Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Measurement and Verification Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Report on Field Test at INL Cask Farm of Single Detector Fast Neutron Spent Fuel Cask Verification System

Detecting diversion of spent fuel elements in dry storage casks is challenging due to the thick shielding used in cask construction. Measurements on top of the cask to map the underlying arrangement of the fuel elements and looking for anomalous changes over time has proven difficult to achieve using gamma rays due to the high scattering and attenuation from the thick steel structure, weakening information on the present or absence of fuel bundles. Simulations and laboratory experiments suggest that the high-energy neutron flux (>200 keV) measured directly above each fuel bundle is sufficient to produce a position map that enables detection of the present or absence of fuel bundles, and therefore diversion of a spent fuel bundle. A single-detector spent-fuel monitoring technique based on this principle was development at the Lawrence Livermore National Laboratory (LLNL). The INL Cask Farm in the INTEC technical area at Idaho National Laboratory (INL) offers the capability to test this technique on an MC-10 storage cask which has a distribution of full and empty fuel positions. An experimental test plan for the single-detector verification system was developed in consultation with INL personnel to be completed in FY2021. Due to travel advisories related to COVID-19, the experimental test plan was adapted to enable INL personnel to carry out the measurements in consultation with LLNL personnel following shipment of the LLNL system to INL. Field test measurements of the single detector verification system were successfully carried out at the INL cask farm on September 7-9, 2021. This document summarizes results of the field test.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Aeroelastic Modeling for Distributed Wind Turbines: March 11, 2021 - November 10, 2021

Aeroelastic modeling (AM) is the primary methodology for structural and performance assessment of any wind turbine whereby providing an understanding of the impact of design parameters on its loading and power response before witnessing it in the field. Despite these advantages, the use of AM in the Distributed Wind Technology (DWT) sector is limited, especially within the less established manufacturers. This project represents an in-depth assessment of the status of AM and its role within the Standards for the DWT industry. The study gathered input and feedback from a large number of national and international stakeholders, reviewed technical strengths and weaknesses of the current edition of the design standards, analyzed recent industry workshops' and meetings' minutes, collected publicly available AM templates, and provided an evaluation of the existing AM codes. The study achieved several goals including providing strategies for the load assessment categorization of turbines based on rotor swept area and archetype, and guidance for AM verification and validation (V&V), which includes discussions of measurement requirements and a sample test-plan useful for future V&V campaigns and design standard development. This document summarizes the different tasks conducted in the course of the project and highlights the steps required to improve the AM adoption based on a multifaceted approach that encompasses: 1) augmenting AM software capabilities, 2) publishing AM best-practices and design-basis, 3) creating new model templates, 4) providing guidance for V&V of codes and specific turbine models leveraging field testing best-practice, and 5) addressing weaknesses in the current standards. Many of the future objectives identified in this study could leverage NREL's upcoming testing campaigns of three modern distributed wind turbines. Recommendations within this study will advance the value and the ease-of-use of AM, thereby allowing the industry to better capitalize this underutilized tool resulting in a more efficient design process, an easier path to certification, and overall better and more distributed reliable wind turbine products.

17 WIND ENERGY↗

Noncontacting device to indicate deflection of turbopump internal rotating parts

Phase 2 (development) which was concluded for the ultrasonic Doppler device and the light-pipe-reflectance device is reported. An ultrasonic Doppler breadboard system was assembled which accurately measured runout in the J-2 LOX pump impeller during operation. The transducer was mounted on the outside of the pump volute using a C-clamp. Vibration was measured by conducting the ultrasonic wave through the volute housing and through the fluid in the volute to the impeller surface. The impeller vibration was also measured accurately using the light-pipe probe mounted in an elastomeric-gland fitting in the pump case. A special epoxy resin developed for cryogenic applications was forced into the end of the fiber-optic probe to retain the fibers. Subsequently, the probe suffered no damage after simultaneous exposure to 2150 psi and 77 F. Preliminary flash X-radiographs were taken of the turbine wheel and the shaft-bearing-seal assembly, using a 2-megavolt X-ray unit. Reasonable resolution and contrast was obtained. A fast-neutron detector was fabricated and sensitivity was measured. The results demonstrated that the technique is feasible for integrated-time measurements requiring, perhaps, 240 revolutions to obtain sufficient exposure at 35,000 rpm. The experimental verification plans are included.

