Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Mars Exploration Rover Project”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Curiosity: the Mars Science Laboratory Project

The Curiosity rover landed successfully in Gale Crater, Mars on August 5, 2012. This event was a dramatic high point in the decade long effort to design, build, test and fly the most sophisticated scientific vehicle ever sent to Mars. The real achievements of the mission have only just begun, however, as Curiosity is now searching for signs that Mars once possessed habitable environments. The Mars Science Laboratory Project has been one of the most ambitious and challenging planetary projects that NASA has undertaken. It started in the successful aftermath of the 2003 Mars Exploration Rover project and was designed to take significant steps forward in both engineering and scientific capabilities. This included a new landing system capable of emplacing a large mobile vehicle over a wide range of potential landing sites, advanced sample acquisition and handling capabilities that can retrieve samples from both rocks and soil, and a high reliability avionics suite that is designed to permit long duration surface operations. It also includes a set of ten sophisticated scientific instruments that will investigate both the geological context of the landing site plus analyze samples to understand the chemical & organic composition of rocks & soil found there. The Gale Crater site has been specifically selected as a promising location where ancient habitable environments may have existed and for which evidence may be preserved. Curiosity will spend a minimum of one Mars year (about two Earth years) looking for this evidence. This paper will report on the progress of the mission over the first few months of surface operations, plus look retrospectively at lessons learned during both the development and cruise operations phase of the mission..

project formulation

Microbiological cleanliness of the Mars Exploration Rover spacecraft

Planetary protection for Mars missions is described, and the approach being taken by the Mars Exploration Rover Project is discussed. Specific topics include alcohol wiping, dry heat microbial reduction, microbiological assays, and the Kennedy Space center's PHSF clean room.

planetary protection Mars Exploration Rover MER

Mars Exploration Rover Cruise Orbit Determination

The Mars Exploration Rover project consisted of two missions (MER-A: spirit rover and MER-B: opportunity rover) that launched spacecraft on June 10, 2003, and July 8, 2003, respectively. The spacecraft arrived at Mars approximately seven months later on January 4, 2004, and January 24, 2004. These spacecraft needed to be precisely navigated to a Mars atmospheric entry flight path angle of -11.5 deg +/-0.12 deg (3(sigma)) for MER-A and +/-0.14 deg (3(sigma)) for MER-B in order to satisfy the landing site delivery requirements. The orbit determination task of the navigation team needed to accurately determine the trajectory of the spacecraft, predict the trajectory to Mars atmospheric entry, and account for all possible errors sources so that the each spacecraft could be correctly targeted using five trajectory corrections along the way. This paper describes the orbit determination analysis which allowed MER-A to be targeted using only four trajectory correction maneuvers to an entry flight path angle of -11.49 deg +/-O.010 deg (3(sigma)) and MER-B to be targeted using only three trajectory correction maneuvers to an entry flight path angle of -11.47 +/-0.021 deg(3(sigma)).

navigation

Dynamic Modeling and Soil Mechanics for Path Planning of the Mars Exploration Rovers

To help minimize risk of high sinkage and slippage during drives and to better understand soil properties and rover terramechanics from drive data, a multidisciplinary team was formed under the Mars Exploration Rover project to develop and utilize dynamic computer-based models for rover drives over realistic terrains. The resulting system, named ARTEMIS (Adams-based Rover Terramechanics and Mobility Interaction System), consists of the dynamic model, a library of terramechanics subroutines, and the high-resolution digital elevation maps of the Mars surface. A 200-element model of the rovers was developed and validated for drop tests before launch, using Adams dynamic modeling software. The external library was built in Fortran and called by Adams to model the wheel-soil interactions include the rut-formation effect of deformable soils, lateral and longitudinal forces, bull-dozing effects, and applied wheel torque. The paper presents the details and implementation of the system. To validate the developed system, one study case is presented from a realistic drive on Mars of the Opportunity rover. The simulation results match well from the measurement of on-board telemetry data. In its final form, ARTEMIS will be used in a predictive manner to assess terrain navigability and will become part of the overall effort in path planning and navigation for both Martian and lunar rovers.

rover

Using RSVP for analyzing state and previous activities for the Mars Exploration Rovers

