Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Michigan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Computational Analysis of Hydraulic Efficiency of Michigan DOT Cover C

Drainage structures are used to capture stormwater runoff in streets and highways in urban environments. These drainage structures, which typically consist of catch basins with grates, inlets, or combination grates/inlets, collect stormwater runoff and discharge through buried conveyance systems. They are strategically placed for public safety in curb and gutter systems to provide efficient drainage of water from roadways and thus reduce the risk of hydroplaning. The performance of drainage structures is measured in terms of hydraulic efficiency, which is defined as the percentage of flow captured by the basin as compared to the total flow drainage to the structure. Understanding of the performance of these drainage structures helps designers properly space inlets to promote an economic design that ensures the safety of the traveling public. The current design methodology used to determine drainage structure follows guidelines established in the current Michigan Department of Transportation (MDOT) Drainage Manual (2006). The guidelines in the MDOT Drainage Manual were modeled after the Federal Highway Administration’s (FHWA) Hydraulic Engineering Circular 22 “Urban Drainage Design” (HEC-22). HEC-22 includes empirically derived equations to calculate the interception capacity of drainage structures for several commonly used grate configurations, such as the parallel bar, curved vane and tilt bar grates, which are based on a research study performed by Burgi et al. in the 1970s. MDOT uses several drainage structures to capture runoff that are detailed as Standard Plans. Many of these drainage structures utilize sinusoidal type grates that are not described in HEC-22. Physical modeling of these structures has been limited, posing the need to have them analyzed to verify their capture efficiency. Current MDOT practice is to assume a similar sized reticuline grate, as described in HEC-22, for capture efficiencies. Until recently, evaluating the hydraulic performance of drainage structures was limited to physical modeling in a hydraulics laboratory. With advances in engineering software and computing power, computational fluid dynamics (CFD) modeling has become a more cost-effective alternative. The Federal Highway Administration (FHWA) provides states the option to evaluate their drainage structures using CFD through the Transportation Pooled Fund Program. This study, “Computational Analysis of Hydraulic Efficiency of Michigan DOT Cover C,” was carried out using the pooled fund. MDOT’s Cover C was chosen as the first test candidate, given its similar sinusoidal pattern to other MDOT grates, but it is typically used for high-volume, higher speed applications. A similar version, Cover CX, is used on interstate highways but does not have traverse bars for bicycle safety. Additional grates may be considered for evaluation in the future.

42 ENGINEERING↗

Spectroscopy of the Hamburg Meteorite, Michigan H4

Spectroscopic studies of the Hamburg (Michigan H4) meteorite using visible–near-infrared (VNIR), mid-infrared (MIR), Raman, and Mössbauer data reproduce the results of more conventional laboratory measurements of petrology and geochemistry. This combination provides general information on the mineral modes of silicates, although spectroscopy was performed on different splits of this meteorite, and varying results may be explained by heterogeneity that is typical of ordinary chondrites. Raman also detects small features assigned to first-order D and G carbon bands, while Mössbauer data show the presence of Fe oxides and carbides. The electron microprobe (EMPA) composition of olivine in this meteorite is accurately measured to be Fo 81.3 , while MIR and Raman closely agree with Fo 80 and Fo 82 , respectively, and Mössbauer, at Fo 60 − Fo 70 , is in the ballpark. Similarly, P. R. Heck et al. report pyroxenes with compositions of Fs 16 Wo 1 , while Raman suggests a somewhat similar composition of Fs 28 Wo 0 . Both VNIR and MIR detect the presence of small amounts of feldspar, while EMPA identifies its composition as An 14 Ab 8 Or 5 . VNIR data were matched to spectral libraries of meteorite and asteroid data and shown to closely match other L and H meteorites. The best spectral matches to the Michigan H4 meteorite are to asteroid classes L/H/LL/URE, EH/EL/AUB, and CO/CV from M. D. Dyar et al.; objects in this group are intermediate in semimajor axis lengths for their orbits. The results highlight the strengths and weaknesses of each technique and show their collective strength when applied together to a single meteorite sample.

