Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

FEED Study for Climeworks Direct Air Capture at a California Geothermal Facility with Long-Term Storage (Final Scientific/Technical Report)

The overall objective of the project is to execute and complete a front-end engineering and design (FEED) study of an advanced Direct Air Capture (DAC) and Storage (DAC+S) system that is capable of removing and sequestering a minimum of 5,000 tonne/yr of CO 2 from the air based on cradle-to-gate life cycle assessment (LCA). The project will examine retrofitting and utilizing an existing domestic geothermal resource. The selected DAC system will be technology from Climeworks AG (Climeworks) that consists of an adsorption-desorption process to remove CO 2 from ambient air by using a selective filter. The geothermal host site is operated by Ormat Technologies Inc. (ORMAT). The DAC system will capture CO 2 using thermal energy from the host geothermal resource. This Final Scientific/Technical Report is a collection of the deliverables for the project. The project team was not able to successfully complete all the necessary tasks for this project. Shortly after the start of the project, two (2) project partners removed themselves from the study. The Awardee attempted to find a replacement for the direct air capture technology provider and geothermal energy provider. Due to this the awardee submitted a letter of cancellation for the project, letter is attached in the appendix. No funds were expended during the course of the project.

15 GEOTHERMAL ENERGY↗

Carbon Capture from ArcelorMittal Hot Briquetted Iron Plant Using Air Liquide Cryocap™ FG Technology – FEED Study

The process of steel production is energy and carbon intensive with global average energy consumption of 5.5 MWh/tonne of steel and CO2 emission intensity of 1.83 tonne CO2/tonne of steel. The steel making process has inherent CO2 emissions from mineral conversion and is considered major contributors to the global carbon emissions. The steel industry is responsible for 8% of global carbon emissions. The main objective of this research project is to execute and complete a front-end engineering and design (FEED) study for a commercial-scale, carbon capture project that separates 95% of the total CO2 emissions at the ArcelorMittal’s Hot Briquetted Iron (HBI) plant in Portland, TX (Figure 1). The HBI is an ore-based metallic that is used as high-grade feedstock for high-quality steel via an Electric Arc Furnace (EAF) route. The HBI plant produces 2.0 million metric tonnes of high-quality HBI and emits approximately 1 million tonnes CO2/yr. The capture system is a Pressure Swing Adsorption (PSA) system assisted Cryocap™ FG technology (Figure 2). The captured CO2 will be pipeline grade and will be geologically stored in a facility within 10 miles of the CO2 source. The Host Site location in Corpus Christi, TX, is near hydrocarbon processing facilities and near Environmental Justice (EJ) and Qualified Opportunity Zone (QOZ) communities. Due to the location of the Host Site, the retrofit project offers the ability to demonstrate how a workforce focused on the fossil energy sector can be redirected to the clean- energy sector. The Air Liquide Cryocap™ capture technology is a proven technology and has been extensively examined for large industrial applications. It has been shown to be applicable to a variety of industrial applications including the steel industry. Cryocap™ FG (specific setup for Flue Gas application) consists of a Pressure Swing Adsorption (PSA) unit coupled with a Cryogenic System. The PSA pre-concentrates the CO2 from the flue gas, while the cryogenic unit enables the CO2 purity to be increased to the desired level. The scope of this study incorporates completing FEED study of the CO2 capture system which includes point-source CO2 capture and balance-of-plant; Business Case Analysis (BCA) outlining the current and projected volumes of the steel plant’s point sources of CO2 and the potential utilization of tax credits, including its projected revenue and duration; Life Cycle Analysis (LCA); Environmental Justice Analysis; Economic Revitalization and Job Creation Outcomes Analysis; and Workforce Readiness Plan. The plant design work was divided into two components: Inside Battery Limits (ISBL) and Outside Battery Limits (OSBL). The ISBL focuses on the capture system, while the OSBL focuses on the utility feeds and ducting from the plant to the capture system. Various design and engineering deliverables will be developed to define commodity quantities, equipment specifications, and labour effort required to execute the project. These FEED study deliverables will be prepared with the intent to develop an overall project capital cost estimate consistent with an AACE Class 3 estimate. The modular approach for the Cryocap™ FG that is being designed for this study integrates compression, PSA, and cryogenic “bricks” to achieve the desired CO2 capture rates. This carbon capture system integrates easily with the existing plant, thus reducing project costs and risks. It is also capable of managing impurities such as nitrogen oxides (NOx), sulfur oxides (SOx), mercury, hydrocarbons, and particulate matter. The capture system has a smaller footprint than amine-based systems. The two-step process uses PSA to preconcentrate the CO2 in the feedstream and then uses the cryogenic portion to purify and compress the resulting high purity CO2 product. This combination of purification and compression (i.e., process intensification) significantly reduces the CAPEX associated with use of a separate compressor commonly utilized for amine solvent-based systems. Successful completion of the FEED study will provide DOE with a detailed understanding of the costs for scaling up this proven capture technology for commercial applications at industrial facilities.