Current developments in immersive environments for mission planning include several tools which make up a system for performing and rehearsing missions. This system, known as the Rover Sequencing and Visualization Program (RSVP), includes tools for planning long range sorties for highly autonomous rovers, tools for planning operations with robotic arms, and advanced tools for visualizing telemetry from remote spacecraft and landers. One of the keys to successful planning of rover activities is knowing what the rover has accomplished to date and understanding the current rover state. RSVP builds on the lessons learned and the heritage of the Mars Pathfinder mission This paper will discuss the tools and methodologies present in the RSVP suite for examining rover state, reviewing previous activities, visually comparing telemetered results to rehearsed results, and reviewing science and engineering imagery. In addition we will present how this tool suite was used on the Mars Exploration Rovers (MER) project to explore the surface of Mars.

Mars Exploration Rover (MER)

Mars Exploration Rovers Launch Performance and TCM-1 Maneuver Design

The Mars Exploration Rover (MER) project successfully landed two identical rovers on Mars in order to remotely conduct geologic investigations, including characterization of rocks and soils that may hold clues to past water activity. Two landing sites, Gusev crater and Meridiani Planum, were selected out of nearly 200 candidate sites after balancing science returns and flight system engineering and safety. Precise trajectory targeting and control was necessary to achieve the atmospheric entry requirements for the selected landing sites within the flight system constraints. This paper discusses the expected and achieved launch vehicle performance and the impacts of that performance on the first Trajectory Correction Maneuver (TCM-1) while maintaining targeting flexibility in accommodating additional project concerns about landing site safety and possible in-flight retargeting to alternate landing sites.

Trajectory Correction Maneuvers (TCMs)

Mission design for the Mars Exploration Rover mission

The Mars Exploration Rover (MER) project, will conduct fundamentally new observations of Mars geology, including the first micro-scale study of rock samples, as well as a detailed study of surface environments for the purpose of calibrating and validating orbital remote sensing data.

Mars Exploration Rover mission design

Mars Exploration Rover surface mission flight thermal performance

NASA launched two rovers in June and July of 2003 as a part of the Mars Exploration Rover (MER) project. MER-A (Spirit) landed on Mars in Gusev Crater at 15 degrees South latitude and 175 degree East longitude on January 4, 2004 (Squyres, et al., Dec. 2004)). MER-B (Opportunity) landed on Mars in Terra Meridiani at 2 degrees South latitude and 354 degrees East longitude on January 25, 2004 (Squyres, et al., August 2004) Both rovers have well exceeded their design lifetime (90 Sols) by more than a factor of 4. Spirit and Opportunity are still healthy and continue to execute their roving science missions at the time of this writing. This paper discusses rover flight thermal performance during the surface missions of both vehicles, covering roughly the time from the MER-A landing in late Southern Summer (Ls = 328, Sol 1A) through the Southern Winter solstice (Ls = 90, Sol 255A) to nearly Southern Vernal equinox (Ls = 160 , Sol 398A).

thermal design

PRTs and Their Bonding for Long-Duration, Extreme-Temperature Environments

Research was conducted on the qualification of Honeywell platinum resistance thermometer (PRT) bonding for use in the Mars Science Laboratory (MSL). This is the first time these sensors will be used for Mars-related projects. Different types of PRTs were employed for the Mars Exploration Rover (MER) project, and several reliability issues were experienced, even for a shortduration mission like MER compared to MSL. Therefore, the development of a qualification process for the Honeywell PRT bonding was needed for the MSL project. Reliability of the PRT sensors, and their bonding processes, is a key element to understand the health of the hardware during all stages of the project, and particularly during surface operations on Mars. Three extreme temperature summer season cycles and three winter season cycles (total: 1983 thermal cycles) were completed, and no Honeywell PRT failures associated with the bonding process were found. Seventy-eight PRTs were bonded onto six different substrate materials using four different adhesives during the thermal cycling, which included a planetary protection cycle to +125 C for two hours, three protoflight/qualification cycles (-135 to 70 C), 1,384 summer cycles (-105 to 40 C), and 599 winter cycles (-130 to 15 C). There were no observed changes in PRT resistances, bonding characteristics, or damage identified from the package evaluation as a result of the qualification tests.

