Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LAUNCH DATE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Optimum Interplanetary Rendezvous Trajectories With Powerlimited Vehicles

The optimum-thrust equations for both variable and constant thrust are presented. These thrust programs are used to generate rendezvous trajectories from the Earth to Mars for various flight times and launch dates during the years 1968-71. The manner in which the propulsion requirements vary with flight time and launch date are considered, and a comparison of vehicle performance using the variable- and constant-thrust programs is presented. The optimization of the pro- pulsion system parameters is discussed, and the existence of optimum launch dates is interpreted in terms of certain transversality conditions derivable from the calculus of variations. A brief comparison of the advanced propulsion vehicle and the ballistic vehicle propulsion requirements is made for Earth-Mars rendezvous trajectories. An appendix considering the analytical basis for this work is included.

INTERPLANETARY TRAJECTORY↗

A Saturn launched X-ray astronomy experiment. Volume 1: S-027

The S-027 X-Ray Astronomy Experiment originally proposed in early 1966, was developed to detect X-rays in the 2 keV to 10 keV range. Both a prototype unit and flight unit were constructed with the prototype unit also serving as the engineering model, the qualification test unit, and after refurbishment, as the back-up flight unit. Two Ground Support Equipment consoles were built to verify the experiment operation. A photograph of one experiment package with its Ground Support Equipment is shown. The S-027 experiment was scheduled for launch in 1968/69 and although both units were completed and tested to the extent that either would be ready for the scheduled launch, delays in the space program resulted in a launch date slip of several years. When the 1968/69 launch delay became official, provisions were made for storage of the two experiment packages at SCI Electronics in Huntsville, Alabama until a new launch date could be established.

Source record↗

An Analysis of 20 Years of Space Weathering Effects on the Boeing 376 Spacecraft

The Boeing HS-376 spin stabilized spacecraft was a popular design that was launched continuously into geosynchronous orbit starting in 1980, with the last launch occurring in 2003. Over 50 of the HS-376 buses were produced to fulfill a variety of different communication missions for countries all over the world. The design of the bus is easily approximated as a telescoping cylinder that is covered with solar cells and an Earth-facing antenna that is despun at the top of the cylinder. The similarity in design and the number of spacecraft launched over a long period of time make the HS-376 a prime target for studying the effects of solar weathering on solar panels as a function of time. A selection of primarily non-operational HS-376 spacecraft launched over a 20-year time period were observed using the United Kingdom Infrared Telescope on Mauna Kea and multi-band, near-infrared photometry produced. Each spacecraft was observed for an entire night cycling through ZYJHK filters and time-varying colors produced to compare near-infrared color as a function of launch date. The resulting analysis shown here may help in the future to set launch date constraints on the parent object of unidentified debris objects or other unknown spacecraft.

Frith, James↗

PRELIMINARY JPSS-3 VIIRS POLARIZATION SENSITIVITY AND COMPARISON WITH S-NPP, JPSS-1 AND -2

The Visible-Infrared Imaging Radiometer Suite (VIIRS) was first launched on-board the Suomi National Polar-orbiting Partnership (S-NPP) spacecraft in October of 2011. There have been three subsequent builds of the VIIRS sensor for the Joint Polar Satellite System (JPSS) program with JPSS-1, -2 and -3 having launch dates of November 2017, March 2022 and 2026 respectively. There is also a JPSS-4 VIIRS, that is in hardware integration during 2020, with a launch date of 2031. VIIRS has 22 bands: 7 thermal emissive bands (TEBs), 14 reflective solar bands (RSBs) and a Day Night Band (DNB). Ocean Color/Chlorophyll (OCC) products use calibrated Science Data Records (SDRs) for bands M1-M7(0.412-0.865μm) to compute their ocean chemistry products. These bands require accurate polarization sensitivity characterization to compensate for polarized upwelling Rayleigh scatter and produce accurate OCC Environment Data Products (EDRs). VIIRS polarization sensitivity requirement failures have driven hardware modifications to the bandpass filters and dichroic beam splitter over the program. This paper will discuss the preliminary JPSS-3 polarization results and how these hardware modifications, as the JPSS program progresses, have affected the sensor performance. Comparisons of the polarization sensitivities between sensor builds will be discussed along with the hardware modifications that contributed to their differences.

