Engineering PapersSearch

SEARCH · Engineering Papers

Results for “IADS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

ATD-2 IADS Metroplex Traffic Management Overview Brief

ATD-2 will improve the predictability and the operational efficiency of the air traffic system in metroplex environments through the enhancement, development and integration of the nation's most advanced and sophisticated arrival, departure, and surface prediction, scheduling and management systems.

airspace technology demonstration

Distributed Schemes for Integrated Arrival Departure Surface (IADS) Scheduling

The objective of the NRA is to investigate and develop integrated scheduling solutions for arrival, departure and surface operations. The option year briefing summarizes simulation-based analyses of the departure metering process to investigate strategic queue management strategies and their robustness to uncertainty, assess the impact of delaying departures at their gates on blocking the arrivals destined for the same gates, and evaluate the effects and benefits of relaxing current-day MIT constraints when ATD-2 is in operation.

ATD-2

Airspace Technology Demonstration II (ATD-2): American Airlines CLT Ramp Training RTC/RMTC: Baseline Integrated Arrival/ Departure/Surface (IADS) - ATD-2 Tech Transfer 1 - Phase 1

This training material was created to train CLT (Charlotte Douglas International Airport) ramp controllers on the ATD-2 (Airspace Technology Demonstration-2) system. It includes an overview of ATD-2 and the RTC/RMTC (Ramp Traffic Console/Ramp Manager Traffic Console). It discusses many interface details, data exchange and integration, metering modes, and scheduler advisories. It concludes with interactive exercises on all topics of the training course.

RTC/RMTC

ATD-2 Integrated Arrival/Departure/Surface (IADS) System Software Version 3.1.x Releases and Notes

This document summarizes the change reports for the ATD-2 V3.1.x series of software releases to Charlotte-Douglas International Airport (CLT). These list all the changes since the previous release. The Release Notes for Distribution are meant to be more readable by stakeholders. [Includes updates to changes for RTC (Ramp Traffic Console), Scheduler, STBO (Surface Trajectory-Based Operations), and Surface Metering Display (graphical-user interface, GUI) clients.]

RTC

Test Plan for the Technology Maturation of Supersonic Inflatable Aerodynamic Decelerators

Supersonic inflatable aerodynamic decelerators (IADs) are drag devices intended to be deployed at high Mach numbers. In the application considered here they assist in the descent and landing of spacecraft on Mars. Although promising, present IAD technology is not yet sufficiently mature for use in the near future. This paper describes a technology maturation plan for tension cone IADs using subscale test articles to reduce development costs. As envisioned, the proposed test plan includes three phases: wind tunnel tests (subsonic), unpowered high-altitude flight tests (transonic), and powered high-altitude tests (supersonic). This test plan is based on a building block approach in which successful completion of each phase adds to the understanding of the behavior of IADs and reduces the risk of the subsequent, more expensive phases. By properly scaling the IADs, test articles of the same size and nearly the same construction can be used for all three phases. The final phase is a dynamically scaled flight test with IAD deployment at the same Mach number as the full-scale vehicle on Mars. Two full-scale example cases are presented: one for a single-stage system (15 m dia. IAD to subsonic retropropulsion), and another for a two-stage system (10.5 m dia. IAD to subsonic parachute). Using scale factors of 0.333 and 0.476 yield subscale test IADs of 5 m dia. The dynamically scaled powered flight test starts at Mach 4 and an altitude of 33.5 km. Existing balloons and rocket motors are shown to be adequate to meet the required test conditions.

Kelly, Jenny R.

The Challenges of Integrating Instrumentation with Inflatable Aerodynamic Decelerators