Ramesham, Rajeshuni

Mars Exploration Rover Surface Mission: Thermal Performance for More Than an Entire Martian Year

This viewgraph presentation reviews the thermal performance of the Mars Exploration Rovers. The Mars Exploration Rover (MER) project landed two identical roving science vehicles on Mars in January 2004; they have continued to perform geological science data collection well beyond their surface design lifetime of 90 sols. The design of the thermal system is described. Pictures from the rovers are also included,

flight performance

The Mars Exploration Rovers Entry Descent and Landing and the Use of Aerodynamic Decelerators

The Mars Exploration Rovers (MER) project, the next United States mission to the surface of Mars, uses aerodynamic decelerators in during its entry, descent and landing (EDL) phase. These two identical missions (MER-A and MER-B), which deliver NASA s largest mobile science suite to date to the surface of Mars, employ hypersonic entry with an ablative energy dissipating aeroshell, a supersonic/subsonic disk-gap-band parachute and an airbag landing system within EDL. This paper gives an overview of the MER EDL system and speaks to some of the challenges faced by the various aerodynamic decelerators.

Steltzner, Adam

EXPLORING MARS WITH SOLAR-POWERED ROVERS

The Mars Exploration Rover (MER) project landed two solar-powered rovers, "Spirit" and "Opportunity," on the surface of Mars in January of 2003. This talk reviews the history of solar-powered missions to Mars and looks at the science mission of the MER rovers, focusing on the solar energy and array performance.

Landis, Geoffrey A.

Power Operations of the Mars Exploration Rovers

The rovers of the National Aeronautics and Space Administration’s (NASA) Mars Exploration Rovers (MER) project, Spirit (MER-A) and Opportunity (MER-B), safely landed on the surface of Mars three weeks apart during January 2004. Spirit and Opportunity were built and operated by the Jet Propulsion Laboratory (JPL), which is managed by the California Institute of Technology (Caltech) for NASA. Spirit landed at Gusev Crater, 14.8 degrees south of the equator, and operated continuously on the surface of Mars from January 4, 2004 until last contact from Spirit on March 22, 2010. Opportunity landed at Meridiani Planum, a location 2.5 degrees south of the Martian equator. Opportunity operated continuously on the Martian surface from January 25, 2004 until the last received transmission from Opportunity on June 10, 2018. The goal of the MER project was to determine if Mars ever had a habitable environment, in particular, if it ever had water. During their missions, both Spirit and Opportunity found evidence that liquid water once flowed on the surface of Mars. Both Spirit and Opportunity used a 1.33 m2 triple-junction solar array as their power sources. Based on observations of the original Mars rover, the Sojourner rover of the Mars Pathfinder mission that landed on Mars on July 4, 1997, the expectation was that the Martian dust would rapidly accumulate on the solar arrays of Spirit and Opportunity, and that the rovers would not have enough energy to continue operations after 90 Martian days (sols). Instead, due in part to lower dust accumulation rates than expected and numerous dust cleaning events, the Spirit and Opportunity rovers continued to operate on the Martian surface for over 2000 sols (MER-A) and 5000 sols (MER-B), respectively. During this time, the rovers experienced multiple Martian winters and several dust storms. Because the sources of solar array energy loss were known, the solar array energy output offered a method to scientifically estimate the loading and aeolian removal of dust from the solar arrays each sol. The MER Power operations team called this value that they calculated the solar array Dust Factor (DF). Dust Factor was defined as the fraction of sunlight that penetrates the accumulated dust on the surface of the solar array. A Dust Factor of 1.0 would indicate that the solar array was perfectly clean. A Dust Factor of 0.6 would indicate that only 60% of the available sunlight was able to penetrate the accumulated dust on the solar arrays. The MER Power subsystem operations team used the Multi-Mission Power Analysis Tool (MMPAT) to perform these Dust Factor calculations. The MMPAT software tool modeled the behavior of the solar arrays and the batteries as they interacted with the spacecraft power loads over the mission timeline. MMPAT also had knowledge (through telemetry and user inputs) of telemetered Power subsystem voltages and currents, atmospheric opacity (Tau), rover surface location, rover attitude, the planetary tilt and distance of Mars from the sun based on day of year, the instantaneous elevation of the sun based on time of day, temperatures (internal and external), terrain masking, and shadowing (due to the camera mast and antennas). Once all of the known sources of array energy loss are accounted, the remaining difference between the expected array energy and the actual array energy determines the solar array Dust Factor. The assumptions made while determining the Dust Factor are 1) that the single measured atmospheric opacity value (Tau) is constant over the course of the entire sol, 2) there is no measurable solar cell degradation, 3) there are no shorted strings and therefore, 4) all unexpected solar array energy losses are due to accumulated dust on the solar array. Although it cannot provide an absolute measure of dust loading, the determination of solar array Dust Factor provides a useful way of tracking dust accumulation and aeolian dust removal trends on Martian spacecraft. Any spacecraft on the Martian surface is vulnerable to dust, especially solar-powered spacecraft. The Spirit and Opportunity rovers were operational on the Martian surface for much longer than expected due in part to aeolian removal of dust from their solar arrays. The first few dust removal events were a pleasant surprise to the MER operations teams; however, over time a pattern began to arise. In over three Mars Years on the surface, the Power operations team tracked the solar array Dust Factor at Gusev Crater (location of MER-A) and observed that there were several significant dust removal and deposition events in Mars Year (MY) 27, even in the absence of a large dust storm. In MY 28 at Gusev Crater, the large atmospheric opacity (Tau) increase lagged significant dust removal events. Overall at Gusev Crater, there was a pattern of steady dust accumulation on the solar arrays, with a small number of significant dust cleaning events. At Meridiani Planum, where Opportunity rover operated for over seven Mars Years (late MY 26 to mid MY 34), a clear and consistent pattern of dust movement emerged. Meridiani Planum had a predictable, seasonally dependent pattern of gradual and continuous dust accumulation and removal. In summary, this paper explains the reasons for the development of the solar array Dust Factor and how it was used in mission operations. In particular, this paper describes the MMPAT software package, how it models array energy, including the important assumptions, model inputs and sources of error. And finally, this paper will show how the calculated solar array Dust Factor was used at Gusev Crater and Meridiani Planum to predict dust accumulation rates and weather patterns, and the importance of this generated data set for current and future solar- powered missions to Mars, such as the InSight lander and the planned Mars Sample Return rover.

