U328 Electrical Reliability Project Soil Sampling and Analysis Plan

Lawrence Livermore National Laboratory's (LLNL’s) Project Management Office (PMO) is planning to install an underground electrical duct bank at the 3200 block of the Livermore Site (project). The proposed project will include a new electrical substation and feeders, demolition and replacement of the U328C utility building with a new structure to the west, re-routing of utilities, and update of the parking lot. This Sampling and Analysis Plan (SAP) outlines the procedures to collect and evaluate environmental samples for disposition of the excavated soil during the project and geotechnical samples for pavement design. This SAP has been prepared and is organized to be consistent with LLNL's Soils Screening and Management Plan (SSMP) (LLNL, 2022), as well as the U.S. Environmental Protection Agency's (EPA) Data Quality Objectives (DQO) process (EPA, 2006). In addition to the environmental samples, geotechnical samples will be collected by Consolidated Engineering Laboratories (CEL) on behalf of PMO. Geotechnical samples will be collected from a dedicated geotechnical boring location or co-located with environmental samples. Collection and evaluation of the geotechnical samples is determined by CEL and is therefore not discussed in this SAP.

54 ENVIRONMENTAL SCIENCES↗

Building 151 NNMA Clean Laboratory Project Soil Sampling and Analysis Plan

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Function Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Building 151 NNMA Clean Laboratory Project (project) located immediately south of Building 154. The purpose of the SAP was to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction in accordance with Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL, 2022), which is consistent with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA, 2006). The SAP was developed in accordance with the SSMP and based on preliminary design information provided to EFA by PMO. In addition to environmental samples, geotechnical samples will be collected by Consolidated Engineering Laboratories (CEL) on behalf of PMO. Geotechnical samples will be collected from a dedicated geotechnical boring location or co-located with environmental samples. Collection of geotechnical samples is determined by CEL and is therefore not discussed in this SAP.

54 ENVIRONMENTAL SCIENCES↗

Cellular cofferdams for hydropower use. Final report

This report presents the results of a comprehensive study on a proposal to use cellular cofferdams as basis for the design and construction of water retaining structures to sustainably and cost-effectively harness hydropower. Previously, cellular cofferdams have been widely used mainly as temporary water exclusion devices to permit dry construction of in-water structures such as dams, locks, bridge footings and piers, and hydroelectric power plants. Design and construction requirements for cellular cofferdams are less stringent than for hydropower dams. To make cellular cofferdams suitable for permanent hydropower use, different design concepts that utilize cellular cofferdams as the main or core element of the water-retaining dam structure are proposed. One key design concept is the so-called “dry construction technique” in which the granular fill in cofferdam cells and the downstream berm are permanently kept dry in contrast to the wet construction technique for temporary use of cellular cofferdams. The viability of the proposed permanent cellular cofferdam design concepts is demonstrated using well-established structural and geotechnical design procedures and computational modeling. The improved performance of the proposed design concepts, particularly in combination with the dry construction technique, show cellular cofferdams have the potential to be used as basis for the construction of permanent hydropower dam structures that are versatile, with less impact on the environment, and will cost less to build than conventional hydropower dams.

13 HYDRO ENERGY↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

RANGERS: State of the Art and Science on Engineered Barrier Systems in Salt Formations

The construction of deep geological repositories (DGR) in salt formations requires penetrating through naturally sealing geosphere layers. While the emplaced nuclear waste is primarily protected by the containment-providing rock zone (CRZ), technical barriers are required, for example during handling. For closure geotechnical barriers seal the repository along the accesses against water or solutions from outside and the possible emission paths for radionuclides contained inside. As these barriers must ensure maintenance-free function on a long-term basis, they typically comprise a set of specialized elements with diversified functions that may be used redundantly. The effects of the individual elements are coordinated so that they are collectively referred to as the Engineered Barrier System (EBS).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Q-Fibre Quarterly Performance Progress Report

The project titled Quantitative Strain Monitoring for Well and Seal Integrity through Wellbore Fiber Optic Cable s, or Q-Fibre in short, is a multi-national collaborative project under the Clean Energy Transitional Partnership (CETP) program. The lead organization of the project is the Norwegian Geotechnical Institute (NGI), and the LLNL team joins as a beneficiary member. The LLNL team receives the funding from the U.S. Department of Energy with the amount of $\$$1 million across three years, and the budget is primarily allocated to Work Package 3 (WP3) of the project, which focuses on Numerical Modeling of Fiber Optic Cable Data . Figure 1 presents all work packages involved in the project and corresponding lead organization for each work package. The LLNL team leads WP3.

42 ENGINEERING↗

Guideline for Characterizing and Evaluating a Candidate Project Site for Solar Thermal Applications