58 GEOSCIENCES↗

Chemically Enabled CO 2 -Enhanced Oil Recovery in Multi-Porosity, Hydrothermally Altered Carbonates in the Southern Michigan Basin - Task 2 Topical Report

This attachment A is a detailed Topical Report for Task 2 (Advanced Field Characterization and Machine Learning Based Data Integration) under the project "Chemically Enabled CO 2 -Enhanced Oil Recovery in Multi-Porosity, Hydrothermally Altered Carbonates in the Southern Michigan Basin." The overall project activity and finding, including the field pilot testing of CO 2 injection are summarized in the companion Final Technical Report The Advanced Field Characterization and Machine Learning Based Data Integration task (Task 2) involved a systematic geologic characterization of the Trenton-Black River (TBR) play in the SMB which included the development of comprehensive datasets, advanced data analytics, risk assessment, and piggyback field characterization. These activities aimed to address the complex carbonate systems by evaluating the extent of fractures, dolomitization, facies, and reservoir properties with the primary objective of informing the static and dynamic modeling, field injection test, and providing input into the development strategy plan. The task was divided into four subtasks: • Subtask 2.1 – Data compilation, review, and analysis • Subtask 2.2 – Risk Assessment • Subtask 2.3 – Advanced Field Characterization • Subtask 2.4 – Integrated Physics-Based Machine Learning and Advanced Data Analytics

02 PETROLEUM↗

Technical Assistance for Beaver Island, Michigan

Beaver Island, Michigan, worked with the Energy Technology Innovation Partnership Project (ETIPP) to develop a path toward energy security based on local production and storage with minimal dependence on the mainland.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Supply chain system for a centralized biorefinery system based on switchgrass grown on marginal land in Michigan

The feedstock supply chain of a biorefinery is critical in determining the economic and environmental performance of biofuels. This study investigated various feedstock supply chains for a centralized biorefinery based on different objective functions and how the biorefinery responds to supply chain volatility. For the analysis, a hypothetical centralized biorefinery was supplied by switchgrass grown on marginal lands in Michigan. From an economic standpoint, the minimum biofuel selling price is an important metric of the objective function, and the greenhouse gas mitigation potential is a similarly important metric for global warming impact. A trade-off therefore exists between the economic and environmental performance of biofuels under this system configuration. However, when a carbon tax credit is applied to soil organic carbon sequestration in switchgrass production, the metric of the objective function may not be the key factor in establishing a supply chain as long as it is associated with biorefinery capacity as well as economic or environmental values. Year-to-year fluctuations in cellulosic biomass yield (supply chain volatility) might also prevent the biorefinery from operating at full capacity. Cellulosic biomass pellets can serve as an auxiliary feedstock for the centralized cellulosic biorefinery system to minimize the impacts of supply chain volatility.

09 BIOMASS FUELS↗

Responding to the US national pollinator plan: a case study in Michigan

The long‐term health of pollinators is a critical issue for the functioning of natural habitats and for agricultural production. In response to widespread public concern about the future of these ecologically and economically important animals, in 2015 the US Government released a national strategy to support pollinators, including research priorities, directives for funding, and timelines for achieving three overarching goals. Five years after this strategic plan was released, we evaluate progress toward the national targets for improved honey bee ( Apis mellifera ) overwintering survival, expanded pollinator habitat, and larger monarch butterfly ( Danaus plexippus ) populations, and find that the three goals of the plan have not yet been reached. Our research and extension programs to improve the health of honey bees, wild bees, and monarch butterflies in the US state of Michigan are described, providing opportunities to contribute to the national pollinator goals.

Bloom, Elias H.↗

Differing behavioral changes in crayfish and bluegill under short- and long-chain PFAS exposures: Field study in Northern Michigan, USA

The emergent contaminant family, per- and poly-fluorinated alkyl substances (PFAS) has gained research attention due to their widespread detection and stability within the environment. Despite the growing amount of research on perfluorooctanesulfonic acid (PFOS) and perfluoro-n-octanoic acid (PFOA) in aquatic organisms, investigations detailing behavioral and physiological effects of aquatic organisms exposed to a mixture of PFAS analytes in the wild have been limited. The objective of this study was to evaluate the potential behavioral and histological effects of environmental exposure to PFAS compounds within multiple trophic levels of aquatic ecosystems. The current study investigates effects of environmentally relevant PFAS concentration exposures in crayfish (Faxonius immunis, F. rusticus, F. virilis) and bluegill (Lepomis macrochirus) sourced from four water bodies in Northern Michigan. Antipredator response and foraging behavioral assays were used to investigate potential effects on crayfish; a swimming speed behavioral assay and liver and gill histology analysis were used to investigate potential effects on fish. Linear mixed model and multiple regression analyses resulted in significant relationships between tissue accumulation levels of long chain PFAS compounds and crayfish foraging and fish critical swimming speed responses. Crayfish foraging decreased and fish critical swim speeds increased with PFAS exposure which may lead to energetic and population concerns. Antipredator response in crayfish and liver and gill histology in fish were not significantly related to PFAS tissue or water concentrations. The sensitivity of crayfish and bluegill behavior contributes to the growing body of research regarding the differential toxicity of short-chain and long-chain PFAS compounds. The sensitivity of some aquatic organism behaviors to PFAS accumulated in tissue may have implications for PFAS transfer and alterations to ecosystem functioning; based on the results of this field study, further laboratory research is recommended to further evaluate these relationships.

