Conceptual design of the 6 MW Mod-5A wind turbine generator

The General Electric Company, Advanced Energy Programs Department, is designing under DOE/NASA sponsorship the MOD-5A wind turbine system which must generate electricity for 3.75 cent/KWH (1980) or less. During the Conceptual Design Phase, completed in March, 1981, the MOD-5A WTG system size and features were established as a result of tradeoff and optimization studies driven by minimizing the system cost of energy (COE). This led to a 400' rotor diameter size. The MOD-5A system which resulted is defined in this paper along with the operational and environmental factors that drive various portions of the design. Development of weight and cost estimating relationships (WCER's) and their use in optimizing the MOD-5A are discussed. The results of major tradeoff studies are also presented. Subsystem COE contributions for the 100th unit are shown along with the method of computation. Detailed descriptions of the major subsystems are given, in order that the results of the various trade and optimization studies can be more readily visualized.

Barton, R. S.↗

Operational results for the experimental DOE/NASA Mod-OA wind turbine project

The Mod-OA wind turbine project which was to gain early experience in the operation of large wind turbines in a utility environment is discussed. The Mod-OA wind turbines were a first generation design, and even though not cost effective, the operating experience and performance characteristics had a significant effect on the design and development of the second and third generation machines. The Mod-OA machines were modified as a result of the operational experience, particularly the blade development and control system strategy. The results of study to investigate the interaction of a Mod-OA wind turbine with an isolated diesel generation system are discussed. The machine configuration, its advantages and disadvantages and the machine performance and availability are discussed.

Shaltens, R. K.↗

Mod-5A wind turbine generator program design report. Volume 3: Final design and system description, book 2

The design, development and analysis of the 7.3MW MOD-5A wind turbine generator is documented. The report is divided into four volumes: Volume 1 summarizes the entire MOD-5A program, Volume 2 discusses the conceptual and preliminary design phases, Volume 3 describes the final design of the MOD-5A, and Volume 4 contains the drawings and specifications developed for the final design. Volume 3, book 2 describes the performance and characteristics of the MOD-5A wind turbine generator in its final configuration. The subsystem for power generation, control, and instrumentation subsystems is described in detail. The manufacturing and construction plans, and the preparation of a potential site on Oahu, Hawaii, are documented. The quality assurance and safety plan, and analyses of failure modes and effects, and reliability, availability and maintainability are presented.

Source record↗

Flight controller alertness and performance during MOD shiftwork operations

Decreased alertness and performance associated with fatigue, sleep loss, and circadian disruption are issues faced by a diverse range of shiftwork operations. During STS operations, MOD personnel provide 24 hr. coverage of critical tasks. A joint JSC and ARC project was undertaken to examine these issues in flight controllers during MOD shiftwork operations. An initial operational test of procedures and measures was conducted during STS-53 in Dec. 1992. The study measures included a background questionnaire, a subjective daily logbook completed on a 24 hr. basis (to report sleep patterns, work periods, etc.), and an 8 minute performance and mood test battery administered at the beginning, middle, and end of each shift period. Seventeen Flight controllers representing the 3 Orbit shifts participated. The initial results clearly support further data collection during other STS missions to document baseline levels of alertness and performance during MOD shiftwork operations. These issues are especially pertinent for the night shift operations and the acute phase advance required for the transition of day shift personnel into the night for shuttle launch. Implementation and evaluation of the countermeasure strategies to maximize alertness and performance is planned. As STS missions extend to further extended duration orbiters, timelines and planning for 24 circadian disruption will remain highly relevant in the MOD environment.

