Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Integration sites”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Study of component technologies for fuel cell on-site integrated energy systems

Heating, ventilation and air conditioning equipment are integrated with three types of fuel cells. System design and computer simulations are developed to utilize the thermal energy discharge of the fuel in the most cost effective manner. The fuel provides all of the electric needs and a loss of load probability analysis is used to ensure adequate power plant reliability. Equipment cost is estimated for each of the systems analyzed. A levelized annual cost reflecting owning and operating costs including the cost of money was used to select the most promising integrated system configurations. Cash flows are presented for the most promising 16 systems. Several systems for the 96 unit apartment complex (a retail store was also studied) were cost competitive with both gas and electric based conventional systems. Thermal storage is shown to be beneficial and the optimum absorption chiller sizing (waste heat recovery) in connection with electric chillers are developed. Battery storage was analyzed since the system is not electric grid connected. Advanced absorption chillers were analyzed as well. Recommendations covering financing, technical development, and policy issues are given to accelerate the commercialization of the fuel cell for on-site power generation in buildings.

Lee, W. D.

Fuel cell on-site integrated energy system parametric analysis of a residential complex

The use of phosphoric acid fuel cell powerplant to provide all the electricity required by an 81-unit garden apartment complex is studied. Byproduct heat is recovered and provides some of the heat required by the complex. The onsite integrated energy system contains energy conversion equipment including combinations of compression and absorption chillers, heat pumps, electric resistance heaters, and thermal storage. The annual fuel requirement for several onsite integrated energy systems as well as the fuel cell breakeven cost for one specific system were calculated. It is found that electrical efficiency cannot be traded off against thermal efficiency without paying a penalty in system efficiency.

Simons, S. N.

Study of fuel cell on-site, integrated energy systems in residential/commercial applications

Three building applications were selected for a detailed study: a low rise apartment building; a retail store, and a hospital. Building design data were then specified for each application, based on the design and construction of typical, actual buildings. Finally, a computerized building loads analysis program was used to estimate hourly end use load profiles for each building. Conventional and fuel cell based energy systems were designed and simulated for each building in each location. Based on the results of a computer simulation of each energy system, levelized annual costs and annual energy consumptions were calculated for all systems.

Wakefield, R. A.

Develop and test fuel cell powered on-site integrated total energy system. Phase 3: Full-scale power plant development

An integrated 5 kW power system based upon methanol fuel and a phosphoric acid fuel cell operating at about 473 K is described. Description includes test results of advanced fuel cell catalysts, a semiautomatic acid replenishment system and a completed 5 kW methanol/system reformer. The results of a preliminary system test on a reformer/stack/inverter combination are reported. An initial design for a 25 kW stack is presented. Experimental plans are outlined for data acquisition necessary for design of a 50 kW methanol/steam reformer. Activities related to complete mathematical modelling of the integrated power system, including wasteheat utilization, are described.

Kaufman, A.

Develop and test fuel cell powered on-site integrated total energy systems. Phase 3: Full-scale power plant development

A schematic and physical layout is given for the 5kW integrated system and the development status of individual components is described. The results of using a one dimensional mathematical model of the 5kW reformer are presented. Plans for a single-tube reformer test unit for the acquisition of temperature profile data are described. Tentative specifications for a 50kW dc-to-ac inverter are listed. Performance data are given on two 3-cell stacks incorporating semiautomatic acid replenishment systems and improved electrocatalysts. A qualification test on methanol/steam reforming catalyst T2107RS is reported, including a portion in which the catalyst was deliberately poisoned with 800 ppm ethanol in the feed.

Source record

Develop and test fuel cell powered on-site integrated total energy system

Satisfactory performance is reported for the first 12-cell sub-stack of the 5 kW rebuild using improved ABA reactant distribution plates. Construction and test results are described for the first full-sized single-cell test (0.33 m x 0.56 m). Test duration was 450 hours. Plans are outlined for construction and testing of two methanol reformer units based on commercially-available shell-and-tube heat exchangers. A 5 kW-equivalent precursor and a 50 kW-equivalent prototype will be built. Supporting design and single-tube experimental data are presented. Stack support efforts are summarized on corrosion currents of graphite materials and acid-management of single-cell test facilities. Comparative properties are summarized for the two methanol/steam reforming catalysts evauated under Task V (now completed); T2107RS and C70-2RS.

Kaufman, A.

Develop and test fuel cell powered on-site integrated total energy systems. Phase 3: Full-scale power plant development

Satisfactory performance is reported for the first three 12-cell sub-stacks of the 5 kW stack rebuild. Early general conclusions are presented from an economic study. Results are reported on a successful 700-hour test of a 3-cell stack in the full-sized configuration (0.33m x 0.56m). Construction of a 5 kW equivalent methanol/steam reformer based on a commercial shell-and-tube heat exchanger was completed. Several test runs are summarized. Preliminary conclusions are presented on the technical and economic aspects of fuel cell/HVAC interaction. Physical data are presented on several dense graphite materials which are candidates for gas-distribution plates. Performance of a new cathode catalyst is reported.

Source record

Develop and test fuel cell powered on-site integrated total energy systems

On-going testing of an 11 cell, 10.7 in. x 14 in. stack (about 1 kW) reached 2600 hours on steady load. Nonmetallic cooling plates and an automated electrolyte replenishment system continued to perform well. A 10 cell, 10.7 in. x 14 in. stack was constructed with a modified electrolyte matrix configuration for the purpose of reducing cell IR loss. The desired effect was achieved, but the general cell performance level was irregular. Evaluation is continuing. Preparations for a long term 25 cell, 13 in. x 23 in. test stack (about 4 kW) approached completion. Start up in early May 1984 is expected.

Kaufman, A.

