Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Material Protection, Accounting and Control Technologies (MPACT) Implementation Plan: Lab-Scale Demonstration of Advanced Safeguard and Security Systems

The Materials Protection, Accounting, and Control Technologies (MPACT) campaign is working towards the goal of developing and demonstrating the next generation of nuclear materials management for the peaceful use of civilian nuclear energy. A major milestone of the campaign is the “Lab-scale demonstration of an advanced safeguards and security system,” due in 2020. This implementation plan describes how tools developed in the MPACT campaign will be used to meet this milestone. These tools consist of instrumentation and devices as well as computer software for modelling, simulation and integration of data and information for safeguard and security analysis. The plan is focused on demonstrating an advanced safeguard and security systems for electrochemical processing plants, but also identifies activities needed to address advanced reactor, aqueous processing and other advanced fuel cycle facilities. A key component to achieving the 2020 milestone is the development of a virtual distributed test bed that incorporates the instruments, data, analysis tools, and models currently under development and provides a framework to link and normalize the data in a way that simulates a facility, including uncertainty quantification. This virtual distributed test bed will integrate computer simulated facilities that make up a fuel cycle of interest, with distributed test beds located in actual operating facilities and laboratories. The MPACT campaign recently issued roadmaps for both Modelling & Simulation and Advanced Integration which address this component, and activities necessary to achieve the 2020 milestone. Research, development and testing of specific technologies have been supported by the MPACT campaign in coordination with other DOE-NE and DOE-NNSA programs. These technologies provide the essential data needed by the safeguard and security systems, and feed into the data analysis and facility models. This plan will identify these technologies, their current status and activities needed to demonstrate the technologies at the laboratory scale. Wherever possible, test of technologies in field conditions using suitable nuclear materials will be used to define performance. Where necessary, surrogate materials and/or simulation will be used to provide useful information for the demonstration. When completed, the 2020 milestone will provide a demonstration of advanced safeguard and security technologies, including advanced modelling, simulation and analysis approaches, applied to electrochemical processing. It will also identify applications of the technology and approaches in other advanced fuel cycle and reactor concepts.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Advanced Simulation and Computing FY18 Implementation Plan, Rev. 0

The ASC Program continues to improve its unique tools to solve stockpile problems— with a focus on sufficient resolution, dimensionality, and scientific detail—to enable Quantification of Margins and Uncertainties (QMU) and to resolve the increasingly difficult analyses needed for stockpile stewardship. The needs of the Directed Stockpile Work (DSW) and major modernization programs also drive the requirements for simulation and computational resources. These requirements include planned LEPs, stockpile support activities, and mitigation efforts against the potential for technical surprise. All of the weapons within the current stockpile are in some stage of the life extension process. The simulation and computational capabilities are crucial for successful execution of these lifetime extensions and for ensuring NNSA can certify these life-extended weapons without conducting a UGT. Specific work activities and scope contained in this Implementation Plan (IP) represent the full-year annual operating plan for FY18. The Initial IP effective October 1, 2017, should be consistent with: 1) the Department’s Base Table when operating under a Continuing Resolution (CR); and 2) the final signed appropriation or full-year CR once enacted.

