Engineering PapersSearch

SEARCH · Engineering Papers

Results for “JETTISON SYSTEM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Objectives and Progress on Ground Vibration Testing for the Ares Projects

Integrated vehicle ground vibration testing (IVGVT) will be a vital component for ensuring the safety of NASA s next generation of exploration vehicles to send human beings to the Moon and beyond. A ground vibration test (GVT) measures the fundamental dynamic characteristics of launch vehicles during various phases of flight. The Ares Flight & Integrated Test Office (FITO) will be conducting the IVGVT for the Ares I crew launch vehicle at Marshall Space Flight Center (MSFC) from 2012 to 2014 using Test Stand (TS) 4550. MSFC conducted similar GVT for the Saturn V and Space Shuttle vehicles. FITO will perform the IVGVT on the Ares I crew launch vehicle, which will lift the Orion crew exploration vehicle to low Earth orbit, and the Ares V cargo launch vehicle, which can launch the lunar lander into orbit and send the combined Orion/lander vehicles toward the Moon. Ares V consists of a six-engine core stage with two solid rocket boosters and an Earth departure stage (EDS). The same engine will power the EDS and the Ares I second stage. The current plan is to test six configurations in three unique test positions inside TS 4550. Four Ares I second stage test configurations will be tested in Position 3, consisting of the Upper Stage and Orion crew module in four nominal conditions: J-2X engine ignition, post Launch Abort System (LAS) jettison, critical slosh mass, and J-2X burn-out. Position 2 consists of the entire launch stack at first stage burn-out (using empty first stage segments). Position 1 represents the entire launch stack at lift-off (using inert first stage segments). Because of long disuse, TS 4550 is being repaired and modified for reactivation to conduct the Ares I IVGVT. The Shuttle-era platforms have been removed and are being replaced with mast climbers that provide ready access to the test articles and can be moved easily to support different positions within the test stand. Two new cranes will help move test articles at the test stand and at the Redstone Arsenal rail-head where first stage segments will be received in late 2010. The electrical system for TS 4550 also will be upgraded. The Hydraulic Support Systems (HDSs) used for Saturn and Shuttle are being disassembled and evaluated for use during IVGVT. Analyses indicate that the 45-year-old HDSs can be refurbished to support the Ares I IVGT. An alternate concept for a pneumatic suspension system is also being explored. A decision on which suspension system configuration to use for IVGVT will be made in 2010.

Tuma, Margaret L.

International Space Station (ISS) External Thermal Control System (ETCS) Loop A Pump Module (PM) Jettison Options Assessment

On December 11, 2013, the International Space Station (ISS) experienced a failure of the External Thermal Control System (ETCS) Loop A Pump Module (PM). To minimize the number of extravehicular activities (EVA) required to replace the PM, jettisoning the faulty pump was evaluated. The objective of this study was to independently evaluate the jettison options considered by the ISS Trajectory Operations Officer (TOPO) and to provide recommendations for safe jettison of the ETCS Loop A PM. The simulation selected to evaluate the TOPO options was the NASA Engineering and Safety Center's (NESC) version of Program to Optimize Simulated Trajectories II (POST2) developed to support another NESC assessment. The objective of the jettison analysis was twofold: (1) to independently verify TOPO posigrade and retrograde jettison results, and (2) to determine jettison guidelines based on additional sensitivity, trade study, and Monte Carlo (MC) analysis that would prevent PM recontact. Recontact in this study designates a propagated PM trajectory that comes within 500 m of the ISS propagated trajectory. An additional simulation using Systems Tool Kit (STK) was run for independent verification of the POST2 simulation results. Ultimately, the ISS Program removed the PM jettison option from consideration. However, prior to the Program decision, the retrograde jettison option remained part of the EVA contingency plan. The jettison analysis presented showed that, in addition to separation velocity/direction and the atmosphere conditions, the key variables in determining the time to recontact the ISS is highly dependent on the ballistic number (BN) difference between the object being jettisoned and the ISS.

