Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “NYISO”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

28 records · Page 2

Survey of U.S. Ancillary Services Markets

In addition to providing energy to end-consumers, power system operators are also responsible for ensuring system reliability. To this end, power markets maintain an array of ancillary services to ensure that it is always possible to balance the supply and demand for energy in real-time. A subset of these ancillary services are commonly procured through market-based mechanisms: namely, Regulation, Spinning, and Non-spinning Reserves. Regulation Reserves are maintained to respond to supply/demand imbalances over short time frames, typically on the order of several seconds to one minute. Resources that provide Regulation Reserves adjust their generation or load levels in response to automatic generation control (AGC) signals provided by the system operator. Contingency reserves are maintained to provide additional generation capacity in the event that load increases substantially or supply side resources reduce their output or are taken offline. The reserves are typically segmented into two categories, 1) Spinning or Synchronized Reserves that are provided by generation units that are actively generating and have the ability to increase or decrease their output, 2) Non-spinning or Non-synchronized Reserves that are provided by generation resources that are not actively generating, but are able to start up and provide generation within a specified timeframe. Contingency reserves typically have response times on the order of ten to 30 minutes and can also be provided by demand-side resources that are capable of reducing their load. There are seven distinct power markets in the United States, each operated by a Regional Transmission Operator (RTO) or Independent System Operator (ISO) that operates the transmission system in its territory, operates markets for energy and ancillary services, and maintains system reliability. Each power market offers its own set of ancillary services, and precise definitions, requirements, and market mechanisms differ between markets. Despite the differences between markets, both in terms of services offered and system requirements, some broad trends generally apply. Regulation Reserves typically have the highest market prices, followed by Spinning Reserves and Non-spinning Reserves. Prices for Regulation Reserves have been the highest in the PJM market, since it opened in October 2012. This is partially because PJM experienced large price spikes during the period of extreme weather conditions in early 2014. ERCOT has traditionally had the highest prices for Spinning Reserves (called Responsive Reserves in ERCOT), including several periods of sustained high prices between 2010 and 2012. This can be explained in part by the relatively high penetration of variable wind resources and a similarly high requirement relative to peak load. ERCOT has also traditionally had the highest price for Non-spinning Reserves, followed by the NYISO East region. Both have experienced several periods of prolonged high prices since their inception, an occurrence that has not been regularly seen in other markets. In ISO-NE and PJM for example, the market clearing price for Non-spinning Reserves is typically $0/MWh more than 95% of the time. Market volume (in terms of the average amount of capacity of each service that is provided to a system) typically follows the reverse order of prices, as systems maintain the most Non-spinning Reserves capacity followed by Spinning Reserves and Regulation Reserves. PJM generally has the largest market for Regulation Reserves both in terms of capacity. The size of most Regulation Reserves markets in terms of capacity stay relatively constant year-to-year, as this is dictated largely by system requirements. PJM also generally has the largest Spinning Reserves market in terms of capacity. SPP, MISO, ISO-NE and SPP (beginning in 2014) all have Spinning Reserve markets with similar average capacity levels. When combined, the markets for Non-spinning and Operating reserves in ISO-NE have a comparable capacity to the market for Primary Reserves 1 in PJM. SPP, MISO, and CAISO all have smaller markets for their respective Non-spinning Reserves products that are roughly the same size as each other in terms of capacity.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Impacts of High Variable Renewable Energy Futures on Electric-Sector Decision Making: Demand-Side Effects

Previous work by the Berkeley Lab describes how high shares of variable renewable energy (VRE) such as wind and solar power could change wholesale electricity price dynamics. These include the timing of when electricity is cheap or expensive, locational differences in the cost of electricity, and the degree of regularity or predictability in those costs. Many decentralized decision-makers on the demand-side may not yet have considered the implications of these possible future changes. In this report, we evaluate the sensitivity of a set of demand-side decisions to different levels of VRE penetration ranging from a low of 5-20% to a high of 40-50%. The analysis builds on hourly wholesale energy and capacity prices in different VRE scenarios for four wholesale markets in the United States for the year 2030 (CAISO, ERCOT, NYISO, and SPP). The principal question for this exploration is whether private and public electric-sector decisions that are made based on assumptions reflecting low VRE levels still achieve their intended objective in a high VRE scenario with 40-50% wind and solar? This scoping report evaluates the impacts of changing patterns of peak system needs on the benefits of demand reductions by examining the altered value of different energy efficiency (EE) measures. Similarly, we investigate new opportunities for large energy consumers that may arise from periods with very low wholesale electricity prices. We calculate the value of new process investments (e.g., hydrogen production and other generalized electro-commodities), showcase the varying value of new product storage investments (such as reservoir extensions at a desalination plant), and estimate the benefits of increased process flexibility that uses electricity as a process-input in addition to traditional fossil fuels (e.g., district energy systems). Finally, many decentralized decision-makers and end-use customers are not directly exposed to wholesale electricity prices but instead receive price signals from their retail electricity rates. As wind and solar shares increase, we compare the economic efficiency of flat retail rates relative to more dynamic time-of-use tariffs with and without critical peak-pricing events.

