Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LOCATION CLOSURE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

TANK 5 SAMPLING

Tank 5 at the Savannah River Site has been used to store high level waste and is currently undergoing waste removal processes in preparation for tank closure. Samples were taken from two locations to determine the contents in support of Documented Safety Analysis (DSA) development for chemical cleaning. These samples were obtained through the use of the Drop Core Sampler and the Snowbank Sampler developed by the Engineered Equipment & Systems (EES) group of the Savannah River National Laboratory (SRNL).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada, for Fiscal Year 2014

This report serves as the combined annual report for post-closure activities for several Corrective Action Units (CAUs). The locations of the sites are shown in Figure 1. This report covers fiscal year 2014 (October 2013–September 2014). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0101 and summarized in each CAU-specific section in Section 1.0 of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted semiannually at CAUs 90 and 91 and quarterly at CAUs 92, 110, 111, and 112. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 0.50 inches (in.) in a 24-hour period and at CAU 111 if precipitation occurs in excess of 1.0 in. in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. In addition to visual inspections, soil moisture monitoring, vegetation evaluations, and subsidence surveys are conducted at CAU 110. At CAU 111, soil moisture monitoring, vegetation evaluations, subsidence surveys, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are conducted. The results of the vegetation surveys and an analysis of the soil moisture monitoring data at CAU 110 are presented in this report. Results of additional monitoring at CAU 111 are documented annually in the Nevada National Security Site Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites and in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site, which will be prepared in approximately June 2015. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. It is recommended to continue inspections and monitoring as scheduled.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reconstruction of the Room D, B, G, and Q Closure Histories at the Waste Isolation Pilot Plant

Experimental measurements of room closure in salt repositories are valuable for understanding the evolution of the underground and for validating geomechanical models. Room closure was measured during a number of experiments at the Waste Isolation Pilot Plant (WIPP) during the 1980's and 1990's. Most rooms were excavated using a multi-pass mining sequence, where each pass necessarily destroyed some of the mining sequence closure measurement points. These destroyed points were promptly reinstalled to capture the closure after the mining pass. After the room was complete, the mining sequence closure measurement stations were supplemented with remotely read closure measurement stations. Although many aspects of these experiments were thoroughly documented, the digital copies of the closure data were inadvertently destroyed, the non-trivial process of zeroing and shifting the raw closure measurements after each mining pass was not precisely described, the various closure measurements within a given room were not directly compared on the same plot, and the measurements were collected for several years longer than previously reported. Consequently, the hand-written mining sequence closure measurements for Rooms D, B, G, and Q were located in the WIPP archives, digitized, and reanalyzed for this report. The process of reconstructing the mining sequence closure histories was documented in detail and the raw data can be found in the appendices. Within the mid-section of a given room, the reconstructed closure histories were largely consistent with other mining sequence and remotely read closure histories, which builds confidence in the experiments and suggests that plane strain is an appropriate modeling assumption. The reconstructed closure histories were also reasonably consistent with previously published results, except in one notable case: the reconstructed Room Q closure histories 30 days after excavation were about 45 % less than the corresponding closures reported in Munson's 1997 capstone paper.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Riparian and Upland Restoration at the U.S. Department of Energy Rocky Flats, Colorado, Site - 12360

Remedial investigation and cleanup at the Rocky Flats, Colorado, Site was completed in 2005. Uplands, riparian, and wetland habitat were disturbed during cleanup and closure activities and required extensive revegetation. Unavoidable disturbances to habitat of the Preble's meadow jumping mouse (a federally listed species) and wetlands required consultation with regulatory agencies and mitigation. Mitigation wetlands were constructed in two drainages, and a third developed naturally where a soil borrow area intercepted the groundwater table. During the 50-plus years of site operations, 12 ponds were constructed in three drainages to manage and retain runoff and sewage treatment plant discharges prior to release off site. A batch-release protocol has been used for the past several decades at the terminal ponds, which has affected the riparian communities downstream. To return the hydrologic regime to a more natural flow-through system similar to the pre-industrial-use conditions, seven interior dams (of 12) have been breached, and the remaining five dams are scheduled for breaching between 2011 and 2020. At the breached dams, the former open water areas have transformed to emergent wetlands, and the stream reaches have returned to a flow-through system. Riparian and wetland vegetation has established very well. The valves of the terminal ponds were opened in fall 2011 to begin flow-through operations and provide water to the downstream plant communities while allowing reestablishment of vegetation in the former pond bottoms prior to breaching. A number of challenges and issues were addressed during the revegetation effort. These included reaching an agreement on revegetation goals, addressing poor substrate quality and soil compaction problems, using soil amendments and topsoil, selecting seeds, determining the timing and location of revegetation projects relative to continuing closure activities, weed control, erosion control, revegetation project field oversight, and contractual limitations. A variety of ecological restoration techniques were conducted at the site to meet these challenges. These efforts have resulted in vegetation becoming well established in most locations. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Inspection Report for the Tonopah Test Range and Nevada Test and Training Range, Nevada for Calendar Year 2020 (Rev. 0)