Hamilton, D. B.↗

Multibody modeling and verification

A summary of a ten week project on flexible multibody modeling, verification and control is presented. Emphasis was on the need for experimental verification. A literature survey was conducted for gathering information on the existence of experimental work related to flexible multibody systems. The first portion of the assigned task encompassed the modeling aspects of flexible multibodies that can undergo large angular displacements. Research in the area of modeling aspects were also surveyed, with special attention given to the component mode approach. Resulting from this is a research plan on various modeling aspects to be investigated over the next year. The relationship between the large angular displacements, boundary conditions, mode selection, and system modes is of particular interest. The other portion of the assigned task was the generation of a test plan for experimental verification of analytical and/or computer analysis techniques used for flexible multibody systems. Based on current and expected frequency ranges of flexible multibody systems to be used in space applications, an initial test article was selected and designed. A preliminary TREETOPS computer analysis was run to ensure frequency content in the low frequency range, 0.1 to 50 Hz. The initial specifications of experimental measurement and instrumentation components were also generated. Resulting from this effort is the initial multi-phase plan for a Ground Test Facility of Flexible Multibody Systems for Modeling Verification and Control. The plan focusses on the Multibody Modeling and Verification (MMV) Laboratory. General requirements of the Unobtrusive Sensor and Effector (USE) and the Robot Enhancement (RE) laboratories were considered during the laboratory development.

Wiens, Gloria J.↗

The Earth Observing System AM Spacecraft - Thermal Control Subsystem

Mission requirements for the EOS-AM Spacecraft intended to monitor global changes of the entire earth system are considered. The spacecraft is based on an instrument set containing the Advanced Spaceborne Thermal Emission and Reflection radiometer (ASTER), Clouds and Earth's Radiant Energy System (CERES), Multiangle Imaging Spectro-Radiometer (MISR), Moderate-Resolution Imaging Spectrometer (MODIS), and Measurements of Pollution in the Troposphere (MOPITT). Emphasis is placed on the design, analysis, development, and verification plans for the unique EOS-AM Thermal Control Subsystem (TCS) aimed at providing the required environments for all the onboard equipment in a densely packed layout. The TCS design maximizes the use of proven thermal design techniques and materials, in conjunction with a capillary pumped two-phase heat transport system for instrument thermal control.

Chalmers, D.↗

Electromagnetic analysis for large reflector antennas

A comparison is made between the measured E and H plane patterns of the 35 GHz offset paraboloidal reflector and the calculated patterns for the same reflector using the 200 points to describe the surface. The accuracy of the computer prediction is quite good considering that the only description of the surface was the coordinates of a finite number of points on the reflector. The results indicate the possibility of acceptable accuracy in the prediction of electromagnetic performance for arbitrarily distorted reflectors using the coordinates of a practical number of measured points. An optimization of the number and distribution of points, and experimental verification for a distorted reflector are planned.

Bailey, M. C.↗

Structural verification of the TOPEX/Poseidon satellite

The prototype flight structural design and verification concept developed for TOPEX/Poseidon is presented. The structural configuration, design requirements, verification plan, analysis, and system level testing are described. The principal goal of the mission is to observe and measure ocean currents via radio altimetry, for enhanced knowledge of the interaction between the atmosphere and ocean.

Larkin, Paul A.↗

Accuracy requirements and benchmark experiments for CFD validation

The role of experiment in the development of Computation Fluid Dynamics (CFD) for aerodynamic flow prediction is discussed. The CFD verification is a concept that depends on closely coordinated planning between computational and experimental disciplines. Because code applications are becoming more complex and their potential for design more feasible, it no longer suffices to use experimental data from surface or integral measurements alone to provide the required verification. Flow physics and modeling, flow field, and boundary condition measurements are emerging as critical data. Four types of experiments are introduced and examples given that meet the challenge of validation: flow physics experiments; flow modeling experiments; calibration experiments; and verification experiments. Measurement and accuracy requirements for each of these differ and are discussed. A comprehensive program of validation is described, some examples given, and it is concluded that the future prospects are encouraging.