42 ENGINEERING↗

Retrofitting Holcim Ste. Genevieve Cement Plant with CO2 Capture Plant Using Air Liquide Cryocap™ FG Technology

The global cement manufacturing industry is a major contributor to carbon dioxide emissions. The International Energy Agency's "Net Zero Emissions by 2050 Scenario" identifies CCS as a major strategy for meeting that goal. This project is among the first attempts to transfer capture technology developed at coal-fired power plants to the cement industry. The main objective of the project is to execute and complete a front-end engineering and design (FEED) studies for commercial-scale, carbon capture projects that separates 95% of the total CO2 emissions at the Holcim (US) Ste. Genevieve cement manufacturing facility using Air Liquide’s Pressure Swing Adsorption system (PSA) assisted Cryocap™ technology. The Holcim Ste. Genevieve cement plant in Missouri, US, boasts one of the largest single cement production lines in the world, with a capacity of approximately 12,000 t/day. The plant currently uses traditional fuels, namely coal and petcoke. The captured CO2 will be pipeline and geological storage grade. The industrial host site emits approximately 3.0 million tonne CO2/yr. Air Liquide’s Cryocap™ technology has been developed over the last 18+ years for CO2 capture applications. It has been shown to be applicable to a variety of industrial applications (e.g., steel, cement, SMR, Fluidized Catalytic Crackers (FCCs)). Cryocap™ FG consists of a Pressure Swing Adsorption (PSA) unit coupled with a Cryogenic System. The PSA pre-concentrates the CO2 from the flue gas, while the cryogenic unit enables the CO2 purity to be increased to the desired level. The project team is led by the Prairie Research Institute at the University of Illinois at Urbana-Champaign. The tasks include: complete FEED study for retrofitting the industrial facility with a carbon capture system to support developing a detailed cost estimate; business case analysis outlining the anticipated revenue and credits if projects was built and operated; technoeconomic analysis (TEA) outlining how capture system achieves DOE capture goals; and life cycle (LCA) analysis demonstrating zero net carbon emissions. The FEED study was successfully completed. This includes completing the process basis of design; preliminary engineering; outside battery limits (OSBL) detailed engineering including a Zero Liquid Discharge (ZLD) wastewater treatment system; inside battery limits (ISBL) detailed engineering [1]. An overall project capital cost estimate within a -20%/+30% accuracy was developed. The major contributors to the Total Plant Cost (TPC), by system, are the costs associated with the Outside Battery Limit (OSBL) section of the plant which includes a new river water intake structure and a Zero Liquid Discharge (ZLD) system. By cost category, the major contributors to the TPC are equipment and subcontractor costs, followed closely by engineering, construction management, home office and contractor fees. The TEA has been created to reflect the findings of the project. It analyzes the economic performance of the Cryocap™ technology by reviewing the estimated capital costs, operating cost, and revenue. The Cost of Capture (COC) associated with the Cryocap™ technology for 95% CO2 capture, when considering NETL 2018 economic assumptions (42/58 debt/equity ratio, 5.15% interest on debt and 1.42% return on equity in real dollars) and 2022 economic assumptions (42/58 debt/equity ratio, 8.82% interest on debt and 4.90% return on equity in real dollars) was found to be much lower than that for the DOE-NETL’s base-line cases. The highest contributors to the COC are annualized capital expenditures (CAPEX) and electricity consumption which can be offset by using lower cost renewable sources. The LCA was conducted using OpenLCA which is an open-source software that is recommended by NETL. The database utilized for this study was a modified version of TRACI 2.1 (developed by the US. Environmental Protection Agency’s National Risk Management Research Laboratory and modified by NETL). The Cryocap™ FG technology does not consume fuels in significant quantities and does not utilize specialized chemical solvents subject to decomposition, such as those utilized in amine-based carbon capture systems. The Cryocap™ FG technology mainly utilizes electricity as its energy input; hence, its calculated emissions are mainly associated with the generation of electricity offsite and are dependent on the energy matrix of the grid at the time of project implementation. The water consumption impact of the Cryocap™ FG is mostly for makeup of the water lost by evaporation in the cooling tower; however, the carbon capture plant will be equipped with a ZLD system to avoid effluent streams and minimize water consumption. The successful construction and operation of this plant based on this study results will provide a means to demonstrate an economically attractive and transformational capture technology that can be used to retrofit existing plants and be deployed at new plants.