VIIRS↗

Preliminary JPSS-3 VIIRS Polarization Sensitivity and Comparison with S-NPP, JPSS-1 and -2

The Visible-Infrared Imaging Radiometer Suite (VIIRS) was first launched on-board the Suomi National Polar-orbiting Partnership (S-NPP) spacecraft in October of 2011. There have been three subsequent builds of the VIIRS sensor for the Joint Polar Satellite System (JPSS) program with JPSS-1, -2 and -3 having launch dates of November 2017, March 2022 and 2026 respectively. There is also a JPSS-4 VIIRS, that is in hardware integration during 2020, with a launch date of 2031. VIIRS has 22 bands: 7 thermal emissive bands (TEBs), 14 reflective solar bands (RSBs) and a Day Night Band (DNB). Ocean Color/Chlorophyll (OCC) products use calibrated Science Data Records (SDRs) for bands M1-M7 (0.412-0.865μm) to compute their ocean chemistry products. These bands require accurate polarization sensitivity characterization to compensate for polarized upwelling Rayleigh scatter and produce accurate OCC Environment Data Products (EDRs). VIIRS polarization sensitivity requirement failures have driven hardware modifications to the bandpass filters and dichroic beam splitter over the program. This paper will discuss the preliminary JPSS-3 polarization results and how these hardware modifications, as the JPSS program progresses, have affected the sensor performance. Comparisons of the polarization sensitivities between sensor builds will be discussed along with the hardware modifications that contributed to their differences.

VIIRS↗

The Propulsive Small Expendable Deployer System (ProSEDS)

This Annual Report covers the following main topics: 1) Updated Reference Mission. The reference ProSEDS (Propulsive Small Expendable Deployer System) mission is evaluated for an updated launch date in the Summer of 2002 and for the new 80-s current operating cycle. Simulations are run for nominal solar activity condition at the time of launch and for extreme conditions of dynamic forcing. Simulations include the dynamics of the system, the electrodynamics of the bare tether, the neutral atmosphere and the thermal response of the tether. 2) Evaluation of power delivered by the tether system. The power delivered by the tethered system during the battery charging mode is computed under the assumption of minimum solar activity for the new launch date. 3) Updated Deployment Control Profiles and Simulations. A number of new deployment profiles were derived based on the latest results of the deployment ground tests. The flight profile is then derived based on the friction characteristics obtained from the deployment tests of the F-1 tether. 4) Analysis/estimation of deployment flight data. A process was developed to estimate the deployment trajectory of the endmass with respect to the Delta and the final libration amplitude from the data of the deployer turn counters. This software was tested successfully during the ProSEDS mission simulation at MSFC (Marshall Space Flight Center) EDAC (Environments Data Analysis Center).

Lorenzini, Enrico C.↗

Overview of the Spacecraft Design for the Psyche Mission Concept

In January 2017, Psyche and a second mission concept were selected by NASA for flight as part of the 14th Discovery mission competition. Assigned for an initial launch date in 2023, the Psyche team was given direction shortly after selection to research the possibility for earlier opportunities. Ultimately, the team was able to identify a launch opportunity in 2022 with a reduced flight time to its destination. This was accomplished in large part to crosscutting trades centered on the electrical power subsystem. These trades were facilitated through the Psyche mission's planned use of Solar Electric Propulsion (SEP), which enables substantial flexibility with respect to trajectory design. In combination with low-thrust trajectory analysis tools, the team was able to robustly converge to solutions with a higher fidelity and accuracy of results. These trades also took advantage of the 1300 series product line produced by Space Systems Loral (SSL), which enabled power growth while maintaining strong system-level heritage through its modular design that has been utilized on a large number of geostationary (GEO) communications satellites. This paper presents an overview of the Psyche mission concept, and the unique architecture that enables the use of commercially developed electric propulsion and space power systems from Space Systems Loral to provide flexibility in mission design. This paper then discusses the trades that allowed the Psyche team to meet a 2022 launch date.