14 SOLAR ENERGY↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2020

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While many projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2020, as well as data on "completed" and "withdrawn" projects for five of the ISOs (CAISO, ISO-NE, MISO, NYISO, PJM). We find that the total capacity active in the queues is growing year-over-year, with over 750 GW of generation and an estimated 200 GW of storage capacity as of the end of 2020. Solar (462 GW) accounts for a large – and growing – share of generator capacity in the queues. Substantial wind (209 GW) capacity is also in development, 29% of which is for offshore projects (61 GW). In total, about 680 GW of zero-carbon capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 159 GW of solar hybrids (primarily solar+battery) and 13 GW of wind hybrids are currently active in the queues. However, much of this proposed capacity will not ultimately be built. Among a subset of queues for which data are available, only 24% of the projects seeking connection from 2000 to 2015 have subsequently been built. Completion percentages appear to be declining, and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: in four ISOs, the typical duration from connection request to commercial operation increased from ~1.9 years for projects built in 2000-2009 to ~3.5 years for those built in 2010-2020. There are growing calls for queue reform to reduce cost, lead times, and speculation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Land-Based Wind Market Report: 2021 Edition

The U.S. Department of Energy's 2021 edition of its land-based wind market report provides an overview of key trends in the U.S. wind power market, with a focus on 2020. You can find a report, data file and presentation on the Files tab, below. Additionally, several data visualizations are available on the Visualizations tab. Highlights of this year’s update include: -Wind comprises a growing share of electricity supply: U.S. wind power capacity grew at a record pace in 2020, with 25 billion dollars invested in 16.8 GW of capacity. Wind energy output rose to account for more than 8% of the entire nation’s electricity supply, and is more than 20% in 10 states. At least 209 GW of wind are seeking transmission interconnection; 61 GW of this capacity are offshore wind and 13 GW are hybrid plants that pair wind with storage or PV. -Wind project performance has increased over time: The average capacity factor among recently built projects was over 40%, considerably higher than projects built earlier. The highest capacity factors are seen in the interior ‘wind belt’ of the country. -Turbines continue to get larger: Improved plant performance has been driven by larger turbines mounted on taller towers and featuring longer blades. In 2010, no turbines employed blades that were 115 meters in diameter or larger, but in 2020, 91% of newly installed turbines featured such rotors. Proposed projects indicate that total turbine height will continue to rise. -Low wind turbine pricing has pushed down installed project costs over the last decade: Wind turbine prices are averaging 775–850 dollars/kW. The average installed cost of wind projects in 2020 was 1,460 dollars/kW, down more than 40% since the peak in 2010, though stable for the last three years. The lowest costs were found in Texas and the (non-ISO) West. -Wind energy prices remain low, around 20 dollars/MWh in the interior of the country: After topping out at 70 dollars/MWh for power purchase agreements (PPAs) executed in 2009, the national average price of wind PPAs has dropped. In the interior ‘wind belt’ of the country, recent pricing is around 20 dollars/MWh. In the West and East, prices tend to average 30 dollars/MWh or more. These prices, which are possible in part due to federal tax support, fall below the projected future fuel costs of gas-fired generation. -Wind PPA prices are often attractive compared to wind’s grid-system market value: The value of wind in wholesale power markets is affected by the location of wind plants, their hourly output profiles, and how those characteristics correlate with real-time electricity prices and capacity markets. The market value of wind declined in 2020, following natural gas prices lower and averaging under 15 dolalrs/MWh in ERCOT, MISO, NYISO and SPP; higher values were seen in CAISO, ISO-NE and PJM. -The average levelized cost of wind energy is down to 33 dollars/MWh: Levelized costs, which exclude the impacts of federal tax incentives, vary across time and geography, but the national average stood at 33 dollars/MWh in 2020—down substantially historically, though consistent with the previous two years. Levelized costs were lowest in ERCOT, SPP, and the (non-ISO) West. -The health and climate benefits of wind in 2020 were larger than its grid-system value, and the combination of all three far exceeds the current levelized cost of wind: Wind generation reduces power-sector emissions of carbon dioxide, nitrogen oxides, and sulfur dioxide. These reductions, in turn, provide public health and climate benefits that vary regionally, but together are economically valued at an average of 76 dollars/MWh-wind nationwide in 2020. -The domestic supply chain for wind equipment is diverse: For wind projects recently installed in the U.S., domestically manufactured content is highest for nacelle assembly (>85%), towers (60-75%), and blades and hubs (30-50%), but is much lower for most components internal to the nacelle.