This report provides the results of the annual post-closure use restriction (UR) inspections at corrective action sites (CASs) located on the Tonopah Test Range (TTR) and Nevada Test and Training Range (NTTR). This report covers post-closure UR inspections for calendar year 2020, and includes visual inspections and repair activities completed at the following corrective action units (CAUs): • CAU 407, Roller Coaster RadSafe Area (TTR) • CAU 424, Area 3 Landfill Complexes (TTR) • CAU 453, Area 9 UXO Landfill (TTR) • CAU 487, Thunderwell Site (TTR). Note: CAU 400, Bomblet Pit and Five Points Landfill (TTR) (CASs TA-19-001-05PT, Ordnance Disposal Pit; and TA-55-00-TAB2, Ordnance Disposal Pit) no longer requires inspection and reporting, as described in the Post-Closure Inspection Report for the Tonopah Test Range and Nevada Test and Training Range, Nevada for Calendar Year 2019. Site figures are included in Appendix A. The Post-Closure Inspection Plans and Record of Technical Change modifying the requirements for each UR are included in Appendix B. The Post-Closure Inspection Checklists are included in Appendix C. Field Notes are included in Appendix D. Appendix E, Inspection Photographs, does not include photographs because none were taken during the 2020 post-closure inspections. Appendix F, Post-Closure Vegetation Monitoring Report, does not include any data because vegetation monitoring was not conducted or required at any CAU in 2020. Visual inspections were conducted according to the post-closure requirements outlined in specific CAU and CAS URs, and approved by NDEP. The annual post-closure inspections for CASs associated with CAUs 407, 424, 453, and 487 were conducted on May 20, 2020. No maintenance or repair issues were noted at CAUs 487, or at CASs associated with CAU 424 (except CASs 03-08-002-A304 and 03-08-002-A308). Maintenance items and subsequent repairs include the following: • CAU 407, CAS TA-23-001-TARC (Roller Coaster RadSafe Area): A UR sign was loose and was rehung during the inspection. • CAU 424, CAS 03-08-002-A304 (Landfill Cell A3-4): The northeast monument needed a UR sign. The UR sign was attached to the monument on August 11, 2020. • CAU 424, CAS 03-08-002-A308 (Landfill Cell A3-8): The southeast monument needed additional lava rock. The lava rock was added during the inspection. • CAU 453, CAS 09-55-001-0952 (Area 9 Landfill): Two animal burrows were noted in the western portion of the northern and southern trenches (one burrow per trench). The animal burrows were repaired on August 11, 2020.

54 ENVIRONMENTAL SCIENCES↗

Closure Report for Corrective Action Unit 127: Areas 25 and 26 Storage Tanks, Nevada Test Site, Nevada

CAU 127, Areas 25 and 26 Storage Tanks, consists of twelve CASs located in Areas 25 and 26 of the NTS. The closure alternatives included no further action, clean closure, and closure in place with administrative controls. The purpose of this Closure Report is to provide a summary of the completed closure activities, documentation of waste disposal, and analytical data to confirm that the remediation goals were met.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A careful examination of closure models in Euler–Lagrange Simulations of compressible multiphase flow in a planar shock particle curtain problem

In this work we present a comprehensive investigation of state-of-the-art closure models employed to represent interphase momentum, thermal, and work exchange between the gas and particulate phases for Euler–Lagrange (EL) simulations in shock-driven flows. A complete list of closures for the force, torque, heat transfer, and work exchange models is provided. In particular, the present work includes a stochastic closure for the particle-to-particle variation in the quasi-steady force and a deterministic closure for particle-to-particle variation in the added mass force in an EL framework. These variations arise due to the presence of neighboring particles and particle–particle interactions. To investigate the importance of each closure term, we carry out fully three-dimensional simulations for a planar shock propagating over a random bed of inert particles. The primary goal is to evaluate the role of each closure term on the gas dynamic features (such as transmitted and reflected shock locations) and particle curtain features (such as upstream and downstream curtain locations). To this end, thirteen cases are considered, with each case progressively including a closure model with the goal to identify and quantify its contribution to the simulated dynamics. We show that the volume fraction dependence of the mean force models plays an important role in generating wave-like instabilities that lead to concentration bands. In addition, fluctuations in quasi-steady and added mass forces primarily decrease the internal instabilities that tend to enhance local volume fraction variations. Particle rotation is primarily due to inter-particle collisions, is generally weak, and does not play an important role in the translational dynamics for the present configuration. Inter-phase heat transfer has a strong effect on gas phase temperature, slows down the transmitted and reflected shocks, and decreases the width of the curtain. Furthermore, the absence of a work-coupling model fails to conserve the total energy, greatly under-predicts the gas temperature which in turn affects the particle dynamics.

