Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Geotechnical engineering”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Stress Dependency of Brittle Creep in Granite: Insights into Source Mechanisms and Parameters

Creep in rocks refers to the gradual deformation of rock material over time under the influence of constant stress. Characterizing these deformations is of great importance for engineering design, geotechnical assessment, mining operations, geological studies, and understanding natural hazards. While laboratory experiments and a variety of numerical approaches have offered explanations for microcrack interaction and damage accumulation under the three stages of creep (primary, secondary and tertiary) in conventional creep experiments, the micromechanisms of the fractures produced in brittle creep and its dependency on the applied stress have not been explored in detail. The present study focused on investigating the fracturing mechanisms that occur during creep-induced fracturing at different stress levels and estimation of the source parameters and energy budget components. A series of uniaxial compression creep experiments have been conducted at different stress level ratios (70%, 75%, 80% and 85%), to the unconfined compressive strength (UCS) of double-flawed Barre granite specimen. Creep measurements were complemented with the Acoustic Emission (AE) measurements. The creep-induced fractures were classified into double-couple (DC), compensated linear vector dipole (CLVD) and isotropic (ISO) components using the AE moment tensor decomposition technique. The results show that non-double-couple sources dominated during creep at all the specified stress levels; however, their proportions decreased as the stress level was increased. The source parameters estimation indicated a significant increase in the magnitude of the events and the radiated seismic energy with increasing levels of stress and a slight increase in the evaluated source radius and stress drop with increasing stress levels. Furthermore, this study contributes to the existing knowledge of creep-induced fracturing by providing insights into the fracturing mechanisms and the radiated seismic energy produced, which can be helpful for the development of improved models and strategies for rock engineering and geoscience applications.

58 GEOSCIENCES↗

A rheological model for loose sands with insights from DEM

A rheological model for loose granular media is developed to capture both solid-like and fluid-like responses during shearing. The proposed model is built by following the mathematical structure of an extended Kelvin–Voigt model, where an elastic spring and plastic slider act in parallel to a viscous damper. This arrangement requires the partition of the total stress into rate-independent and rate-dependent stress components. To model the solid-like behavior, a simple frictional plasticity model is adopted without modifications, thus contributing to the rate-independent stress. Instead, the fluid-like or rate-dependent stress is further decomposed into deviatoric and volumetric parts, by proposing a new formulation based on a combination of the μ(I) relation, originally developed under pressure-controlled shear, with a pressure-shear rate relation derived under volume-controlled shear. The proposed formulation allows the model to capture both the increase in the friction coefficient and the enhanced dilation at high shear rates. High-fidelity simulation data, obtained from discrete element method and multiscale modelling, are used to evaluate the performance of the proposed constitutive model. The model provides accurate results under both drained and undrained simple shear paths across a wide range of shear rates. Furthermore, it successfully reproduces at much lower computational cost the flowslide mobility computed through multiscale simulations, which is primarily regulated by the shear rate dependence of the material properties during the dynamic runout stage.

Elasticity↗

Geomechanical characterization of Rock Valley carbonates

In Rock Valley, Nevada, the USA, past earthquake sequences and shallow faulting in Paleozoic carbonates remain poorly understood. Carbonates are typically more ductile rocks that do not experience large stress drops or fracture coalescence, which contradicts previous observations in the region. As part of the Source Physics Experiment, an effort has been made to experimentally characterize the petrophysical and geomechanical properties of carbonates from Rock Valley. Well core and outcrop samples were used to determine the difference between shallow-buried Tertiary limestones and deeply buried Paleozoic limestones and dolostones. The carbonates possessed porosities between 3 and 9%, with V P and V S in the Tertiary carbonates around 2700 and 1800 m/s, respectively, and 6000 and 3100 m/s, respectively, in the Paleozoic carbonates. Microstructural characterization revealed that the Paleozoic carbonates contained significantly more pre-existing damage and alteration than the Tertiary carbonates, though the deformation varies from localized to diffuse. Unconfined Brazilian tests and triaxial tests with confining pressures between 0 and 50 MPa showed that, although samples all experienced failure, the dolostones typically failed at greater stresses and possessed greater E/ν ratios than the limestones. Furthermore, the Hoek–Brown failure criterion was used to construct failure envelopes with the compressive and tensile failure tests. Velocity, density, and porosity measurements were used to construct a hypothetical velocity-depth profile and compare the results with the theoretical petrophysical measurements. Using brittleness analysis, the likely failure conditions were determined to be low-porosity dolomitic rock for fault nucleation in the Paleozoic basement.