97 MATHEMATICS AND COMPUTING↗

Advanced Simulation and Computing FY19 Implementation Plan, Rev. 1

The capabilities that the ASC Program provides at the national laboratories play a vital role in the Nuclear Security Enterprise and are necessary for fulfilling the stockpile stewardship and life extension requirements outlined for NNSA. The Program develops modern simulation tools that provide insights into stockpile aging issues, provide the computational and simulation tools that enable designers and analysts to certify the current stockpile and life-extended nuclear weapons, and inform the decision-making process when any modifications in nuclear warheads or the associated manufacturing processes are deemed necessary. Furthermore, ASC is enhancing the predictive simulation capabilities that are essential to evaluate weapons effects, design experiments, and ensure test readiness. The ASC Program continues to improve its unique tools to solve stockpile problems— with a focus on sufficient resolution, dimensionality, and scientific detail—to enable Quantification of Margins and Uncertainties (QMU) and to resolve the increasingly difficult analyses needed for stockpile stewardship. The needs of the Directed Stockpile Work (DSW) and major modernization programs also drive the requirements for simulation and computational resources. These requirements include planned LEPs, stockpile support activities, and mitigation efforts against the potential for technical surprise. All of the weapons within the current stockpile are in some stage of the life extension process. The simulation and computational capabilities are crucial for successful execution of these lifetime extensions and for ensuring NNSA can certify these life-extended weapons without conducting a UGT. Specific work activities and scope contained in this Implementation Plan (IP) represent the full-year annual operating plan for FY19. The Initial IP, effective August 8, 2018, should be consistent with the Department’s Base Table when operating under a Continuing Resolution (CR). The final IP, effective date TBD, is consistent with the final, enacted appropriation.

97 MATHEMATICS AND COMPUTING↗

Advanced Simulation and Computing FY18 Implementation Plan, Rev. 1

The capabilities that the ASC Program provides at the national laboratories play a vital role in the Nuclear Security Enterprise and are necessary for fulfilling the stockpile stewardship and life extension requirements outlined for NNSA. The Program develops modern simulation tools that provide insights into stockpile aging issues, provide the computational and simulation tools that enable designers and analysts to certify the current stockpile and life-extended nuclear weapons, and inform the decision-making process when any modifications in nuclear warheads or the associated manufacturing processes are deemed necessary. Furthermore, ASC is enhancing the predictive simulation capabilities that are essential to evaluate weapons effects, design experiments, and ensure test readiness. The ASC Program continues to improve its unique tools to solve stockpile problems— with a focus on sufficient resolution, dimensionality, and scientific detail—to enable Quantification of Margins and Uncertainties (QMU) and to resolve the increasingly difficult analyses needed for stockpile stewardship. The needs of the Directed Stockpile Work (DSW) and major modernization programs also drive the requirements for simulation and computational resources. These requirements include planned LEPs, stockpile support activities, and mitigation efforts against the potential for technical surprise. All of the weapons within the current stockpile are in some stage of the life extension process. The simulation and computational capabilities are crucial for successful execution of these lifetime extensions and for ensuring NNSA can certify these life-extended weapons without conducting a UGT. Specific work activities and scope contained in this Implementation Plan (IP) represent the full-year annual operating plan for FY18. The Initial IP effective October 1, 2017, should be consistent with the Department’s Base Table when operating under a Continuing Resolution (CR). The final IP, effective March 24, 2018, is consistent with the final, enacted appropriation.

97 MATHEMATICS AND COMPUTING↗

Advanced Simulation and Computing FY19 Implementation Plan, Rev. 0

The ASC Program continues to improve its unique tools to solve stockpile problems— with a focus on sufficient resolution, dimensionality, and scientific detail—to enable Quantification of Margins and Uncertainties (QMU) and to resolve the increasingly difficult analyses needed for stockpile stewardship. The needs of the Directed Stockpile Work (DSW) and major modernization programs also drive the requirements for simulation and computational resources. These requirements include planned LEPs, stockpile support activities, and mitigation efforts against the potential for technical surprise. All of the weapons within the current stockpile are in some stage of the life extension process. The simulation and computational capabilities are crucial for successful execution of these lifetime extensions and for ensuring NNSA can certify these life-extended weapons without conducting a UGT. Specific work activities and scope contained in this Implementation Plan (IP) represent the full-year annual operating plan for FY19. The Initial IP, effective August 8, 2018, should be consistent with the Department’s Base Table when operating under a Continuing Resolution (CR). The final IP, effective date TBD, is consistent with the final, enacted appropriation.

