Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “INVESTMENT PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

A Scalable Solution Framework for Stochastic Transmission and Generation Planning Problems. Draft

Current commercial software tools for transmission and generation investment planning have limited stochastic modeling capabilities. Because of this limitation, electric power utilities generally rely on scenario planning heuristics to identify potentially robust and cost effective investment plans for a broad range of system, economic, and policy conditions. Several research studies have shown that stochastic models perform significantly better than deterministic or heuristic approaches, in terms of overall costs. However, there is a lack of practical solution approaches to solve such models. In this paper we propose a scalable decomposition algorithm to solve stochastic transmission and generation planning problems, respectively considering discrete and continuous decision variables for transmission and generation investments. Given stochasticity restricted to loads and wind, solar, and hydro power output, we develop a simple scenario reduction framework based on a clustering algorithm, to yield a more tractable model. The resulting stochastic optimization model is decomposed on a scenario basis and solved using a variant of the Progressive Hedging (PH) algorithm. We perform numerical experiments using a 240-bus network representation of the Western Electricity Coordinating Council in the US. Although convergence of PH to an optimal solution is not guaranteed for mixed-integer linear optimization models, we find that it is possible to obtain solutions with acceptable optimality gaps for practical applications. Our numerical simulations are performed both on a commodity workstation and on a high-performance cluster. The results indicate that large-scale problems can be solved to a high degree of accuracy in at most two hours of wall clock time.

24 POWER TRANSMISSION AND DISTRIBUTION↗

On the use of genetic algorithm to optimize industrial assets lifecycle management under safety and budget constraints

The purpose of this paper is to describe the method and tool dedicated to optimize investments planning for industrial assets. These investments may either be preventive maintenance tasks, asset enhancements or logistic investments such as spare parts purchases. The two methodological points to investigate in such an issue are: 1. The measure of the profitability of a portfolio of investments 2. The selection and planning of an optimal set of investments 3. The measure of the risk of a portfolio of investments The measure of the profitability of a set of investments in the IPOP tool is synthesised in the Net Present Value indicator. The NPV is the sum of the differences of discounted cash flows (direct costs, forced outages...) between the situations with and without a given investment. These cash flows are calculated through a pseudo-Markov reliability model representing independently the components of the industrial asset and the spare parts inventories. The component model has been widely discussed over the years but the spare part model is a new one based on some approximations that will be discussed. This model, referred as the NPV function, takes for input an investments portfolio and gives its NPV. The second issue is to optimize the NPV. If all investments were independent, this optimization would be an easy calculation, unfortunately there are two sources of dependency. The first one is introduced by the spare part model, as if components are indeed independent in their reliability model, the fact that several components use the same inventory induces a dependency. The second dependency comes from economic, technical or logistic constraints, such as a global maintenance budget limit or a safety requirement limiting the residual risk of failure of a component or group of component, making the aggregation of individual optimum not necessary feasible. The algorithm used to solve such a difficult optimization problem is a genetic algorithm. After a description of the features of the software a test case is presented showing the influence of the optimization algorithm parameters on its efficiency to find an optimal investments planning. (authors)

97 MATHEMATICS AND COMPUTING↗

Integrated Planning: Consolidating Annual Facility Planning - More Time for Execution

Previously, annual planning for Readiness in Technical Base and Facilities (RTBF) at the Nevada National Security Site (NNSS) was fragmented, disconnected, circular, and occurred constantly throughout the fiscal year (FY) comprising 9 of the 12 months, reducing the focus on implementation and execution. This required constant “looking back” instead of “looking forward.” In FY 2009, annual planning was consolidated into one comprehensive integrated plan (IP) for each facility/project, which comprised annual task planning/outyear budgeting, AMPs, and investment planning (i.e., TYIP). In FY 2010, the Risk Management Plans were added to the IPs. The integrated planning process achieved the following: 1) Eliminated fragmented, circular, planning and moved the plan to be more forward-looking; 2) Achieved a 90% reduction in schedule planning timeframe from 40 weeks (9 months) to 6 weeks; 3) Achieved an 80% reduction in cost from just under $1.0M to just over $200K, for a cost savings of nearly $800K (reduced combined effort from over 200 person-weeks to less than 40); 4) Reduced the number of plans generated from 21 plans (1 per facility per plan) per year to 8 plans per year (1 per facility plus 1 program-level IP); 5) Eliminated redundancy in common content between plans and improved consistency and overall quality; 6) Reduced the preparation time and cost of the FY 2010 SEP by 50% due to information provided in the IP; 7) Met the requirements for annual task planning, annual maintenance planning, ten-year investment planning, and risk management plans.