Marvin, Joseph G.↗

Accuracy requirements and benchmark experiments for CFD validation

The role of experiment in the development of Computational Fluid Dynamics (CFD) for aerodynamic flow prediction is discussed. The CFD verification is a concept that depends on closely coordinated planning between computational and experimental disciplines. Because code applications are becoming more complex and their potential for design more feasible, it no longer suffices to use experimental data from surface or integral measurements alone to provide the required verification. Flow physics and modeling, flow field, and boundary condition measurements are emerging as critical data. Four types of experiments are introduced and examples are given that meet the challenge of validation: flow physics experiments; flow modeling experiments; calibration experiments; and verification experiments. Measurement and accuracy requirements for each of these differ and are discussed. A comprehensive program of validation is described, some examples given, and it is concluded that the future prospects are encouraging.

Marvin, Joseph G.↗

Energy Management Information Systems Technical Resources Report

Guide supports federal facility staff in understanding, designing, procuring, and implementing Energy Management Information Systems (EMIS) as a valuable component of their portfolio-level energy and water planning and management strategies. As a broad and rapidly evolving family of tools that monitor, analyze, and control building energy use and system performance, EMIS tools present significant opportunities for federal sector energy savings and improved operational performance. EMIS are at the forefront of transforming energy management best practices by providing building owners and operators with well-organized building performance and energy consumption data, enabling a host of analytic capabilities. These capabilities include portfolio-wide energy benchmarking, data visualization, and key performance indicator tracking; automated fault detection and diagnostics (AFDD); artificial intelligence for predictive analytics and control; automated measurement and verification of energy conservation measures; and supervisory control enabling automated system optimization and demand management.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Computer simulated building energy consumption for verification of energy conservation measures in network facilities

A computer program called ECPVER (Energy Consumption Program - Verification) was developed to simulate all energy loads for any number of buildings. The program computes simulated daily, monthly, and yearly energy consumption which can be compared with actual meter readings for the same time period. Such comparison can lead to validation of the model under a variety of conditions, which allows it to be used to predict future energy saving due to energy conservation measures. Predicted energy saving can then be compared with actual saving to verify the effectiveness of those energy conservation changes. This verification procedure is planned to be an important advancement in the Deep Space Network Energy Project, which seeks to reduce energy cost and consumption at all DSN Deep Space Stations.

Plankey, B.↗

Baseline Characterization Database Verification Report – 2114 Billet A20568

This ECAR provides the results of a validity evaluation of the physical and mechanical property data collected on a billet of nuclear-grade graphite (i.e., 2114 Billet A20568) in support of the ART Baseline Graphite Characterization Program.1,2 Millions of raw data points have been collected during testing and quantification analyses for these billets. The summary scalar property values and supplementary traceability data are collected into comprehensive spreadsheets. Data sets are composed of single billets of graphite for any given grade, organized by mechanical test-specimen type, and further subdivided into individual spreadsheet tabs according to the specific test or evaluation being performed. A direct analysis of properties was not conducted, and this report does not provide information on the validity or performance characteristics of the graphite itself. Rather, this report is intended as a verification of the completeness of actual data collected in accordance with PLN-3467, “Baseline Graphite Characterization Plan: Electromechanical Testing,”3 and their representation of the measurement and test results with sole regard to the graphite billets under evaluation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2024