Kelly, Sean M.↗

Calculation of design load for the MOD-5A 7.3 mW wind turbine system

Design loads are presented for the General Electric MOD-SA wind turbine. The MOD-SA system consists of a 400 ft. diameter, upwind, two-bladed, teetered rotor connected to a 7.3 mW variable-speed generator. Fatigue loads are specified in the form of histograms for the 30 year life of the machine, while limit (or maximum) loads have been derived from transient dynamic analysis at critical operating conditions. Loads prediction was accomplished using state of the art aeroelastic analyses developed at General Electric. Features of the primary predictive tool - the Transient Rotor Analysis Code (TRAC) are described in the paper. Key to the load predictions are the following wind models: (1) yearly mean wind distribution; (2) mean wind variations during operation; (3) number of start/shutdown cycles; (4) spatially large gusts; and (5) spatially small gusts (local turbulence). The methods used to develop statistical distributions from load calculations represent an extension of procedures used in past wind programs and are believed to be a significant contribution to Wind Turbine Generator analysis. Test/theory correlations are presented to demonstrate code load predictive capability and to support the wind models used in the analysis. In addition MOD-5A loads are compared with those of existing machines. The MOD-5A design was performed by the General Electric Company, Advanced Energy Program Department, under Contract DEN3-153 with NASA Lewis Research Center and sponsored by the Department of Energy.

Mirandy, L.↗

MOD: An Organic Detector for the Future Exploration of Mars

The Mars Organic Detector (MOD) is designed to assess whether organic compounds, possibly associated with life, are present in Martian rock and soil samples. MOD has a detection limit that is at least two orders of magnitude more sensitive than the Viking GCMS. MOD is focused on detecting amino acids, amines and PAH (polycyclic aromatic hydrocarbons). Amino acids play an essential role in biochemistry on Earth and PAH are widespread throughout the universe and can provide an indication of the delivery of meteoritic organic material to Mars. The advantage of MOD is the absence of wet chemistry and its simple and robust design. The sample will be extracted from the mineral matrix (0.1 - 1 g of rock-powder) using sublimation and analyzed with a fluorescence detector. The isolation method is based on the fact that amino acids and PAH are volatile at temperatures greater than 150C. The fluorescence detection scheme is based on UV excitation with LED's, optical filters, PrN diode photon detector and a sample calibration reservoir. Fluorescamine is used as a fluorescing reagent for amino acids and amines, while PAH are naturally fluorescent. There is no sample preparation required and the turnaround time for a single analysis is on the order of minutes.

Kminek, G.↗

MOD: An Instrument for the 2005 Mars Explorer Program HEDS Payload

The Mars Organic Detector (MOD) was recently selected for the definition phase of the HEDS '05 (originally scheduled for '03) lander instrument package for fundamental biology and in situ resource utilization. MOD is designed to detect organic compounds in rock and soil samples directly on the surface of Mars in order to assess the biological potential of the planet. In addition, a MOD Tunable Diode Laser Spectrometer (TDLS) will provide information on desorption and decomposition temperatures, as well as the release rates and quantities of water and carbon dioxide that can be liberated from regolith samples, thereby providing the parameters needed for the design of systems for the future large-scale in situ extraction of valuable consumable resources. A MOD TDLS will also measure the atmospheric water and carbon dioxide content, as well as the atmospheric carbon dioxide isotopic composition, in order to determine whether there is an isotopic offset between atmospheric and surface carbon.

Bada, J. L.↗

Cruise Propulsion System Thermal Analysis for NASA’s X-57 “Maxwell” Mod II Configuration

The X-57 “Maxwell” is NASA’s flight demonstrator for distributed electric propulsion technologies. The X-57 Mod II configuration is designed to test the electric cruise propulsion system for X-57 and features an electric cruise motor mounted in an integral nacelle on each wing. The electric motors and associated control equipment for X-57 Mod II are air-cooled; therefore, they require adequate cooling airflow to stay within temperature limits set by the X-57 project in all relevant flight conditions. A computational flow analysis was conducted to estimate the internal flow properties of the X-57 Mod II cruise nacelles in three critical flight conditions. These flow properties were then used to determine the boundary conditions for individual component thermal models, which were used to estimate individual component operating temperatures. The results indicated that the low-speed, low-altitude initial takeoff climb during hot day conditions was the sizing condition from a cooling perspective. The analysis found that the cooling flowpaths in the X-57 Mod II cruise nacelles are adequate to provide cooling to most of the components with the appropriate amount of thermal margin. The two components that are not anticipated to have the appropriate margin can be accommodated with a small (< 2°C) adjustment to the project operating limitations.