Murri, Daniel G.

The design and development of a mounting and jettison assembly for the shuttle orbiter advanced gimbal system

This paper describes the requirements, design development, and qualification of the mounting and jettison assembly (MJA) which serves as the base structure for the advanced gimbal system (AGS) developed for NASA, Marshall Space Flight Center, for use during shuttle missions. An engineering model of the MJA has been built and subjected to the following testing: stiffness and modal characterization, sine and random vibration, and a jettison function and energy release. A qualitative summary of the results and the problems encountered during testing, together with the design solutions, is presented.

Korzeniowski, E. S.

Apollo-Lunar Orbital Rendezvous Technique

The film shows artists rendition of the spacecrafts, boosters, and flight of the Apollo lunar missions. The Apollo spacecraft will consist of three modules: the manned Command Module; the Service Module, which contains propulsion systems; and the Lunar Excursion Module (LEM) to carry astronauts to the moon and back to the Command and Service Modules. The spacecraft will be launched via a three-stage Saturn booster. The first stage will provide 7.5 million pounds of thrust from five F-1 engines for liftoff and initial powered flight. The second stage will develop 1 million pounds of thrust from five J-2 engines to boost the spacecraft almost into Earth orbit. Immediately after ignition of the second stage, the Launch Escape System will be jettisoned. A single J-2 engine in the S4B stage will provide 200,000 pounds of thrust to place the spacecraft in an earth parking orbit. It also will be used to propel the spacecraft into a translunar trajectory, then it will separate from the Apollo Modules. Onboard propulsion systems will be used to insert the spacecraft into lunar orbit. Two astronauts will enter the LEM, which will separate from the command and service modules. The LEM will go into elliptical orbit and prepare for landing. The LEM will lift off of the Moon's surface to return to the Command and Service Modules, and most likely be left in lunar orbit. After leaving the Moon's orbit, and shortly before entering Earth's orbit, the Service Module will be ejected. The Command Module will be oriented for reentry into the Earth's atmosphere. A drogue parachute will deploy at approximately 50,000 feet, followed by the main parachute system for touchdown.

Source record

Centaur Standard Shroud (CSS) cryogenic unlatch tests

Cryogenic tanking and partial jettison (unlatch) tests were performed on a full scale Centaur vehicle and Centaur Standard Shroud (CSS) to develop and qualify the CSS insulation system, the CSS and Centaur ground-hold purge systems, and the Centaur hydrogen tank flight vent system. Operation of the shroud/Centaur pyrotechnic systems, seals, and the shroud jettison springs, hinges, and other separation systems was demonstrated by a partial jettison of the shroud into catch nets. The Centaur tanks were filled with liquid hydrogen and liquid nitrogen. Prelaunch operations were performed, and data taken to establish system performances. Results from the initial tests showed a higher than expected heat transfer rate to the Centaur hydrogen tank. In addition, the release mechanism for the forward seal between the Centaur and the CSS did not function properly, and the seal was torn during jettison of the shroud.

Source record

Explosively Actuated Opening for Rapid Egress

Flexible linear-shaped charge provides explosive energy to create opening and to jettison panel. Container around explosive charge protects pilot from effects of explosion. Exterior steel strip receives most of force of explosion to jettison severed panel. System allows pilot to bail out from left side of airplane by creating opening where no door exists. Egress system is simple and highly responsive, requiring minimal modifications to airplane.

Bement, L. J.

Flight testing the Rotor Systems Research Aircraft (RSRA)

The Rotor Systems Research Aircraft (RSRA) is a dedicated rotor test vehicle whose function is to fill the gap between theory, wind tunnel tests and flight verification data. Its flight test envelope has been designed to encompass the expected envelopes of future rotor systems under all flight conditions. The test configurations of the RSRA include pure helicopter and compound (winged helicopter) modes. In addition, should it become necessary to jettison an unstable rotor system in flight, the RSRA may be flown as a fixed wing aircraft. The heart of the RSRA's electronic flight control system is the TDY-43 computer, which can be programmed in numerous ways to change stability and control or force feel system gains. Computer programming changes allow the RSRA to be used as a five-degree-of-freedom inflight simulator for studying the handling qualities of research rotors.