01 COAL, LIGNITE, AND PEAT↗

Gasification of Coal and Biomass: The Route to Net-Negative-Carbon Power and Hydrogen

One promising process that is a candidate for meeting the goals of the US Department of Energy’s 21st Century Power Plant initiative is to gasify a mixture of coal and biomass to yield a syngas, which can have CO2 removed and then be used to produce hydrogen as well as an off-gas that can be used to flexibly produce power. This concept would overall be carbon net-negative and readily meet the 21st Century Power Plant initiative targets of smaller scale MW generation, high ramp rates and turndown, feedstock flexibility, and high efficiency—at a reasonable cost. Moreover, adding the large-scale production of “ultra-green” hydrogen yields a system tailored for the coming hydrogen economy, providing long-term energy storage and an attractive co-product for sale. The objective of the work being led by the Electric Power Research Institute, Inc. (EPRI), with support by Bechtel Corporation (Bechtel), Gas Technology Institute (GTI), Hamilton Mauer International, Inc. (HMI), Nebraska Public Power District (NPPD), NexantECA, Inc. (Nexant), and Wärtsilä, is to perform a front-end design and engineering (FEED) study on an oxygen-blown gasification system coupled with water-gas shift, pre-combustion CO2 capture, and pressure-swing adsorption working off a coal/biomass mix to yield high-purity hydrogen and a fuel off-gas that can generate power. Several designs are being considered that will be capable of producing 50 MW net from a flexible generator, over 8500 kg/hr of hydrogen, and net-negative CO2 emissions, at an efficiency of 50% net HHV. The plant would be hosted at an NPPD site, where opportunities for enhanced oil recovery and sequestration have been investigated and the need for low-carbon power and hydrogen is imminent. The principal biomass to be used is corn stover—prevalent in Nebraska where the plant will be located—mixed with Powder River Basin (PRB) coal, necessitating a gasifier that can use this feedstock and be flexible to allow other types. Waste plastics will also be reviewed for use. Two oxygen-blown gasifiers have been identified as candidates that have done testing with biomass including corn stover: the GTI gasifier—a high-pressure, fluidized-bed type—and HMI’s, a lower pressure moving-bed type. Both have relative advantages that are being investigated in the Phase I design study, with a resultant down select of one system for which the FEED will be performed in Phase II. The technical tasks for the proposed project are: • Design Development: Completion of design activities necessary to provide inputs for the FEED study. Multiple design cases will be assessed with the selection of the optimal one for the FEED. • Investment Case Preparation: Development of the draft investment case for the proposed process with business cases performed for the proposed host site and two other locations. • Host Site Selection: Evaluation of the two potential host sites within NPPD’s portfolio to select the preferred candidate based on technical, economic, and environmental considerations. • Environmental Information Volume (EIV) Development: Completion of the EIV for the host site. • FEED Study: Completion of a FEED study based on the design selected in Phase I. A Greenhouse Gas Life Cycle Analysis will also be performed for the process. • Update Investment Case: Finalization of the investment case based on findings from the FEED. The advantages of the proposed project are significant. Having an engaged U.S. power utility willing to provide a host site that will produce energy from coal plus a deep and experienced team is critical; the process meets all the goals of DOE’s 21st Century Power Plant initiative at an estimated total plant cost of ~$880M and a production cost of hydrogen of ~$2/kg-H2 while producing net-negative carbon power. If developed, this process has real commercial potential in the United States—supported by EPRI’s initial review of the considerable interest from selected U.S. utilities—and elsewhere around the globe. The process has fewer environmental hurdles compared to other concepts, lowering regulatory and protest risks—providing a pathway to preserving the viability of a critical indigenous energy source by transforming its use to match a changing world. This presentation will outline the motivation for the effort, summarize project plans, work completed to date, results of the Design Development task, and detailed work scope for the remainder of the project.