59 BASIC BIOLOGICAL SCIENCES↗

A comprehensive analysis of transient pressure and rate data from CO 2 storage projects in a depleted pinnacle reef oil field complex, Michigan, USA

Pressure and rate data are commonly recorded as part of a basic monitoring program in CCS projects. This paper discusses the application of multiple analytical techniques to interpret pressure and rate transient data from CO 2 injection and storage operations. The techniques of interest, i.e., injection-falloff analysis, injectivity/productivity index analysis and pressure pulse arrival time analysis, are commonly used in the oil and gas industry to assess reservoir properties, but not well known in the CCS literature (especially the last two). Injection-falloff analysis involves log-log pressure derivative plotting for the falloff data and history-matching of the entire injection-falloff sequence to determine permeability. In the injectivity/productivity index analysis, rate-normalized pressure buildup is plotted against material balance time or ratio of cumulative injection to injection rate to determine the injectivity index (ratio of injection rate to stabilized pressure buildup) which can be related to the permeability-thickness product. The arrival time analysis identifies the arrival of a pressure disturbance (~0.1 psi change from ambient) to determine the hydraulic diffusivity from which permeability can be estimated. The applicability of these techniques is demonstrated via illustrative examples from multiple wells in different pinnacle carbonate reefs undergoing CO 2 -EOR in Northern Michigan. The paper ends with a discussion of the relative merits of each interpretive technique, as well as recommendations that could be useful for other field projects.

42 ENGINEERING↗

Performance of Michigan sMDT prototype chambers for the HL-LHC ATLAS muon detector upgrade

A new small-diameter Monitored Drift Tube (sMDT) chamber has been developed for the muon spectrometer of the ATLAS experiment to handle the higher collision rates expected at the CERN High Luminosity Large Hadron Collider (HL-LHC). This paper presents measurements of the tracking resolution and hit efficiency of two prototype sMDT chambers constructed at the University of Michigan. Using cosmic-ray muons the sMDT tracking resolution of 103.7 ± 8.1 μm was measured for one chamber and 101.8 ± 7.8 μm for the other, compared with a design resolution of 106 μm. A further tracking resolution improvement to 83.4 ± 7.8 μm was obtained by using new high-gain readout electronics which will be added for HL-LHC. An average tracking efficiency of (98.5 ± 0.2)% was found for both chambers. The methodology used to determine the detector tracking resolution and efficiency, including reconstruction of sMDT data and a Geant4 simulation of the test chamber, is presented in detail.

43 PARTICLE ACCELERATORS↗

The fall, recovery, classification, and initial characterization of the Hamburg, Michigan H4 chondrite

Abstract The Hamburg meteorite fell on January 16, 2018, near Hamburg, Michigan, after a fireball event widely observed in the U.S. Midwest and in Ontario, Canada. Several fragments fell onto frozen surfaces of lakes and, thanks to weather radar data, were recovered days after the fall. The studied rock fragments show no or little signs of terrestrial weathering. Here, we present the initial results from an international consortium study to describe the fall, characterize the meteorite, and probe the collision history of Hamburg. About 1 kg of recovered meteorites was initially reported. Petrology, mineral chemistry, trace element and organic chemistry, and O and Cr isotopic compositions are characteristic of H4 chondrites. Cosmic ray exposure ages based on cosmogenic 3 He, 21 Ne, and 38 Ar are ~12 Ma, and roughly agree with each other. Noble gas data as well as the cosmogenic 10 Be concentration point to a small 40–60 cm diameter meteoroid. An 40 Ar‐ 39 Ar age of 4532 ± 24 Ma indicates no major impact event occurring later in its evolutionary history, consistent with data of other H4 chondrites. Microanalyses of phosphates with LA‐ICPMS give an average Pb‐Pb age of 4549 ± 36 Ma. This is in good agreement with the average SIMS Pb‐Pb phosphate age of 4535.3 ± 9.5 Ma and U‐Pb Concordia age of 4535 ± 10 Ma. The weighted average age of 4541.6 ± 9.5 Ma reflects the metamorphic phosphate crystallization age after parent body formation in the early solar system.

