Engineering PapersSearch

SEARCH · Engineering Papers

Results for “LAUNCH TIME”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Three Orbital Burns to Molniya Orbit Via Shuttle_Centaur G Upper Stage

An unclassified analytical trajectory design, performance, and mission study was done for the 1982 to 1986 joint National Aeronautics and Space Administration (NASA)-United States Air Force (USAF) Shuttle/Centaur G upper stage development program to send performance-demanding payloads to high orbits such as Molniya using an unconventional orbit transfer. This optimized three orbital burn transfer to Molniya orbit was compared to the then-baselined two burn transfer. The results of the three dimensional trajectory optimization performed include powered phase steering data and coast phase orbital element data. Time derivatives of the orbital elements as functions of thrust components were evaluated and used to explain the optimization's solution. Vehicle performance as a function of parking orbit inclination was given. Performance and orbital element data was provided for launch windows as functions of launch time. Ground track data was given for all burns and coasts including variation within the launch window. It was found that a Centaur with fully loaded propellant tanks could be flown from a 37 deg inclination low Earth parking orbit and achieve Molniya orbit with comparable performance to the baselined transfer which started from a 57 deg inclined orbit: 9,545 versus 9,552 lb of separated spacecraft weight, respectively. There was a significant reduction in the need for propellant launch time reserve for a 1 hr window: only 78 lb for the three burn transfer versus 320 lb for the two burn transfer. Conversely, this also meant that longer launch windows over more orbital revolutions could be done for the same amount of propellant reserve. There was no practical difference in ground tracking station or airborne assets needed to secure telemetric data, even though the geometric locations of the burns varied considerably. There was a significant adverse increase in total mission elapsed time for the three versus two burn transfer (12 vs. 1-1/4 hr), but could be accommodated by modest modifications to Centaur systems. Future applications were discussed. The three burn transfer was found to be a viable, arguably preferable, alternative to the two burn transfer.

Orbital trajectory design

STS-114: Discovery Post MMT Press Conference

Bruce Buckingham, NASA Public Affairs hosted this conference. Bill Parsons, Space Shuttle Program Manager; John Muratore, Shuttle System and Integration Manager; Mike Wetmore, Shuttle Processing Director were present. The Panel summarizes that thorough effort of analysis and test techniques and great amount of work is being done to fix the sensor problem and will be ready to call the stations for a launch countdown process after the trouble shooting is fully completed. Launch time, grounding problem, sensor failure, trouble shooting, tanking test, pin swap, and heaters were topics covered with the News media. For clarification, Bruce Buckingham provided information that preferred launch time is at 10:39am on July 26, Eastern Time.

Source record

Orbital analysis for atmospheric trace molecule spectroscopy (ATMOS) Shuttle missions

An orbital analysis was carried out to define the geographical coverage capabilities of an ATMOS solar occultation experiment on Space Shuttle/Spacelab missions. Particular attention was given to the effects of launch time, orbit inclination, altitude, and season on latitude-longitude coverage. It is shown that the widest band of latitude coverage in the tropics and temperate zones can be achieved with a midinclined orbit and a midmorning or late-night launch time. The use of ATMOS Shuttle underflights to provide coincident measurements with a solar occultation experiment on the Upper Atmospheric Research Satellite is also examined.

Harrison, Edwin F.

Mission analysis for earth atmospheric measurements using solar occultation experiments on Shuttle Spacelabs

The maximum geographical coverage of solar occultation experiments for various Shuttle-Spacelab mission concepts is defined and an analysis that includes trade-offs between parameters such as launch time, season, orbital inclination and altitude is presented as well as the mission design data for the Spacelab-3 flight. The effects of orbital ranges from 220 to 600 km on geographical coverage are examined with inclinations up to 97 deg for sun-synchronous orbit. Results show that the widest band of latitude coverage in the tropics and the temperate zones can be achieved with a mid-inclined (i.e., 57 deg) orbit and a mid-morning or late-night launch time.