01 COAL, LIGNITE, AND PEAT↗

Large-Scale Commercial Carbon Capture Retrofit of the San Juan Generating Station

Enchant Energy, L.L.C. (Enchant) was selected to conduct a Front-End Engineering Design study (FEED) for the addition of a full-scale carbon capture system to remove carbon dioxide from the flue gas emissions of the two coal-fired generating units (total of 847 MW net) at San Juan Generating Station (SJGS), using Mitsubishi Heavy Industries Americas (MHIA) KM CDR Process™. Sargent & Lundy LLC (S&L) was selected as the primary technical lead, and along with various other organizations, were able to support Enchant’s completion of the following FEED tasks: Task 1 – Project Management & Planning; Task 2 – FEED Study; Task 3 - Final FEED Study Package. The FEED study period was between October 15, 2019 to September 30, 2022.

01 COAL, LIGNITE, AND PEAT↗

Gasification of Coal and Biomass: The Route to Net-Negative-Carbon Power and Hydrogen

One promising process that is a candidate for meeting the goals of the US Department of Energy’s 21st Century Power Plant initiative is to gasify a mixture of coal and biomass to yield a syngas, which can have CO2 removed and then be used to produce hydrogen as well as an off-gas that can be used to flexibly produce power. This concept would overall be carbon net-negative and readily meet the 21st Century Power Plant initiative targets of smaller scale MW generation, high ramp rates and turndown, feedstock flexibility, and high efficiency—at a reasonable cost. Moreover, adding the large-scale production of “ultra-green” hydrogen yields a system tailored for the coming hydrogen economy, providing long-term energy storage and an attractive co-product for sale. The objective of the work being led by the Electric Power Research Institute, Inc. (EPRI), with support by Bechtel Corporation (Bechtel), Gas Technology Institute (GTI), Hamilton Mauer International, Inc. (HMI), Nebraska Public Power District (NPPD), NexantECA, Inc. (Nexant), and Wärtsilä, is to perform a front-end design and engineering (FEED) study on an oxygen-blown gasification system coupled with water-gas shift, pre-combustion CO2 capture, and pressure-swing adsorption working off a coal/biomass mix to yield high-purity hydrogen and a fuel off-gas that can generate power. Several designs are being considered that will be capable of producing 50 MW net from a flexible generator, over 8500 kg/hr of hydrogen, and net-negative CO2 emissions, at an efficiency of 50% net HHV. The plant would be hosted at an NPPD site, where opportunities for enhanced oil recovery and sequestration have been investigated and the need for low-carbon power and hydrogen is imminent. The principal biomass to be used is corn stover—prevalent in Nebraska where the plant will be located—mixed with Powder River Basin (PRB) coal, necessitating a gasifier that can use this feedstock and be flexible to allow other types. Waste plastics will also be reviewed for use. Two oxygen-blown gasifiers have been identified as candidates that have done testing with biomass including corn stover: the GTI gasifier—a high-pressure, fluidized-bed type—and HMI’s, a lower pressure moving-bed type. Both have relative advantages that were investigated in the Phase I design study, with a resultant down select of one system for which the FEED will be performed in Phase II. The technical tasks for the project are: • Design Development: Completion of design activities necessary to provide inputs for the FEED study. Multiple design cases will be assessed with the selection of the optimal one for the FEED. • Investment Case Preparation: Development of the draft investment case for the proposed process with business cases performed for the proposed host site and two other locations. • Host Site Selection: Evaluation of the two potential host sites within NPPD’s portfolio to select the preferred candidate based on technical, economic, and environmental considerations. • Environmental Information Volume (EIV) Development: Completion of the EIV for the host site. • FEED Study: Completion of a FEED study based on the design selected in Phase I. A Greenhouse Gas Life Cycle Analysis will also be performed for the process. • Update Investment Case: Finalization of the investment case based on findings from the FEED. The advantages of the proposed project are significant. Having an engaged U.S. power utility willing to provide a host site that will produce energy from coal plus a deep and experienced team is critical; the process meets all the goals of DOE’s 21st Century Power Plant initiative at an estimated total plant cost of ~$880M and a production cost of hydrogen of ~$2/kg-H2 while producing net-negative carbon power. If developed, this process has real commercial potential in the United States—supported by EPRI’s initial review of the considerable interest from selected U.S. utilities—and elsewhere around the globe. The process has fewer environmental hurdles compared to other concepts, lowering regulatory and protest risks—providing a pathway to preserving the viability of a critical indigenous energy source by transforming its use to match a changing world. This presentation outlines the motivation for the effort, summarizes project plans, work completed to date, results of the Phase I effort and, and detailed work scope for the remainder of the project in the Phase II FEED effort.

