Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LWRS Program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Development of Plant Reload Optimization Framework Capabilities for Core Design and Fuel Performance Analysis

The United States (U.S.) nuclear industry faces a challenge in maintaining required levels of safety while ensuring economic competitiveness to stay in business. Safety remains a key parameter for all aspects of light water reactor (LWR) nuclear power plant (NPP) operations. Safety can become more economical by using a risk-informed ecosystem, such as the one being developed by the Risk-Informed Systems Analysis (RISA) Pathway under the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program. The LWRS Program promotes a wide range of research and development activities with the goal of maximizing both the safety and economic efficiency of NPPs through improved scientific understanding, especially given many plants are now considering second license renewals. The RISA Pathway has two main goals: (1) deploy methodologies and technologies that better represent safety margins and cost and safety factors and (2) develop advanced applications that enable cost-effective plant operation. The Plant Reload Optimization Platform development project aims to build a reactor core design tool that includes reactor safety and fuel performance analyses, and also uses artificial intelligence to support optimization of core design solutions. This report summarizes Fiscal Year 2022 (FY-22) activity in platform capability developments in RAVEN. This platform performs simulations using industry codes for core design (i.e., PARCS) and fuel performance (i.e., TRANSURANUS) which will allow expansion of the capabilities to include advanced fuel designs such as accident-tolerant fuel (ATF)s with high burnup.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Demonstration of the Plant Fuel Reload Process Optimization for an Operating PWR

The United States (U.S.) nuclear industry is facing a strong challenge to maintain regulatory-required levels of safety while ensuring economic competitiveness to stay in business. Safety remains a key parameter for all aspects related to the operation of light water reactor (LWR) nuclear power plants (NPPs) and can be achieved more economically by using a risk-informed ecosystem such as that being developed by the Risk-Informed Systems Analysis (RISA) Pathway under the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program. The LWRS Program is promoting a wide range of research and development (R&D) activities with the goal to maximize both the safety and economically efficient performance of NPPs through improved scientific understanding, especially given that many plants are considering second license renewal. The RISA Pathway has two main goals: (1) the deployment of methodologies and technologies that enable better representation of safety margins and the factors that contribute to cost and safety; and (2) the development of advanced applications that enable cost-effective plant operation. This report summarizes the research outcomes in FY-2021, which the project progressed from the planning and methodology development phase to the early demonstration phase. The highlights of these activities are: (1) the development of a multi-objective optimization process using Genetic Algorithms (GAs); (2) the development and test of an approach for optimization process acceleration using artificial intelligence (AI) that significantly reduces the computational burden; (3) the demonstration of the fuel reload optimization framework for a generic pressurized water reactor (PWR); and (4) the demonstration of limiting design basis accident (DBA) scenarios for evaluation of the transition from deterministic to risk-informed approach for fuel reload optimization.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

DOE-NE LWRS Integrated Program Plan - Physical Security Pathway

Domestic nuclear power is facing increased financial pressures from a variety of areas and there is pressure on these utilities to reduce their cost of operation. Currently, about 20%-30% of all on-site personnel are related to physical security. The LWRS Program recognized that R&D related to physical security could play a role in providing nuclear utilities technical and staffing efficiency options to meet their physical security commitments, but utilities often lack the technical basis or the ability to create the technical basis to realize or implement these efficiencies; towards this end, the LWRS Program created the Physical Security Pathway in September 2019. The pathway performs R&D to develop methods, tools, and technologies to optimize and modernize a nuclear power facility’s security posture. The pathway will: (1) conduct research on risk-informed techniques for physical security that account for a dynamic adversary; (2) apply advanced modeling and simulation tools to better inform physical-security scenarios and reduce uncertainties in force-on-force modeling; (3) assess benefits from proposed enhancements and novel mitigation strategies and explore changes to best practices, guides, or regulation to enable modernization; and (4) enhance and provide the technical basis for stakeholders to employ new security methods, tools, and technologies.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Light Water Reactor Sustainability Accomplishments Report