Brittleness↗

Design, Fabrication and Testing of an Experimental Apparatus for Determining Particle Behavior Under Very Low Intergranular Stresses

Because the constitutive laws for soils are governed mainly by interparticle friction, all aspects of their mechanical behavior depend strongly on gravitational body forces. This fact poses serious limitations on the formulation of a materially objective soil constitutive theory, based on experimentation performed on Earth. In particular, the presence of the Earth's gravity prohibits the design of controlled experiments to properly simulate a variety of critical phenomena associated with the dynamic response of soils to seismic excitation in a very low effective confining stress field. For these reasons, laboratory-controlled experiments in the Space Shuttle, under essentially zero-gravity conditions, could offer invaluable opportunities for developing a quantitative understanding of fundamental aspects of soil behavior during or after an earthquake, which, in turn, could result in significant technological advances in geotechnical earthquake engineering.

Sture, S.↗

Updating Lunar Subsurface Geotechnical Properties Based Upon Nonlinear Winkler Modeling of Apollo and Lunokhod Measurements

Returning human and robotic explorers to the lunar surface has identified a need for a renewed understanding of lunar geotechnical properties related to landing on and exploring the lunar surface. We review fundamental lunar geotechnical properties such as bulk density, cohesion, friction angle and shear strength, and apply new data derived from Apollo and Lunokhod geotechnical measurements to update the understanding of lunar regolith behavior. The analysis derives a new, nonlinear relationship of lunar geotechnical properties as a function of depth.

Lunar Geotechnical engineering↗

U328 Electrical Reliability Project Soil Sampling and Analysis Plan

Lawrence Livermore National Laboratory's (LLNL’s) Project Management Office (PMO) is planning to install an underground electrical duct bank at the 3200 block of the Livermore Site (project). The proposed project will include a new electrical substation and feeders, demolition and replacement of the U328C utility building with a new structure to the west, re-routing of utilities, and update of the parking lot. This Sampling and Analysis Plan (SAP) outlines the procedures to collect and evaluate environmental samples for disposition of the excavated soil during the project and geotechnical samples for pavement design. This SAP has been prepared and is organized to be consistent with LLNL's Soils Screening and Management Plan (SSMP) (LLNL, 2022), as well as the U.S. Environmental Protection Agency's (EPA) Data Quality Objectives (DQO) process (EPA, 2006). In addition to the environmental samples, geotechnical samples will be collected by Consolidated Engineering Laboratories (CEL) on behalf of PMO. Geotechnical samples will be collected from a dedicated geotechnical boring location or co-located with environmental samples. Collection and evaluation of the geotechnical samples is determined by CEL and is therefore not discussed in this SAP.

54 ENVIRONMENTAL SCIENCES↗

Building 151 NNMA Clean Laboratory Project Soil Sampling and Analysis Plan

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Function Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Building 151 NNMA Clean Laboratory Project (project) located immediately south of Building 154. The purpose of the SAP was to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction in accordance with Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL, 2022), which is consistent with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA, 2006). The SAP was developed in accordance with the SSMP and based on preliminary design information provided to EFA by PMO. In addition to environmental samples, geotechnical samples will be collected by Consolidated Engineering Laboratories (CEL) on behalf of PMO. Geotechnical samples will be collected from a dedicated geotechnical boring location or co-located with environmental samples. Collection of geotechnical samples is determined by CEL and is therefore not discussed in this SAP.

