Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Integration and Testing of DERs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Optimized V1G and V2G Electric Vehicle Fleet Management and Grid Transaction at Marine Corps Air Station Miramar in San Diego, CA

The overall technical goal of the project was to demonstrate an all-electric bi-directional non-tactical fleet at Marine Corps Air Station (MCAS) Miramar that was integrated and controlled with other distributed energy resources (DERs) (i.e., PV, stationary battery, and building loads) to provide resilience to critical electric loads in the event of grid outages, to minimize charging costs, and to provide economic energy resources to electricity markets. In this project, the specific, technical objectives were: 1. Demonstrate that bi-directional electric vehicles can provide critical complementary services to fixed storage batteries in microgrid applications while performing function as non-tactical vehicles. 2. Demonstrate participation of bi-directional (V2G) and unidirectional (V1G) PEVs for demand management and minimization of charging costs. 3. Demonstrate integration of multiple DERs for grid service participation. US Marine Corps Air Station (MCAS) Miramar in San Diego was the site of this electric vehicle-to-microgrid-utility grid test and demonstration project. Existing microgrid assets in this study included (1) a public works building; (2) a 30-kW rooftop photovoltaic (PV) system and (3) a separate 250 kW carport PV system. In this project, six bi-directional V2G vans were located at the MCAS Miramar’s showcase building-scale microgrid to develop and test technical capabilities that V2G can provide in microgrid applications (e.g., cost reduction and resiliency). These resources provided aggregated demand management and simulated participation in current retail DR programs. The vehicles used in this demonstration were selected because they provided functionality that MCAS Miramar needed, 15 passenger transport and facilities work cargo carrying capacity, and bi-directional charging capability that the research project required. All vehicles in this study were manufactured and distributed by VIA Motors, Inc. There were six vehicles total and each was VIA’s VTRUX eREV V2G model, a modified General Motors Chevrolet 2500 2WD van. Three of the vans were configured as passenger vans and the other three were configured as cargo vans. Each van had an on-board bi-direcrtional inverter/charger, Bel Power Solutions model 350INVCHGT150-120-240-8G nominally rated at +/-15 kW. The VIA van’s charging connector follows the J1772 charging protocol. The bi-directional EVSEs demonstrated in this study were manufactured by Coritech, Inc. Each VGI-80-AC charging station enabled enhanced V2G charging capability to a Clipper Creek CS-100 charging module. The enhanced capabilities included ethernet communication following the SEP2.0 protocol with a distributed energy resource function set and an operator screen displaying real-time SOC, voltage, and current. The VGI-80-AC charging stations are classified as level 2 with a maximum current output of 80 A or effectively 19 kW. The VIA van’s onboard charger limited the charging and discharging power to 15 kW in each direction. A control computer was installed in the EWOC and connected to an existing monitor. The V2G control communication network was a completely stand-alone closed system that did not have any connection to any other networks on the base. A cybersecure remote communication connection was created with a cellular modem, firewall hardware, and a virtual private network configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Introducing the 9500 Node Distribution Test System to Support Advanced Power Applications: An Operations-Focused Approach