Nicholas K. Borer↗

Cruise Propulsion System Thermal Analysis for NASA’s X-57 “Maxwell” Mod II Configuration

The X-57 “Maxwell” is NASA’s flight demonstrator for distributed electric propulsion technologies. The X-57 Mod II configuration is designed to test the electric cruise propulsion system for X-57 and features an electric cruise motor mounted in an integral nacelle on each wing. The electric motors and associated control equipment for X-57 Mod II are air-cooled; therefore, they require adequate cooling airflow to stay within temperature limits in all relevant flight conditions within the operational ambient temperature limits set by the X-57 project. A computational flow analysis was conducted to estimate the internal flow properties of the X-57 Mod II cruise nacelles in three critical flight conditions. These flow properties were then used to determine the boundary conditions for individual component thermal models, which were used to estimate individual component operating temperatures. The results indicated that the low-speed, low-altitude initial takeoff climb during hot day conditions was the sizing condition from a cooling perspective. The analysis found that the cooling flowpaths in the X-57 Mod II cruise nacelles are adequate to provide cooling to all components with the appropriate amount of thermal margin except two of the low-voltage control boards in the cruise motor controller. These components would violate required thermal margins by less than two degrees Celsius in the Project Hot Day reference atmosphere.

Nicholas K Borer↗

X-57 Mod III Wing Ground Vibration Test

The X-57 “Maxwell” all-electric experimental aircraft was an electric propulsion demonstrator developed by the National Aeronautics and Space Administration to inform airworthiness standards for electrified aircraft. The development of the X-57 aircraft was separated into configuration modifications culminating in a distributed electric propulsion flight demonstrator named Modification IV (a.k.a., Mod IV). One of these configurations, the X-57 Mod III aircraft, involved flight-testing of a long, slender, high-aspect-ratio wing with two electric motors located at the wingtips. The X-57 Mod III wing ground vibration test was performed in the Flight Loads Laboratory at the National Aeronautics and Space Administration Armstrong Flight Research Center to measure the structural dynamics properties of the newly developed wing, and to confirm airworthiness of the Mod III/IV aircraft. This paper describes the testing performed to acquire the modal data and the subsequent results from the test.

Samson Truong↗

60 years of science in ICF: from conception to scientific breakeven on the National Ignition Facility

The recent achievements of a burning plasma, fusion ignition, and scientific energy gain with deuterium-tritium (DT) fuel at Lawrence Livermore National Laboratory’s National Ignition Facility (NIF) represents a major milestone in the development of inertial confinement fusion (ICF) and all of fusion research. In these experiments, fuel pressures well in excess of hundreds of GBars were achieved in the compressed fuel, and robust alpha heating of the fuel, far in excess of the energy provided by the implosion, were demonstrated for the first time. These achievements occurred 60 years after the inception of ICF and the first laser demonstration, and were made possible by more than five decades of research at laser facilities around the world. Advances in laser technology both in wavelength and precision, motivated by improved understanding of laser-plasma interaction physics and the demands of targets; improvements in target fabrication inspired by the need to control and minimize hydrodynamic instabilities in the implosion; and multi-dimensional simulations and diagnostics have been critical to this achievement. This paper will summarize the scientific and technical advances, the surprises, and the challenges that had to be overcome to achieve these goals.

fusion↗

Determination of confinement regime boundaries via separatrix parameters on Alcator C-Mod based on a model for interchange-drift-Alfvén turbulence

The separatrix operational space (SepOS) model (Eich and Manz 2021 Nucl. Fusion 61 086017) is shown to predict the L–H transition, the L-mode density limit, and the ideal magnetohydrodynamic ballooning limit in terms of separatrix parameters for a wide range of Alcator C-Mod plasmas. The model is tested using Thomson scattering measurements across a wide range of operating conditions on C-Mod, spanning $\overline{n}_{\mathrm{e}}$ = 0.3–5.5 $\times 10^{20}\,$m −3 , $B_{\mathrm{t}} = 2.5$–8.0 T, and $B_{\mathrm{p}}$= 0.1–1.2 T. An empirical regression for the electron pressure gradient scale length, $\lambda_{{p}_{\mathrm{e}}}$, against a turbulence control parameter, $\alpha_{\mathrm{t}}$, and the poloidal fluid gyroradius, $\rho_{\mathrm{s,p}}$, is constructed for H-modes and found to require positive exponents for both regression parameters, indicating turbulence widening of near-scrape-off layer widths at high $\alpha_{\mathrm{t}}$ and an inverse scaling with $B_{\mathrm{p}}$, consistent with results on ASDEX Upgrade. The SepOS model is also tested in the unfavorable drift direction and found to apply well to all three boundaries, including the L–H transition as long as a correction to the Reynolds energy transfer term, $\alpha_\mathrm{RS} \lt 1$ is applied. I-modes typically exist in the unfavorable drift direction for values of $\alpha_{\mathrm{t}} \lesssim 0.3$. Finally, an experiment studying the transition between the Type-I ELMy and EDA H-mode is analyzed using the same framework. It is found that a recently identified boundary $\alpha_{\mathrm{t}} = 0.55$ at excludes most EDA H-modes but that the balance of wavenumbers responsible for the L-mode density limit, namely $k_\mathrm{EM} = k_\mathrm{RBM}$, may better describe the transition on C-Mod. The ensemble of boundaries validated and explored is then applied to project regime access and limit avoidance for the SPARC primary reference discharge parameters.