Compressible flow↗

Assessing Impacts on Pressure Stabilization and Leasing Acreage for CO 2 Storage Utilizing Oil Migration Concepts

Favorable geological storage for CO 2 has long been pictured as large anticlines with thick sandstones, similar to oil reservoirs in the petroleum system. Unlike oil, however, stored CO 2 does not need to be recoverable, which raises the possibility of using dissolution and residual trapping to augment the capacity of buoyant traps and tap more of the bulk rock volume. The work presented builds on that idea, asking the following question: If we inject CO 2 down to a syncline – analogous to the carrier bed in the petroleum system – how would this injection mechanism impact storage capacity and plume shape, migration, and stabilization? To address this question, we built a reservoir model, based on seismic interpretation of Middle Miocene strata, offshore Galveston, Texas. 3-D seismic and well logs were used to characterize key intervals. Reservoirs chosen for modeling are progradational-aggradational sands with mud intercalation. They have a higher degree of heterogeneity than the more conventional reservoirs commonly targeted for CO 2 storage. Modeling investigated how far the CO 2 plume would migrate under two scenarios: (1) injecting CO 2 at the base of the salt withdrawal basin (syncline scenario) and (2) injecting CO 2 at the base of the structural closure, similar to a common injection well location for EOR purposes (base scenario). For each scenario, we separately simulated injection of 30 MT of CO 2 and 60 MT of CO 2 continuously for 30 years and observe the plume and pressure evolution for 100 years after the injection stops. The simulation shows that injecting the CO 2 into a syncline limits the vertical migration of CO 2 , thus making synclinal injection more secure. In the syncline scenario, the geological layer around the injection point is more heterogeneous than the layer in the base scenario; thus, the CO 2 tends to migrate laterally. Additionally, in the syncline scenario, the plume does not even reach the upper part of the anticline, allowing us to safely store an additional amount of CO 2 into the reservoir. Furthermore, the simulation also shows that in the syncline scenario, the times needed for the reservoir to reach its stabilized pressure after the end of injections are faster. To summarize, CO 2 injection at the base of a syncline could provide additional storage, increase the safety of the project from the limited vertical plume migration, and expedite plume stabilization, which could result in the decrease of monitoring frequency as the project runs, thus lowering the operating cost of the project in the long run.

58 GEOSCIENCES↗

High-Spin States of {sup 84,85}Br: Mapping the Proton Sub-Shells towards {sup 78}Ni

The {sup 84,85}Br nuclei have been produced as fission fragments in the fusion reaction {sup 18}O+{sup 208}Pb at 85 MeV bombarding energy and studied with the Euroball IV array. The high-spin states of the odd-odd {sup 84}Br nucleus have been identified for the first time. From angular correlation analysis, spin values have been assigned to most of the {sup 85}Br excited states up to 4 MeV. All observed states in {sup 84,85}Br can be described by various proton excitations involving at least the two sub-shells ({pi}f{sub 5/2} and {pi}p{sub 3/2}) located just above the Z = 28 shell closure.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Final Monitoring Plan for Site Closure at Inman, Kansas

Inman, Kansas, is a rural town located in southwest McPherson County, in sections 8, 9, 16, and 17, Township 21 South, Range 4 West (Figure 1.1). There are 1,377 people in 513 households, as of the census of 2010. The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA), operated a grain storage facility at the southern edge of the city of Inman, Kansas, from 1954 to 1965. During this time, commercial grain fumigants containing carbon tetrachloride were in common use by the grain storage industry to preserve grain in their facilities. In 1997, trace to low levels of carbon tetrachloride (below the maximum contamination level [MCL] of 5.0 μg/L) were detected in three private wells near the former grain storage facility at Inman, as part of a statewide USDA private well sampling program that was implemented by the Kansas Department of Health and Environment (KDHE) near former CCC/USDA facilities. No public water supply wells were identified within 1 mi of the town by the KDHE in 1998. Carbon tetrachloride is the contaminant of primary concern at sites associated with grain storage operations. To determine whether the former CCC/USDA facility at Inman is a potential contaminant source and its possible relationship to the carbon tetrachloride contamination in groundwater, the CCC/USDA agreed to conduct a multi-phase investigation at Inman. The investigation was performed by the Environmental Science Division of Argonne National Laboratory in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the USDA.