Develop and test fuel cell powered on-site integrated total energy systems. Phase 3: Full-scale power plant development

Two 25-cell, 13 inch x 23 inch (4kW) stacks were started up to evaluate the reliability of component and stack technology developed through the end of 1983. Both stacks started up well and are running satisfactorily on hydrogen-air after 1900 hours and 800 hours, respectively. A synthetic-reformat mixing station is nearing completion, and both stacks will be operated on reformate fuel. A stack-protection control system was placed in operation for Stack No. 2, and a similar set-up is in preparation for Stack No. 1. This system serves to change operating conditions or shut the stack down to avoid deleterious effects from nonstack-related upsets. The capability will greatly improve changes of obtaining meaningful long-term test data.

Kaufman, A.

Develop and test fuel cell powered on-site integrated total energy systems: Phase 3, full-scale power plant development

Two 25 cell stacks of the 13 inch x 23 inch cell size (about 4kW) remain on test after 4000 hours and 2900 hours, respectively, using simulated reformate fuel. These tests are focusing on the durability of fuel cell stack components developed through the end of 1983. Also, these stacks are serving as forerunners of a 25kW stack that will contain 175 cells of the same size and will employ the same technology base. The stack technology development program has focused on a new, low cost bipolar plate edge seal technique and evaluation of advanced cathode catalysts, an electrolyte replenishment system, and nonmetallic cooling plates in small stacks.

Kaufman, A.

Develop and test fuel cell powered on-site integrated total energy systems: Phase 3, full-scale power plant development

A 25 cell stack of the 13 inch x 23 inch cell size (about 4kW) remains on test after 6000 hours, using simulated reformate fuel. A similar stack was previously shut down after 7000 hours on load. These tests were carried out for the purpose of assessing the durability of fuel cell stack components developed through the end of 1983. In light of the favorable results obtained, a 25kW stack that will contain 175 cells of the same size is being constructed using the same technology base. The components for the 25kW stack have been completed. A methanol steam reformer with a design output equivalent to 50kW has been constructed to serve as a hydrogen generator for the 25kW stack. This reformer and the balance of the fuel processing sub system are currently being tested and debugged. The stack technology development program focused on cost reduction in bipolar plates, nonmetallic cooling plates, and current collecting plates; more stable cathode catalyst support materials; more corrosion resistant metal hardware; and shutdown/start up tolerance.

Kaufman, A.

Develop and test fuel cell powered on site integrated total energy systems. Phase 3: Full-scale power plant development

The third in a series of 4kW stacks, consisting of 24 cells of the 13 inch x 23 inch cell size, has been on test for about 1600 hours. This stack is similar to the first two stacks, which ran 7000 and 8400 hours, respectively. The present stack incorporates technology improvements relating to the electrolyte-matrix, the current-collector assembly, and a reduction in the number of cooling plates. Performance is currently averaging about 0.64 per cell at 161 mA sq cm.

Kaufman, A.

Develop and test fuel cell powered on-site integrated total energy systems. Phase 3: Full-scale power plant development

The testing of two 25-cell stacks of the 13 inch x 23 inch cell size (about 4kW) was carried out for 7000 and 8400 hours, respectively. A 25kW stack containing 175 cells of the same size and based on the same technology was constructed and is on test. A third 4kW stack, which will contain 24 cells, will comprise several new technology features; these will be assesed for performance and durability in long-term testing.

Kaufman, A.

Develop and test fuel cell powered on site integrated total energy sysems: Phase 3: Full-scale power plant development

A 25-cell stack of the 13 inch x 23 inch cell size (about 4kW) remains on test after 8300 hours, using simulated reformate fuel. A similar stack was previously shut down after 7000 hours on load. These tests have been carried out for the purpose of assessing the durability of fuel cell stack components developed through the end of 1983. A 25kW stack containing 175 cells of the same size and utilizing a technology base representative of the 25-cell stacks has been constructed and is undergoing initial testing. A third 4kW stack is being prepared, and this stack will incorporate several new technology features.

Kaufman, A.

The first Spacelab mission

The purpose of Spacelab, an Orbiter-mounted NASA/ESA laboratory, is to include in the Space Transportation System (STS) a payload carrier with maximum flexibility to accommodate multidisciplinary scientific payloads. The major Spacelab configurations obtained by combination of two basic elements, the module and pallet, are described along with the anticipated program of experiments and payloads, and mission management general concept. The first Spacelab 7-day mission is scheduled for flight in the second half of 1980, with the primary objective being to verify system performance capabilities. Detailed attention is given to the payload mission management responsibilities for the first flight, including program control, science management, payload interfaces, integrated payload mission planning, integration requirements, payload specialist training, payload integration, launch site integration, payload flight/mission operations, and postmission activities. The Spacelab configuration (including the long module and one pallet) and the overall schedule for this mission are presented.

Pace, R. E., Jr.

Current DOT research on the effect of multiple site damage on structural integrity

Multiple site damage (MSD) is a type of cracking that may be found in aging airplanes and which may adversely affect their continuing airworthiness. The Volpe National Transportation Systems Center has supported the Federal Aviation Administration Technical Center on structural integrity research for the past two and half years. The work has focused on understanding the behavior of MSD, detection of MSD during airframe inspection, and the avoidance of MSD in future designs. These three elements of the MSD problem are addressed and a summary of the completed work, the current status, and requirements for future research.

Aging Aircraft

Zhao-Group/Integration-Sites-IFO0880

Integration sites for Rhodotorula toruloides strain NBRC 0880. This repository accompanies the work "Discovery, characterization, and application of chromosomal integration sites for stable heterologous gene expression in Rhodotorula toruloides". Add scripts and ifo0880 folders to code and data folder of "CRISPR-COPIES" repository.

Boob, Aashutosh