The 9500 Node Test System is a representative section of distribution power system model developed as a part of the GridAPPS-D™ project, an effort funded by DOE as a part of the Grid Modernization Lab Consortium (GMLC) program. The test system was developed to fulfill a growing need to represent the rapidly evolving state of electric distribution systems by combining elements of legacy infrastructure systems, modern feeder topologies, and an anticipated future with smart grid technologies. It also provides a network model capable of supporting the simulation of operational scenarios such as the ones in a utility distribution control center. This test system allows the evaluation of the performance of advanced power applications in real-time, such as one that simulates the operations of an Advanced Distribution Management Systems (ADMS), Distributed Energy Resource Management Systems (DERMS), etc. in a Distribution control center. This model is an extension of the widely used IEEE 8500 Node Test Feeder and is currently being validated to become an IEEE test case to help increase adoption and widespread usage among both academia and industry. It is a full-size model representative of a section of a utility’s distribution system with multiple feeders fed from different substations. The model includes multiple distribution circuits, a sub-transmission system, multiple substations, behind the meter customer rooftop photovoltaics (PV), and multiple utility-scale distributed energy resources. To enable accurate simulations of operational scenarios, the 9500 Node Test System is designed to support procedure-based operations, with the ability to realistically demonstrate switching operations, feeder reconfiguration, adjustment of volt-var control equipment, dispatch of distributed generation, and response to planned and unplanned outages. The 9500 Node Test System includes three radial distribution feeders with 12.3 MVA of average load, consisting of both medium voltage and low voltage equipment each supplied by a different distribution substation. The three distribution feeders are connected to each other through Normally-Open switches which can be closed when needed to simulate restoration scenarios due to a fault. One feeder represents today’s grid with low penetration of customer-side renewables. The second represents a potential future grid with microgrids and 100% renewable penetration. The third has no customer generation resources, a district steam plant, and a utility-scale solar farm. The three diverse circuits were created to allow the simulation of both today’s situation as well as potential future scenarios. All three feeders have customers connected by low-voltage secondary triplex lines. This test system meets all requirements outlined in the report for creating a simulation environment that would enable discussion between key technical stakeholders as well as having the potential to accelerate operational application development and their subsequent testing and integration. The new model is a possible representation of what we believe the distribution grid may look like in the future: a high penetration of renewables, reconfigurable radial and mesh topology, numerous DERs, islanded microgrids, and significantly increased data and measurement density. The system supports both the solution of existing and newer algorithms but also enables the evaluation of applications in a realistic operational environment defined by task oriented procedural steps that represent the interaction between the control center operator and field personnel.

24 POWER TRANSMISSION AND DISTRIBUTION↗

DEReliction: A Cybersecurity Vulnerability Assessment Methodology for Distributed Energy Resources

With the increasing integration of Distributed Energy Resources (DER) into the electric grid, maintaining grid reliability and resilience requires that these devices remain secure. This paper discusses a cybersecurity vulnerability assessment methodology that incorporates best practices from Sandia National Laboratories, SANS Institute, OWASP Foundation, and other web and Internet of Things (IoT) penetration testing (“pen testing”) programs, courses, and frameworks for assessing the security posture of devices. The methodology involves five sequential steps: (1) Collect Public Information, (2) Extract Hardware Details, (3) Inventory Software Components, (4) Identify Vulnerabilities, and (5) Test Vulnerabilities. Each step uncovers potential weaknesses in both hardware and software components of DER devices, considering adversary tactics, techniques, and procedures (TTPs), and potential attack vectors along the way. The results from the execution of this method on multiple residential- and small commercial-scale photovoltaic (PV) inverters reveled hardware and software vulnerabilities, which highlight the benefit of taking a methodical approach to discover vulnerabilities. While the specific vulnerability details are not shared here, a generalized overview of findings underscore the importance of robust security assessments for DER devices. Adoption of an assessment framework of this kind will identify and mitigate cybersecurity threats and bolster the resilience of DER-integrated electric grids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Blockchain Based Co-Simulation Framework for Integrating DERs into Wholesale Electricity Markets

As the number of distributed energy resources (DERs) continue to increase across energy-delivery systems, there remains a need for integrating their capabilities into traditional grid operations. In this paper, a blockchain-based solution is proposed to facilitate FERC's Order No. 2222 implementations. The presented use-case enables small-scale DERs to participate in wholesale market operations through DER aggregators, while also enabling local distribution system operators to enforce distribution system constraints in a secure and traceable manner. The presented use case is built around the Unified Testing Platform (UTP) being developed as a part of the Blockchain for Optimized Security and Energy Management (BLOSEM) project. This is a multi-lab effort intended to simplify the deployment of blockchain-powered grid solutions by enabling the integration of simulation tools, and blockchain technologies through the use of system-agnostic interfaces that provide a modular, interoperable, and reusable connectivity layer.

blockchain testing↗

A Blockchain Based Co-Simulation Framework for Integrating DERs to Wholesale Electricity Markets: Preprint