Nelson, J. G.↗

Application of the Software as a Service Model to the Control of Complex Building Systems

In an effort to create broad access to its optimization software, Lawrence Berkeley National Laboratory (LBNL), in collaboration with the University of California at Davis (UC Davis) and OSISoft, has recently developed a Software as a Service (SaaS) Model for reducing energy costs, cutting peak power demand, and reducing carbon emissions for multipurpose buildings. UC Davis currently collects and stores energy usage data from buildings on its campus. Researchers at LBNL sought to demonstrate that a SaaS application architecture could be built on top of this data system to optimize the scheduling of electricity and heat delivery in the building. The SaaS interface, known as WebOpt, consists of two major parts: a) the investment& planning and b) the operations module, which builds on the investment& planning module. The operational scheduling and load shifting optimization models within the operations module use data from load prediction and electrical grid emissions models to create an optimal operating schedule for the next week, reducing peak electricity consumption while maintaining quality of energy services. LBNL's application also provides facility managers with suggested energy infrastructure investments for achieving their energy cost and emission goals based on historical data collected with OSISoft's system. This paper describes these models as well as the SaaS architecture employed by LBNL researchers to provide asset scheduling services to UC Davis. The peak demand, emissions, and cost implications of the asset operation schedule and investments suggested by this optimization model are analyzed.

25 ENERGY STORAGE↗

Application of the Software as a Service Model to the Control of Complex Building Systems

In an effort to create broad access to its optimization software, Lawrence Berkeley National Laboratory (LBNL), in collaboration with the University of California at Davis (UC Davis) and OSISoft, has recently developed a Software as a Service (SaaS) Model for reducing energy costs, cutting peak power demand, and reducing carbon emissions for multipurpose buildings. UC Davis currently collects and stores energy usage data from buildings on its campus. Researchers at LBNL sought to demonstrate that a SaaS application architecture could be built on top of this data system to optimize the scheduling of electricity and heat delivery in the building. The SaaS interface, known as WebOpt, consists of two major parts: a) the investment& planning and b) the operations module, which builds on the investment& planning module. The operational scheduling and load shifting optimization models within the operations module use data from load prediction and electrical grid emissions models to create an optimal operating schedule for the next week, reducing peak electricity consumption while maintaining quality of energy services. LBNL's application also provides facility managers with suggested energy infrastructure investments for achieving their energy cost and emission goals based on historical data collected with OSISoft's system. This paper describes these models as well as the SaaS architecture employed by LBNL researchers to provide asset scheduling services to UC Davis. The peak demand, emissions, and cost implications of the asset operation schedule and investments suggested by this optimization model are analysed.

25 ENERGY STORAGE↗

Co-Planning of Investments in Transmission and Merchant Energy Storage

We observe suitably located energy storage systems are able to collect significant revenue through spatiotemporal arbitrage in congested transmission networks. However, transmission capacity expansion can significantly reduce or eliminate this source of revenue. Investment decisions by merchant storage operators must, therefore, account for the consequences of potential investments in transmission capacity by central planners. This paper presents a tri-level model to co-optimize merchant electrochemical storage siting and sizing with centralized transmission expansion planning. The upper level takes the merchant storage owner's perspective and aims to maximize the lifetime profits of the storage, while ensuring a given rate of return on investments. The middle level optimizes centralized decisions about transmission expansion. The lower level simulates market clearing. The proposed model is recast as a bi-level equivalent, which is solved using the column-and-constraint generation technique. A case study based on a 240-bus, 448-line testbed of the Western Electricity Coordinating Council interconnection demonstrates the usefulness of the proposed tri-level model.