Welcome to the 2014 Light Water Reactor Sustainability (LWRS) Program Accomplishments Report, covering research and development highlights from 2014. The LWRS Program is a U.S. Department of Energy research and development program to inform and support the long-term operation of our nation’s commercial nuclear power plants. The research uses the unique facilities and capabilities at the Department of Energy national laboratories in collaboration with industry, academia, and international partners. Extending the operating lifetimes of current plants is essential to supporting our nation’s base load energy infrastructure, as well as reaching the Administration’s goal of reducing greenhouse gas emissions to 80% below 1990 levels by the year 2050. The purpose of the LWRS Program is to provide technical results for plant owners to make informed decisions on long-term operation and subsequent license renewal, reducing the uncertainty, and therefore the risk, associated with those decisions. In January 2013, 104 nuclear power plants operated in 31 states. However, since then, five plants have been shut down (several due to economic reasons), with additional shutdowns under consideration. The LWRS Program aims to minimize the number of plants that are shut down, with R&D that supports long-term operation both directly (via data that is needed for subsequent license renewal), as well indirectly (with models and technology that provide economic benefits). The LWRS Program continues to work closely with the Electric Power Research Institute (EPRI) to ensure that the body of information needed to support SLR decisions and actions is available in a timely manner. This report covers selected highlights from the three research pathways in the LWRS Program: Materials Aging and Degradation, Risk-Informed Safety Margin Characterization, and Advanced Instrumentation, Information, and Control Systems Technologies, as well as a look-ahead at planned activities for 2015. If you have any questions about the information in the report, or about the LWRS Program, please contact me, Richard A. Reister (the Federal Program Manager), or the respective research pathway leader (noted on pages 26 and 27), or visit the LWRS Program website (www.inl.gov/lwrs). The annually updated Integrated Program Plan and Pathway Technical Program Plans are also available for those seeking more detailed technical Information.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Light Water Reactor Sustainability Program

The Computer-Based Procedure (CBP) research effort is a part of the Light Water Reactor Sustainability (LWRS) Program The LWRS program is a research and development (R&D) program sponsored by Department of Energy (DOE) and performed in close collaboration with industry R&D programs that provides the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. One of the primary missions of the LWRS program is to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Light Water Reactor Sustainability Program: Digital Architecture Requirements

The Digital Architecture effort is a part of the Department of Energy (DOE) sponsored Light-Water Reactor Sustainability (LWRS) Program conducted at Idaho National Laboratory (INL). The LWRS program is performed in close collaboration with industry research and development (R&D) programs that provides the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants (NPPs). One of the primary missions of the LWRS program is to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. Therefore, a major objective of the LWRS program is the development of a seamless digital environment for plant operations and support by integrating information from plant systems with plant processes for nuclear workers through an array of interconnected technologies. In order to get the most benefits of the advanced technology suggested by the different research activities in the LWRS program, the nuclear utilities need a digital architecture in place to support the technology. A digital architecture can be defined as a collection of information technology (IT) capabilities needed to support and integrate a wide-spectrum of real-time digital capabilities for nuclear power plant performance improvements. It is not hard to imagine that many processes within the plant can be largely improved from both a system and human performance perspective by utilizing a plant wide (or near plant wide) wireless network. For example, a plant wide wireless network allows for real time plant status information to easily be accessed in the control room, field workers’ computer-based procedures can be updated based on the real time plant status, and status on ongoing procedures can be incorporated into smart schedules in the outage command center to allow for more accurate planning of critical tasks. The goal of the digital architecture project is to provide a long-term strategy to integrate plant systems, plant processes, and plant workers. This include technologies to improve nuclear worker efficiency and human performance; to offset a range of plant surveillance and testing activities with new on-line monitoring technologies; improve command, control, and collaboration in settings such as outage control centers and work execution centers; and finally to improve operator performance with new operator aid technologies for the control room. The requirements identified through the activities in the Digital Architecture project will be used to estimate the amount of traffic on the network and hence estimating the minimal bandwidth needed.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Developing a Strategy for Full Nuclear Plant Modernization