Harrison, E. F.

Space Launch System Launch Window and Day of Launch Processes

Lunar missions benefit from varying the launch azimuth as a function of launch time to allow longer launch windows with minimum performance impacts. This variable azimuth approach allows the vehicle to track the Moon’s apparent motion due to Earth’s rotation . The Space Launch System (SLS) Block 1 vehicle design requires the mission to launch into an elliptical parking orbit to provide sufficient energy to insert Orion into a trans-lunar trajectory. The primary benefit of varying the launch azimuth, and as a result the parking orbit inclination, allows the SLS Interim Cryogenic Propulsion Stage (ICPS) to perform its Trans-Lunar Injection (TLI) burn closer to perigee and take advantage of performing a burn in a location where the burn will primarily raise apogee.

A. S. Craig

Space Launch System Launch Windows and Day of Launch Processes

Lunar missions benefit from varying the launch azimuth as a function of launch time to allow longer launch windows with minimum performance impacts. This variable azimuth approach allows the vehicle to track the Moon’s apparent motion due to Earth’s rotation. The Space Launch System (SLS) Block 1 vehicle design requires the mission to launch into an elliptical parking orbit to provide sufficient energy to insert Orion into a Trans-Lunar Injection (TLI) orbit. The primary benefit of varying the launch azimuth, and as a result the achieved orbit inclination, allows the SLS Interim Cryogenic Propulsion Stage (ICPS) to perform its TLI burn closer to perigee and take advantage of performing a burn in a location where the burn will optimally raise apogee.

launch window

Space Shuttle Day-of-Launch Trajectory Design Operations

A top priority of any launch vehicle is to insert as much mass into the desired orbit as possible. This requirement must be traded against vehicle capability in terms of dynamic control, thermal constraints, and structural margins. The vehicle is certified to specific structural limits which will yield certain performance characteristics of mass to orbit. Some limits cannot be certified generically and must be checked with each mission design. The most sensitive limits require an assessment on the day-of-launch. To further minimize vehicle loads while maximizing vehicle performance, a day-of-launch trajectory can be designed. This design is optimized according to that day s wind and atmospheric conditions, which increase the probability of launch. The day-of-launch trajectory design and verification process is critical to the vehicle s safety. The Day-Of-Launch I-Load Update (DOLILU) is the process by which the National Aeronautics and Space Administration's (NASA) Space Shuttle Program tailors the vehicle steering commands to fit that day s environmental conditions and then rigorously verifies the integrated vehicle trajectory s loads, controls, and performance. This process has been successfully used for almost twenty years and shares many of the same elements with other launch vehicles that execute a day-of-launch trajectory design or day-of-launch trajectory verification. Weather balloon data is gathered at the launch site and transmitted to the Johnson Space Center s Mission Control. The vehicle s first stage trajectory is then adjusted to the measured wind and atmosphere data. The resultant trajectory must satisfy loads and controls constraints. Additionally, these assessments statistically protect for non-observed dispersions. One such dispersion is the change in the wind from the last measured balloon to launch time. This process is started in the hours before launch and is repeated several times as the launch count proceeds. Should the trajectory design not meet all constraint criteria, Shuttle would be No-Go for launch. This Shuttle methodology is very similar to other unmanned launch vehicles. By extension, this method would likely be employed for any future NASA launch vehicle. This paper will review the Shuttle s day-of-launch trajectory optimization and verification operations as an example of a more generic application of day-of-launch design and validation. With Shuttle s retirement, it is fitting to document the current state of this critical process and capture lessons learned to benefit current and future launch vehicle endeavors.

Harrington, Brian E.