01 COAL, LIGNITE, AND PEAT↗

New England Aqua Ventus I: 100% Hull Design (Final Technical Report)

This report serves as the final technical report for the US Department of Energy (DOE) award DE-EE0006713 (Award 6713). The project is titled “New England Aqua Ventus I Offshore Wind Advanced Technology Demonstration Project 100% Front-End Engineering and Design (FEED)”. The New England Aqua Ventus I (NEAV) project demonstrates a unique prestressed concrete semi-submersible floating hull technology, called VolturnUS. The technology is applicable to harness nearly 60% of the US offshore wind resource within 50 miles of the coast. The hull will be demonstrated at full-scale with a commercial scale wind turbine connected to the grid in the Northeast US off Monhegan Island, Maine for 20 years.

17 WIND ENERGY↗

Front-End Engineering and Design: Project Tundra Carbon Capture System (Final Report)

As the next phase of Project Tundra, Minnkota Power Cooperative (MPC) completed a front-end engineering and design (FEED) study to install a post-combustion CO 2 capture system (CCS) at the MPC operated (Square Butte Electric Cooperative-owned) Milton R. Young Station (MRYS) Unit 2 (MRY2), a 477-MW power plant fueled by North Dakota lignite. The project team completed the FEED with Fluor’s Econamine FG Plus℠ (EFG+) technology and is taking the next steps leading up to start of construction. Team members included FEED technical lead Fluor Enterprises (Fluor); owner’s engineer and balance of plant (BOP) engineer Burns & McDonnell (BMcD); leading carbon capture consultants (David Greeson Consulting, Hunt International Energy Services); environmental consultants (AECOM, Agora Environmental), other BOP engineering consultants (Golder Associates, Nels); cost-share funding agency, the North Dakota Industrial Commission (NDIC); and the Energy & Environmental Research Center (EERC). Project Tundra’s goal is to implement carbon capture, utilization, and storage (CCUS) in North Dakota, while preserving the use of lignite. Future options could lead to revitalizing legacy oil fields and creating a new CO 2 enhanced oil recovery (EOR) industry. The topic of this report is the FEED study for the carbon dioxide capture portion of Project Tundra. Building on the findings of a pre-FEED study for MRY2, the key deliverables contained in this FEED study are: a) design, costing, and performance data needed to commence project financing activities; b) engineering and material balances required to file for all project permits; and c) a final project schedule. Based on the results of the previous pre-FEED study, MPC and its team evaluated two options to provide the large amount of steam needed to operate the CCS: 1) installation of new natural gas package boilers and a new pipeline to supply natural gas to the facility and 2) extraction of steam from the existing MRYS steam turbine generator. The FEED study was performed using the package boilers option, as it was deemed to have the lowest technical risk, overall cost, and cost uncertainty. A key feature of the design, however, was the mixing the natural gas boilers’ flue gas with the MRY2 flue gas. This increased the size of the CCS system. This design also enabled the tie-in of Unit 1 flue gas for times when Unit 2 is offline. The CCS was designed to capture a combined 12,978 short tons per day (STPD) of CO 2 from the flue gases produced by the existing MRY Unit 2 along with flue gas produced by the new boiler package within the CCS. The 12,978 STPD CO 2 capture is achieved by normally processing 100% of the total available MRY Unit 2 flue gas (considering full load operation) and 100% of the boiler package flue gas, then removing 90% of the CO 2 available from the processed flue gas streams.