ELM suppression↗

Wake characteristics of a tower for the DOE-NASA MOD-1 wind turbine

A 1/40th scale model of a tower concept designed for a MOD-1 wind power turbine was tested in a low speed wind tunnel. Wake wind speed profiles were measured, and from these were determined local values of wake minimum velocity ratio, average velocity ratio, and width over a range of tower elevations and wind approach angles. Comparison with results from two other all tubular models (MOD-0 and eight leg designs) tested earlier in the same tunnel indicated that wake width and flow blockage at the rotor plane of rotation were slightly larger for the MOD-1 tower than for the other two models. The differences in wake characteristics were attributed to differences in tower geometry and member dimensions.

Savino, J. M.↗

MOD-2 wind turbine system concept and preliminary design report. Volume 2: Detailed report

The configuration development of the MOD-2 wind turbine system (WTS) is documented. The MOD-2 WTS project is a continuation of DOE programs to develop and achieve early commercialization of wind energy. The MOD-2 is design optimized for commercial production rates which, in multiunit installations, will be integrated into a utility power grid and achieve a cost of electricity at less than four cents per kilowatt hour.

Source record↗

Automotive Stirling Engine Mod 1 Design Review, Volume 1

Risk assessment, safety analysis of the automotive stirling engine (ASE) mod I, design criteria and materials properties for the ASE mod I and reference engines, combustion are flower development, and the mod I engine starter motor are discussed. The stirling engine system, external heat system, hot engine system, cold engine system, and engine drive system are also discussed.

Source record↗

Mod-2 wind turbine project assessment and cluster test plans

An assessment of the Mod-2 Wind Turbine project is presented based on initial goals and present results. Specifically, the Mod-2 background, project flow, and a chronology of events/results leading to Mod-2 acceptance is presented. After checkout/acceptance of the three operating turbines, NASA/LeRC will continue management of a two year test program performed at the DOE Goodnoe Hills test site. This test program is expected to yield data necessary for the continued development and optimization of wind energy systems. These test activities, the implementation of, and the results to date are also presented.

Gordon, L. H.↗

Initial utility experience with cluster of three Mod-2 wind turbine systems

This paper describes the initial utility experiences of operating three MOD-2s during the Engineering Acceptance Testing. Electrical quantities of bus voltage, phase currents and power are initially being recorded to evaluate impacts to customers on the 69-kV subtransmission line during synchronization and operation of one or more WTSs. To date, effects on the system have been essentially undetectable. Measurements of television signal strengths were taken at an existing television remote pickup and relay station at the WTS site. Potential TV signal interference problems from the WTSs have been avoided by replacing the remote pickups with microwave repeater links for the four TV channels received from Portland, Oregon. Preliminary measurements of audible and sub-audible noise levels indicate that the upwind rotor, tubular tower design of the MOD-2 does not have the pulsing high intensity infrasound problems experienced by the MOD-1 machine at Boone, North Carolina.

Seely, D. B.↗

Mod-2 wind turbine system development. Volume 2: Detailed report

Progress in the design, fabrication, and testing of a wind turbine system is reported. The development of the MOD-2 wind turbine through acceptance testing and initial operational evaluation is documented. The MOD-2 project intends to develop early commercialization of wind energy. The first wind turbine farm (three MOD-2 units) are now being operated at the Bonneville Power Administration site near Goldendale, Washington.

Source record↗