Recognizing the important role commercial nuclear power generation plays in the powering the economy and providing energy security to the nation, the U.S. Department of Energy (DOE) has established the Light Water Reactor Sustainability (LWRS) program to perform research and development (R&D) that further establishes the technical foundations for managing the long-term, safe, and economical operation of nuclear power plants (NPPs). One particular R&D area in the LWRS program is the Plant Modernization pathway, which includes human factors R&D and instrumentation and control systems engineering to enable full plant modernization. By funding R&D on plant modernization, the LWRS program provides important technical information that can be used by decision makers on how to best proceed with modernizing the existing fleet of NPPs. Under the LWRS program Plant Modernization pathway, a considerable amount of R&D has been performed in the human factors and I&C engineering areas. This work has been done in collaboration with many different U.S. utilities, and focused on both control room instrumentation and control (I&C) upgrades, and I&C upgrades in the field. The work performed to date under the LWRS program has had a notable impact on the ability for these utilities to continue to operate their respective fleets of reactors, and LWRS program researchers are intent on doing even more. In order to do this, a more unified strategy for full nuclear plant modernization needs to be developed. This report documents the latest step LWRS program researchers have taken to develop this strategy. Taken together with prior reports written on this specific topic the work described here provides an even clearer picture on what the strategy for full nuclear plant modernization should look like.

99 GENERAL AND MISCELLANEOUS↗

2018 Accomplishments Report

Nuclear energy is an important part of supplying our nation’s electricity safely, dependably, and economically, with reduced carbon dioxide emissions, through the long-term safe and economical operation of current nuclear power plants. The United States (U.S.) Department of Energy-Office of Nuclear Energy (DOE-NE) supports a strong and viable domestic nuclear industry and preserves the ability of that industry to participate in nuclear projects here and abroad. In collaboration with industry programs, the LWRS Program provides the technical basis for extended safe, reliable, and economical operations of the existing commercial fleet of nuclear power plants.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Technologies for Detecting Interactions between Current Plant Configuration States and Component Manipulations Directed by In-Use Procedures

This research effort is a part of the Light Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by the Department of Energy. The LWRS Program is performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long term, safe, and economical operation of current nuclear power plants (NPPs). The LWRS Program serves to help the United States (U.S.) nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of these NPPs and extension of their current operating licenses. A new area of LWRS research, Outage Risk Management Improvement (ORMI) seeks to improve the management of nuclear power plant outages through the development of tools to assist in evaluating pending activities against requirements to detect undesired interactions. Significant efforts are expended to manage the nuclear risk of an outage. The utilities conduct pre outage risk assessments, based on a very detailed review of the outage schedule, to identify where combinations of outage work and equipment out of service would result in degraded conditions with respect to nuclear safety or regulatory compliance. Probabilistic risk assessment studies are conducted to quantify the incremental core damage frequency as a result of the outage activities and system unavailability. These studies are usually presented to site and fleet management, the site plant operational review committee, and the NPP’s independent Nuclear Safety Review Board for concurrence that the outage is planned safely and that reasonable measures have been taken to reduce the added risk of conducting the outage. During the outage, the plant configuration is monitored continuously to ensure that it conforms to the approved safety plan. Deviations must be assessed and approved by management committees and, in some cases, the plant operational review committee. In virtually all outage meetings and job briefings, the current nuclear safety status of the plant is communicated, including information on the specific equipment that is being relied on to meet the requirements of the nuclear safety plan. In addition, Operations and the Outage organizations implement several layers of physical and administrative barriers to prevent unintended interaction with the systems and equipment credited for nuclear safety. In spite of all these efforts, nuclear safety challenges still occur too frequently in outages. While some of these are due to failures of equipment credited for safety, the majority occur because of human error. These typically involve some form of interaction between work activities and plant configuration changes. Some of them are very subtle and are extremely challenging to detect in advance. Nevertheless, they are not acceptable and represent clear opportunities to improve nuclear safety during outages. This project will develop tools and strategies to minimize these interactions.