01 COAL, LIGNITE, AND PEAT↗

Front-End Engineering Design for Carbon Capture from Shell's Deer Park Chemical Complex (Final Scientific/Technical Report)

This is the final scientific/technical report for a Front-End Engineering and Design (FEED) whose objective was to separate and capture over 820,000 tonnes per year (tpy) CO2 emissions from the commercially operated Shell Chemicals Complex located in Deer Park, Texas, USA reducing the overall facility CO2 emissions by 95% while providing energy transition jobs in a commercial area with a high concentration of refinery and chemical facilities producing CO2 emissions. The emission sources at the facility that were in scope were a total of Sixteen Furnaces – 8 OP3 furnaces and 8 OP3/HT2 Furnaces. Other minor sources were out of scope.

01 COAL, LIGNITE, AND PEAT↗

Industrial Carbon Capture from a Cement Facility Using the Cryocap™ FG Process

The objective of the project was to execute and complete front-end engineering and design (FEED) studies for commercial-scale, carbon capture projects that separate 95% of the total CO 2 emissions at an industrial facility, producing at least 100,000 metric tonnes/year of CO 2 for sequestration. The industrial facility selected is the Holcim (US) Ste. Genevieve cement manufacturing facility (the largest single kiln line in the world), while the carbon capture system selected is Pressure Swing Adsorption system (PSA) assisted Cryocap™ technology developed by Air Liquide. The industrial host site emits approximately 3 million tonnes CO 2 /year based on plant data from 2020-2022. The captured CO 2 will meet the requirements of transport (Pipeline Grade) and geological storage, and the geological storage facilities within 80 miles of the CO 2 source. The impact of the project on Environmental Justice and the regional economy was also analyzed.

01 COAL, LIGNITE, AND PEAT↗

Industrial Carbon Capture from a Cement Facility Using the Cryocap FG Process (FE0032136)

The project's objective was to execute and complete front-end engineering and design (FEED) studies for commercial-scale, carbon capture projects that separate 95% of the total CO2 emissions at an industrial facility, producing at least 100,000 metric tonnes/year of CO2 for sequestration. The industrial facility selected is the Holcim (US) Ste. Genevieve cement manufacturing facility (the largest single kiln line in the world), while the carbon capture system selected is Pressure Swing Adsorption system (PSA) assisted Cryocap™ technology developed by Air Liquide. The impact of the project on Environmental Justice and the regional economy was also analyzed.

01 COAL, LIGNITE, AND PEAT↗

Industrial Carbon Capture from a Cement Facility Using the CryocapTM FG Process (2023 FECM/NETL Conference Proceeding)

The project's objective was to execute and complete front-end engineering and design (FEED) studies for commercial-scale, carbon capture projects that separate 95% of the total CO2 emissions at an industrial facility, producing at least 100,000 metric tonnes/year of CO2 for sequestration. The industrial facility selected is the Holcim (US) Ste. Genevieve cement manufacturing facility (the largest single kiln line in the world), while the carbon capture system selected is Pressure Swing Adsorption system (PSA) assisted Cryocap™ technology developed by Air Liquide. The impact of the project on Environmental Justice and the regional economy was also analyzed.