To realize the National Aeronautics and Space Administration s (NASA) goal of landing humans on Mars, development of technologies to facilitate the landing of heavy payloads are being explored. Current entry, decent, and landing technologies are not practical when utilizing these heavy payloads due to mass and volume constraints dictated by limitations imposed by current launch vehicle fairings. Therefore, past and present technologies are now being considered to provide a mass and volume efficient solution, including Inflatable Aerodynamic Decelerators (IADs) [1]. IAD ground and flight tests are currently being conducted to develop and characterize their performance under flight-like conditions. The integrated instrumentation systems, which are key to the performance characterization in each of these tests, have proven to be a challenge compared to the instrumentation of traditional rigid aeroshells. To overcome these challenges, flexible and embedded sensing systems have been developed, along with improved instrumenting techniques. This development opportunity faces many difficult aspects specific to inflatable structures in extreme environments. These include but are not limited to: physical flexibility, packaging, temperature, structural integration and data acquisition [2]. To better define the instrumentation challenges posed by IAD technology development, a survey was conducted to identify valuable measurements for ground and flight testing. From this survey many sensing technologies were explored, resulting in a down-selection to the most viable prospects. These systems were then iterated upon in design to determine the best integration techniques specific to a 3m and 6m stacked torus IAD. Each sensing system was then integrated and employed to support the IAD testing in the National Full-Scale Aerodynamics Complex 40 x 80 wind tunnel at NASA Ames Research Center in the summer of 2012. Another challenge that has been explored is the data acquisition of IAD sensing technologies. Traditionally all space based sensing systems transmit their data through a wired interface. This limits the amount of sensors able to be integrated within the IAD due to volume and routing restrictions of the supporting signal and excitation wires. To alleviate this situation, multiple wireless data acquisition technologies have been researched and developed through rapid prototyping efforts. The final custom multi-nodal wireless system utilized during the summer 2012 IAD test series consisted of four remote nodes and one receiving base station. The system reliably conditioned and acquired 20+ sensors over the course of the wind tunnel test series. These developments in wireless data acquisition techniques can eliminate the need for structural feedthroughs and reduce system mass associated with wiring and wire harnesses. This makes the utilization of flight instrumentation more attractive to future missions, which would result in further improved characterization of IAD technology, and overall, increased scientific knowledge regarding the response of inflatable structures to extreme entry environments. [

Swanson, Gregory T.

Airspace Technology Demonstration 2 (ATD-2) Phase 2 Technology Description Document (TDD)

This Technology Description Document (TDD) provides an overview of the technology for the Phase 1 Baseline and Phase 2 Fused demonstrations of the Integrated Arrival, Departure, and Surface (IADS) prototype system of the National Aeronautics and Space Administration’s (NASA) Airspace Technology Demonstration 2 (ATD-2) project, which has been demonstrated since October of 2017 at Charlotte Douglas International Airport (CLT). Development, integration, and field demonstration of relevant technologies of the IADS system directly address recommendations made by the Next Generation Air Transportation System (NextGen) Integration Working Group (NIWG) on Surface and Data Sharing and the Surface Collaborative Decision Making (Surface CDM) concept of operations developed jointly by the Federal Aviation Administration (FAA) and aviation industry partners. NASA has been developing the IADS traffic management system under the ATD-2 project in coordination with the FAA, flight operators, CLT airport operators, and the National Air Traffic Controllers Association (NATCA). The primary goal of ATD-2 is to improve the predictability and operational efficiency of the air traffic system in metroplex environments, through the enhancement, development, and integration of the nation’s most advanced and sophisticated arrival, departure, and surface prediction, scheduling, and management systems. The ATD-2 project is a 5-year research activity beginning in 2015 and extending through 2020. The Phase 1 Baseline IADS capability resulting from the ATD-2 research has been demonstrated at the CLT airport since the beginning of October 2017. Phase 1 provided data exchange and integration with the initial demonstration of the integrated system of strategic and tactical scheduling, collaborative tactical surface metering, tactical departure scheduling to an en route meter point and overhead stream insertion, initial integration of a TFDM SWIM prototype feed, and an early implementation prototype of a Terminal Flight Data Manager (TFDM) Electronic Flight Data (EFD) system. The strategic surface scheduling element of the capability is consistent with the Surface CDM Concept of Operations published in 2014 by the FAA Surface Operations Directorate.1 The Phase 2 Fused IADS system provided substantial updates to baseline IADS Demonstration capability. Improvements were made to the IADS modeler; tactical surface scheduling, and metering; tactical departure scheduling for overhead stream insertion; Electronic Flight Data (EFD) and the integration with the FAA Advanced Electronic Flight Strip (AEFS); RTC/RMTC, and departure trajectories. New capabilities included a TFDM SWIM prototype feed and delivery of IADS data via the TFDM Terminal Publication (TTP) service of the FAA’s SWIM system; strategic surface scheduling and metering as well as fusion with tactical surface metering; integration and ingestion of data from TTP-connected Mobile App and texting industry for General Aviation (GA) flights; and expansion of airspace deployments to include adjacent Center automation, in particular interface with the Atlanta Center (ZTL) arrival metering TBFM system to evaluate pre-scheduling of flights. Improvements in Data Analysis and System Health (DASH) monitoring and updates were completed as well.