54 ENVIRONMENTAL SCIENCES↗

Regolith Simulant Preparation and Geotechnical Characterization for Plume Surface Interaction Testing

Descent engine plumes interact with the lunar surface and accelerate regolith particles to potentially high velocities. These ejecta create risks to surface assets that have yet to be fully assessed. To better understand these risks, plume surface interactions can be simulated on the ground by firing a test engine plume into a bin of lunar regolith simulant under vacuum conditions. The dynamics of the resultant ejecta can then be recorded. In this technical memorandum we discuss the processes used in preparing a 150 kg bin of lunar regolith simulant for plume surface interaction ground tests under vacuum conditions for the NASA STMD Plume Surface Interaction project. We present our approach to mitigating regolith simulant eruptions during pump-down, the methods used to fill and reset the regolith simulant bin for each test, and the techniques used to characterize the consistency of regolith simulant geotechnical properties before each new firing. The challenges of preparing a regolith simulant test bin below an ambient pressure of one atmosphere, particularly on the large scale, could largely be overcome with a system that could fill the test bin with simulant inside the chamber and under vacuum conditions.

lunar regolith↗

Cellular cofferdams for hydropower use. Final report

This report presents the results of a comprehensive study on a proposal to use cellular cofferdams as basis for the design and construction of water retaining structures to sustainably and cost-effectively harness hydropower. Previously, cellular cofferdams have been widely used mainly as temporary water exclusion devices to permit dry construction of in-water structures such as dams, locks, bridge footings and piers, and hydroelectric power plants. Design and construction requirements for cellular cofferdams are less stringent than for hydropower dams. To make cellular cofferdams suitable for permanent hydropower use, different design concepts that utilize cellular cofferdams as the main or core element of the water-retaining dam structure are proposed. One key design concept is the so-called “dry construction technique” in which the granular fill in cofferdam cells and the downstream berm are permanently kept dry in contrast to the wet construction technique for temporary use of cellular cofferdams. The viability of the proposed permanent cellular cofferdam design concepts is demonstrated using well-established structural and geotechnical design procedures and computational modeling. The improved performance of the proposed design concepts, particularly in combination with the dry construction technique, show cellular cofferdams have the potential to be used as basis for the construction of permanent hydropower dam structures that are versatile, with less impact on the environment, and will cost less to build than conventional hydropower dams.

13 HYDRO ENERGY↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Asteroid Redirect Mission (ARM) Formulation Assessment and Support Team (FAST) Final Report

The Asteroid Redirect Mission (ARM) Formulation Assessment and Support Team (FAST) was a two-month effort, chartered by NASA, to provide timely inputs for mission requirement formulation in support of the Asteroid Redirect Robotic Mission (ARRM) Requirements Closure Technical Interchange Meeting held December 15-16, 2015, to assist in developing an initial list of potential mission investigations, and to provide input on potential hosted payloads and partnerships. The FAST explored several aspects of potential science benefits and knowledge gain from the ARM. Expertise from the science, engineering, and technology communities was represented in exploring lines of inquiry related to key characteristics of the ARRM reference target asteroid (2008 EV5) for engineering design purposes. Specific areas of interest included target origin, spatial distribution and size of boulders, surface geotechnical properties, boulder physical properties, and considerations for boulder handling, crew safety, and containment. In order to increase knowledge gain potential from the mission, opportunities for partnerships and accompanying payloads were also investigated. Potential investigations could be conducted to reduce mission risks and increase knowledge return in the areas of science, planetary defense, asteroid resources and in-situ resource utilization, and capability and technology demonstrations. This report represents the FASTâ€"TM"s final product for the ARM.