As the number of distributed energy resources (DERs) continue to increase across energy-delivery systems, there remains a need for integrating their capabilities into traditional grid operations. In this paper, a blockchain-based solution is proposed to facilitate FERC's Order No. 2222 implementations. The presented use-case enables small-scale DERs to participate in wholesale market operations through DER aggregators, while also enabling local distribution system operators to enforce distribution system constraints in a secure and traceable manner. The presented use case is built around the Unified Testing Platform (UTP) being developed as a part of the Blockchain for Optimized Security and Energy Management (BLOSEM) project. This is a multi-lab effort intended to simplify the deployment of blockchain-powered grid solutions by enabling the integration of simulation tools, and blockchain technologies through the use of system-agnostic interfaces that provide a modular, interoperable, and reusable connectivity layer.

blockchain testing↗

Sensitivity-Based Reactive Power Dispatch of DERs to Support Transmission Grid During Emergency

This paper proposes a TSO-DSO framework including DER set-point dispatch using sensitivity analysis. We address all three steps of TSO-DSO integration stating by estimating the capability curve of an unbalanced distribution system and then modeling of capability curve on the transmission side grid and estimating the reactive power needed from DSO during emergencies, and ending by dispatching the requested reactive power from TSO. The proposed interaction framework is tested on an IEEE 37-node distribution network connected to IEEE 9 bus transmission system. The simulation shows that using sensitivity-based dispatch would reduce the number of communication signals between DERs and DSO and that can decrease the risk of communication contingency.

Alkhonain, Ahmed↗

Converter-Interfaced CHP Plant for Improved Grid-Integration, Flexibility and Resiliency

GE Research and its partner GE Renewables have proposed the use of an interface converter solution to increase the penetration of small to medium-sized CHP (1MWe to 20MWe) into distribution grids and improve their flexibility and grid support capability. Indeed, the proposed interface converter solution thanks to presence of the grid-ready inverter, allows to streamline the compliance to grid codes requirements, reduce the interconnection delays and costs and ultimately one of the main barriers for CHP adoption by commercial and industrial facilities. An additional benefit provided by the interface converter is the use of the grid-ready inverter for reactive power which eliminates the need of sizing the generator for that capability. These two benefits highly favor the economic feasibility of converter-interfaced CHP. Five user cases, each in one of the leading U.S states for CHP potential reported by the DOE in its estimation of the U.S Technical Potential of CHP, were selected to compare the economic performances of converter-interfaced CHP as compared with directly-coupled. They include a college campus in California, a hospital in New York, a water reclamation plant in Texas, a hotel in Minnesota, and a large office building in Pennsylvania. Results showed that, the presence of the interface converter allows to increase the return on investment (ROI) by 0.5 to 2 percentage points in most of the cases (4 of 5). Indeed, the interface converter by shortening the interconnection process allows to accelerate revenues while reducing interconnection costs. Added to the reduced cost of the required generator these savings trade favorably the capital cost of the converter. The analysis also showed that the profitability of the converter-interfaced CHP is highly sensitive to the energy price, interconnection delay, and converter cost. However, it appears that if the interface converter can shorten the interconnection process by at least 6 months, adopting this solution will be more economically viable than directly-coupled configuration in almost all the +23,000 sites of the U.S Technical Potential CHP. The evaluation of the benefits of a converter-interfaced CHP also showed that it enables higher ROI when coupled with other distributed energy resources (DER) such as battery energy systems (BESS) or solar photovoltaic (PV). Indeed, in those scenario, the grid-ready inverter included in the interface converter eliminates the need of separate inverters if DC-coupling is used. On the technical performance, it has been verified that the presence of the interface converter allows to reduce by 70% to 80% the CHP short-circuit contribution to grid faults. This not only reduces the mechanical and thermal stresses exposed to the CHP electrical components but also increases the grid hosting capacity which ultimately enables higher penetrations CHP. Another key benefit of the interface converter validated with hardware-in-the-loop simulations and testing is its superior capability for reactive power support. Indeed, using a power hardware testbed with two +700kW inverters configured in back-to-back, a microgrid controller and actual facilities loads it was demonstrated that the presence of the interface converter can help maintain a power factor near ~1 or regulate the voltage to ~1.0pu at the point of common coupling. This benefit can be highly valuable if in the future, due to higher penetration of renewable distributed energy resources (DER), utilities start billing demand charge based on kVA instead of kW as currently. It was also validated that converter-interfaced CHP can dispatch heat and power commands and seamlessly switch between the two modes while consistently controlling the power factor or voltage at PCC. Indeed, the power hardware testing showed that grid-connected converter-interfaced CHP can follow either the power or heat demand while maintaining a unity power factor at converter output. This research proved that the adoption of an interface converter as the solution for interconnection of CHP system into the distribution grid can greatly improve the economic feasibility of small to medium-sized CHP as well as the plant power quality, flexibility and resiliency. Additionally, it allows increased penetrations of CHP into the distribution grid, extends their grid support capability, and facilitates the integration of BESS and PV DER by streamlining their collocation within the same facilities. This ultimately provides an opportunity for commercial and small industrial facilities in the U.S to accelerate their energy transition thanks to the high energy efficiency of CHP systems and its reliable, flexible, and resilient microgrid operation when interconnected with an interface converter.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Low-Cost Recyclable Oxygen Carrier and Novel Process for Chemical Looping Combustion

