Development of MELCOR 2.1 Guidance Report for LPF Applications
A complex nuclear facility includes several pathways that can transport accidentally released materials throughout the facility and potentially to the exterior environment. To model and estimate material transport and possible release as a source term from a U.S. Department of Energy (DOE) nuclear facility requires proficiency in applying simulation tools, such as the MELCOR code. DOE has designated MELCOR version 1.8.5, an obsolete version, as a DOE Tool Box code in its Central Registry. A leak path factor (LPF) guidance report written in 2004 did not include experimental validation data. Using an obsolete version of MELCOR requires additional verification and validations, which may be cost prohibitive. Without any developer support and lack of experimental data validation, it is difficult to justify to regulators that the calculated source term with the obsolete version of MELCOR from the facility is accurate and defensible. The goal of this work is to replace the obsolete guidance report with MELCOR 2.1 with experimental validations. In this paper, we will present our approach to develop a MELCOR 2.1 guidance report for LPF applications. (authors)