79 ASTRONOMY AND ASTROPHYSICS↗

Jeankempite, Ca 5 (AsO 4 ) 2 (AsO 3 OH) 2 (H 2 O) 7 , a new arsenate mineral from the Mohawk Mine, Keweenaw County, Michigan, USA

Abstract Jeankempite, Ca 5 (AsO 4 ) 2 (AsO 3 OH) 2 (H 2 O) 7 , is a new mineral species (IMA2018-090) discovered amongst coatings of arsenate minerals on oxidised copper arsenides from the Mohawk No. 2 mine, Mohawk, Keweenaw County, Michigan, USA. The new mineral occurs as lamellar bundles of colourless to white plates up to 1 mm wide and is visually indistinguishable from guérinite, with which it forms intergrowths. Jeankempite is transparent to translucent with a waxy lustre and white streak, is non-fluorescent under longwave and shortwave ultraviolet illumination, has a Mohs hardness of ~1.5 and brittle tenacity with uneven fracture. Crystals are flattened on {01 $\bar{1}$ } and exhibit perfect cleavage on {01 $\bar{1}$ }. Optically, jeankempite is biaxial (+), α = 1.601(2), β = 1.607(2), γ = 1.619(2) (white light); 2V meas. = 72(2)° and 2V calc. = 71.0°. The empirical formula is (Ca 4.97 Na 0.013 Mg 0.017 )(As 3.99 S 0.01 ) 4 O 23 H 16 , based on 23 O and 16 H atoms per formula unit. Thermogravimetric analysis indicates that jeankempite undergoes four weight losses totalling 16.82%, close to the expected loss of 16.30%, corresponding to eight H 2 O. Jeankempite is triclinic, P $\bar{1}$ , a = 6.710(6), b = 14.901(14), c = 15.940(15) Å, α = 73.583(12)°, β = 81.984(12)°, γ = 82.754(12)°, V = 1507(2) Å 3 and Z = 3. The final structure was refined to R 1 = 0.0591 for 2781 reflections with I obs > 3σ I . The crystal structure of jeankempite is built from a network of edge- and vertex-sharing CaO 6 , CaO 7 and AsO 4 polyhedra, and we hypothesise that the new mineral has formed due to a topotactic reaction brought on by dehydration of preexisting guérinite.

Mineralogy↗

Pulsed Neutron Capture for monitoring CO2 Storage with Enhanced Oil Recovery in Northern Michigan

Pulsed neutron capture (PNC) logging has been used as part of the Midwest Regional Carbon Sequestration Partnership (MRCSP) monitoring of CO2 injection and storage during assessment of enhanced oil recovery (EOR) in several northern Niagaran trend reefs in Michigan. A total of four reefs were selected for these studies to monitor CO2 migration and to test the viability and effectiveness of the PNC technology on reefs in various stages (depleted, active and new reefs) of CO2-EOR activities.

Bagley↗

First N-Doping and Mid-T Baking of Medium-ß 644 MHz 5-Cell Elliptical Superconducting RF Cavities for Michigan State University’s Facility for Rare Isotope Beams

Two hadron linacs currently under development in the US, the PIP-II linac at Fermi National Accelerator Laboratory (FNAL) and the upgrade for Michigan State University’s Facility For Rare Isotope Beams (FRIB), will employ 650 and 644 MHz ß-0.6 elliptical superconducting cavities respectively to meet their design energy requirements. The desired CW operation modes of these two linacs sets Q-factor requirements well above any previously achieved for cavities at this operating frequency and velocity, driving the need to explore new high-Q treatments. The N-doping technique developed at FNAL and employed at an industrial scale to the LCLS-II cryomodules is a strong candidate for high-Q treatments, but work is needed to refine the treatment to the lower operating frequency and velocity regime. We present the first results of the first N-doping tests and a "mid-T" bake test in the FRIB 644 MHz 5-cell elliptical cavities.

43 PARTICLE ACCELERATORS↗