Chin, Keith B.

Mars Exploration Rover Flight Operations Technical Consultation

The Mars Exploration Rover (MER) Project at the Jet Propulsion Laboratory developed two golf-cart size robotic vehicles, Spirit and Opportunity, for geological exploration of designated target areas on the surface of Mars. The primary scientific objective of these missions was the search for evidence of the presence of water on or near the surface of the planet during its history. Spirit and Opportunity were launched on June 10 and July 7, 2003, with their respective landings scheduled for January 4 and January 25, 2004 (UTC). NASA views the MER missions as particularly critical because of their scientific importance in the ongoing search for conditions under which life might have existed elsewhere in the solar system, because of their high level of public interest and because more than half of all prior missions launched to Mars internationally have failed. This report summarizes the findings and recommendations of the NASA Engineering and Safety Center review of the project.

Leckrone, Dave S.

Independent Review Support for Phoenix Mars Mission Robotic Arm Brush Motor Failure

The Phoenix Project requested the NASA Engineering and Safety Center (NESC) perform an independent peer review of the Robotic Arm (RA) Direct Current (DC) motor brush anomalies that originated during the Mars Exploration Rover (MER) Project and recurred during the Phoenix Project. The request was to evaluate the Phoenix Project investigation efforts and provide an independent risk assessment. This includes a recommendation for additional work and assessment of the flight worthiness of the RA DC motors. Based on the investigation and findings contained within this report, the IRT concurs with the risk assessment Failure Cause / Corrective Action (FC/CA) by the project, "Failure Effect Rating "3"; Major Degradation or Total Loss of Function, Failure Cause/Corrective Action Rating Currently "4"; Unknown Cause, Uncertainty in Corrective Action."

McManamen, John P.

Dynamic testing and simulation of the Mars Exploration Rover

In January of 2004, NASA landed two mobile robotic spacecraft on the surface of Mars as part of the Mars Exploration Rover (MER) project. The results and lessons learned of the test and dynamic simulation of the MER vehicles is provided in this paper.

rovers