The University of North Dakota, through its Institute for Energy Studies and Energy & Environmental Research Center, partnered with Envergex LLC, Barr Engineering and Microbeam Technologies to develop a transformational enabling technology for advancement of Chemical Looping Combustion technology. Industrial support was provided by Carbontec Energy Corporation. The project targeted the two biggest challenges to chemical looping combustion: (1) High costs of oxygen carrier replacement/loss due to expensive manufacturing and high replacement rates from physical attrition and/or decrease in reactivity, and (2) Inherently slow fuel char conversion which represents the rate-limiting step for chemical looping combustion and results in very large equipment sizes, and overall lower carbon dioxide capture efficiency. The project activities were addressed in a series of seven tasks. Task 1 extended throughout the entire project and oversaw project management and execution. Task 2 and 3 focused on development and evaluation of the novel oxygen carrier. Task 4 to 7 focused on design of the novel reactor, testing with the novel oxygen carrier and a techno-economic assessment of the process. The list of tasks are: Task 1 – Project management and planning, Task 2 – Laboratory scale oxygen carrier manufacturing and assessment, Task 3 – Modeling and laboratory-scale evaluation of oxygen carrier performance with coal, Task 4 – 10-kilowatt thermal integrated system installation, Task 5 – Scaled-up oxygen carrier manufacturing, Task 6 – 10-kilowatt testing, and Task 7 – Process design and techno-economic analysis.

01 COAL, LIGNITE, AND PEAT↗

Cybersecurity for Grid Connected eXtreme Fast Charging (XFC) Station (CyberX) (Final Scientific/Technical Report)