Prikl, Zachary↗

NASA Advisory Council Task Force on the Shuttle-Mir Rendezvous and Docking Missions

The NASA Advisory Council Task Force on the Shuttle-Mir rendezvous and docking convened on May 24 and 25, 1994. Based on the meetings, the Task Force made the following recommendations: at a minimum, the mission commander and payload commander for all subsequent Shuttle-Mir missions should be named at least 18 months in advance of the scheduled launch date; in order to derive early operational experience in advance of the first Mir docking mission, the primary objective of STS-63 should be Mir rendezvous and proximity operations; and if at all possible, the launch date for STS-63 should be moved forward.

Source record↗

Trajectory design for the Comet Rendezvous Asteroid Flyby 1995-1996 opportunities

Recent reprogramming of NASA's Comet Rendezvous Asteroid Flyby (CRAF) mission has motivated an examination of the comet rendezvous opportunities available with launch dates in 1995 and 1996. Various interplanetary transfer modes have been investigated including direct, Delta V-earth-gravity- assist and Venus/earth gravity assist trajectories. Optimal trajectories have been generated and their performance assessed for a spacecraft using a chemical propulsion system and the upgraded Titan/Centaur launch vehicle. Of the viable options available, a new CRAF baseline mission has been selected. One important result of the present study is that while there are comet rendezvous trajectories with launch dates throughout the next decade, 1997 marks the beginning of a hiatus of opportunities with short flight times to the comet targets which promise the greatest potential science return.

Myers, Mark R.↗

NASA's Work in Exoplanet Hunting Satellites and Robotic Servicing of Satellites

An overview of three missions connected with NASA's Goddard Space Flight Center at the present time: (1) NASA's flagship mission, the James Webb Space Telescope, is nearing its 2021 launch date. The James Webb, which is considered the successor to the Hubble Space Telescope, will orbit at the Earth-Sun Lagrangian Point Two where it will peer back in time, using infrared detectors, to the beginnings of our Universe. (2) NASA is conducting pioneering work in the field of robotic satellite servicing in earth orbit. The RESTORE-L project, which is slated for a 2021 launch date, is expected to pave the way for the inception of robotic assembly for deep space exploration as well as the commercialization of satellite servicing. (3) The Transiting Exoplanet Survey Satellite (TESS) has been orbiting the Earth actively searching for new planets since April of 2018. The discoveries that TESS has made to-date have benefited from a careful characterization of the refractive lens assemblies on its science instruments. The presentation will provide a detailed description of how the index of refraction of the glasses used to fabricate the TESS lens assemblies were measured at Goddard to an accuracy that enables the ability to make exoplanet discoveries hundreds of light years from Earth.

Miller, Kevin H.↗

The Assembly, Test, and Integration of LOFTID (Low-Earth Orbit Flight Test of an Inflatable Decelera-tor)

