At least 37 records · Page 2

Large Scale Pumped Storage to Support Renewable Deployment; PSH Resource Assessment and Complementary Analysis for Alaska

The State of Alaska has a rather unique electric power system, as it has two larger transmission grids (Railbelt and Southeast Alaska) and over 150 islanded stand-alone power systems that are serving remote rural communities. In 2010, the Alaska legislature enacted a non-binding goal for 50% of renewable electricity generation by 2025. With the expected increase in wind and solar generation in the future, the role of energy storage becomes increasingly important. Considering the specific power system characteristics in Alaska, energy storage technologies that can supply electricity over an extended period of time, such as pumped storage hydropower (PSH), may play a key role in enabling the reliability and resiliency of both integrated and rural power systems. The overarching objective of the subject study of this presentation is to investigate the prospects and opportunities for PSH in Alaska.

Alaska↗

Real-World Demonstration of a New, American Low-Head Hydropower Turbine (Final Technical Report)

Hydro Green Energy (HGE) has designed and model tested a Modular Bulb Turbine (MBT) with a simplified civil structure which shows potential to provide an economical alternative for undeveloped low-head projects in the United States, such as at existing locks and dams and constructed waterways. The primary objective of this project was to fabricate, install and operate a full scale interchangeable Modular Bulb Turbine (MBT), which will be inserted in a Large Frame Module (LFM) and supporting civil infrastructure designed by Hydro Green Energy at Braddock Locks and Dam, a low-head hydropower project site at an existing lock and dam currently in federal licensing by Hydro Green Energy. HGE would finance and install the remaining six turbines, which would have completed the larger 5.2 MW head hydropower project.

13 HYDRO ENERGY↗

Corral Summit Pumped Storage Hydropower Hybrid: Site Suitability Assessment

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗

Corral Summit Pumped Storage Hydropower Hybrid Site Suitability Assessment (Rev.1)

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗

Hybridization Assessment of Trybrid Pumped Storage Hydropower System—Part 1: A Case Study of Corral Summit

This report is a part of the deliverables for technical assistance provided to Cat Creek Energy for the Coral Summit Trybrid (Triple Hybrid-Pumped Storage Hydropower, Battery Energy Storage System, and photovoltaic solar energy) energy project. This report explores the operational benefits and challenges of hybridizing an open loop PSH (200MW) located at Mackay, Custer County, Idaho with solar PV (Ground mount 300MW and floating 40MW) and battery (720MWhr). This document reports two activities performed as a part of the hybridization assessment task 1) optimal resource allocation and energy management strategy, and 2) power quality and reliability assessment. From optimal resource allocation and energy management strategy (activity 1), the following key findings can be observed: • Conventional PSH (CPSH) with two reversible pump turbines and separate penstocks can provide required flexibility equivalent to that from two ternary PSH with separate penstock. With single unit CPSH, upper reservoir head cannot be maintained accurately, the variation of water level is rapid and pump mode flexibility is not available. These disadvantages can be overcome by single unit TPSH. However, using two CPSH units with separate penstocks also overcome these disadvantages with the formation of the hydraulic short circuit between two conventional units. • Flooding of the lower reservoir is a severe concern when considering continuous operation for black start. This limits the duration of continuous operation from PSH alone to around 50 hours. Due to the complementary PV and battery action, the duration of continuous operation and smooth power output can be extended. • An optimization problem is framed that maximizes the power output on an hourly basis while minimizing constraint violations and respecting seasonal variations of solar PV and load profiles . Two value streams, arbitrage and baseload generation are served by this profile. It was uncovered that for smooth power output during regular operation, PV curtailment will be required, or the battery capacity needs to be increased above 90MW to accommodate additional PV. From power quality and reliability assessment (activity 2) the following takeaway points can be observed: • The Trybrid, when integrated at the Lost River bus, and limited to 250MW in generation mode and -150MW in the pump mode, causes no violation of voltage or flow.

13 - HYDRO ENERGY↗

Wind Turbine Design Optimization for Hydrogen Production

To help meet the need for inexpensive green fuels, we are working on wind turbine design optimization specifically for hydrogen production. We have thus far achieved a 1.53% decrease in LCOH as compared to a turbine optimized for LCOE using the same code, design variables, and models. We accomplished this by optimizing some components of the wind turbine tower, rotor, and drivetrain design with hydrogen production and costs in the design loop.

hydrogen↗

A Configuration Based Pumped Storage Hydro Model in the MISO Day-Ahead Market

Pumped storage hydro units (PSHU) can provide flexibility to power systems. This becomes particularly valuable in recent years with the increasing shares of intermittent renewable resources. However, due to emphasis on thermal generation in the current market practices, the flexibility from PSHUs have not been fully explored and utilized. This paper proposes a configuration based pumped storage hydro (PSH) model for the day-ahead market, in order to enhance the use of PSH resources in the system. A strategic design of incorporating and fully optimizing PSHUs in the day-ahead market is presented. Here, we show the compactness of the proposed model. Numerical studies are presented in an illustrative test system and the Midcontinent Independent System Operator (MISO) system.