Geometric Assessment of PlanetScope Imagery

Commercial companies such as Maxar, Planet Labs, and BlackSky have built large archives of high resolution (1-3 m) Earth observing data. The high temporal resolution and global coverage of these satellites makes commercial satellite images ideal for scientists studying rapidly changing processes such as flooding and fires. The high spatial resolution allows scientists to push studies to a fine scale such as monitoring agricultural growth experiments or detecting vehicles for traffic management. Scientists using these data need to know geolocation accuracy, band-to-band registration (BBR), and pixel footprint size to best determine appropriate applications as well as what extra steps they will need to take to use the data. Here, we find those key geometric properties for images from Planet Labs’ SuperDove constellation. Geolocation accuracy is assessed relative to WorldView images at globally distributed cities, band-to-band registration (BBR) is examined for every image we acquired (200+ images), and pixel footprint sizes are calculated from edge responses of the images over Cal/Val sites in China, India, or USA both near launch time and 1+ years after launch. We find that SuperDove geolocation is highly self-consistent with average global offsets among SuperDove images of 3.80 m (1.27 pixels). Despite this self-consistency, relative geolocation accuracy (with WorldView images as reference) varies by location from 3.20 m – 28.09 m mean offset. SuperDove BBR is sub-pixel and varies by band, with a mean radial offset relative to red band varying from 0.39 - 1.13 m. SuperDove image footprint size improves after 1+ years in orbit, with an average footprint size of 3.41 pixels (10.24 m) soon after launch and 3.23 pixels (9.7 m) 1+ years after launch. The BBR and self-consistency offsets are relatively small, given the large footprint sizes. A similarly extensive investigation is in progress for Planet Labs’ Dove-R series.

Alana G. Semple

ASTP (SA-210) Launch vehicle operational flight trajectory. Part 3: Final documentation

Trajectory data are presented for a nominal and two launch window trajectory simulations. These trajectories are designed to insert a manned Apollo spacecraft into a 150/167 km. (81/90 n. mi.) earth orbit inclined at 51.78 degrees for rendezvous with a Soyuz spacecraft, which will be orbiting at approximately 225 km. (121.5 n. mi.). The launch window allocation defined for this launch is 500 pounds of S-IVB stage propellant. The launch window opening trajectory simulation depicts the earliest launch time deviation from a planar flight launch which conforms to this constraint. The launch window closing trajectory simulation was developed for the more stringent Air Force Eastern Test Range (AFETR) flight azimuth restriction of 37.4 degrees east-of-north. These trajectories enclose a 12.09 minute launch window, pertinent features of which are provided in a tabulation. Planar flight data are included for mid-window reference.

Carter, A. B.

Trajectory and System Analysis For Outer-Planet Solar-Electric Propulsion Missions

Outer-planet mission and systems analyses are performed using three next generation solar-electric ion thruster models. The impact of variations in thruster model, flight time, launch vehicle, propulsion and power systems characteristics is investigated. All presented trajectories have a single Venus gravity assist and maximize the delivered mass to Saturn or Neptune. The effect of revolution ratio - the ratio of Venusian orbital period to the flight time between launch and flyby dates - is also discussed.