This report summarizes the activities conducted under the DOE VTO funded project DE- EE0008451, where ABB Inc. (ABB), in collaboration with Idaho National Laboratory (INL), APS Global (APS), and XOS Trucks (XOS) pursued the development of a cyber-resilient extreme fast charging (XFC) management system. This project entitled Cybersecurity for Grid Connected eXtreme Fast Charging (XFC) Station (CyberX) focuses on a resilient architecture for smart charging EV Supply Equipment (EVSE) device control and Coordinated Anomaly Detection System (CADS) features that can be added at the charging site depot level to increase cybersecurity. The project was split into two budget periods focused first on developing the threat model and resilient control concepts and second on testing, improving, and validating those developed resilient control algorithms and features with a focus on key vulnerabilities identified during the threat assessment portion of the project. During the first budget period of the CyberX project, the ABB led team focused on activities to identify, model, and quantitatively prioritize high-impact attack scenarios with potential cyber-physical effects while also modeling and developing concepts for a resilient control system that could securely address integration of DERs and other resources with EV charging. Development of the security focused XFC management system (XMS) was accomplished first by offline simulation using a developed XFC station or depot with 480V input level and simulating measurement inputs to monitoring and control systems in concept development. A representative distribution grid model was developed supporting an EV charging site model with BESS and 6 general EV charging models. These EV charging models allowed multiple configurations of charging level, multiple connected protection and measurement devices, and simulation function to show general compromise of EV, BESS, and protection features based on parallel threat analysis. During the second budget period, the EV site and supporting systems model was developed in more detail and converted from offline model to real-time to real-time with EV charging hardware in the loop (HIL). The resilient control architecture developed as concept in the first part of the project was further tested and validated for integration of local energy resources and XFC charging station site equipment while maintaining cybersecure operating principles. The proposed resilient architecture for smart charging and cybersecurity features consists of two main concepts developed and tested within the project. The first concept is an XFC management system (XMS) consisting of a hardware gateway, software platform, and Supervisory Control and Data Acquisition (SCADA) or Distribution Management System integration components. The second concept is a Coordinated Anomaly Detection System (CADS) which forms a primarily software-related subsystem of the total CyberX solution focused on monitoring system measurements, estimation of measurement states, and predicting current at the utility point of interaction based on machine learning for anomaly detection.

33 ADVANCED PROPULSION SYSTEMS↗

Cybersecurity Standards for Distributed Energy Resources: Gaps and Harmonization Strategy

This report examines cybersecurity standards for Distributed Energy Resources (DERs) in light of their rapid growth and increasing integration into energy systems. It identifies critical gaps in existing frameworks, including inadequate coverage of DER-specific challenges, complexities in implementing comprehensive standards, integration issues with legacy systems, adoption hurdles for newer standards, and a lack of harmonization across regulatory landscapes. The analysis highlights vulnerabilities such as data integrity risks, unauthorized device control, and denial-of-service attacks across various DER technologies like solar PV, wind turbines, energy storage systems, and hydrogen fuel cells. The report proposes a harmonization strategy to address these deficiencies by developing unified cybersecurity requirements, certification programs, and training resources while fostering collaboration among stakeholders such as government agencies, industry groups, DER operators, manufacturers, and research institutions. A phased roadmap is outlined to refine and implement these measures through pilot testing and widespread adoption. Ultimately, the report underscores the urgent need for coordinated efforts to enhance DER cybersecurity and ensure the reliable operation of future energy systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Electrical substation grid testbed for DLT applications of electrical fault detection, power quality monitoring, DERs use cases and cyber-events

Electrical utilities continue to deploy more intelligent electronic devices (IEDs) inside and outside electrical substation, and are associated with customer-owned distributed energy resources (DERs). The integrity and confidentiality of data from these IEDs, like power meters and protective relays, is crucial. Blockchain technology could improve the resilience of microgrids by improving the security of data sharing. The penetration of customer-owned DERs (renewable energy sources) and the increasing deployment of IEDs can lead to integrate power system applications with Distributed Ledger Technology (DLT). In this study, we implemented the electrical faulted phase detection and power quality monitoring algorithms with a Cyber Grid Guard (CGG) system using DLT. In addition, the DERs (wind turbine farms) use case and protective relay cyber-event tests were assessed, by using the CGG system with DLT. In the experimental model, the testbed was created by using a real-time simulator and CGG system with power meters/ protective relays in-the-loop. The data collected from the CGG system and IEDs were compared with the same time stamp source. These results had shown the successful assessment of protection, control and monitoring applications using a CGG system with DLT. In the future, the ESGT with DERs and the CGG system will be used in other power system applications, based on implementing smart contracts between electrical utilities with customer-owned DERs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Active Learning of Microgrid Frequency Dynamics Using Neural Ordinary Differential Equations

