Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Level 2”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

ChargePoint Level 2 Charging Data

This dataset contains charging data from the SWS Level 2 charger. This charger is exclusively used to charge the 220EV box truck. Data fields include charging duration (HH:MM:SS) and total energy charged during a session.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ChargePoint Level 2 Charging Data

This dataset contains charging data from the SWS Level 2 charger. This charger is exclusively used to charge the 220EV box truck. Data fields include charging duration (HH:MM:SS) and total energy charged during a session.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ChargePoint Level 2 Charging Data

This dataset contains charging data from the SWS Level 2 charger. This charger is exclusively used to charge the 220EV box truck. Data fields include charging duration (HH:MM:SS) and total energy charged during a session.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ChargePoint Level 2 Charging Data

This dataset contains charging data from the SWS Level 2 charger. This charger is exclusively used to charge the 220EV box truck. Data fields include charging duration (HH:MM:SS) and total energy charged during a session.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ChargePoint Level 2 Charging Data

This dataset contains charging data from the SWS Level 2 charger. This charger is exclusively used to charge the 220EV box truck. Data fields include charging duration (HH:MM:SS) and total energy charged during a session.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ChargePoint Level 2 Charging Data

This dataset contains charging data from the SWS Level 2 charger. This charger is exclusively used to charge the 220EV box truck. Data fields include charging duration (HH:MM:SS) and total energy charged during a session.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ChargePoint Level 2 Charging Data

This dataset contains charging data from the SWS Level 2 charger. This charger is exclusively used to charge the 220EV box truck. Data fields include charging duration (HH:MM:SS) and total energy charged during a session.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ChargePoint Level 2 Charging Data

This dataset contains charging data from the SWS Level 2 charger. This charger is exclusively used to charge the 220EV box truck. Data fields include charging duration (HH:MM:SS) and total energy charged during a session.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ChargePoint Level 2 Charging Data

This dataset contains charging data from the SWS Level 2 charger. This charger is exclusively used to charge the 220EV box truck. Data fields include charging duration (HH:MM:SS) and total energy charged during a session.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ChargePoint Level 2 Charging Data

This dataset contains charging data from the SWS Level 2 charger. This charger is exclusively used to charge the 220EV box truck. Data fields include charging duration (HH:MM:SS) and total energy charged during a session.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ChargePoint Level 2 Charging Data

This dataset contains charging data from the SWS Level 2 charger. This charger is exclusively used to charge the 220EV box truck. Data fields include charging duration (HH:MM:SS) and total energy charged during a session.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Code Verification Capabilities and Assessments in Support of ASC V&V Level 2 Milestone #6035

This document provides a summary of the code verification activities supporting the FY17 Level 2 V&V milestone entitled “Deliver a Capability for V&V Assessments of Code Implementations of Physics Models and Numerical Algorithms in Support of Future Predictive Capability Framework Pegposts.” The physics validation activities supporting this milestone are documented separately. The objectives of this portion of the milestone are: 1) Develop software tools to support code verification analysis; 2) Document standard definitions of code verification test problems; and 3) Perform code verification assessments (focusing on error behavior of algorithms). This report and a set of additional standalone documents serve as the compilation of results demonstrating accomplishment of these objectives.

97 MATHEMATICS AND COMPUTING↗

ASC CSSE Level 2 Milestone #6362: Resilient Asynchronous Many Task Programming Model

This report is an outcome of the ASC CSSE Level 2 Milestone 6362: Analysis of Re- silient Asynchronous Many-Task (AMT) Programming Model. It comprises a summary and in-depth analysis of resilience schemes adapted to the AMT programming model. Herein, performance trade-offs of a resilient-AMT prograrnming model are assessed through two ap- proaches: (1) an analytical model realized by discrete event simulations and (2) empirical evaluation of benchmark programs representing regular and irregular workloads of explicit partial differential equation solvers. As part of this effort, an AMT execution simulator and a prototype resilient-AMT programming framework have been developed. The former permits us to hypothesize the performance behavior of a resilient-AMT model, and has undergone a verification and validation (V&V) process. The latter allows empirical evaluation of the perfor- mance of resilience schemes under emulated program failures and enabled the aforementioned V&V process. The outcome indicates that (1) resilience techniques implemented within an AMT framework allow efficient and scalable recovery under frequent failures, that (2) the abstraction of task and data instances in the AMT programming model enables readily us- able Application Program Interfaces (APIs) for resilience, and that (3) this abstraction enables predicting the performance of resilient-AMT applications with a simple simulation infrastruc- ture. This outcome will provide guidance for the design of the AMT programming model and runtime systems, user-level resilience support, and application development for ASC's next generation platforms (NGPs).