Cupples, Michael

Small satellite space operations

CTA Space Systems has played a premier role in the development of the 'lightsat' programs of the 80's and 90's. The high costs and development times associated with conventional LEO satellite design, fabrication, launch, and operations continue to motivate the development of new methodologies, techniques, and generally low cost and less stringently regulated satellites. These spacecraft employ low power 'lightsat' communications (versus TDRSS for NASA's LEO's) and typically fly missions with payload/experiment suites that can succeed, for example, without heavily redundant backup systems and large infrastructures of personnel and ground support systems. Such small yet adaptable satellites are also typified by their very short contract-to-launch times (often one to two years). This paper reflects several of the methodologies and perspectives of our successful involvement in these innovative programs and suggests how they might relieve NASA's mounting pressures to reduce the cost of both the spacecraft and their companion mission operations. It focuses on the use of adaptable, sufficiently powerful yet inexpensive PC-based ground systems for wide ranging user terminal (UT) applications and master control facilities for mission operations. These systems proved themselves in successfully controlling more than two dozen USAF, USN, and ARPA satellites at CTA/SS. UT versions have linked with both GEO and LEO satellites and functioned autonomously in relay roles often in remote parts of the world. LEO applications particularly illustrate the efficacy of these concepts since a user can easily mount a lightweight antenna, usually an omni or helix with light duty rotors and PC-based drivers. A few feet of coax connected to a small transceiver module (the size of a small PC) and a serial line to an associated PC establishes a communications link and together with the PC constitute a viable ground station. Applications included geomagnetic mapping; spaceborne solid state recorder validation; global store-and-forward data communications for both scientific and military purposes such as Desert Storm; UHF transponder services for both digital data and voice using a constellation; remote sensor monitoring of weather and oceanographic conditions; classified payloads; and UHF spectrum surveillance. Ground processing has been accomplished by automatic unattended or manual operation. Management of multiple assets highlights the relative ease with which two constellations totaling nine satellites were controlled from one system including constellation station keeping. Our experience in small end-to-end systems including concurrent design, development, and testing of the flight and operational ground systems offers low cost approaches to NASA scientific satellite operations of the 1990's.

Reiss, Keith

Autonomous Soaring for Improved Endurance of a Small Uninhabited Air Vehicle

A relatively unexplored method to improve the endurance of an autonomous aircraft is to use buoyant plumes of air found in the lower atmosphere called thermals or updrafts. Glider pilots and birds commonly use updrafts to improve range, endurance, or cross-country speed. This report presents a quantitative analysis of a small electric-powered uninhabited air vehicle using updrafts to extend its endurance over a target location. A three-degree-of-freedom simulation of the uninhabited air vehicle was used to determine the yearly effect of updrafts on performance. Surface radiation and rawinsonde balloon measurements taken at Desert Rock, Nevada, were used to determine updraft size, strength, spacing, shape, and maximum height for the simulation. A fixed-width spiral path was used to search for updrafts at the same time as maintaining line-of-sight to the surface target position. Power was used only when the aircraft was flying at the lower-altitude limit in search of updrafts. Results show that an uninhabited air vehicle with a nominal endurance of 2 hours can fly a maximum of 14 hours using updrafts during the summer and a maximum of 8 hours during the winter. The performance benefit and the chance of finding updrafts both depend on what time of day the uninhabited air vehicle is launched. Good endurance and probability of finding updrafts during the year was obtained when the uninhabited air vehicle was launched 30 percent into the daylight hours after sunrise each day. Yearly average endurance was found to be 8.6 hours with these launch times.

Allen, Michael J.

The analysis of a generic air-to-air missile simulation model

A generic missile model was developed to evaluate the benefits of using a dynamic missile fly-out simulation system versus a static missile launch envelope system for air-to-air combat simulation. This paper examines the performance of a launch envelope model and a missile fly-out model. The launch envelope model bases its probability of killing the target aircraft on the target aircraft's position at the launch time of the weapon. The benefits gained from a launch envelope model are the simplicity of implementation and the minimal computational overhead required. A missile fly-out model takes into account the physical characteristics of the missile as it simulates the guidance, propulsion, and movement of the missile. The missile's probability of kill is based on the missile miss distance (or the minimum distance between the missile and the target aircraft). The problems associated with this method of modeling are a larger computational overhead, the additional complexity required to determine the missile miss distance, and the additional complexity of determining the reason(s) the missile missed the target. This paper evaluates the two methods and compares the results of running each method on a comprehensive set of test conditions.

Kaplan, Joseph A.

Orbit on demand - In this century if pushed

Performance requirements and design features of the next generation of manned launch vehicles are discussed. The vehicles will launch within minutes of demand and will have a several-day turnaround time. Launch and landing sites will have minimal facilities. Baseline requirements comprise carriage and return of a 5000 lb, 7 ft diam, 15 ft long payload, a 160 n. mi. polar orbit, a 200 fps on-orbit delt-V capability, provisions for two men for 24 hr, an 1100 n. mi. cross range option, 500 flights/vehicle, land on 10,000 ft runways, and be acceptable passing over populated areas. Significant advances are needed in propulsion and fuel systems, lightweight durable structures and airbreathing acceleration engines. Trade-offs have yet to be fully explored among the number of stages and horizontal or vertical take-off.