Accurate frequency modelling of inverter‐based resource (IBR)‐dominated power systems is crucial for ensuring stable, reliable and resilient operations, particularly given their inherent low‐inertia characteristics and fast dynamics that traditional swing equation‐based models inadequately capture. This paper explores neural ordinary differential equations (Neural ODEs) as a computationally efficient, data‐driven framework for modelling power system frequency dynamics, specifically within microgrids integrating high penetrations of distributed energy resources (DERs). The developed neural ODEs framework incorporates a neural network architecture designed to capture input dynamics. By actively perturbing the system with a known signal, the Python‐based neural ODEs framework was trained using measured system states and inputs, without the need for detailed system information. The framework, tested on a model of the Cordova, AK, microgrid, achieved a goodness of fit ranging from 60% to 99% across different state variables and maintained a mean square error in the 10 -6 p.u. range under square and step excitation signals. The proposed approach demonstrated robustness to measurement noise and initial condition variations while maintaining low computational complexity suitable for real‐time power system control applications. Furthermore, transfer learning enabled the neural ODEs model to adapt to the following changes in system topology or generator dispatch, highlighting its effectiveness for dynamic microgrids with frequently evolving configurations and diverse DERs.

Aryal, Tara [South Dakota State Univ., Brookings, ↗

Wettability of Two-Dimensional Carbon Allotropes from Molecular Simulations

Force-field Monte Carlo and Molecular Dynamics simulations are used to compare wetting behaviors of model carbon sheets mimicking neat graphene, its saturated derivative, graphane, and related planar allotropes penta-graphene, γ-graphyne, and ψ-graphene in contact with aqueous droplets or an aqueous film confined between parallel carbon sheets. Atomistic and area-integrated surface/water potentials are found to be essentially equivalent in capturing moderate differences between the wetting free energies of tested substrates. Despite notable differences in mechanical and electric properties of distinct allotropes, the predicted allotrope/water contact angles span a narrow window of weakly hydrophilic values. Contact angles in the range of 80 ± 10° indicate modest hydration repulsion incapable of competing with van der Waals attraction between carbon particles. Poor dispersibility in neat water is hence a common feature of studied materials.

Biochemistry & Molecular Biology↗

Identification and Testing of Electric Vehicle Fast Charger Cybersecurity Mitigations

Fast-charging infrastructure for electric vehicles (EVs) is needed to enable and achieve the national goals of transitioning the vehicle fleet toward more electrification. Idaho National Laboratory, Oak Ridge National Laboratory, and the National Renewable Energy Laboratory (NREL) have jointly worked to identify, evaluate, and mitigate potential cyber-related consequences associated with fast charger systems. NREL contributed by considering cyberattack scenarios and consequences associated with integrating distributed energy resources (DERs) at fast-charging stations. The dynamic nature of fast-charger load profiles would encourage site operators to incorporate solar for energy cost reduction and energy storage for peak demand cost management at future charging facilities with multiple fast chargers at a site. These energy resources would be monitored and coordinated via a site energy management controller with data exchange between devices and local power metering infrastructure; thus, networking between devices and the design of the system becomes important in the overall cybersecurity posture. In addition, component vendors and system operators might have remote interfaces to any of these systems. It is therefore important to understand the breadth of the cyberattack surface and potential strategies to mitigate impacts. This project has focused on components and protocols expected to be found within a local charging site that includes multiple chargers and DER resources. Our methods and results are summarized in this final report.

42 ENGINEERING↗

Key Insights: Interconnecting Behind-the-Meter Microgrids

This technical brief explores the interconnection challenges and evolving standards associated with behind-the-meter (BTM), facility-scale microgrids. It clarifies key functions related to customer microgrids and backup systems while addressing critical questions regarding certification coverage, operational impacts, customer relationships, and testing requirements for BTM microgrid systems. The document emphasizes the need for updated standards and additional witness testing to ensure safe and effective microgrid operation as well as improved grid integration and compliance with power quality standards.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Enhancing Active Distribution Systems Resilience by Fully Distributed Self-Healing Strategy