97 MATHEMATICS AND COMPUTING↗

Advanced Simulation and Computing (FY22 Implementation Plan Rev 0)

The DOE National Nuclear Security Administration (NNSA) Stockpile Stewardship Program (SSP) is an integrated technical program for maintaining the safety, surety, and reliability of the U.S. nuclear stockpile. The SSP incorporates nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. The suite of data analyzed comes from activities including stockpile surveillance, experimental research, and development and engineering programs. This integrated national program requires the continued use of experimental facilities and the computational capabilities to support the SSP missions. These component parts, in addition to an appropriately scaled production capability, enable NNSA to support stockpile requirements. The ultimate goal of the SSP, and thus of the Advanced Simulation and Computing (ASC) Program, is to ensure that the U.S. maintains a safe, secure, and effective strategic deterrent. Specific work activities and scope contained in this Implementation Plan (IP) represent the full-year annual operating plan for FY22. The Initial IP, effective , should be consistent with the Department’s Base Table when operating under a Continuing Resolution (CR). The final IP, effective date TBD, is consistent with the final, enacted appropriation.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

NSUF CoMET Project, Implementation Plan FY2019

The Combined Materials and Experiment Toolkit (CoMET) is an NSUF information management resource designed to give users access to the information and tools necessary for designing meaningful experiments and writing clear, structured proposals. NSUF has a milestone to deploy an experiment design expert system to the NSUF website to support applications for the FY2020 CINR, due on August 30, 2019. To meet this milestone, the CoMET project work for FY2019 focuses on three main objectives: 1.) Integrate the three NSUF web applications by linking data fields in one application with the data found in the others. The NSUF web applications are: The Rapid Turnaround Experiment (RTE) Proposal Solicitation system, the Nuclear Fuels and Materials Library (NFML) and the Nuclear Energy Infrastructure Database (NEID) and the researcher and technical staff account and profile management systems. 2.) Build an Experiment Design Wizard (expert system) that will guide users through the process of writing a statement of work for a CINR or RTE experiment. 3.) Build an Irradiation Effects Calculator to help a PI choose the best neutron irradiation facility for their needs, estimate the time needed to achieve their goals, and estimate the resulting radioactivity of their samples, post-irradiation. These objectives are designed to support the mission of the NSUF and optimize the experiment design portion of the proposal processes. The new researcher database will make finding collaborators easier. The wizard will provide the PI with early NSUF expertise so that their proposed experiments, at the “Letter of Intent” and “Pre-Application” stages are better designed to work within the available NSUF facilities. Utilization of these tools should reduce the proportion of proposals that are judged to be infeasible or “not ready” for NSUF access. It should also improve the efficiency of the NSUF technical leads since the PI will be starting with a better statement of work for the project. The tools will also provide resources for NSUF staff to more efficiently screen and score incoming proposals. This implementation plan will layout the work breakdown structure, activities, resources required, and plan for completion of the activities for CoMET in FY2019.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Implementation Plan for Qualification of Sodium-Cooled Fast Reactor Technology Information

This document identifies and discusses implementation elements that can be used to facilitate consistent and systematic evaluation processes relating to quality attributes of technical information (with focus on SFR technology) that will be used to support licensing of advanced reactor designs. Information may include, but is not limited to, design documents for SFRs, research-and-development (R&D) data and associated documents, test plans and associated protocols, operations and test data, international research data, technical reports, and information associated with past U.S. Nuclear Regulatory Commission (NRC) reviews of SFR designs. The approach for determining acceptability of test data, analysis, and/or other technical information is based on guidance provided in INL/EXT-15-35805, “Guidance on Evaluating Historic Technology Information for Use in Advanced Reactor Licensing.” The implementation plan can be adopted into a working procedure at each of the national laboratories performing data qualification, or by applicants seeking future license application for advanced reactor technology.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