25 ENERGY STORAGE↗

Decision-Dependent Uncertainty-Aware Distribution System Planning Under Wildfire Risk

The interaction between power systems and wildfires can be dangerous and costly. Distribution grids can be liable for the outbreak of wildfires during extreme weather. In wildfire-prone areas, investment planning should consider the impact of operational actions on wildfire-related uncertainties affecting line failure likelihood. Here, in this case, endogenous-based uncertainty modeling should comprise the backbone of the investment planning model viz-a-viz the inability of standard exogenous-based uncertainty modeling. Therefore, we propose a decision-dependent uncertainty (DDU) aware methodology to optimize investment portfolios for distribution systems, considering that high power-flow levels in high-threat areas can ignite wildfires and increase line failure probability. The methodology identifies the best combination of upgrades (new lines, hardening existing lines, and placing switching devices). Methodologically, we propose a two-stage distributionally robust planning optimization problem with DDU that considers the distribution system's multiperiod operation. The first stage determines optimal switching actions and line investments, and the second stage evaluates the worst-case expected operational cost under a DDU framework designed to account for the endogenous impact of power-flow levels and hardening investment decisions in the line failure probabilities. An iterative method is tailored to handle the problem and numerical experiments demonstrate a more prepared grid to deal with wildfire risk.

Power systems investment planning↗

Modeling Resource, Infrastructure, and Policy Cost Layers for Optimizing Renewable Energy Investment and Deployment

This paper presents a framework for creating a common spatial canvass that can bring together considerations of resource availability, infrastructure reliability, and development costs while strategizing renewable energy investment. We describe the underlying models and methodologies that annotate an investment plan for potential sites over a time-period with costs and constraints which may be imposed on distance from infrastructure, system impact on infrastructure, and policy incentives. The framework is intended as an enabler for visualization, optimization and decision making across diverse dimensions while searching for lucrative investment-plans.

24 POWER TRANSMISSION AND DISTRIBUTION↗

When do different scenarios of projected electricity demand start to meaningfully diverge?

Resource adequacy studies look at balancing electricity supply and demand on 10- to 15-year time horizons while asset investment planning typically evaluates returns on 20- to 40-year time horizons. Projections of electricity demand are factored into the decision-making in both cases. Climate, energy policy, and socioeconomic changes are key uncertainties known to influence electricity demands, but their relative importance for demands over the next 10-40 years is unclear. The power sector would benefit from a better understanding of the need to characterize these uncertainties for resource adequacy and investment planning. In this study, we quantify when projected United States (U.S.) electricity demands start to meaningfully diverge in response to a range of climate, energy policy, and socioeconomic drivers. Here we use a wide yet plausible range of 21st century scenarios for the U.S. The projections span two population/economic growth scenarios (Shared Socioeconomic Pathways 3 and 5) and two climate/energy policy scenarios, one including climate mitigation policies and one without (Representative Concentration Pathways 4.5 and 8.5). Each climate/energy policy scenario has two warming levels to reflect a range of climate model uncertainty. We show that the socioeconomic scenario matters almost immediately – within the next 10 years, the climate/policy scenario matters within 25-30 years, and the climate model uncertainty matters only after 50+ years. This work can inform the power sector working to integrate climate change uncertainties into their decision-making.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Valuing Resilience

There is a variety of work in progress at NREL that is evaluating the value of resiliency. This presentation summarizes of this ongoing work, which including: 1. The development of quantitative resilience metrics for the power system. 2. The implementation of quantitative, performance-based resilience metrics into existing models and tools 3. Methods for valuing resilience, including a time-varying value of lost load. 4. The extent to which accounting for performance-based resilience metrics and/or the value of resilience could impact investment (planning) decisions related to electricity supply. 5. Developing and implementing a consistent valuation methodology for resilience distribution system field validation projects.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Performance Metrics to Evaluate Utility Resilience Investments