99 GENERAL AND MISCELLANEOUS↗

Methods to Automate Assessing the Outage Risk and Technical Specification Compliance for Planned Work and Current Plant Conditions. Light Water Reactor Sustainability Program report

This research effort is a part of the Light Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by the Department of Energy. The LWRS Program is performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long term, safe, and economical operation of current nuclear power plants (NPPs). The LWRS Program serves to help the United States (U.S.) nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of these NPPs and the extension of their current operating licenses. The Outage Risk Management Improvement Pilot Project seeks to improve the management of nuclear power plant outages. This is done through the development of tools to assist in evaluating pending activities against requirements to detect undesired interactions. Significant efforts are expended to manage the nuclear risk of an outage. The utilities conduct pre outage risk assessments, based on a very detailed review of the outage schedule, to identify where combinations of outage work and out of service equipment would result in degraded conditions with respect to nuclear safety or regulatory compliance. Probabilistic risk assessment studies are conducted to quantify incremental core damage frequency as a result of the outage activities and system unavailability. These studies are usually presented to site and fleet management, the site plant operational review committee, and the NPP’s independent Nuclear Safety Review Board for concurrence that the outage is planned safely and that reasonable measures have been taken to reduce the added risk of conducting the outage. During the outage, the plant configuration is monitored continuously to ensure that it conforms to the approved safety plan. Deviations must be assessed and approved by management committees and, in some cases, the plant operational review committee. In virtually all outage meetings and job briefings, the current nuclear safety status of the plant is communicated, including information on the specific equipment necessary to meet the requirements of the nuclear safety plan. In addition, the operations and outage organizations implement several layers of physical and administrative barriers to prevent unintended interaction with the systems and equipment credited for nuclear safety. In spite of all these efforts, nuclear safety challenges still occur too frequently during outages. While some of these are due to failures of equipment credited for safety, the majority occur because of human error. These typically involve some form of interaction between work activities and plant configuration changes. Some of them are very subtle and are extremely challenging to detect in advance. Nevertheless, they are not acceptable and represent clear opportunities to improve nuclear safety during outages. This particular report will provide a demonstration of the capabilities in the development of a predictive software platform for improving configuration control and accessing the plant risks associated with outage work protocols and illustrate how the software assists in strategies to minimize these interactions. In addition to maintaining nuclear safety, there are numerous administrative requirements that must be complied with during an outage. This report will discuss the use of logic modelling to monitor planned work against technical specification requirements for given plant conditions and to integrate these requirements with shutdown risk models, clearance order requirements and other plant condition requirements.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Planning and Analyses Performed to Install Halden’s Advanced Control Room Concept in the Human Systems Simulation Laboratory

The United States (U.S.) Department of Energy (DOE) sponsors the Light Water Reactor Sustainability (LWRS) Program, which has the goal of sustaining U.S. nuclear assets through conducting high-quality, value-added research and development (R&D) that provides the technical bases to extend the operating life of commercial NPPs. One area in the LWRS program is the Plant Modernization pathway, which includes human factors R&D, human factors engineering (HFE), and ergonomics, conducts targeted R&D to address aging and reliability concerns with the legacy instrumentation and control (I&C) and related information systems in NPPs. LWRS program researchers have been conducting R&D that enables the modernization of the I&C technologies in NPP main control rooms and have authored numerous reports on those research activities. Interestingly, however, virtually all of the control room modernization activities that have been researched in collaboration with various U.S. utility partners has been on upgrades that are the first steps to position these legacy control rooms for further full nuclear plant modernization. So, while many nuclear utility owners and operators have taken the first steps toward the digitalization of the control room I&C, LWRS program researchers are not aware of what any utility’s end-state vision is for full control room modernization. Thus, the purpose of this LWRS R&D activity is to start developing an advanced control room interface concept for legacy NPPs and to demonstrate it in the Human Systems Simulation Laboratory (HSSL) at Idaho National Laboratory (INL) so that utility partners can see what a potential end state is for their control room upgrade activities. The end state shows what a fully modernized control room looks like and how it works, and is the result of HFE and I&C work to transition the existing control room and its concept of operations to a new advanced control room configuration. This report documents the planning and analyses performed to install an advanced control room concept in the HSSL. Future LWRS reports will document the process to set up the HSSL and the gPWR with the HSI developed in Halden, and then document how LWRS program researchers at INL and Halden are supporting the capability to conduct future studies by creating additional HSIs that support control room modernization.