54 ENVIRONMENTAL SCIENCES↗

Closure Report (CR) for CAU 127, Areas 25 and 26 Storage Tanks, Nevada Test Site, Nevada, Rev. 0 with ROTCs 1-2

CAU 127, Areas 25 and 26 Storage Tanks, consists of twelve CASs located in Areas 25 and 26 of the NTS. The closure alternatives included no further action, clean closure, and closure in place with administrative controls. The purpose of this CR is to provide a summary of the completed closure activities, documentation of waste disposal, and analytical data to confirm that the remediation goals were met.

54 ENVIRONMENTAL SCIENCES↗

Chemical Waste Landfill Annual Post-Closure Care Report Calendar Year 2014

The CWL is a 1.9-acre remediated interim status landfill located in the southeastern corner of SNL/NM Technical Area III (Figures 2-1 and 2-2) undergoing post-closure care in accordance with the PCCP (NMED October 2009 and subsequent revisions). From 1962 until 1981, the CWL was used for the disposal of chemical and solid waste generated by SNL/NM research activities. Additionally, a small amount of radioactive waste was disposed of during the operational years. Disposal of liquid waste in unlined pits and trenches ended in 1981, and after 1982 all liquid waste disposal was terminated. From 1982 through 1985, only solid waste was disposed of at the CWL, and after 1985 all waste disposal ended. The CWL was also used as a hazardous waste drum-storage facility from 1981 to 1989. A summary of the CWL disposal history is presented in the Closure Plan (SNL/NM December 1992) along with a waste inventory based upon available disposal records and information.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Heritage Center Cleanup, Closure, and Revitalization - 17426

For the past 20 years, Heritage Center, located at the East Tennessee Technology Park (ETTP), has been undergoing re-industrialization (RI) at the same time that legacy contamination from the Manhattan Project has been cleaned up. The DOE Oak Ridge Office of Environmental Management (OREM), cleanup contractor URS - CH2M Oak Ridge LLC (UCOR), and the Community Reuse Organization of East Tennessee (CROET) have developed a roadmap to achieve the desired end state for the site. The plan builds on ETTP cleanup, which will complete remediation to regulatory requirements, followed by closure activities that have identified all of the activities necessary to fully transition the site from closure to Heritage Center Revitalization. The ultimate goal is to eliminate or minimize DOE's long-term financial responsibility by transferring ownership of all of the property within the former ETTP site. DOE OREM is in the unique position of nearing the completion of cleanup scope at ETTP, planned for fiscal year (FY) 2020, and finalizing closure of the site (minimizing DOE's long-term liability and responsibility). In tandem, CROET is revitalizing and transforming the site into a unique end state, including a private industrial park and a National Historical Park with conservation activities integrated around and through the site. The closure and revitalization planning efforts were initiated during FY 2016 and will be finalized in FY 2017. The Closure Plan identifies all of the potential gaps between environmental cleanup of the site per the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the ultimate preferred end state. CROET, involved throughout the development of the closure strategy, is building upon the Closure Plan by completing the Revitalization Plan. The Revitalization Plan takes advantage of the Heritage Center's diverse amenities and uniqueness while maximizing its economic development potential, including a private-sector industrial park, conservation area, National Historical Park, and proposed regional airport. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Closure Strategy for a Waste Disposal Facility with Multiple Waste Types and Regulatory Drivers at the Nevada Test Site