17 WIND ENERGY↗

Land-Based Wind Market Report: 2022 Edition

The U.S. Department of Energy's 2022 edition of its Land-Based Wind Market Report provides an overview of key trends in the U.S. wind power market, with a focus on 2021. You can find a report, data file and presentation on the Files tab, below. Additionally, several data visualizations are available on the Visualizations tab. Despite ongoing supply chain challenges, wind energy in 2021 continued to see strong growth, technology improvements, and low prices in the U.S. Key highlights include: Wind comprises a growing share of electricity supply: U.S. wind power capacity grew at a strong pace in 2021, with the 13.4 GW of new additions representing a $\$20$ billion investment and 32% of all newly added U.S. generation capacity. Wind energy output rose to account for more than 9% of the entire nation’s electricity supply. At least 247 GW of wind are seeking transmission interconnection; 77 GW of this capacity are offshore wind and 19 GW are hybrid plants that pair wind with storage or solar PV. Wind project performance has increased over the decades: The average capacity factor among recently built projects was nearly 40%, considerably higher than projects built earlier. The highest capacity factors are seen in the interior ‘wind belt’ of the country. Turbines continue to get larger: Improved plant performance has been driven by larger turbines mounted on taller towers and featuring longer blades. In 2011, no turbines employed blades that were 115 meters in diameter or larger, but in 2021, 89% of newly installed turbines featured such rotors. Proposed projects indicate that total turbine height will continue to rise. Low wind turbine pricing has pushed down installed project costs over the last decade: Wind turbine prices averaged $\$800$–$\$950$/kW in 2021, a 5% to 10% increase from the year prior but substantially lower than in 2010. The average installed cost of wind projects in 2021 was $\$1,500$/kW, down more than 40% since the peak in 2010, though relatively stable in recent years. The lowest costs were found in Texas and the (non-ISO) West. Wind energy prices are on the rise, but generally remain low, around $\$20$/MWh in the interior of the country with higher prices in the West and East. After topping out above $\$75$/MWh for power purchase agreements (PPAs) executed in 2009, the national average price of wind PPAs has dropped—though supply-chain pressures have resulted in increased prices in recent years. In the interior ‘wind belt’ of the country, recent pricing is around $\$20$/MWh. In the West and East, prices tend to average above $\$30$/MWh. These prices, which are possible in part due to federal tax support, fall below the projected future fuel costs of gas-fired generation. Wind PPA prices are often attractive compared to wind’s grid-system market value: The value of wind in wholesale power markets is affected by the location of wind plants, their hourly output profiles, and how those characteristics correlate with real-time electricity prices and capacity markets. The market value of wind increased in 2021, averaging $\$16$/MWh in MISO, $\$19$/MWh in SPP, $\$23$/MWh in NYISO, $\$31$/MWh in ERCOT, $\$33$/MWh in PJM, $\$44$/MWh in ISO-NE, and $\$48$/MWh in CAISO. The average levelized cost of wind energy was $\$32$/MWh for plants built in 2021: Levelized costs, which exclude the impacts of federal tax incentives, vary across time and geography. The national average stood at $\$32$/MWh in 2021—down substantially historically, though relatively stable in recent years. Levelized costs were lowest in ERCOT, SPP, and the (non-ISO) West. The health and climate benefits of wind in 2021 were larger than its grid-system value, and the combination of all three far exceeds the current levelized cost of wind: Wind generation reduces power-sector emissions of carbon dioxide, nitrogen oxides, and sulfur dioxide. These reductions, in turn, provide public health and climate benefits that vary regionally, but together are economically valued at an average of over $\$90$/MWh-wind for plants built in 2021.