This document presents a structured procedure for characterizing and evaluating candidate project sites for concentrating solar power (CSP) and solar heat for industrial processes (SHIP) applications. The objective is to provide project developers, researchers, and other stakeholders with a consistent, technology-agnostic framework for early-stage site assessment, enabling informed decision-making prior to significant investment in project development. Site selection is a critical factor in project success or failure for both CSP and SHIP projects. Key factors such as solar resource availability, land characteristics, environmental and regulatory constraints, infrastructure availability, and community context are determined by the choice of project site and can materially impact project performance, cost, schedule, and overall viability. This procedure is designed to systematically evaluate these factors, identify potential fatal flaws, and prioritize the most favorable candidate sites for further development. The process begins with rapid screening-level evaluation, using publicly available data to assess solar resource, land availability and suitability, zoning and land-use compatibility, and exclusion zones such as protected lands or sensitive habitats. Sites that meet the minimum screening criteria advance to a more detailed characterization. Subsequent sections of this report provide guidance for a next-level assessment of the most important technical and environmental parameters, including: 1) Solar resource quality, variability, and uncertainty using multiyear datasets and, where appropriate, on-site measurement campaigns; 2) Meteorological conditions such as wind, temperature, extreme weather events, and soiling impacts; 3) Land characteristics including slope, shading, and geotechnical conditions; and 4) Environmental and regulatory considerations, including permitting processes, endangered species, cultural resources, and visual impacts. The procedure also addresses infrastructure and integration considerations, including: 1) Grid interconnection requirements for CSP power generation projects; 2) Electrical and operational integration for SHIP facilities; 3) Water availability, quality, and permitting constraints, which are particularly critical for CSP in arid regions; and 4) Site access, construction logistics, and availability of workforce and supporting services. Recognizing the importance of social and economic context, the procedure includes evaluation of community engagement factors, such as stakeholder sentiment, proximity to sensitive visual receptors, workforce development opportunities, and local economic incentives. The outputs of these assessments are synthesized in a cost and risk evaluation, translating site characteristics into expected impacts on capital cost, operating cost, schedule, and technical risk. This is complemented by screening-level performance modeling, including 8760 simulations and long-term projections, to quantify expected energy or thermal output, assess variability thereof, and support comparison between candidate sites. Finally, the procedure provides high-level guidance on a structured go/no-go decision framework, categorizing sites based on identified risks and constraints, and outlining a clear path forward to feasibility studies and front-end engineering design for viable projects. By standardizing the site characterization process across both CSP and SHIP applications, this guideline aims to: 1) Improve consistency and transparency in early-stage project evaluation; 2) Reduce development risk and avoid investment in nonviable project sites; 3) Support collaboration between developers, researchers, and public agencies; and 4) Accelerate successful deployment of concentrating solar technologies for both power generation and industrial process heat.

14 SOLAR ENERGY↗

Jackson, L., Johnson, M.B., Latrach, A., Grimes, D., Martinez, C., and Mclaughlin, J.F., 2024, Multidisciplinary geotechnical data collection, curation, and analysis for conformity with the regulatory framework for geologic carbon storage in Wyoming, USA: Geological Society of America Abstracts with Programs. Vol. 56, No. 5, 2024, doi: 10.1130/abs/2024AM-405024

Title: Multidisciplinary Geotechnical Data Collection, Curation, and Analysis for Conformity with the Regulatory Framework for Geologic Carbon Storage in Wyoming, USA. Text: Construction and operation of wells for geologic sequestration of carbon dioxide necessitate that they are permitted under the Environmental Protection Agency’s Underground Injection Control Class VI requirements. Class VI wells conform to stringent requirements to ensure long-term safety and integrity of the storage site and the protection of Underground Sources of Drinking Water. Entities pursuing Class VI permitting must provide comprehensive geologic site characterization, including regional geologic structure and stratigraphy, aquifer information, reservoir and confining unit geomechanical properties, geochemical analyses, assessment of trapping capacity and mechanisms, and a variety of other of multidisciplinary geotechnical data. The Wyoming Class VI Site Characterization Database Project is focused on developing a geologic site characterization database of geotechnical information, which has been compiled and verified from established, public databases/entities and scientific literature to expedite Class VI permitting in Sweetwater County within the Greater Green River Basin of southern Wyoming. The preliminary suite of compiled data from 14,000 wells includes 8,000 wells with logs and 7,250 wells with formation tops, ~70 wells with core data (e.g., X-Ray diffraction, petrographic, and petrophysical data), ~2,500 water analyses, ~740 seismic events data, and ~520 bottom-hole temperature measurements. Future work on—and stemming from—this project will include new core analyses, calculation and interpolation of subsurface temperature gradients, mechanical earth models, geochemical simulations, storage capacity estimation, stratigraphic column generation and correlation, and construction of subsurface maps. Finally, this work will help to inspire and facilitate subsurface data compilation and curation beyond Sweetwater County, Wyoming.

42 ENGINEERING↗

Estimating epistemic uncertainty in soil parameters for nonlinear site response analyses: Introducing the Latin Hypercube Sampling technique

This study quantifies the effects of epistemic uncertainty in soil parameters on nonlinear (NL) site response analysis (SRA) results, validated against the data recorded at a well-instrumented geotechnical downhole array located in Japan. To this end, a one-dimensional soil column model of the Service Hall Array (SHA) near the Kashiwazaki-Kariwa Nuclear Power Plant (KKNPP) is developed using the finite element (FE) program LS-DYNA. The dynamic stress–strain relationship is characterized by a modified two-stage hyperbolic (MTH) NL backbone curve formulation capable of capturing soil behavior at both small- and large-shear strains. The model is then validated against the ground motion recordings to capture the model bias. The uncertainties associated with the shear-wave velocity profile (a small-strain soil property) and soil shear strength (a large-strain soil property) are incorporated in NL SRA to quantify their separate and joint randomization effects on the results. This study proposes using the Latin Hypercube Sampling (LHS) method as an efficient alternative to commonly used methods, such as Standard Monte Carlo (SMC), to account for uncertainty propagation in such reliability analysis. Both low-intensity and design-level records from the recordings at the SHA are applied to study the contribution of the small- and large-strain NL dynamic soil properties. Results from 46,200 NL FE analyses (23,100 per input motion) are presented. Measured and predicted site response, using recorded ground motions at this downhole array, is compared to assess the significance of soil parameter uncertainty on the observed ground motion dispersions. It is demonstrated that increasing the number of soft realizations and implementing higher level earthquake intensity lead to higher ground motion dispersion. Unlike past studies in randomization of Vs profiles with the SMC method, the LHS method is shown to have no significant effect on the predicted median surface response spectra and amplification factors (AFs) for this case study.

Engineering↗