Mazanek, Daniel D.↗

Systems engineering studies of lunar base construction

Many ingenious concepts have been proposed for lunar base construction, but few systematic studies exist which relate time-consistent lunar base construction technologies and the choice of lunar base approach with the long-term SEI objectives - i.e., lunar indigenous base construction and Mars Exploration equipment development. To fill this gap, CSC has taken a two-pronged approach. First, the Center undertook basic geotechnical investigations of lunar soil, fabrication of a scale prototype of a lunar construction crane, a multi-robot construction team laboratory experiment, and a preliminary design of lunar base structures. Second, during Jun. and Jul. 1991 two lunar base construction systems engineering studies were accomplished - a 'near term lunar base' study, and a 'far-term lunar base' study. The goals of these studies were to define the major lunar base construction research problems in consistent technology/construction frameworks, and to define design requirements for construction equipment such as a lunar crane and a regolith mover. The 'near-term lunar base' study examined three different construction concepts for a lunar base comprised of pre-fabricated, pre-tested, Space Station Freedom-type modules, which would be covered with regolith shielding. Concept A used a lunar crane for unloading and transportation; concept B, a winch and cart; and concept C, a walker to move the modules from the landing site to the base site and assemble them. To evaluate the merits of each approach, calculations were made of mass efficiency measure, source mass, reliability, far-term base mass, Mars base mass, and base assembly time. The model thus established was also used to define the requirements for crane speed and regolith mover m(sup 3)/sec rates. A major problem addressed is how to 'mine' the regolith and stack it over the habitats as shielding. To identify when the cost of using indigenous lunar materials to construct the base exceeds the cost of development and delivery of the equipment for processing lunar materials, a study of construction of a candidate sintered regolith 'far term lunar base' was undertaken. A technique was devised for casting slabs of sintered (basaltic) regolith and assembling these into a hemispherical (or geodesic) dome. The major problem occurs with the inner liner. At 14.7 psi and 20 percent oxygen internal atmosphere, the entire structure is in tension, even with the regolith load. Also, another study has indicated that at 14.7 psi major resupply of air will be needed because of leakage, and astronauts may have to engage in extensive pre-breathing and post-breathing for extravehicular activity (EVA) tasks, thus detracting from useful mission work time. An alternative is to operate part of the base at, say, 5 psi and 70 percent oxygen, or to equip the astronauts with hard suits at 8.3 psi or greater. All of these choices directly influence base design and construction techniques.

Morgenthaler, George W.↗

RANGERS: State of the Art and Science on Engineered Barrier Systems in Salt Formations

The construction of deep geological repositories (DGR) in salt formations requires penetrating through naturally sealing geosphere layers. While the emplaced nuclear waste is primarily protected by the containment-providing rock zone (CRZ), technical barriers are required, for example during handling. For closure geotechnical barriers seal the repository along the accesses against water or solutions from outside and the possible emission paths for radionuclides contained inside. As these barriers must ensure maintenance-free function on a long-term basis, they typically comprise a set of specialized elements with diversified functions that may be used redundantly. The effects of the individual elements are coordinated so that they are collectively referred to as the Engineered Barrier System (EBS).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lunar Simulants: JSC-1 is Gone; The Need for New Standardized Root Simulants

A workshop was held in 1991 to evaluate the status of simulated lunar regolith material and to make recommendations on future requirements and production of such material. As an outgrowth of that workshop, a group centered at Johnson Space Center (JSC) teamed with James Carter of the University of Texas at Dallas and Walter Boles of Texas A&M University to produce and distribute a new standardized lunar regolith simulant termed JSC-1. Carter supervised the field collection, shipping, processing, and initial packaging and transportation of JSC-1. Boles stored and distributed JSC-1. About 25 tons were created and distributed to the lunar science and engineer community; none is left for distribution. JSC-1 served an important role in concepts and designs for lunar base and lunar materials processing. Its chemical and physical properties were described by McKay et al., with its geotechnical properties described by Klosky et al.. While other lunar regolith simulants were produced before JSC-1, they were not standardized, and results from tests performed on them were not necessarily equivalent to test results performed on JSC-1. JSC-1 was designed to be chemically, mineralogically, and texturally similar to a mature lunar mare regolith (low titanium). The glass-rich character of JSC-1 (approx. 50%) produced quite different properties compared to other simulants that were made entirely of comminuted crystalline rock, but properties similar to lunar mare near surface regolith.

Carter, James L.↗

Geotechnical investigation report for proposed array of six 40-meter diameter antennas, Pioneer site, DSS 11, Goldstone, California tracking complex

The geotechnical investigation was conducted in three disciplines: (1) geological field reconnaissance of the general area of proposed construction; (2) geophysical seismic refraction survey of the localized area surrounding the six proposed antenna sites, including shear wave velocity determination; and (3) detailed foundation engineering investigation of each of the six sites. The investigations indicate that the six sites selected are relatively free from geologic hazards which would inhibit the proposed construction or future antenna operations.

Sweitzer, J. S.↗