99 GENERAL AND MISCELLANEOUS↗

Prototype System for Detecting Interactions between Current Plant Configuration States and Component Manipulations Directed by In-Use Procedures

This research effort is a part of the Light Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by the Department of Energy. The LWRS Program is performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long term, safe, and economical operation of current nuclear power plants (NPPs). The LWRS Program serves to help the United States (U.S.) nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of these NPPs and extension of their current operating licenses. The Outage Risk Management Improvement Pilot Project seeks to improve the management of nuclear power plant outages through the development of tools to assist in evaluating pending activities against requirements to detect undesired interactions. Significant efforts are expended to manage the nuclear risk of an outage. The utilities conduct pre outage risk assessments, based on a very detailed review of the outage schedule, to identify where combinations of outage work and equipment out of service would result in degraded conditions with respect to nuclear safety or regulatory compliance. Probabilistic risk assessment studies are conducted to quantify the incremental core damage frequency as a result of the outage activities and system unavailability. These studies are usually presented to site and fleet management, the site plant operational review committee, and the NPP’s independent Nuclear Safety Review Board for concurrence that the outage is planned safely and that reasonable measures have been taken to reduce the added risk of conducting the outage. During the outage, the plant configuration is monitored continuously to ensure that it conforms to the approved safety plan. Deviations must be assessed and approved by management committees and, in some cases, the plant operational review committee. In virtually all outage meetings and job briefings, the current nuclear safety status of the plant is communicated, including information on the specific equipment that is being relied on to meet the requirements of the nuclear safety plan. In addition, Operations and the Outage organizations implement several layers of physical and administrative barriers to prevent unintended interaction with the systems and equipment credited for nuclear safety. In spite of all these efforts, nuclear safety challenges still occur too frequently in outages. While some of these are due to failures of equipment credited for safety, the majority occur because of human error. These typically involve some form of interaction between work activities and plant configuration changes. Some of them are very subtle and are extremely challenging to detect in advance. Nevertheless, they are not acceptable and represent clear opportunities to improve nuclear safety during outages. This project will develop tools and strategies to minimize these interactions. This report describes a prototype tool designed to support plant personnel in controlling work during NPP outages to prevent unintended interactions. A software application was created to manage and display important configuration information and utilize natural language processing to access the impacts of upcoming procedures and work orders. Initial industry feedback is also presented.

99 GENERAL AND MISCELLANEOUS↗

Light Water Reactor Sustainability: Program Materials Research Pathway (FY22 Technical Program Plan)

The Materials Research (MR) Pathway within the Light Water Reactor Sustainability (LWRS) program is charged with performing R&D to develop the scientific basis for understanding and predicting the long-term environmental degradation behavior of materials in nuclear reactors. Furthermore, the mechanistic understanding of degradation phenomena in materials must be leveraged to develop mitigation and repair strategies and new material alternatives for existing components. This research will provide data and methods to assess the performance of systems, structures, and components essential to safe and sustained reactor operations. The R&D products developed from the LWRS program will be used by stakeholders—including utilities, industry groups, and regulators—to inform operational and regulatory requirements for materials in reactor systems, structures, and components subjected to long-term operation conditions, providing key inputs to regulators and industry. Therefore, the intent of this research is to provide options to reduce the operating costs, which may be in the form of offset maintenance costs due to better predictive models for component lifetimes, improved analyses of materials through nondestructive evaluation, reduced costs for repairs, or extended performance of plants through the selection of improved replacement materials. To provide the best options, industry experience and guidance are important because of their role in coordinated or collaborative research projects. The objectives of this report are to describe the motivation and organization of the MR Pathway within the LWRS program; provide details on the individual research tasks within the MR Pathway; describe the outcomes and deliverables of the MR Pathway, including recent technical highlights and progress; and describe the requirements for performing this critically important research.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Light Water Reactor Sustainability Program Materials Research Pathway Technical Program Plan