Distributed restoration can exploit smart grid technologies to enhance the resilience of active distribution networks toward a self-healing smart grid. However, the large number of decision variables, especially the binary ones for reconfiguration, bring challenges to developing scalable distributed distribution service restoration (DDSR) strategies. This paper proposes a fully distributed solution procedure based on the alternating direction method of multipliers (ADMM) for mixed-integer programming problems and applies to develop the DDSR framework. The method consists of relax-drive-polish phases, 1) relaxing binary variables, and applying the convex ADMM as a warm start; 2) driving the solutions toward Boolean values through a proximal operator; 3) fixing the obtained binding binary variables and solving the rest of the problem to polish results and achieve a high-quality suboptimal solution. Then, an autonomous clustering strategy and consensus ADMM are integrated with the proposed method to realize the fully distributed cluster-based framework of DDSR. This framework can first determine DER scheduling and switch status for reconfiguration to energize the out-of-service areas from local faults, and then provide the load restoration solution in a distributed manner for total blackouts in large-scale distribution networks. Furthermore, the effectiveness and scalability of the proposed DDSR framework are demonstrated through testing on the IEEE 123-node, IEEE 8500-node, and synthetic 100k-node test feeders.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Scalable Solution for Grid Optimization and DER Integration (CRADA Final Report)

Utilidata Inc. is an energy software company that provides clean energy and digital solutions for utilities. This work was the result of Utilidata Inc. being awarded a New York State Energy Research and Development Agency award to integrate Utilidata volt-VAR optimization (VVO) software with smart inverters to explore enhanced voltage control. This project was conducted in partnership with Utilidata Inc., National Grid, the New York State Energy and Research Development Authority, and the National Renewable Energy Laboratory (NREL). As part of the project NREL conducted modeling and simulation analysis, developed cost-benefit analysis framework, and conducted laboratory testing to understand the potential for smart inverter integration to a centralized VVO control scheme. The remainder of the report provides an executive summary of the work, an introduction to the challenges, sections detailing specific aspects of the work, and the overall findings and conclusions.

14 SOLAR ENERGY↗

Grid Resiliency with a 100% Renewable Microgrid

San Diego Gas & Electric Company (SDG&E) installed America’s first and largest utility-scale microgrid in Borrego Springs in 2013. The first generation Borrego Springs Microgrid utilized diesel generators to form and stabilize the microgrid island, with support from grid-scale batteries and local solar photovoltaic (PV) generation. In this project, SDG&E in partnership with National Renewable Energy Laboratory (NREL) demonstrated through modeling, simulation and utility field testing that blackstart and islanding of the microgrid can be led with 100% renewable, inverter based resources (IBRs), to help reduce community reliance on conventional generation resources. Through equipment upgrades, grid-forming island leader capability was transitioned to a battery IBR instead of the Borrego Springs Microgrid diesel generators. A new microgrid controller was integrated to the microgrid and programmed to control and manage multiple energy storage systems. Synchrophasor and other power quality data verified autonomous, high-speed response of the IBRs through blackstart, islanding, and load step testing. Results of project field evaluations provide distribution systems operators (DSO) with increased confidence that renewable, IBR can replace traditional generators to blackstart and island microgrids and rapidly establish stable island frequency with rapid changes in peak power demand. Importantly, the project validated the integration feasibility of a distributed energy resource management system (DERMS) controller that manages multiple grid-forming and grid-following IBRs, establishing a standard design interface to reduce the complexity of integrating new DERs in the future and supporting replication by the industry. As a result of learnings in this project, SDG&E has implemented the microgrid controller strategy at multiple other microgrid sites, thereby validating the replicability of the solution. Hardware-in-the-loop (HIL) simulations including power and controller HIL hardware — along with electromagnetic transient (EMT) simulations of Borrego Springs Microgrid —informed adjustments to inverter parameters and were important to characterize the performance of the IBRs in relevant operating conditions before deployment. The EMT and HIL simulations of islanding the entire community are important contributions in providing confidence in IBR performance prior to future islanding of the community in the field. High-fidelity EMT and/or HIL simulation of IBRs can de-risk field operations, and its relevance and importance as a tool is increasing as distribution grids and microgrids become more complex and dynamic with an increasing proportion of renewable generation, distributed energy storage, and two-way power and energy flows.

24 POWER TRANSMISSION AND DISTRIBUTION↗