R.J. Bodkin Biography Mr. Bodkin worked in industry for a rapid prototype company focusing on UAVs and manned experimental aircraft. Later he served as the Inflation System Lead on IRVE-II and 3 and the Re-Entry Vehicle Lead for LOFTID at NASA Langley Research Center. Introduction: The Low-Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID), developed in partnership with United Launch Alliance (ULA) and flown in conjunction with the National Oceanic and Atmospheric Administration (NOAA) Joint Polar Satellite System-2 (JPSS-2) satellite, demonstrated Hypersonic Inflatable Aerodynamic Decelerator (HIAD) technology has progressed and is ready for mission infusion. LOFTID’s success demonstrates that aeroshells are not limited to the internal diame-ter of the launch vehicle payload fairing, allowing larger payloads to be deployed to the surfaces of planetary bodies with atmospheres. The challenges of assembling, integrating, and testing this revolutionary spacecraft will be dis-cussed as well as issues associated with doing this with a fixed launch date the project did not control. Assembly: Because LOFTID flew as a rideshare partner with JPSS-2, it was constrained with addi-tional schedule, milestone, and technical require-ments that were beyond the project’s control. As-sembly of the LOFTID hardware was challenged with the normal mechanical fit issues while also having to navigate the SARS-COVID-II pandemic. Challenges ranged from availability of team per-sonnel required on-site for vehicle assembly to dif-ficulties associated with team collaboration while working remotely and increased costs and lead times of components due to supply chain con-straints. Numerous additional challenges cascaded from the additional time required. Integration: LOFTID flew as a secondary pay-load to JPSS-2 in a mission-unique configuration, directly under JPSS-2 primary payload, inside the Payload Adapter that integrated JPSS-2 to the Atlas V launch vehicle. A mission unique Payload Adapt-er Separation System (PASS) was required to sepa-rate the Payload Adapter from the Launch Vehicle prior to the start of the LOFTID flight demonstra-tion. Development of this system was challenging due to a shortened development schedule resulting from the iterative nature of Payload Adapter devel-opment with the partners at ULA. Preparations to integrate the main segments of the LOFTID vehicle posed unique challenges of having to accommodate issues with a fixed launch date that led to some cre-ative solutions to the integration. The partnership agreement with ULA and JPSS-2 resulted in a mass simulator designed to be installed late in the inte-gration in the event the LOFTID vehicle was not ready in time.. Test: LOFTID testing was carried out in several phases. Some components were tested at the com-ponent level, others at the sub-system levels and then finally the integrated vehicle level. This culmi-nated with the Complete Systems Test (CST) per-formed in a vacuum chamber as one of the final checkouts prior to disassembly for re-packing of the aeroshell. CST challenges will be discussed as well as obstacles encountered post-CST. After CST, the vehicle was disassembled so the HIAD could be repacked, and the vehicle was reassembled for ac-ceptance vibration testing. Testing concluded with the fully assembled vehicle being shipped to the launch site for final testing and integrations with the Payload Adapter to JPSS-2 for launch and opera-tions. Conclusion: The challenges posed by the AI&T for LOFTID could inform the planetary community of some of the opportunities and challenges of de-veloping technologies on a rideshare with a rela-tively small budget.

R.J. Bodkin↗

Development of the Architectural Simulation Model for Future Launch Systems and its Application to an Existing Launch Fleet

A significant portion of lifecycle costs for launch vehicles are generated during the operations phase. Research indicates that operations costs can account for a large percentage of the total life-cycle costs of reusable space transportation systems. These costs are largely determined by decisions made early during conceptual design. Therefore, operational considerations are an important part of vehicle design and concept analysis process that needs to be modeled and studied early in the design phase. However, this is a difficult and challenging task due to uncertainties of operations definitions, the dynamic and combinatorial nature of the processes, and lack of analytical models and the scarcity of historical data during the conceptual design phase. Ultimately, NASA would like to know the best mix of launch vehicle concepts that would meet the missions launch dates at the minimum cost. To answer this question, we first need to develop a model to estimate the total cost, including the operational cost, to accomplish this set of missions. In this project, we have developed and implemented a discrete-event simulation model using ARENA (a simulation modeling environment) to determine this cost assessment. Discrete-event simulation is widely used in modeling complex systems, including transportation systems, due to its flexibility, and ability to capture the dynamics of the system. The simulation model accepts manifest inputs including the set of missions that need to be accomplished over a period of time, the clients (e.g., NASA or DoD) who wish to transport the payload to space, the payload weights, and their destinations (e.g., International Space Station, LEO, or GEO). A user of the simulation model can define an architecture of reusable or expendable launch vehicles to achieve these missions. Launch vehicles may belong to different families where each family may have it own set of resources, processing times, and cost factors. The goal is to capture the required resource levels of the major launch elements and their required facilities. The model s output can show whether or not a certain architecture of vehicles can meet the launch dates, and if not, how much the delay cost would be. It will also produce aggregate figures of missions cost based on element procurement cost, processing cost, cargo integration cost, delay cost, and mission support cost. One of the most useful features of this model is that it is stochastic where it accepts statistical distributions to represent the processing times mimicking the stochastic nature of real systems.