In 2019, Sandia National Laboratories (Sandia) contracted Synapse Energy Economics (Synapse) to research the integration of community and electric grid resilience investment planning as part of the Designing Resilient Communities (DRC): A Consequence-Based Approach for Grid Investment project. Synapse produced a series of reports to explore the challenges and opportunities in several key areas, including benefit-cost analysis (BCA), performance metrics, microgrids, and regulatory mechanisms. This report focuses on BCA. BCA is an approach that electric utilities, electric utility regulators, and communities can use to evaluate the costs and benefits of a wide range of grid resilience investments in a comprehensive and consistent way. While BCA is regularly applied to some types of grid investments, application of BCA to grid resilience investments is in the early stages of development. Though resilience is increasingly cited in connection with grid investment proposals and plans, the resilience- related costs and benefits of grid resilience investments are typically not fully identified, infrequently quantified, and almost never monetized. Without complete assessments of costs and benefits, regulators can be hesitant to approve some types of grid resilience investments. This report provides the first application of the framework developed in the 2020 National Standard Practice Manual for Benefit-Cost Analysis of Distributed Energy Resources (NSPM for DERs) to grid resilience investments. We provide guidance on next steps for implementation to enable grid resilience investments to receive due consideration. We suggest developing BCA principles and standards for jurisdiction-specific BCA tests. We also recommend identifying the resilience impacts of the investments and quantification of these impacts by establishing utility performance metrics for resilience. Proactive integration of grid resilience investments into existing regulatory processes and practices can increase the capacity of jurisdictions to respond to and recover from the consequences of extreme events. 1 National Energy Screening Project. 2020. National Standard Practice Manual for Benefit-Cost Analysis of Distributed Energy Resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Regulatory Mechanisms to Enable Investments in Electric Utility Resilience

In 2019, Sandia National Laboratories contracted Synapse Energy Economics (Synapse) to research the integration of community and electric utility resilience investment planning as part of the Designing Resilient Communities: A Consequence-Based Approach for Grid Investment (DRC) project. Synapse produced a series of reports to explore the challenges and opportunities in several key areas, including benefit-cost analysis, performance metrics, microgrids, and regulatory mechanisms to promote investments in electric system resilience. This report focuses on regulatory mechanisms to improve resilience. Regulatory mechanisms that improve resilience are approaches that electric utility regulators can use to align utility, customer, and third-party investments with regulatory, ratepayer, community, and other important stakeholder interests and priorities for resilience. Cost-of-service regulation may fail to provide utilities with adequate guidance or incentives regarding community priorities for infrastructure hardening and disaster recovery. The application of other types of regulatory mechanisms to resilience investments can help. This report: characterizes regulatory objective as they apply to resilience; identifies several regulatory mechanisms that are used or can be adapted to improve the resilience of the electric system--including performance-based regulation, integrated planning, tariffs and programs to leverage private investment, alternative lines of business for utilities, enhanced cost recovery, and securitization; provides a case study of each regulatory mechanism; summarizes findings across the case studies; and suggests how these regulatory mechanisms might be improved and applied to resilience moving forward. In this report, we assess the effectiveness of a range of utility regulatory mechanisms at evaluating and prioritizing utility investments in grid resilience. First, we characterize regulatory objectives which underly all regulatory mechanisms. We then describe seven types of regulatory mechanisms that can be used to improve resilience--including performance-based regulation, integrated planning, tariffs and programs to leverage private investment, alternative lines of business for utilities, enhanced cost recovery, and securitization--and provide a case study for each one. We summarize our findings on the extent to which these regulatory mechanisms have supported resilience to date. We conclude with suggestions on how these regulatory mechanisms might be improved and applied to resilience moving forward.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Data for Renewable Energy Planning, Policy, and Investment

Reliable, robust, and validated data are critical for informed planning, policy development, and investment in the clean energy sector. The Renewable Energy (RE) Explorer was developed to support data-driven renewable energy analysis that can inform key renewable energy decisions globally. This document presents the types of geospatial and other data at the core of renewable energy analysis and decision making. Individual data sets used to inform decisions vary in relation to spatial and temporal resolution, quality, and overall usefulness. From Data to Decisions, a complementary geospatial data and analysis decision guide, provides an in-depth view of these and other considerations to enable data-driven planning, policymaking, and investment. Data support a wide variety of renewable energy analyses and decisions, including technical and economic potential assessment, renewable energy zone analysis, grid integration, risk and resiliency identification, electrification, and distributed solar photovoltaic potential. This fact sheet provides information on the types of data that are important for renewable energy decision making using the RE Data Explorer or similar types of geospatial analysis tools.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Systematic Technology Planning: GSFC Perspective