Merrill, R. K.

A spin-recovery parachute system for light general-aviation airplanes

A tail mounted spin recovery parachute system was designed and developed by the NASA Langley Research Center for use on light general aviation airplanes. The system was designed for use on typical airplane configurations, including low wing, single engine, and twin-engine design. A mechanically triggered pyrotechnic slug gun is used to forcibly deploy a pilot parachute which extracts a bag that deploys a ring slot spin recovery parachute. The total system weighs 8.2 kg (18 lb). System design factors included airplane wake effects on parachute deployment, prevention of premature parachute deployment, positive parachute jettison, compact size, low weight, system reliability, and pilot and ground crew safety. Extensive ground tests were conducted to qualify the system. The recovery parachute was used successfully in flight 17 times.

Bradshaw, C.

A spin-recovery parachute system for light general-aviation airplanes

A tail mounted spin recovery parachute system was designed and developed for use on light general aviation airplanes. The system was designed for use on typical airplane configurations, including low wing, high wing, single engine and twin engine designs. A mechanically triggered pyrotechnic slug gun is used to forcibly deploy a pilot parachute which extracts a bag that deploys a ring slot spin recovery parachute. The total system weighs 8.2 kg. System design factors included airplane wake effects on parachute deployment, prevention of premature parachute deployment, positive parachute jettison, compact size, low weight, system reliability, and pilot and ground crew safety. Extensive ground tests were conducted to qualify the system. The recovery parachute was used successfully in flight 17 times.

Bradshaw, C.

A spin-recovery parachute system for light general aviation airplanes

A tail-mounted spin-recovery parachute system has been designed and developed by the NASA Langley Research Center for use on light general aviation airplanes. The system was designed for use on typical airplane configurations, including low-wing, high-wing, single- and twin-engine designs. A mechanically triggered pyrotechnic slug gun is used to forcibly deploy a pilot parachute which extracts a bag that deploys a ring-slot spin-recovery parachute. The total system weighs 8.2 kg (18 lb). System design factors included airplane wake effects on parachute deployment, prevention of premature parachute deployment, positive parachute jettison, compact size, low weight, system reliability, and pilot and ground crew safety. Extensive ground tests were conducted to qualify the system. The recovery parachute has been used successfully in flight 17 times.

Bradshaw, C. F.

Summary of investigation

Summary of design, construction, test results, and weight comparison of jettisonable and nonjettisonable insulation systems for liquid hydrogen propellant tanks

LIQUID HYDROGEN

Development of an Aerodynamic Analysis Method and Database for the SLS Service Module Panel Jettison Event Utilizing Inviscid CFD and MATLAB

This paper describes the development, testing, and utilization of an aerodynamic force and moment database for the Space Launch System (SLS) Service Module (SM) panel jettison event. The database is a combination of inviscid Computational Fluid Dynamic (CFD) data and MATLAB code written to query the data at input values of vehicle/SM panel parameters and return the aerodynamic force and moment coefficients of the panels as they are jettisoned from the vehicle. The database encompasses over 5000 CFD simulations with the panels either in the initial stages of separation where they are hinged to the vehicle, in close proximity to the vehicle, or far enough from the vehicle that body interference effects are neglected. A series of viscous CFD check cases were performed to assess the accuracy of the Euler solutions for this class of problem and good agreement was obtained. The ultimate goal of the panel jettison database was to create a tool that could be coupled with any 6-Degree-Of-Freedom (DOF) dynamics model to rapidly predict SM panel separation from the SLS vehicle in a quasi-unsteady manner. Results are presented for panel jettison simulations that utilize the database at various SLS flight conditions. These results compare favorably to an approach that directly couples a 6-DOF model with the Cart3D Euler flow solver and obtains solutions for the panels at exact locations. This paper demonstrates a method of using inviscid CFD simulations coupled with a 6-DOF model that provides adequate fidelity to capture the physics of this complex multiple moving-body panel separation event.