Talebi, Ehsan

Airspace Technology Demonstration 2 (ATD-2) Phase 1 Concept of Use (ConUse)

This document presents an operational Concept of Use (ConUse) for the Phase 1 Baseline Integrated Arrival, Departure, and Surface (IADS) prototype system of NASA's Airspace Technology Demonstration 2 (ATD-2) sub-project, which began demonstration in 2017 at Charlotte Douglas International Airport (CLT). NASA is developing the IADS system under the ATD-2 sub-project in coordination with the Federal Aviation Administration (FAA) and aviation industry partners. The primary goal of ATD-2 sub-project is to improve the predictability and the operational efficiency of the air traffic system in metroplex environments, through the enhancement, development, and integration of the nation's most advanced and sophisticated arrival, departure, and surface prediction, scheduling, and management systems. The ATD-2 effort is a five-year research activity through 2020. The initial phase of the ATD-2 sub-project, which is the focus of this document, will demonstrate the Phase 1 Baseline IADS capability at CLT in 2017. The Phase 1 Baseline IADS capabilities of the ATD-2 sub-project consists of: (a) Strategic and tactical surface scheduling to improve efficiency and predictability of airport surface operations, (b) Tactical departure scheduling to enhance merging of departures into overhead traffic streams via accurate predictions of takeoff times and automated coordination between the Airport Traffic Control Tower (ATCT, or Tower) and the Air Route Traffic Control Center (ARTCC, or Center), (c) Improvements in departure surface demand predictions in Time Based Flow Management (TBFM), (d) A prototype Electronic Flight Data (EFD) system provided by the FAA via the Terminal Flight Data Manager (TFDM) early implementation effort, and (e) Improved situational awareness and demand predictions through integration with the Traffic Flow Management System (TFMS), TBFM, and TFDM (3Ts) for electronic data integration and exchange, and an on-screen dashboard displaying pertinent analytics in real-time. The surface scheduling and metering element of the capability is consistent with the Surface CDM Concept of Operations published in 2014 by the FAA Surface Operations Directorate.1 Upon successful demonstration of the Phase 1 Baseline IADS capability, follow-on demonstrations of the matured IADS traffic management capabilities will be conducted in the 2018-2020 timeframe. At the end of each phase of the demonstrations, NASA will transfer the ATD-2 sub-project technology to the FAA and industry partners.

integrated arrival

Scheduling Improvements Following the Phase 1 Field Evaluation of the ATD-2 Integrated Arrival, Departure, and Surface Concept

NASA is conducting the Airspace Technology Demonstration-2 to evaluate an Integrated Arrival, Departure, and Surface (IADS) traffic management system that extends traffic sequencing for the entire life-cycle of a flight from departure gate to arrival gate within multi-airport, metroplex environments. After development and testing in human-in-the-loop simulations, the IADS system was deployed to Charlotte Douglas International Airport for a three-year field evaluation. From the initial IADS concept development through the end of the Phase 1 field evaluation many lessons were learned with regards to the IADS scheduler. In this paper we describe how data from the Phase 1 field evaluation helped identify scheduler improvements and guided the implementation of refinements. The improvements in the IADS scheduler described in this paper are incorporated into the IADS Phase 2 scheduler enabling strategic Surface Metering Programs and will be evaluated during the field evaluation.

Coupe, William J.

Scheduling Improvements Following the Phase 1 Field Evaluation of the ATD-2 Integrated Arrival, Departure, and Surface Concept

NASA is conducting the Airspace Technology Demonstration-2 (ATD-2) to evaluate an Integrated Arrival, Departure, and Surface (IADS) traffic management system that extends traffic sequencing for the entire life-cycle of a flight from departure gate to arrival gate within multi-airport, metroplex environments. After development and testing in human-in-the-loop simulations, the IADS system was deployed to Charlotte Douglas International Airport for a three-year field evaluation. From the initial IADS concept development through the end of the Phase 1 field evaluation many lessons were learned with regards to the IADS scheduler. In this paper we describe how data from the Phase 1 field evaluation helped identify scheduler improvements and guided the implementation of refinements. The improvements in the IADS scheduler described in this paper are incorporated into the IADS Phase 2 scheduler enabling strategic Surface Metering Programs and will be evaluated during the field evaluation.