Energy Savings Performance Contracts (ESPCs)are a contractual mechanism that allow a federal agency to procure energy savings and facility improvements without upfront capital costs to reduce costs and resiliency. ESPCs are covered under FAR Part 23.2, and 42 USC § 8287. Section 8287(a)(2)(A) of Title 42 of the U.S. Code requires that each energy savings performance contract (ESPC) undergo an annual energy audit, resulting in a separate audit report for every project. The objective of the present report is to compile and analyze all annual ESPC audit reports issued between October 1, 2023, and September 30, 2024, for projects awarded under Generations 1, 2, and 3 of DOE’s ESPC IDIQ contracts. During this period, 205 measurement and verification (M&V) reports were produced for 200 projects; the total number of reports exceeds the number of projects because some projects generated more than one report(for example, a few projects measure savings twice per year and produce two audit reports annually, each covering a different six-month period). By aggregating the results from these individual audits, the report determines the portfolio-wide realization rate of energy and cost savings for all active ESPC projects awarded under DOE’s IDIQ program. For all 205audit reports, sufficient information was available to compare project-level estimated, reported, and guaranteed cost savings. Reported cost savings accounted for ESCO verified savings per each project’s M&V plan. The total reported cost savings for the period addressed were $\$$647.8million,compared with the total guaranteed cost savings of $\$$601.6million. On average across the reported projects: •ESPC contractors guaranteed 92.8% of the estimated cost savings• projects reported achieving 100.0% of the estimated cost savings• projects reported achieving 107.7% of the guaranteed cost savings. The M&V performed for the period indicated adjustments for government operations and maintenance impacts to savings amount to$\$$43.9millionandcould be restored with the original operational parameters for impacted projects. Accounting for this potential cost savings impact, these projects still realized 100.4% of the guaranteed cost savings. The information on estimated and reported energy savings was collected and compared for all 205of the reports examined. Based on site energy, estimated savings totaled 14.88million MMBtu, and reported savings were 15.33million MMBtu; 3.1% greater than the estimated energy savings. All of the reports examined contained sufficient information to calculate source energy savings. Based on site-adjusted source energy, total estimated energy savings were 20.90 million MMBtu, and reported savings were 21.22million MMBtu, 101.5% of the estimated energy savings. For water savings, the estimated savings were 11,539,055 kGal and the reported savings were 13,315,930 kGal. This means 1,776,875 kGal more water was saved than estimated, which is about 15% higher than the estimate. These results indicate that, overall, the reported energy savings slightly exceeded the estimated values, while estimated water savings significantly exceeded estimated values, suggesting that the projects achieved greater cost savings than originally projected. The total annual expense for the ESCOs to perform annual M&V audits and reporting was $\$$10.02million. Through this effort, $\$$647.8 million in annual cost savings was verified. The M&V results indicated that $\$$43.9 million of these verified savings reflected adjustments due to government operations A-6and maintenance impacts, which could be restored under the original operational parameters for the affected projects. These findings show the value of M&V that only costs 1.7%of the guaranteed cost savings to ensure guarantees are met.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Impact of Increased Requirements for Verification Measurements of Category III and IV Receipts

As part of the regular nuclear material accounting and control process, sites that have accountable nuclear material regularly perform measurements of the material in their possession. The expectation for the type of measurements and their frequency is set out in Department of Energy (DOE) Order 474.2, and further detailed in each site’s respective material control and accountability (MC&A) plan and associated controlling documents. The measurements of interest in this report are those performed on external (between DOE sites) transfer receipts of Category III or IV accountable materials. In 2020, a revision of DOE Order 474.2 was proposed that would significantly increase the requirement that measurements be performed upon receipt of material, and further, that those measurements be quantitative verification (rather than qualitative confirmatory) measurements. A survey was performed of DOE sites to discuss the impact on their MC&A measurements program if more rigorous verification measurements requirements for Category III and IV receipts were implemented. An assessment of nondestructive assay (NDA) measurement instruments to meet those needs was also performed. Across the board, sites indicated that personnel and budget would cause the largest impact. Sites which are qualified as Category I/II indicated a reduced impact as these sites already have the measurement capabilities and some personnel but would require the acquisition of additional measurement systems. Category III/IV sites indicated a much larger impact as these sites generally have smaller MC&A programs. A few smaller sites stated a measurement program would need to be created to handle the demand. Calorimetry, quantitative gamma spectroscopy and neutron coincidence counting systems were identified as common systems that could meet the verification measurement requirements. The other, and perhaps larger issue is the need for calibration standards for the calorimetry and neutron coincidence counting systems. It is proposed that a comparative study be performed for ISOCS and ISOTOPICS, qualification of a COTS calorimetry system be performed, and development of an AWCC system that uses a neutron generator.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Analysis of the GOES 6.7 micrometer channel observations during FIRE 2