Martin, J. A.

STS-77 Flight Day 1

On this first day of the STS-77 mission, the flight crew, Cmdr. John H. Casper, Pilot Curtis L. Brown, Jr., and Mission Specialists Andrew S.W. Thomas, Ph.D., Daniel W. Bursch, Mario Runco, Jr., and Marc Garneau, Ph.D., can be seen preforming pre-launch activities such as eating the traditional breakfast, crew suit-up, and the ride out to the launch pad. Also, included are various panoramic views of the shuttle on the pad. The crew can be seen being readied in the 'white room' for their mission. After the closing of the hatch and arm retraction, launch activities are shown including countdown, engine ignition, launch, and the separation of the Solid Rocket Boosters. Following an on-time launch, the crew of Endeavor are shown setting up a variety of experiments that will operate for much of the mission.

Source record

STS-78 Mission Highlights Resource Tape

The flight crew of the STS-78 mission, Cmdr. Terence T. Henricks, Pilot Kevin R. Kregel, Payload Cmdr. Susan J. Helms, Mission Specialists Richard M. Linnehan, Charles E. Brady, Jr., and Payload Specialists Jean-Jacques Favier, Pd.D. and Robert B. Thirsk, M.D., present a video mission over-view of their space flight. Images include: pre-launch activities such as eating the traditional breakfast, crew suit-up, and the ride out to the launch pad. Also, included are various panoramic views of the shuttle on the pad. The crew can be seen being readied in the white room' for their mission. After the closing of the hatch and arm retraction, launch activities are shown including countdown, engine ignition, launch, and the separation of the Solid Rocket Boosters. Following an on-time launch, the crew of Endeavor are shown setting up a variety of experiments that will operate for much of the mission.

Source record

STS-79 Post Flight Presentation

The flight crew of the STS-79 mission, Cmdr. William F. Readdy, Pilot Terrence W. Wilcutt, and Mission Specialists, Thomas D. Akers, John E. Blaha, Jay Apt, and Carl E. Walz, present a video mission over-view of their space flight. Images include: pre-launch activities such as eating the traditional breakfast, crew suit-up, and the ride out to the launch pad. Also, included are various panoramic views of the shuttle on the pad. The crew can be seen being readied in the white room' for their mission. After the closing of the hatch and arm retraction, launch activities are shown including countdown, engine ignition, launch, and the separation of the Solid Rocket Boosters. Following an on-time launch, the crew of Endeavor are shown setting up a variety of experiments that will operate for much of the mission.

Source record

STS-77 Post Flight Presentation

The flight crew of the STS-77 mission, Cmdr. John H. Casper, Pilot Curtis L. Brown, Jr., and Mission Specialists Andrew S.W. Thomas, Ph.D., Daniel W. Bursch, Mario Runco, Jr., and Marc Garneau, Ph.D., present a video mission over-view of their space flight. Images include: pre-launch activities such as eating the traditional breakfast, crew suit-up, and the ride out to the launch pad. Also, included are various panoramic views of the shuttle on the pad. The crew can be seen being readied in the white room' for their mission. After the closing of the hatch and arm retraction, launch activities are shown including countdown, engine ignition, launch, and the separation of the Solid Rocket Boosters. Following an on-time launch, the crew of Endeavor are shown setting up a variety of experiments that will operate for much of the mission. Also seen is the deployment and inflation of the Spartan Satellite, experiments being conducted in the Spacehab module, thruster firing to stabilized the shuttle, and the mission ending re-entry and landing of the shuttle Endeavor. The crew than answers questions from the press.

Source record