01 COAL, LIGNITE, AND PEAT↗

Recovery and Refining of Rare Earth Elements from Lignite Mine Wastes

The University of North Dakota (UND), in collaboration with a comprehensive team of technical, business and host-site partners, built on prior technology development to complete a front-end engineering and design (FEED) and business planning study to recover and refine rare earth elements (REE) and critical minerals (CM) from North Dakota (ND) lignite mine wastes. The end of project goal was to have an investment quality project and a committed team ready to commercialize the proposed technologies in a future construction and operations phase.

01 COAL, LIGNITE, AND PEAT↗

Carbon Capture on Air Liquide United States Gulf Coast Steam Methane Reformer using the Cryocap TM Flue Gases Process

The objective of this DOE-funded project is to execute and complete a Front-End Engineering and Design (FEED) study for a commercial-scale carbon capture project for Air Liquide’s Steam Methane Reformer (SMR) located at La Porte, near Houston, Texas. The Host Site is one of Air Liquide’s largest SMR assets, and supplies hydrogen to the Air Liquide Gulf Coast Hydrogen System, which serves refiners and petrochemical manufacturers through an existing H2 pipeline spanning roughly 200 miles from Port Arthur, TX to Bay City, TX. The Host Site produces up to 116.5 million standard cubic feet per day (MMSCFD) of gaseous hydrogen and emits approximately 950 ktpy CO 2 at the nameplate capacity. The evolving importance of decarbonized H2 for both existing customers and new markets, as well as the availability and intent of prominent third-party partners to transport and sequester captured CO 2 in locally abundant geological sites for 45Q credits, make the AL US Gulf Coast SMR an ideal site for the proposed FEED study. The envisioned carbon capture system is based on Air Liquide’s proprietary Cryocap™ Flue Gas (FG) process. The integration of the Cryocap™ FG technology to the existing SMR would enable the capture of 900 ktpy of CO 2 , with a net carbon capture rate of >95% and with minimum impact on the levelized cost of hydrogen produced at 99.97% purity.

03 NATURAL GAS↗

Wyoming Trails Carbon Hub (WyoTCH)

The Wyoming Trails Carbon Hub (WyoTCH) project completed a front-end engineering and design (FEED) study for a commercial-scale, open-access carbon dioxide (CO 2 ) transport pipeline in Wyoming under U.S. Department of Energy (DOE) Award DEFE0032347, funded through the Bipartisan Infrastructure Law Carbon Capture Technology Program and administered by the National Energy Technology Laboratory. The project’s approach of designing a multi-source, multi-destination pipeline, rather than a dedicated line serving a single project, would lower the barrier to entry for individual CO 2 projects. The projects would leverage Wyoming's concentrated industrial and power generation CO 2 sources, its existing CO 2 pipeline infrastructure, and its extensive CO 2 storage and utilization capacity. This is the project's final technical report.

01 COAL, LIGNITE, AND PEAT↗

Economically Viable Intermediate to Long Duration Hydrogen Energy Storage Solutions for Fossil Fueled Assets