The U.S. Department of Energy, National Security Administration Nevada Site Office (NNSA/NSO) is planning to close the 92-Acre Area of the Area 5 Radioactive Waste Management Site (RWMS) at the Nevada Test Site (NTS), which is about 65 miles northwest of Las Vegas, Nevada. Closure planning for this facility must take into account the regulatory requirements for a diversity of waste streams, disposal and storage configurations, disposal history, and site conditions. This paper provides a brief background of the Area 5 RWMS, identifies key closure issues, and presents the closure strategy. Disposals have been made in 25 shallow excavated pits and trenches and 13 Greater Confinement Disposal (GCD) boreholes at the 92-Acre Area since 1961. The pits and trenches have been used to dispose unclassified low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform waste, and to store classified low-level and low-level mixed materials. The GCD boreholes are intermediate-depth disposal units about 10 feet (ft) in diameter and 120 ft deep. Classified and unclassified high-specific activity LLW, transuranic (TRU), and mixed TRU are disposed in the GCD boreholes. TRU waste was also disposed inadvertently in trench T-04C. Except for three disposal units that are active, all pits and trenches are operationally covered with 8-ft thick alluvium. The 92-Acre Area also includes a Mixed Waste Disposal Unit (MWDU) operating under Resource Conservation and Recovery Act (RCRA) Interim Status, and an asbestiform waste unit operating under a state of Nevada Solid Waste Disposal Site Permit. A single final closure cover is envisioned over the 92-Acre Area. The cover is the evapotranspirative-type cover that has been successfully employed at the NTS. Closure, post-closure care, and monitoring must meet the requirements of the following regulations: U.S. Department of Energy Order 435.1, Title 40 Code of Federal Regulations (CFR) Part 191, Title 40 CFR Part 265, Nevada Administrative Code (NAC) 444.743, RCRA requirements as incorporated into NAC 444.8632, and the Federal Facility Agreement and Consent Order (FFACO). A grouping of waste disposal units according to waste type, location, and similarity in regulatory requirements identified six closure units: LLW Unit, Corrective Action Unit (CAU) 111 under FFACO, Asbestiform LLW Unit, Pit 3 MWDU, TRU GCD Borehole Unit, and TRU Trench Unit. The closure schedule of all units is tied to the closure schedule of the Pit 3 MWDU under RCRA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Closure Report for Corrective Action Unit 151: Septic Systems and Discharge Area, Nevada Test Site, Nevada (Rev.0 with ROTC 1)

CAU 151, Septic Systems and Discharge Area, consists of eight CASs located in Areas 2, 12, and 18 of the NTS. The closure alternatives included no further action, clean closure, and closure in place with administrative controls. The purpose of this CR is to provide a summary of the completed closure activities, documentation of waste disposal, and analytical data to confirm that the remediation goals were met.

54 ENVIRONMENTAL SCIENCES↗

Cultural Resources Review for Closure of the nonradioactive Dangerous Waste Landfill and Solid Waste Landfill in the 600 Area, Hanford Site, Benton County, Washington, HCRC# 2010-600-018R

The U.S. Department of Energy Richland Operations Office is proposing to close the Nonradioactive Dangerous Waste Landfill (NRDWL) and Solid Waste Landfill (SWL) located in the 600 Area of the Hanford Site. The closure of the NRDWL/SWL entails the construction of an evapotranspiration cover over the landfill. This cover would consist of a 3-foot (1-meter) engineered layer of fine-grained soil, modified with 15 percent by weight pea gravel to form an erosion-resistant topsoil that will sustain native vegetation. The area targeted for silt-loam borrow soil sits in Area C, located in the northern central portion of the Fitzner/Eberhardt Arid Lands Ecology (ALE) Reserve Unit. The pea gravel used for the mixture will be obtained from both off-site commercial sources and an active gravel pit (Pit #6) located just west of the 300 Area of the Hanford Site. Materials for the cover will be transported along Army Loop Road, which runs from Beloit Avenue (near the Rattlesnake Barricade) east-northeast to the NRDWL/SWL, ending at State Route 4. Upgrades to Army Loop Road are necessary to facilitate safe bidirectional hauling traffic. This report documents a cultural resources review of the proposed activity, conducted according to Section 106 of the National Historic Preservation Act of 1966.

54 ENVIRONMENTAL SCIENCES↗

HWMA/RCRA Closure Plan for the Basin Facility Basin Water Treatment System - Voluntary Consent Order NEW-CPP-016 Action Plan

This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan for the Basin Water Treatment System located in the Basin Facility (CPP-603), Idaho Nuclear Technology and Engineering Center (INTEC), Idaho National Laboratory Site, was developed to meet future milestones established under the Voluntary Consent Order. The system to be closed includes units and associated ancillary equipment included in the Voluntary Consent Order NEW-CPP-016 Action Plan and Voluntary Consent Order SITE-TANK-005 Tank Systems INTEC-077 and INTEC-078 that were determined to have managed hazardous waste. The Basin Water Treatment System will be closed in accordance with the requirements of the Hazardous Waste Management Act/Resource Conservation and Recovery Act, as implemented by the Idaho Administrative Procedures Act 58.01.05.009 and 40 Code of Federal Regulations 265, to achieve "clean closure" of the tank system. This closure plan presents the closure performance standards and methods of achieving those standards for the Basin Water Treatment Systems.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