TCCSP Project Implementation Plan

The TCCSP CarbonSAFE Phase II efforts focused on developing the technical, community, and economic foundation for a commercial-scale regional geologic storage complex for CO 2 captured. TCCSP has conducted a thorough evaluation of the regional, local, and site-specific geology, legacy well infrastructure, injection site design, and project planning as part of the CarbonSAFE Phase II TCCSP. Specially, the work performed under the CarbonSAFE Phase II has significantly furthered the advancement towards the commerciality of the TCCSP storage complex by delivering on the following objectives: Objective 1: Acquire site-specific characterization data to validate carbon dioxide (CO 2 ) storage estimates of reservoir units and the competency of confining layers in the region to prevent CO 2 leakage to develop a commercial-scale CO 2 project. Objective 2: Assess technical, economic, regulatory, and stakeholder aspects of the TCCSP.

54 ENVIRONMENTAL SCIENCES↗

LLNL DOE Order 420.2 D Implementation Plan

This plan will serve as the basis for the ongoing implementation of DOE O 420.2D to contractor requirements applicable to the use of Radiation Generating Devices (RGDs) at Lawrence Livermore National Laboratory (LLNL).

61 RADIATION PROTECTION AND DOSIMETRY↗

Igiugig Comprehensive Energy Plan Implementation Assistance

In 2023, the National Laboratory of the Rockies (NLR) partnered with the Renewable Energy Alaska Project (REAP) to provide technical assistance to Igiugig through the US Department of Energy's Energy Transitions Initiative Partnership Project (ETIPP). The overall objective of this ETIPP project was to provide technical support to help the community achieve their energy goal of reducing diesel fuel for electricity by 50% by 2030 through the implementation of high priority strategies defined in their 2022 Community Energy Plan. Technical support focused on evaluating additional renewables and renewable heating scenarios, identifying heat recovery system design options for high penetration renewables, investigation power quality and line loss issues, and supporting integration of battery energy storage.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SAM Software Quality Assurance Plan Implementation and NQA-1 Assessment

The System Analysis Module (SAM) is an advanced and modern system analysis tool being developed at Argonne National Laboratory under the U.S. DOE Office of Nuclear Energy’s Nuclear Energy Advanced Modeling and Simulation (NEAMS) program. As a modern-day software, SAM development included efforts to follow best practices in software development. These best practices include version control using git, independent reviews of development activities, and detailed descriptions of developments and bug fixes using the GitLab issue and merge request system. In Fiscal Year 2023 (FY23), the SAM development team set out to formalize a Software Quality Assurance (SQA) program that allowed industry partners to credit the informal steps being taken by the SAM development team to ensure the quality of the software. As part of formalizing an SQA program, a SQA Plan (SQAP) was developed, implemented, and assessed. The SAM SQAP targets compliance with NQA-1-2008/2009 Addenda. The SQAP builds on the MOOSE SQAP and the Argonne SSQAPP while accounting for the needs of the multi-organization SAM development team. Modifications to the SAM repository structure, including a new testing system, updated test cases, and the development of an internal website, facilitate the implementation of the SAM SQAP. The initial assessment of the SAM SQAP indicated that the SAM SQAP was adequately and effectively implemented and additional work was required to improve the compliance of the SAM SQAP with NQA-1 2008/2009 Addenda. Several improvements to the SQAP have already been drafted to address these assessments and future work is planned to further improve the SAM SQAP in support of end-user needs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Decadal Vision Progress Report Implementation Plans and Status for the Next Generation ARM Facility

The reconfiguration of the ARM facility, formally initiated in early 2014, is geared toward implementing the Next Generation of the ARM Facility, which will more tightly link ARM measurements and atmospheric models. The strategy is outlined in the ARM Climate Research Facility Decadal Vision (DOE 2014a). The strategy includes the implementation of a high-resolution model, initially at the Southern Great Plains (SGP) site, and enhancements at the SGP and North Slope of Alaska (NSA) sites to provide additional observations to support modeling and process studies. Enhancements at the SGP site focus on ground-based instruments while enhancements at the NSA make use of Unmanned Aerial Systems (UAS) and Tethered Balloon Systems (TBS). It is also recognized that new data tools and data products will need to be developed to take full advantage of these improvements. This document provides an update on the status of these ARM facility enhancements, beginning with the measurement enhancements at the SGP and NSA, followed by a discussion of the modeling project including associated data-processing activities.