Applebaum, Michael P.

Software Tool for Tracking & Mapping the NASA Orion AA-2 Test Flight Ejectable Data Recorders in Real Time

On 2 July 2019, the NASA Ascent Abort 2 flight took place off the Florida coast to test the emergency systems to separate the Orion Crew Module (CM) from the future Space Launch System rocket in the event of a malfunction. During this high-altitude test, instrumentation data was recorded on twelve customized buoyant Ejectable Data Recorders (EDRs) and subsequently jettisoned from the CM in mid-air. Upon release, the EDRs activated their GPS-Iridium beacon systems and began transmitting Short Burst Data (SBD) messages via the Iridium satellite network to relay their individual location and system health information. To locate, track and retrieve each EDR from the ocean surface in real-time, multiple open-source programming tools (Python and Linux shells) were developed for parsing the incoming Iridium binary SBD messages. For this, a Linux laptop was used to receive the Iridium-generated emails containing the SBD messages and autonomously execute the parsing tools. The received SBD data contained location, timestamp and health status information that was translated, saved, and subsequently used for simultaneously generating a continuously updated color-coded tabular display summary and unique KML files used with Google Earth to track their locations. Once their locations were known, dedicated recovery vessels retrieved all EDRs from the ocean. An additional tool was also developed in order to generate 5- and 10-minute geolocation predictions for each EDR by deriving the displacement distance, elapsed time, displacement heading and velocity based on the latest known information available. The recovery vessels were also tracked with the use of a separate commercial GPS beacon system. After jettison, 67% of the EDRs transmitted valid data by the time they were retrieved from the ocean. However, the real-time information presented by the plotting tool allowed for the ready depiction of EDR dispersal patterns and reference drift trajectories, which contributed to the recovery of all twelve EDRs and the AA-2 flight data. Lastly, the available data showed that the distance between the software’s reported drift/predicted locations and the recovery locations did not exceed 38 meters, therefore demonstrating the advantages of this software tool for supporting real-time tracking and recovery efforts of beacon devices.

Moxey, Lucas

A Supersonic/Hypersonic Aerodynamic Investigation of the Saturn 1B/Apollo Upper Stage

The static stability and axial force characteristics of an upper stage Saturn 1B/Apollo model were investigated in a series of wind tunnel tests at Mach numbers between 1. 93 and 8. 05. This report presents and analyzes the results of these small-scale studies. Test procedures and models are described, and consideration of boundary layer characteristics and violated modeling rules yields an assessment of the validity of the data. Four basic models provided evaluation of the basic launch vehicle characteristics, as well as the effects of two modes of mission abort and jettison of the launch escape system. The launch configuration experienced sudden, strong changes in stability derivatives and axial force coefficients near Mach 5. No similar changes were observed on the other configurations. Effects of Reynolds number, Mach number and boundary layer trips were obtained for each shape. The faired curves are believed to be valid for full-scale flight of the Saturn 1B/Apollo upper stage.

Source record

Crew Exploration Vehicle Service Module Ascent Abort Coverage

The Crew Exploration Vehicle (CEV) is required to maintain continuous abort capability from lift off through destination arrival. This requirement is driven by the desire to provide the capability to safely return the crew to Earth after failure scenarios during the various phases of the mission. This paper addresses abort trajectory design considerations, concept of operations and guidance algorithm prototypes for the portion of the ascent trajectory following nominal jettison of the Launch Abort System (LAS) until safe orbit insertion. Factors such as abort system performance, crew load limits, natural environments, crew recovery, and vehicle element disposal were investigated to determine how to achieve continuous vehicle abort capability.

Tedesco, Mark B.