay (Gymnorhinus cyanocephalus). Shannon diversity values at TA-36 Minie Site, TA-39, and DARHT were statistically higher than one or more of their associated controls. Annual species diversity at treatment sites was high in 2024 across all firing sites relative to similar habitat control sites. We also monitored avian nest boxes to compare occupancy and nest success data from nest boxes at treatment sites with the overall avian nest box monitoring network and against a subset of relevant control sites. Nest box success has decreased at both treatment and control sites since monitoring began, suggesting that overlapping climatic factors are responsible for patterns of declining nest success. In 2024, nonviable avian eggs and one nestling were opportunistically collected at Bandelier National Monument, TA-16 Burn Ground, TA-36 Minie, TA-39 Point 6, and DARHT. All egg samples and the one nestling sample were evaluated for per- and polyfluoroalkyl substances, which were detected from all locations, including the control site at Bandelier National Monument. Overall results from 2024 continue to suggest that operations at the four treatment sites are not negatively impacting bird populations. This long-term project will continue to monitor for any changes over time.

54 ENVIRONMENTAL SCIENCES↗