13 HYDRO ENERGY↗

Basic Design Layout of a Modular Pumped Hydro Teaching Unit

This work was originally completed in July 2015 as a proposal to Santa Fe Community College (SFCC) for their engineering program and a follow up to a feasibility study completed for the Community College the year earlier as indicated below. The work was ahead of its time and funding was hard to obtain to implement a project. This work is now being formally released for distribution to a wider audience based on the evolving circumstances in greater society that now favor this approach with funding more readily available. Due to the distribution outside of SFCC, specific architectural drawing sets of the pertinent buildings called out in the design have been removed. No changes to the design have been made. The design layout utilizing a building is not meant to limit the implementation of the design. The elevation difference required may be obtained with a building, a small hill, jacking up the upper tank, or similar means. The design presented is a basic design, identifying major components and how they are connected together. The user may change components under their own liability. All local applicable codes and standards must be followed when building an actual unit, under the authority of a responsible engineer or owner. Appropriate measures must be followed to protect people from hazards such as electricity, water pressure, and general construction. A leak test to verify water tightness of the system should be conducted prior to any operations. The vision of this design is to allow a class of 10 to 15 students to construct the assembly within a month or so time period, and then learn to operate the assembly at their school location under the guidance of their instructor. This will allow the students to learn about the practical concept of storing electricity with water, and gain a hands on experience of the real world challenges faced with full Modular Pumped Hydro Projects.

13 HYDRO ENERGY↗

Revenue prediction for integrated renewable energy and energy storage system using machine learning techniques

Revenue estimation for integrated renewable energy and energy storage systems is important to support plant owners or operators’ decisions in battery sizing selection that leads to maximized financial performances. A common approach to optimizing revenues of a hybrid hydro and energy storage system is using mixed-integer linear programming (MILP). Although MILP models can provide accurate production cost estimations, they are typically very computationally expensive. To provide a fast yet accurate first-step information to hydropower plant owners or operators who consider integrating energy storage systems, we propose an innovative approach to predicting optimal revenues of an integrated energy generation and storage system. In this study, we examined the performance of two prediction techniques: Generalized Additive Models (GAMs) and machine learning (ML) models developed based on artificial neural networks (ANN). Predictive equations and models are generated based on optimized solutions from a market participation optimization model, the Conventional Hydropower Energy and Environmental Resource System (CHEERS) model. The two predicting techniques reduce the computational time to evaluate annual revenue for one set of battery configurations from 3 h to 1 to 4 min per run while also being implementable with significantly less data. The model validation prediction errors of developed GAMs and ML models are generally below 5%; for model testing predictions, the ML models consistently outperform the regression equations in terms of root mean square errors. This new approach allows plant owners, operators, or potential investors to quickly access multiple battery configurations under different energy generation and market scenarios. This new revenue prediction method will therefore help reduce the barriers, and thereby promoting the deployment of battery hybridization with existing renewable energy sources.

13 HYDRO ENERGY↗

Developing a Marine Energy Workforce Pipeline

Marine Energy is a nascent, but growing industry and will need a strong workforce to be successful. This paper examines the resources and programs needed to achieve the industry's goals.

education↗

Status and Trends in the U.S. Voluntary Green Power Market (2021 Data)

Voluntary green power, for the purposes of this report, refers to renewable energy procurement by retail electricity customers above state renewable energy mandates. In this report, we present data and key trends for voluntary green power markets, except for a small portion of voluntary purchasing where no data are available. In 2021, about 8 million retail electricity customers procured about 244 million megawatt-hours (MWh) of voluntary green power (Figure ES-1), representing about 27% of all U.S. renewable energy sales, about 39% of non-hydro renewable energy sales, and about 6% of all U.S. retail electricity sales. Most of the remainder of U.S. renewable energy sales reflects renewable energy procured by load-serving entities to comply with state renewable energy mandates, also known as compliance-based procurement.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

New Tool Evaluates the Financial Viability of Pumped Storage Hydropower

The rapidly evolving electricity system with increasing variable renewable energy (VRE) resources provides both opportunities and challenges for the power sector. With the significant ramps and intermittency associated with VRE resources, the requirements and need for additional flexible resources increase. Pumped storage hydropower (PSH) provides flexibility to the electricity grid to replace fossil fuel plants, which are responsible for 25% of U.S. emissions. PSH projects support various aspects of power system operations, including flexibility, ramping capability, energy, ancillary service, black start, and others. The significant potential of hydropower requires understanding the different value drivers to the electricity system specific to the location of a project and then optimizing the plant for the different system values. Thus, determining the value of PSH projects and their many services and contributions to the electricity system can be a challenge for potential developers, system owners, regulators, policy makers, and consultants.