Clouds form in moist environments. FIRE Phase II Cirrus Implementation Plan (August, 1990) noted the need for mesoscale measurements of upper tropospheric water vapor content. These measurements are needed for initializing and verifying numerical weather prediction models and for describing the environment in which cirrus clouds develop and dissipate. Various instruments where deployed to measure the water vapor amounts of the upper troposphere during FIRE II (e.g. Raman lidar, CLASS sonds and new cryogenic frost hygrometer on-board aircraft). The formation, maintenance and dissipation of cirrus clouds involve the time variation of the water budget of the upper troposphere. The GOES 6.7 mu m radiance observations are sensitive to the upper tropospheric relative humidity, and therefore proved extremely valuable in planning aircraft missions during the field phase of FIRE II. Warm 6.7 mu m equivalent black body temperatures indicate a relatively dry upper troposphere and were associated with regions generally free of cirrus clouds. Regions that were colder, implying more moisture was available may or may not have had cirrus clouds present. Animation of a time sequence of 6.7 mu m images was particularly useful in planning various FIRE missions. The 6.7 mu m observations can also be very valuable in the verification of model simulations and describing the upper tropospheric synoptic conditions. A quantitative analysis of the 6.7 mu m measurement is required to successfully incorporate these satellite observations into describing the upper tropospheric water vapor budget. Recently, Soden and Bretherton (1993) have proposed a method of deriving an upper tropospheric humidity based on observations from the GOES 6.7 mu m observations. The method is summarized in the next section. In their paper they compare their retrieval method to radiance simulations. Observations were also compared to ECMWF model output to assess the model performance. The FIRE experiment provides a unique opportunity to further verify the GOES upper tropospheric relative humidity retrieval scheme by providing (1) aircraft observations to cross-validate the calibration of the GOES 6.7 mu m channel, (2) accurate upper tropospheric water vapor concentrations for verification, and (3) veritical variability of upper tropospheric water vapor.

Soden, B. J.↗

Case Study: Field Evaluation of a Low-Cost Circuit-Level Electrical Submetering System

Circuit-level metering technologies provide the ability to monitor individual circuits within an electrical panel in a building, providing detailed power and energy consumption data at a much more granular level than was previously achievable in a cost-effective manner. While the fundamental hardware components of circuit-level—split-core current transformers (CTs) and power monitoring meters—have existed for some time, the new offerings in the market have tightly integrated these components, lower costs, and have streamlined data organization, transport, and access via software solutions accessible through web and application programming interfaces (API). NREL evaluated Meazon’s single-circuit metering system. The evaluation of the equipment under test (EUT) focused on three aspects: (1) accuracy of the data provided by the system, (2) ease of installation of this technology and ease of data integration into existing U.S. General Services Administration (GSA) analytics platforms, and (3) total cost of ownership and cost-effectiveness of the technology. The metering technology was tested in a field deployment where it was installed in low and high-voltage commercial electrical panels in the César E. Chávez Memorial Building in Denver, Colorado. The goals were to assess the metering accuracy, the ease of installation and data retrieval, and the total cost of ownership and cost-effectiveness. This technology proved easy to install by a certified electrician who completed the install of 6 meters in 2 separate panels (120/208 V and 277/480 V) and 2 circuit disconnects (along with associated commissioning) at the César E. Chávez Memorial Building in less than one day. The technology was installed in high- and low-voltage panels and with limited space in the electrical room, demonstrating the applicability of this technology to almost all commercial buildings in the GSA portfolio. Primary considerations for this technology include appropriate sizing of CTs for each circuit, selection of loads/circuits/panels that are of high value for detailed submetering (e.g., tailored for high-load devices), and how GSA would like to integrate these data with its existing energy management infrastructure. Through the field evaluation, we demonstrated data integration from the vendor system into the primary software component on the GSA enterprise-level energy management and information system, GSA Link. Data from the circuit-level metering were integrated into this platform and used to perform FDD. This demonstrated the ability of the EUT to augment existing energy management and information systems in buildings where GSA Link is deployed and provides a pathway for delivering FDD at other buildings throughout the portfolio.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Uniform Methods Project: Smart Thermostat Evaluation Protocol