This viewgraph presentation describes the experiences of Goddard Space Flight Center (GSFC) in integrating systematic technology investment planning into the process of architecting NASA space missions. The presentation uses the assessment of a lidar mission as a case study, and illustrates integration strategies through flow charts and dynamic systems models.

Steiner, Mark↗

Transportation Plan Los Alamos National Laboratory FY2023

Los Alamos National Laboratory’s (LANL’s) mission expansion is expected to increase the workforce population (badge holders) to more than 18,000 by 2028. Before the COVID-19 pandemic, traffic congestion was notable and was impeding commuting workers in the forms of traffic congestion, travel delay, inconvenience, frustration, and time lost hunting for parking near an office location or programmatic operation. The Laboratory transportation strategy is moving toward transit-based commuting and not status quo expansion of onsite parking and roadways to serve this growing workforce. This plan addresses a multi-faceted transit and transportation solution. The body of the plan describes each aspect of this solution and concludes with a recommended set of Fiscal Year 2023 (FY23) investments planned as next steps toward implementation. The broad strategy is to offer agility and program depth for services and systems that can enable LANL to confidently invest, monitor performance, seek participant feedback, and make necessary adjustments.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Quantification of Commercially Planned Battery Component Supply in North America through 2035

There is the potential for rapid growth in battery manufacturing in North America in the coming years, as indicated by investment plans which companies have announced. Argonne National Laboratory is tracking these investment announcements to understand the availability of domestically produced battery cells and battery components over the next decade. We find that companies have made announcements for over 1,300 GWh/year of lithium-ion battery cell production by 2030, enough to conservatively supply ten million electric vehicles and expected growth in stationary grid storage. From 2021 to 2032, battery cell production is modeled to grow 28-fold. For each of the core battery components of lithium-ion batteries (cathodes, anodes, separators, electrolytes, and foils), we describe the current announced capacities for materials with respect to cell production and end-use demand, finding similar rapid growth for each.

25 ENERGY STORAGE↗

The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure

With the support of DOE's Vehicle Technologies Office and the DOE/DOT Joint Office (JO), NREL has applied the EVI-X modeling suite to conduct a National Electric Vehicle Infrastructure Needs Assessment. This report considers a 2030 scenario in which 50% of light-duty sales are electric (including plug-in hybrids), resulting in an on-road stock of 33 million vehicles. We consider the needs of vehicles used for typical daily driving, drivers without access to residential charging, corridor charging supporting long-distance travel, and ride-hailing electrification. We find that a cumulative capital investment of $82 billion in public and private charging infrastructure will be necessary in our baseline scenario (approximately 3x greater than our estimate of planned investments to date). This result is framed as a conservative estimate as the assumed costs include charging equipment and installation but exclude the cost of grid upgrades and distributed energy resources.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Modeling U.S. Light-Duty Demand for EV Charging Infrastructure in 2030

With the support of DOE's Vehicle Technologies Office and the DOE/DOT Joint Office (JO), NREL has applied the EVI-X modeling suite to conduct a National Electric Vehicle Infrastructure Needs Assessment. This report considers a 2030 scenario in which 50% of light-duty sales are electric (including plug-in hybrids), resulting in an on-road stock of 33 million vehicles. We consider the needs of vehicles used for typical daily driving, drivers without access to residential charging, corridor charging supporting long-distance travel, and ride-hailing electrification. We find that a cumulative capital investment of $82 billion in public and private charging infrastructure will be necessary in our baseline scenario (approximately 3x greater than our estimate of planned investments to date). This result is framed as a conservative estimate as the assumed costs include charging equipment and installation but exclude the cost of grid upgrades and distributed energy resources.

33 ADVANCED PROPULSION SYSTEMS↗