Challenges, Successes, and Lessons Learned on Two Active DOE Facility D and D Projects - 18379
'Surgical removal', although having a number of technical and safety challenges, is an effective alternative to traditional Demolition and Decommissioning (D and D) methods. When carefully planned and managed, surgical removal of equipment can be safely performed to achieve cost savings and accelerated schedule. At Fernald, a large groundwater extraction system that treats radionuclides was downsized during continued operations. Challenges included demolition of remedial components in tight spaces adjacent to active components, in-situ management and removal of slurry multimedia and resins, and complex hoisting/rigging of whole vessels from very tight areas. The approach realized a significant reduction in waste volumes and slurry transfer to reduce radionuclide exposure while allowing use of existing vessels as IP-1 shipping containers while providing an opportunity to implement out of the box design for hoisting/rigging/moving large vessels. Several lessons were learned as Los Alamos Technical Associates, Inc. (LATA) faced the project challenges and progressed through the D and D process. The slurry removal required thorough understanding of equipment selection and circulation techniques to maintain a slurry while avoiding plugging of extraction equipment. The physical condition of each individual tank was different and required development of alternate removal techniques, such as draining the vessel and removal of the hard material with an air vacuum truck, for each one. Lessons learned regarding large tank removal focused on recertification of an overhead crane, determination of pick points from a partially filled vessel, reanalyzing the lifting lugs for a partially full tank, and requirements to fill all void space in the vessels to meet off-site disposal specifications. At Oak Ridge National Laboratory (ORNL), LATA performed the surgical removal of all biomass process equipment inside ORNL's Building 2719. Among the challenges was a requirement that the removal action had to be conducted during continued operations. Live steam lines, fire protection, water process and boiler feed water systems were operational during LATA's D and D effort and were in close proximity to removal operations. (authors)