The Materials Research (MR) Pathway within the Light Water Reactor Sustainability (LWRS) Program is charged with performing the research and development (R&D) to develop the scientific basis for understanding and predicting long-term environmental degradation behavior of materials in nuclear reactors. Furthermore, it is essential to use the mechanistic understanding of degradation phenomena in materials to develop mitigation, repair, and new material alternatives for existing components. The work will provide data and methods to assess performance of systems, structures, and components (SSCs) essential to safe and sustained reactor operations. The R&D products developed from the LWRS Program will be used by utilities, industry groups, and regulators to inform operational and regulatory requirements for materials in reactor SSCs subjected to long-term operation conditions, providing key input to both regulators and industry. The intent of this research is to help in reducing the operating costs, which may be in the form of offset maintenance costs due to better predictive models for component lifetimes, improved analysis of materials through nondestructive evaluation, reduced costs for repairs, or extended performance of plants through the selection of improved replacement materials. To best achieve this, industry experience and guidance are important as is their role in coordinated or collaborative research projects. The objectives of this report are to describe the motivation and organization of the MR Pathway within the LWRS Program, provide details on the individual research tasks within the MR Pathway, describe the outcomes and deliverables of the MR Pathway, including recent technical highlights and progress, and list the requirements for performing the research.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Development of an Assessment Methodology That Enables the Nuclear Industry to Evaluate Adoption of Advanced Automation

Nuclear power has a crucial role in providing safe, reliable, and economical carbon-free electricity for today and the future. For continued operation, many of the existing United States nuclear power plants will begin the subsequent license renewal process for extending their operating license periods. As plants extend their expected operating lifetimes, there is a significant opportunity to modernize. These plants have a much stronger business case with these extended mission periods to modernize and significantly enhance their economic viability in current and future energy markets by implementing digital technologies that support innovation, efficiency gains, and business-model transformation. Ensuring continued safety and reliability is crucial. Transformative digital technologies—including automation—that fundamentally change the concept of operation for the nuclear power plant operating model requires a critical focus on the human and technology integration element. Further, the nuclear industry has historically been reluctant to modernize due to having a risk adverse culture and lack of clarity for a transformative new state vision (Joe & Remer, 2019; Thomas et al., 2020). Common barriers include (1) the perceived value and return on investment (ROI) of digital technology, (2) the perceived risk associated with licensing, regulatory, and cybersecurity, and (3) insufficient guidance for performing digital modifications to power generation systems. This work presents a methodology to address these barriers and support the industry in adopting advanced automation and digital technology through developing a transformative vision and implementation strategy that will address the human and technology integration element. This research leverages previous LWRS Program and industry results. It draws specifically on previous LWRS Program research in the areas of advanced alarm systems, computer-based procedures, model informed decision support, and advanced human-system interface displays (e.g., overviews and task-based). The modernization methodology can be used to guide transformative thinking when integrating a set of vendor-specific capabilities to support a new concept of operations and a utility’s end-state vision. The results of this research are organized into six major sections: - Section 1 introduces the need for supporting large-scale digital modifications that will renew the technology base for extended operating life beyond 60 years - Section 2 describes the challenges that the nuclear industry is enduring with modernizing. - Section 3 summarizes the primary standards and guidance. - Section 4 presents earlier work from the LWRS Program regarding the development of a transformative conceptual design for an advanced control room of a hybrid plants. - Section 5 presents a methodology that is designed at addressing the challenges in the industry today in achieving a transformative new state vision and concept of operations. - Conclusions and next steps of this research are provided in Section 6.