Airspace Technology Demonstration-2

ATD-2 Benefits Mechanism

NASA has been developing and demonstrating a suite of decision support capabilities for integrated arrival, departure, and surface (IADS) operations in a metroplex environment. The effort is being made in three phases, under NASA’s Airspace Technology Demonstration 2 (ATD-2) sub-project, through a close partnership with the Federal Aviation Administration (FAA), air carriers, airport, and general aviation community. The Phase 1 Baseline IADS capabilities provide enhanced operational efficiency and predictability of flight operations through data exchange and integration, tactical surface metering, and automated coordination of release time of controlled flights for overhead stream insertion. The Phase 2 Fused IADS capabilities include the fusion of strategic and tactical surface metering, Atlanta Center airspace tactical scheduling, Electronic Flight Data (EFD) integration, Terminal Flight Data Manager (TFDM) Terminal Publication (TTP) prototype, and Mobile App for General Aviation (GA) community. In the Phase 2 field evaluation, strategic surface metering provides advance notice of metering and additional stability to the assigned gate holds. The users of the IADS system in Phases 1 and 2 include the personnel at Charlotte Douglas International Airport (CLT) air traffic control tower, American Airlines ramp tower, CLT terminal radar approach control (TRACON), and Washington and Atlanta Center. This document describes the ATD-2 benefits mechanism used to assess the Phases 1 and 2 IADS capabilities and field evaluation conducted at CLT since September 2017. The ATD-2 benefits mechanism mainly consists of surface metering and overhead stream insertion. This document provides detailed calculation methods of major benefit metrics, such as fuel savings, gas emissions savings, and engine runtime reduction, which can be obtained through surface metering, gate hold of Approval Request (APREQ) flights prior to pushback, and the renegotiation of release time while taxiing. As of March 31, 2020, it is estimated that 5,075,981 pounds of fuel savings and 15,634,022 pounds of CO2 emission reduction have been achieved so far, with a reduction of 3,832 hours in total engine runtime. The amount of CO2 savings is estimated to be equivalent to planting 116,254 urban trees. The pre- and post-metering comparison results using FAA’s Aviation System Performance Metrics (ASPM) data have also shown that the surface metering had no negative impact on the on-time arrival performance of both outbound and inbound flights at CLT.

ATD-2

ATD-2 Benefits Mechanism

NASA has been developing and demonstrating a suite of decision support capabilities for integrated arrival, departure, and surface (IADS) operations in a metroplex environment. The effort is being made in three phases, under NASA’s Airspace Technology Demonstration 2 (ATD-2) sub-project, through a close partnership with the Federal Aviation Administration (FAA), air carriers, airport, and general aviation community. The Phase 1 Baseline IADS capabilities provide enhanced operational efficiency and predictability of flight operations through data exchange and integration, tactical surface metering, and automated coordination of release time of controlled flights for overhead stream insertion. The Phase 2 Fused IADS capabilities include the fusion of strategic and tactical surface metering, Atlanta Center airspace tactical scheduling, Electronic Flight Data (EFD) integration, Terminal Flight Data Manager (TFDM) Terminal Publication (TTP) prototype, and Mobile App for General Aviation (GA) community. In the Phase 2 field evaluation, strategic surface metering provides advance notice of metering and additional stability to the assigned gate holds. The users of the IADS system in Phases 1 and 2 include the personnel at Charlotte Douglas International Airport (CLT) air traffic control tower, American Airlines ramp tower, CLT terminal radar approach control (TRACON), and Washington and Atlanta Center. This document describes the ATD-2 benefits mechanism used to assess the Phases 1 and 2 IADS capabilities and field evaluation conducted at CLT since September 2017. The ATD-2 benefits mechanism mainly consists of surface metering and overhead stream insertion. This document provides detailed calculation methods of major benefit metrics, such as fuel savings, gas emissions savings, and engine runtime reduction, which can be obtained through surface metering, gate hold of Approval Request (APREQ) flights prior to pushback, and the renegotiation of release time while taxiing. As of April 30, 2020, it is estimated that 5,097,173 pounds of fuel savings and 15,699,292 pounds of CO2 emission reduction have been achieved so far, with a reduction of 3,831 hours in total engine runtime. The amount of CO2 savings is estimated to be equivalent to planting 116,739 urban trees. The pre- and post-metering comparison results using FAA’s Aviation System Performance Metrics (ASPM) data have also shown that the surface metering had no negative impact on the on-time arrival performance of both outbound and inbound flights at CLT.

ATD-2