This report was prepared as an account of work sponsored by the Office of Fossil Energy and Carbon Management of U.S. Department of Energy under Funding Opportunity Announcement Number DE-FOA-0002332 “Energy Storage for Fossil Power Generation”. The work aimed to explore and advance an innovative hydrogen energy storage system – the synergistically integrated hydrogen energy storage system (SIHES) – that has the following characteristics: • Compatible with existing or new coal and gas fuel electricity generation units, • best suited for intermediate to long duration energy storage, from 12 hours to weeks even months, and • capable of storing energy at the utility scale – hundreds of MWh to GWh energy storage with power output level in tens to hundreds of MW. Preliminary front-end engineering design (Pre-FEED) studies was carried out to develop and refine a site-specific SIHES as peaking power generation units (so named as HyPeaker) as the first market entry point, to demonstrate both the technical feasibility and the economic viability to integrate the HyPeaker “within the fence” of a fossil power plant. This specific site was TVA’s Johnsonville Combustion Turbine Plant. The HyPeaker was designed and engineered to integrate with a 60MW aeroderivative gas turbine unit already available at TVA’s Johnsonville site. This site-specific HyPeaker consists of an alkaline electrolyzer to produce hydrogen from CO 2 free electricity sources, an innovative low-cost high-pressure hydrogen storage system (Big-Ton) and the aero gas turbine to generate electricity using blend of hydrogen and natural gas. A holistic system level technoeconomic analysis tool specific to HyPeaker was developed to optimize the engineering design of the Johnsonville site-specific HyPeaker for cost and performance. The optimal design and specification of the Johnsonville site-specific HyPeaker are the following: • Alkaline electrolyzer: 3MW • Big-Ton storage vessel: 11,000kg H 2 at 3000psi. • 4-stage diaphragm hydrogen compressor: 55kg-H 2 /hr from 150psi to 3000psi. The HyPeaker is designed to provide sufficient hydrogen for 90% continuous operation of the HyPeaker. All major components have design life of 30 years. The capex of HyPeaker is estimated at $\$$7.1M. This included $\$$1.5M for the electrolyzer, $\$$5.6M for the storage vessel and compressor. The cost of aero gas turbine was included as it is already available at the site. Key findings are: • HyPeaker can be designed, manufactured, installed and integrated with the fossil power plants, with sub-systems and components commercially available on the market today, even when it is scaled up to an order of magnitude larger than the one at the Johnsonville site. HyPeaker is a technologically viable solution to cover a wide range of energy storage duration needs, from daily peaking operation to seasonal shifting for fossil fueled assets. • The cost advantage of SCCV based Big-Ton H 2 storage vessel made it possible to “oversize” the H 2 storage subsystem to achieve overall system level cost optimization. The benefits are two-fold. First, it allows to significantly reduce the capacity and cost of electrolyzer by spreading H 2 production over a much longer period of time when the fuel cost for electricity production is low. Second, it allows to balance the hydrogen production and usage shift over weeks to months to meet the peak demands. As such, the capital cost of HyPeaker system using the Big-Ton was less than half of the cost of a system with today’s steel tube based H 2 storage system. The HyPeaker has even better cost advantage Li-ion battery based energy storage system. The estimated capital cost of Li-Ion battery system would be at $\$$38M, under the same projected 20-year electricity generation profile of the Johnsonville site. This is over 5 times more expensive than the HyPeaker system. • Since industry scale energy storage systems do not have 100% energy conversion and storage efficiency, energy storage systems using fossil fuel generated electricity would increase the CO 2 emission. This is particularly the case for HyPeaker due to its low round trip efficiency. Therefore, a more sensible solution would be to the excessive or curtailed electricity from CO 2 emission free sources such as solar farms, wind farms or nuclear power plants, to produce hydrogen, and integrate them with the HyPeaker. Electricity from TVA’s nuclear power plants was used for the Johnsonville HyPeaker. • The economic viability of HyPeaker is expected to be further improved when global supply chains are taken into consideration. For the same Johnsonville site specific HyPeaker, the capex would be reduced to ~$\$$3.6M from ~$\$$7.1M, and the added LCOE is reduced to ~$\$$85/MWh. With the bipartisan Infrastructure Investment and Jobs Act, the cost of domestically produced HyPeaker sub-systems would be at the level of today’s global suppliers. Since the peaking units generally operate at peak usage period, thereby demanding higher price, the projected $\$$85/MWh LCOE would be within the realm of financial viability for utility operators.

08 HYDROGEN↗

Polk Power Station NGCC Carbon Capture FEED Study

Final Technical Report for Tampa Electric Company's Front-End Engineering Design Study for the implementation of an amine-based Carbon Capture System by ION Clean Energy at the Polk Power Station, Unit 2.

20 FOSSIL-FUELED POWER PLANTS↗