13 HYDRO ENERGY↗

Tool-Based Case Studies on Strategic Deployment of Untapped Micro-Pumped Hydro Storage in Michigan

With most classical hydropower sites already utilized and the global push for rapid integration of renewable energy sources accelerating, there is a critical need to identify alternative energy storage solutions. Pumped hydro energy storage, which accounts for the vast majority of global grid-scale storage, remains one of the most cost-effective and long-duration storage technologies available. Hence, this study presents a novel tool designed to assess the untapped potential of inland lakes and reservoirs for micro-PSH, using Michigan’s relatively flat landscape as a case study due to its extensive but underutilized water infrastructure. To ensure accuracy and reliability, the tool incorporates extensive data gathered from authorized sources, covering more than 420 water facilities and potential reservoirs in the state. The tool evaluates key parameters such as horizontal and vertical distances, volume, and the total storage capacity of each reservoir. Its robust assessment framework integrates these metrics to evaluate each site’s potential. The tool’s intuitive interface and geospatial visualizations support actionable insights for planners and scalable deployment of distributed storage infrastructure.

13 HYDRO ENERGY↗

Anomaly Detection and Mitigation for Dynamic Frequency Regulation in Hydropower-Battery Systems

Hydropower operators and energy storage providers are increasingly interested in participating in frequency regulation services, driven by the incentives offered by independent system operators, such as the PJM Interconnection. This transition, however, unfolds against the backdrop of a modernizing and rapidly digitizing power grid, exposing the integrated legacy infrastructure to a multitude of cybersecurity threats. This work presents an approach for developing an anomaly detection and mitigation system to address cybersecurity challenges during the participation of a hydropower-integrated battery energy storage system (BESS) in a frequency regulation market. The applied anomaly detector utilizes machine learning algorithms to provide detailed classification of cyber-physical events. Later, the applied mitigation system triggers predefined corrective actions to minimize the impact of data integrity attacks on the regulation market and system stability. We evaluated the proposed approach on a hydropower-integrated BESS topology, specifically analyzing the slow regulation signal (Reg A) coming from the PJM market. Our simulation results demonstrate that the proposed approach performs well in detecting data integrity attacks within the allocated time frame and also minimizes the system's transient instability during the participation of hydropower and BESS in the regulation market.

battery energy storage system↗

CELLULAR COFFERDAMS AS PERMANENT HYDROPOWER DAM STRUCTURES

This paper presents the results of a comprehensive study on the potential use of cellular cofferdams as basis for the design and construction of water retaining structures to sustainably and cost-effectively harness hydropower. Previously, cellular cofferdams have been widely used mainly as temporary water exclusion devices to permit dry construction of in-water structures such as dams, locks, bridge footings and piers, and hydroelectric power plants. Design and construction requirements for cellular cofferdams are less stringent than for hydropower dams. To make cellular cofferdams suitable for permanent hydropower use, different design concepts that utilize cellular cofferdams as the main or core element of the water-retaining dam structure are proposed. One particular key design concept is the so-called “dry construction technique” in which the granular fill in cofferdam cells and the downstream berm are permanently kept dry in contrast to the wet construction technique for temporary use of cellular cofferdams. The viability of the proposed permanent cellular cofferdam design concepts is demonstrated using well-established structural and geotechnical design procedures and computational modeling. The improved performance of the proposed design concepts, particularly in combination with the dry construction technique, show cellular cofferdams have the potential to be used as basis for the construction of permanent hydropower dam structures that are versatile, with less impact on the environment, and will cost less to build than conventional hydropower dams.

13 HYDRO ENERGY↗

Basin-Wide Approaches to Hydropower Licensing

This presentation summarizes findings from a 2020 NREL technical report including the FERC relicensing process for non-federal hydropower projects, analyzes FERC-licensed projects with license expiration dates from 2018-2037, discusses FERC's authority to coordinate license terms of hydropower projects within a shared river basin and provides basin-wide case studies and considerations to hydropower relicensing. In the United States there are 1,043 active FERC-licensed hydroelectric projects with a total capacity of 56,097 MW. Of those, 647 with a total capacity of 21,870 MW have license expiration dates from 2018-2037. The expected workload in conjunction with the time, cost, and complexity associated with issuing a single new license has led to initiatives that aim to increase the efficiency of the relicensing process. Federal and state regulators and licensees in California, Maine, New York, and Wisconsin have begun to develop approaches to look at hydropower relicensing as part of a larger system - a river basin. These basin-wide approaches seek to coordinate different stages of the relicensing process for multiple projects at the same time. The goal of these basin-wide approaches is to increase the efficiency of the relicensing process and allow for a more comprehensive analysis of the cumulative impacts of the projects within the basin. These innovative approaches to relicensing could also reduce the workload for regulators and costs associated with relicensing. This presentation discusses some of the findings from the Basin-wide Approaches to Hydropower Relicensing: Case Studies and Considerations including a summary of the key considerations for the FERC relicensing process for non-federal hydropower projects, key findings from the analysis of FERC-licensed projects with license expiration dates from 2018-2037, discusses FERC's authority to coordinate license terms of hydropower projects within a shared river basin and provides basin-wide case studies and considerations to hydropower relicensing.