Rabadi, Ghaith↗

Overview of the NASA LISA Laser System Development

NASA Goddard Space Flight Center (GSFC) is developing the Laser System (LS) for the Laser Interferometer Space Antenna (LISA) mission, led by the European Space Agency (ESA) with a launch date of 2035. The LS under development at NASA GSFC consists of the Laser Head (LH), the Frequency Reference System (FRS), and the Power Monitor (PMON) Detector Assemblies. Since late 2017, we have been developing various models to advance the technology readiness level (TRL) for the LH from prototype (TRL4) to a system model demonstration in a relevant environment (TRL6). For the LH and FRS, the models further breakdown into the optical and electronics modules where the LH is made up of the Laser Optical Module (LOM) and the Laser Electronics Module (LEM) and the FRS consists of the FRS Optical Reference Cavity (FRS-O) and the FRS Electronics (FRS-E). The LS development follows the established NASA process in demonstrating the performance requirements [1] through the TRL4 effort and then advancing the form factor and package design to meet relevant environment requirements and qualifying the TRL6 design through rigorous testing and performance verification for space applications. The LOM for the LH is a main oscillator power amplifier (MOPA) with wavelength of 1064 nm and nominal output power of 2 Watt throughout the mission. The low-power, low-noise main oscillator (MO) is a custom micro non-planar ring oscillator (µNPRO) [2] that is phase modulated then amplified by the forward pumped ytterbium-dope fiber power amplifier (PA) stage to meet the output power requirement. The FRS is baselined on the GRACE Follow-On (GFO) [3] approach with updated FRS-E design to work with the LH-LEM. The PMON is located on the Optical Bench Assembly (OBA) [4] that samples a small portion of the LH output signal and provides the feedback signal to the LH-LEM for relative intensity noise (RIN) control. In this paper, we will report on the latest status of the LH testing and system level tests, explain the other subsystems involved in the test campaigns, and discuss the path to bring each LS subsystem to TRL6. We will also present the NASA GSFC roadmap in advancing the LISA LS to TRL6+ and plans for future system level testing as well as the preparation for space flight development to meet the LISA launch date of 2035.

amplifier↗

Mission opportunity maps for rendezvous with earth-crossing asteroids

Rendezvous missions for earth-crossing asteroids are of interest to NASA, for scientific purposes as well as for technological applications and ecological implications. To provide a comprehensive data base for planners of such missions, a mission opportunity map (MOM) has been created for eight relatively easy-to-access asteroids. A MOM presents such mission data as launch dates, flight times, and launch and postlaunch delta-V requirements for all useful mission opportunities. The merits of a MOM are: (1) searches for all useful mission opportunities are completed in the process of generating a MOM, and (2) a clear view of good and bad opportunities, the extent of performance variations, and the repeatability of the missions.

Yen, C.-W. L.↗

Mission opportunity maps for rendezvous with earth-crossing asteroids

Rendezvous missions to earth-crossing asteroids are of interest to NASA, for scientific purposes as well as for technological applications and ecological implications. To provide a comprehensive data base for planners of such missions, a mission opportunity map (MOM) has been created for eight relatively easy-to-access asteroids. A MOM presents such mission data as launch dates, flight times, and launch and postlaunch delta V requirements for all useful mission opportunities. The merits of a MOM are: (1) searches for all useful mission oportunities are completed in the process of generating a MOM, and (2) a MOM provides a clear view of good and bad opportunities, the extent of performance variations, and the repeatability of the missions.

Yen, Chen-Wan L.↗

Pegsat - First Pegasus payload

Pegsat was designed, built, and tested in slightly more than 6 months to meet the planned launch date for the first launch of the Pegasus vehicle. The primary objective of this multifunction spacecraft was to obtain environmental data from the Pegasus vehicle for use in designing future satellite busses. Taking full advantage of the opportunity, Pegsat also deployed a small Navy experimental satellite, and conducted scientific experiments over northern Canada in support of the upcoming CRRES mission.

Pincus, Robert↗