97 MATHEMATICS AND COMPUTING↗

ASC ATDM Level 2 Milestone #6015: Asynchronous Many-Task Software Stack Demonstration

This report is an outcome of the ASC ATDM Level 2 Milestone 6015: Asynchronous Many-Task Software Stack Demonstration. It comprises a summary and in depth analysis of DARMA and a DARMA-compliant Asynchronous Many-Task (AMT) runtime software stack. Herein performance and productivity of the over- all approach are assessed on benchmarks and proxy applications representative of the Sandia ATDM applications. As part of the effort to assess the perceived strengths and weaknesses of AMT models compared to more traditional methods, experiments were performed on ATS-1 (Advanced Technology Systems) test bed machines and Trinity. In addition to productivity and performance assessments, this report includes findings on the generality of DARMAs backend API as well as findings on interoperability with node- level and network-level system libraries. Together, this information provides a clear understanding of the strengths and limitations of the DARMA approach in the context of Sandias ATDM codes, to guide our future research and development in this area.

97 MATHEMATICS AND COMPUTING↗

Level 2 Milestone MRT 6218: Improve Nuclear Measurements on the NIF

This report documents the completion of the Inertial Confinement Fusion, Level 2 Milestone MRT 6218, “Improve Nuclear Measurements on the NIF.” The three completion criteria are, “1) Complete Operational qualification (OQ) of Pulse Dilation PMT on the Gas Cherenkov Detector in the Well DIM at NIF, 2) Measure highly resolved (temporal magnification >= 5x) gamma signals for Carbon (ablator) history, 3) Measure highly resolved (temporal magnification >= 5x) gamma signals for DT fusion reaction history.”

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

ASC ATDM Level 2 Milestone #6358: Assess Status of Next Generation Components and Physics Models in EMPIRE

This report documents the outcome from the ASC ATDM Level 2 Milestone 6358: Assess Status of Next Generation Components and Physics Models in EMPIRE. This Milestone is an assessment of the EMPIRE (ElectroMagnetic Plasma In Realistic Environments) application and three software components. The assessment focuses on the electromagnetic and electrostatic particle-in-cell solutions for EMPIRE and its associated solver, time integration, and checkpoint-restart components. This information provides a clear understanding of the current status of the EMPIRE application and will help to guide future work in FY19 in order to ready the application for the ASC ATDM L1 Milestone in FY20. It is clear from this assessment that performance of the linear solver will have to be a focus in FY19.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Characterize Clustering of Non-Residential Alternating Current Level 2 Electric Vehicle Supply Equipment

The EVSE deployed by The EV Project included both residential and non-residential units. Approximately 4,000 non-residential AC Level 2 (ACL2) EVSE were installed in workplace environments, fleet applications and those publicly accessible located near retail centers, parking lots, and similar locations. The Blink ACL2 is capable of charging at up to 7.2 kW power, although most vehicles in The EV Project charged at about 3.7 kW. The charge rate and energy consumed to recharge the battery are determined by the plug-in electric vehicle’s (PEV’s) on-board battery management system. The impact on the local electrical grid becomes greater when several EVSE are charging PEVs on a site at the same time, or when several commercial EVSE sites are geographically close and charging simultaneously. This may place stresses on the local power transformer providing energy to these sites. What insight can The EV Project data provide in characterizing the effect of several geographically close non-residential EVSE?

33 ADVANCED PROPULSION SYSTEMS↗

Planning for Pre-Exascale Platform Environment (Fiscal Year 2015 Level 2 Milestone 5216)

This Plan for ASC Pre-Exascale Platform Environments document constitutes the deliverable for the fiscal year 2015 (FY15) Advanced Simulation and Computing (ASC) Program Level 2 milestone Planning for Pre-Exascale Platform Environment. It acknowledges and quantifies challenges and recognized gaps for moving the ASC Program towards effective use of exascale platforms and recommends strategies to address these gaps. This document also presents an update to the concerns, strategies, and plans presented in the FY08 predecessor document that dealt with the upcoming (at the time) petascale high performance computing (HPC) platforms. With the looming push towards exascale systems, a review of the earlier document was appropriate in light of the myriad architectural choices currently under consideration. The ASC Program believes the platforms to be fielded in the 2020s will be fundamentally different systems that stress ASC’s ability to modify codes to take full advantage of new or unique features. In addition, the scale of components will increase the difficulty of maintaining an errorfree system, thus driving new approaches to resilience and error detection/correction. The code revamps of the past, from serial- to vector-centric code to distributed memory to threaded implementations, will be revisited as codes adapt to a new message passing interface (MPI) plus “x” or more advanced and dynamic programming models based on architectural specifics. Development efforts are already underway in some cases, and more difficult or uncertain aspects of the new architectures will require research and analysis that may inform future directions for program choices. In addition, the potential diversity of system architectures may require parallel if not duplicative efforts to analyze and modify environments, codes, subsystems, libraries, debugging tools, and performance analysis techniques as well as exploring new monitoring methodologies. It is difficult if not impossible to selectively eliminate some of these activities until more information is available through simulations of potential architectures, analysis of systems designs, and informed study of commodity technologies that will be the constituent parts of future platforms.

97 MATHEMATICS AND COMPUTING↗