Southern Great Plains, North Slope of Alaska, Unma↗

Final Scientific/Technical Report for DOE/EERE Comprehensive Community Renewable Energy Implementation Plan in Forest County and Milwaukee County

Forest County Potawatomi Community (the “Community”) sought and obtained Community Renewable Energy Deployment funding from the Department of Energy to evaluate and implement a diverse number of renewable energy technologies throughout its lands held in trust or owned in fee simple in Forest County and Milwaukee County (the “Project”). The technologies and sites evolved during the Project, ultimately leading to the investigation of biomass and solar projects on the Community’s reservation in Forest County, as well as the investigation and eventual deployment of a solar project and an anaerobic digestion and biogas project on Community lands in Milwaukee.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Summary of Planned Implementation for the HTGR Lessons Learned Applicable to the NGNP

This document presents a reconciliation of the lessons learned during a 2010 comprehensive evaluation of pertinent lessons learned from past and present high temperature gas-cooled reactors that apply to the Next Generation Nuclear Plant Project along with current and planned activities. The data used are from the latest Idaho National Laboratory research and development plans, the conceptual design report from General Atomics, and the pebble bed reactor technology readiness study from AREVA. Only those lessons related to the structures, systems, and components of the Next Generation Nuclear Plant (NGNP), as documented in the recently updated lessons learned report are addressed. These reconciliations are ordered according to plant area, followed by the affected system, subsystem, or component; lesson learned; and finally an NGNP implementation statement. This report (1) provides cross references to the original lessons learned document, (2) describes the lesson learned, (3) provides the current NGNP implementation status with design data needs associated with the lesson learned, (4) identifies the research and development being performed related to the lesson learned, and (5) summarizes with a status of how the lesson learned has been addressed by the NGNP Project.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Developing a New National Programme and Implementation Plan for the Management and Disposal of Spent Fuel and Radioactive Wastes in Romania - 16391

The European 'Waste Directive' (2011/70/Euratom) required each Member State to report by August 2015 on their National Programme for management of spent fuel and radioactive wastes. In Romania, the Nuclear Agency (ANDR) was responsible for preparing the National Programme report, and this was done in a step-wise manner that involved the regulators and waste producers. The starting point for the process was an assessment of existing policy against the evolving situation in the nuclear sector in the country, most notably the decision to progress with the construction of two new CANDU reactors. The final agreed National Programme report submitted to the European Commission describes the activities currently undertaken to manage spent fuel and radioactive wastes in Romania. The report also sets out, at a high-level, the additional activities that will need to be taken in the future (and an indicative timeline), including those steps that will be required to implement a new surface repository for short-lived wastes, and a geological repository for spent fuel and long-lived wastes. Additional, on-going work is intended to lead to a revision of Government policy and the development of a more detailed implementation strategy, underpinned by a programme of R and D and robust financing plans. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

City-Level Energy Decision Making: Data Use in Energy Planning, Implementation, and Evaluation in U.S. Cities

The report analyzes and presents information learned from a sample of 20 cities across the United States, from New York City to Park City, Utah, including a diverse sample of population size, utility type, region, annual greenhouse gas reduction targets, vehicle use, and median household income. The report compares climate, sustainability, and energy plans to better understand where cities are taking energy-related actions and how they are measuring impacts. Some common energy-related goals focus on reducing city-wide carbon emissions, improving energy efficiency across sectors, increasing renewable energy, and increasing biking and walking.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