A smart thermostat is an internet-connected device that controls home heating, ventilation, and air-conditioning (HVAC) equipment and can automatically adjust temperature set points to optimize performance and achieve energy savings. Smart thermostat features often include two way communication, occupancy detection (such as geofencing and occupancy sensors), schedule learning, and seasonal optimization algorithms. Smart thermostats can control most conventional HVAC systems, including central air conditioners, heat pumps, and forced air furnaces. Several types of residential utility programs offer smart thermostats as replacements measures. Working with smart thermostat vendors, utilities can offer separate optimization programs to produce energy savings beyond those achieved by installing a smart thermostat. From an evaluation perspective, smart thermostat programs have several noteworthy features. First, the energy savings from a smart thermostat may change over the life of the device. As a smart thermostat is connected to the internet, original equipment manufacturers can update the thermostat software to improve the thermostat's energy efficiency. Likewise, users can adjust the thermostat settings and schedules over time in response to changes in weather, thermal comfort, energy prices, or preferences for energy efficiency. Additionally, many thermostat manufacturers offer seasonal optimization programs that recommend changes or make minor, automated adjustments to the thermostat settings to improve energy efficiency. These opt-in programs are now standard offerings for many smart thermostat manufacturers and provided at no additional cost to users. The potential for software updates and continuous optimization and the evolving nature of user interactions mean future energy savings may differ from first-year savings and the energy savings of smart thermostats may need to be evaluated more than once. Second, smart thermostats often have small unit energy savings relative to a home's total energy consumption, especially in comparison to whole- home retrofit programs. This can make it difficult to detect the smart thermostat savings in billing or advanced metering infrastructure (AMI) meter consumption data. For example, as cooling loads in many regions average about 20% of annual electricity consumption, smart thermostat savings of 10% of cooling energy use would equate to a 2% reduction in home electricity consumption. Evaluators should use regression analysis of whole-home billing consumption or advanced metering infrastructure (AMI) meter consumption data to evaluate smart thermostat savings because, as explained at greater length below , these data are usually available to evaluators and regression can control for the impacts of weather and other potentially confounding factors on a home's energy consumption. Finally, as with other energy efficiency programs, participation in smart thermostat programs is self-selective. As discussed at greater length below , smart thermostat participants tend to be, among other things, younger, higher-income, and more likely to adopt electric vehicles (EVs) and internet connected devices than nonparticipants. These differences are often unobservable to the evaluator and correlated with a home's energy consumption, creating the potential for bias in estimating savings. Due to the small unit savings of thermostats, errors and biases from self-selection that may not be very consequential when evaluating a whole- home retrofits (e.g., ±2% of home electricity consumption) can have a major impact when evaluating the savings and cost-effectiveness of smart thermostat programs. A percentage point change in the estimated savings could affect the cost-effectiveness of a program. This means it is important for evaluators to assess and to minimize the potential for error from selection bias in estimating smart thermostat program savings. The Uniform Methods Project provides model protocols for determining energy savings and demand reductions that result from specific energy efficiency measures implemented through state and utility programs. In most cases, the measure protocols are based on a particular option identified by the International Performance Verification and Measurement Protocol ; however, this work provides a more detailed approach to implementing that option. Each chapter is written by technical experts in collaboration with their peers, reviewed by industry experts, and subject to public review and comment. The UMP protocols can be used by utilities, program administrators, public utility commissions, evaluators, and other stakeholders for both program planning and evaluation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Measurements of Parachute Dynamics in the World's Largest Wind Tunnel by Stereo Photogrammetry

Between 2012 and 2017, parachutes for four NASA Projects were tested in the 80- by 120-Ft test section of the National Full-Scale Aerodynamic Complex (NFAC) at NASA Ames Research Center. These projects were: (1) Low-Density Supersonic Decelerator (LDSD); (2) Capsule Parachute Assembly System (CPAS, for Orion); (3) Interior Exploration using Seismic Investigations, Geodesy and Heat Transport (InSight, a Mars mission); and (4) Mars 2020. In all tests stereo photogrammetry was used to measure time-dependent positions of features on the canopies. For the LDSD and CPAS tests, where the purpose was to study the trade-off between stability and drag of different parachute designs, the pendulum motion of the canopies about the riser attachment point was measured by calibrated cameras in the diffuser. The CPAS test also included static measurements where the inflated parachutes were pulled to the side by a system of tethers. The Insight tests were structural qualification tests where each canopy was packed in a bag and launched from a mortar. Cameras in the diffuser measured the trajectory of the bag and the stripping of the bag from the canopy. The Mars 2020 test was a workmanship verification test where the canopies were either launched from a mortar or deployed from a sleeve stretched along the tunnel axis. The deployments were recorded from many directions by thirteen high-speed cameras distributed in the diffuser and test section. Photogrammetry was not planned; however, after a tunnel-related accident ended the test prematurely, photogrammetric measurements were bootstrapped from the images to support the accident investigations. This paper describes how the photogrammetry measurements were made in each test and presents typical results.

Schairer, Edward T.↗