99 GENERAL AND MISCELLANEOUS↗

Developing a Human Factors Engineering Program Plan and End State Vision to Support Full Nuclear Power Plant Modernization

The Light Water Reactor Sustainability (LWRS) Program, which is sponsored by the United States (U.S.) Department of Energy (DOE), conducts research and development (R&D) to establish the technical bases to sustain U.S. nuclear assets. One area in the LWRS program is the Plant Modernization pathway, which includes human factors R&D, human factors engineering (HFE), and ergonomics. LWRS program researchers in this pathway conduct targeted R&D to address aging and reliability concerns with the legacy instrumentation and control (I&C) and related information systems in commercial nuclear power plants (NPPs). One key aspect of this pathway is to develop a strategy for full nuclear plant modernization, which previous LWRS plant modernization milestone reports have begun to describe. To further support this comprehensive plan and vision for full plant modernization, additional details need to be further developed. In particular, a core aspect of a strategy for full nuclear plant modernization is an HFE program plan and an end state vision for plant modernization that is well-integrated with both 1) a technically defensible approach to migrating the existing, mostly analog I&C infrastructure to a digital I&C infrastructure, and 2) a valid business case methodology to cost-justify the modernization activity. Thus, the purpose of this LWRS R&D activity and milestone report is threefold. First, the report provides guidance for operating commercial NPPs to support their development and evaluation of an HFE program management plan (HFE PMP) and an end state vision for plant modernization. The report presents best practices and lessons learned related to HFE PMPs based on MCR modifications in which analog systems were replaced by digital I&C systems. Second, the report summarizes the rationale for full digital I&C integration, highlights a number of factors that are critical to consider, and describes how HFE should merge with full digital I&C integration. Finally, the report summarizes and integrates the economic factors that must be considered to cost-justify HFE involvement in plant modernization.

99 GENERAL AND MISCELLANEOUS↗

Light Water Reactor Sustainability Program: Integrated Program Plan

Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 60%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to grow by about 24% from 2013 to 2040 . At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license, for a total of 60 years of operation (the oldest commercial plants in the United States reached their 40th anniversary in 2009). Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity for 40- and 60-year license periods. If current operating nuclear power plants do not operate beyond 60 years (and new nuclear plants are not built quickly enough to replace them), the total fraction of generated electrical energy from nuclear power will rapidly decline. That decline will be accelerated if plants are shut down before 60 years of operation. Decisions on extended operation ultimately rely on economic factors; however, economics can often be improved through technical advancements. The U.S. Department of Energy Office of Nuclear Energy’s 2010 Research and Development Roadmap (2010 Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: 1. Develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; 2. Develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals; 3. Develop sustainable nuclear fuel cycles; and 4. Understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program’s plans. For the LWRS Program, sustainability is defined as the ability to maintain safe and economic operation of the existing fleet of nuclear power plants for a longer-than-initially-licensed lifetime. It has two facets with respect to long-term operations: (1) manage the aging of plant systems, structures, and components so that nuclear power plant lifetimes can be extended and the plants can continue to operate safely, efficiently, and economically; and (2) provide science-based solutions to the industry to implement technology to exceed the performance of the current labor-intensive business model.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Light Water Reactor Sustainability Program Integrated Program Plan

Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 60%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to grow by about 24% from 2013 to 2040 . At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license, for a total of 60 years of operation (the oldest commercial plants in the United States reached their 40th anniversary in 2009). Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity for 40- and 60-year license periods. If current operating nuclear power plants do not operate beyond 60 years (and new nuclear plants are not built quickly enough to replace them), the total fraction of generated electrical energy from nuclear power will rapidly decline. That decline will be accelerated if plants are shut down before 60 years of operation. Decisions on extended operation ultimately rely on economic factors; however, economics can often be improved through technical advancements. The U.S. Department of Energy Office of Nuclear Energy’s 2010 Research and Development Roadmap (2010 Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: 1. Develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors. 2. Develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals. 3. Develop sustainable nuclear fuel cycles. 4. Understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program’s plans. For the LWRS Program, sustainability is defined as the ability to maintain safe and economic operation of the existing fleet of nuclear power plants for a longer-than-initially-licensed lifetime. It has two facets with respect to long-term operations: (1) manage the aging of plant systems, structures, and components so that nuclear power plant lifetimes can be extended and the plants can continue to operate safely, efficiently, and economically; and (2) provide science-based solutions to the industry to implement technology to exceed the performance of the current labor-intensive business model.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