17 WIND ENERGY↗

Generator Interconnection Cost Analysis in the Midcontinent Independent System Operator (MISO) territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the Midcontinent Independent System Operator (MISO), representing nearly 50% of all projects requesting interconnection from 2010 to 2020. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Interconnection Cost Analysis in the PJM Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the PJM Territory, representing nearly 86% of all new unique generators requesting interconnection from 2000 to 2022. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Generator Interconnection Cost Analysis in the Southwest Power Pool (SPP) Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 845 projects from interconnection studies for the Southwest Power Pool (SPP) Territory. The studies were performed between 2002 and 2023 and include all of the most refined cost estimates available. Project-level cost summary data are available for download on this page. We find: -Project-specific interconnection costs can differ widely. -Average interconnection costs are stable for projects that complete all interconnection studies but have escalated for those that withdraw. -Broader network upgrade costs are the primary driver of recent cost increases, especially for withdrawn projects. -Potential interconnection costs of all solar and wind requests have been greater than those of storage and natural gas projects. -Economies of scale exist for completed wind and solar projects but not for other fuel types or withdrawn projects. -Interconnection costs vary by location. Berkeley Lab publishes a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electric Utility Distribution Costs: Scoping Study on Trends, Drivers, and Possible Response Strategies [Slides]

This scoping study synthesizes information that will help stakeholders understand the scope, scale, and drivers of recent increases in investor-owned utility (IOU) expenditures on local distribution power grids, while providing regulators and other decision-makers with potential strategies to keep electricity bills down. The study includes five distinct components. Drawing first on data from FERC Form 1, it summarizes key trends in past and recent IOU distribution costs. Next, through a review of a sample of distribution-system plans, it characterizes material drivers of planned distribution expenditures. Ultimately, regulators must approve cost recovery for IOU expenditures, including those for the distribution system. The study therefore also: examines trends in utility requests and regulatory approvals related to changes in retail rates and return on equity; identifies areas where utility shareholder and customer incentives may be misaligned; and develops a menu of options that state regulators might consider to optimize distribution system expenditures. Some of the key findings include: - IOU distribution spending at a national level has grown by 6%/yr since 2014 in real dollar terms, 4x faster than in the prior 20 years and consisting mostly of capital (not operating) expenditure. - On a per-kWh basis, increases in IOU distribution costs since 2014 represent over 30% of the overall national-average increase in retail electricity rates. - Regional spending growth has ranged from 2-8%/yr, with larger estimated rate impacts in CAISO, then NYISO & ISO-NE, and then the Southeast, MISO & PJM (see figure). - Some utilities are planning for significantly increased distribution system spending. Planned spending on managing the existing system (asset replacement, safety & reliability, and resilience are all important drivers) exceeds that for capacity expansion. - IOU rate increase requests ($18 billion in 2025) and public utility commission (PUC) approval levels (average of 64% of requested amounts from 2021-2025) have recently hit multi-decadal highs. - PUCs in New England and the Southeast have recently approved a greater fraction of rate requests (>75%, on average) than in ther regions, while PUCs in California and the Southeast have generally authorized higher equity returns than in other regions. - Regulators have many tools to tackle potential misalignments between utility and customer interests and, more specifically, to optimize and reduce distribution costs. Shorter-term options include those related to return on equity, capital structure, depreciation, trackers, construction work in progress, and securitization. Longer-term options include performance-based regulation and a wide variety of planning-related requirements. All options embed important tradeoffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Power Market Primers

The National Energy Technology Laboratory (NETL) has developed a series of primers on independent system operators (ISOs) and regional transmission organizations (RTOs). The primers primarily explore the history, workings, and types of electricity markets composing the seven ISOs/RTOs in the United States (U.S.) (Exhibit 1-1). The primer series includes sixteen documents. A general introduction to ISOs/RTOs is given in Independent System Operators and Regional Transmission Organizations. Specific details about the seven existing ISOs/RTOs in the United States are given in seven additional primers: California Independent System Operator, ERCOT Independent System Operator, ISO New England Regional Transmission Operator, MISO Regional Transmission Operator, New York Independent System Operator, PJM Regional Transmission Operator, and Southwest Power Pool, Inc. These primers provide a history of each ISO/RTO, short explanations of products and services (different types of electricity markets) offered by ISO/RTO, and the ISO/RTO generation mix. Readers who are not familiar with the different types of markets and their mechanisms can find basic information in six additional primers titled: Power Markets, Energy Market, Capacity Market, Comparisons of Different ISO/RTO Capacity Market Structures, Ancillary Services, and Financial Transmission Rights. Additionally, the primer North American Electric Reliability Corporation introduces the electric reliability organization, which is responsible for reliability of the bulk power system and Federal Energy Regulatory Commission introduces the federal commission responsible for overseeing the nation's electric power markets and related energy and financial markets and issuing market related rules and regulations. All the primers are very short and concise documents. They are accompanied by a Glossary of Terms in which many of the technical terms used in these primers are defined.

24 POWER TRANSMISSION AND DISTRIBUTION↗