Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Fluid resupply”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Vented Tank Resupply Experiment Demonstrated Vane Propellant Management Device for Fluid Transfer

The Vented Tank Resupply Experiment (VTRE) flown on STS-77 confirmed the design approaches presently used in the development of vane-type propellant management devices (PMD) for use in resupply and tank-venting situations, and it provided the first practical demonstration of an autonomous fluid transfer system. All the objectives were achieved. Transfers were more stable than drop tower testing indicated. Liquid was retained successfully at the highest flow rate tested (2.73 gal/min), demonstrating that rapid fills could be achieved. Liquid-free vents were achieved for two different tanks, although the flow rate was higher for the spherical tank (0.1591 cu ft/min) than for the tank with a short barrel section (0.0400 cu ft/min). Recovery from a thruster firing, which moved the liquid to the opposite end of the tank from the PMD, was achieved in 30 sec, showing that liquid rewicked more quickly into the PMD after thruster firing than pretest projections had predicted. In addition, researchers obtained great insights into the PMD behavior from the video footage provided, and discovered new considerations for future PMD designs that would not have been seen without this flight test.

Chato, David J.↗

ECLS resupply for Space Station Freedom

The design of logistics carriers is presented emphasizing the use of cost-effective pressurized and nonpressurized versions to resupply consumable fluids and provide on-orbit support for the Space Station Freedom. The requirements for the Environmental Control and Life Support (ECLS) system include high-pressure oxygen and nitrogen as well as consumables that do not require pressurization. The nominal and contingency requirements are given for logistics carriers designed to support various mission scenarios by resupplying and servicing fluid systems on-orbit. The resulting design overview for the logistics carriers describes the cryogenic-nitrogen storage during launch and operation of the unpressurized version and the flexible payload-support capacity of the pressurized version. The carriers are characterized as lightweight and versatile, and the resupply of cryogenic nitrogen is a flight-proven capability.

Higginbotham, Keith↗

Space platform expendables resupply concept definition study

NASA has recognized that the capability for remote resupply of space platform expendable fluids will help transition space utilization into a new era of operational efficiency and cost/effectiveness. The emerging Orbital Maneuvering System (OMV) in conjunction with an expendables resupply module will introduce the capability for fluid resupply enabling satellite lifetime extension at locations beyond the range of the Orbiter. This report summarizes a supplemental study to the original Phase A study and is presented as addenda to that study.

Source record↗

Space platform expendables resupply concept definition study. Volume 1: Executive summary

NASA has recognized that the capability for remote resupply of space platform expendable fluids will help transition space utilization into a new era of operational efficiency and cost/effectiveness. The emerging Orbital Maneuvering System (OMV) in conjunction with an expendables resupply module will introduce the capability for fluid resupply enabling satellite lifetime extension at locations beyond the range of the Orbiter. This report summarizes a Phase A study of a remote resupply module for the OMV. Volume 1 is the executive summary.

Source record↗

Space platform expendables resupply concept definition study, volume 2

NASA has recognized that the capability for remote resupply of space platform expendable fluids will help transition space utilization into a new era of operational efficiency and cost/effectiveness. The emerging Orbital Maneuvering System (OMV) in conjunction with an expendables resupply module will introduce the capability for fluid resupply enabling satellite lifetime extension at locations beyond the range of the Orbiter. This report summarizes a Phase A study of a remote resupply module for the OMV. Volume 2 represents study results.

Source record↗

Fluid management

The Fluid Management Panel's assessment of the technology is summarized. Since a baseline space station was not defined as a reference guide and the results of the eight contracted space station studies were not available as input, the assessment focused on technology and not programmatics. The ground rules that were key to the deliberations and guided the assessment are: (1) The space station will be operational in 1991, and (2) A space-based OTV will be operational in 1992. Thus, the capability to transport, transfer, and resupply all fluids, including those for the OTV, is required in the initial space station. The only evolutionary aspect is the refinement of capability. Fluid management includes fluid transport to orbit, liquid storage/supply, fluid transfer/resupply, and integral thermal control.

Fester, D.↗

Orbital Spacecraft Consumables Resupply System (OSCRS). Volume 1: Executive summary

The objective was to establish an earth storable fluid tanker concept which satisfies the initial resupply requirements for the Gamma Ray Observatory (GRO) at a reasonable front end cost while providing growth potential for foreseeable future earth storable fluid resupply mission requirements. The estimated costs required to design, develop, qualify, fabricate, and deliver a flight tanker and its associated control avionics, ground support equipment (GSE), and processing facilities, and the contractors costs to support the first operations mission are reviewed.

Source record↗

Fluid acquisition system for superfluid helium

To enable the resupply of liquid helium users on orbit, the technology for helium transfer in space is being developed. A key element of the resupply process is the fluid acquisition in the supply dewar; feeding the liquid to the pump. For the Superfluid Helium On-Orbit Transfer (SHOOT) flight experiment a number of fluid acquisition techniques have been examined. Subscale tests performed in one gravity on two of the candidates are described. The hope is that these results may be scaled to much larger systems in low gravity. These two types are a screened channel device and a capillary device. Flow rates versus negative head height are presented. Difficulties with each device and the test environment are explained. Some of the measurements to be made on orbit on the fluid acquisition for SHOOT are described.

Dipirro, M. J.↗

STS-53 Space Shuttle mission report

The STS-53 Space Shuttle Program Mission Report provides a summary of the Orbiter, External Tank (ET), Solid Rocket Booster/Redesigned Solid Rocket Motor (SRB/RSRM), and the Space Shuttle Main Engine (SSME) subsystems performance during the fifty-second flight of the Space Shuttle Program, and the fifteenth flight of the Orbiter vehicle Discovery (OV-103). In addition to the Orbiter, the flight vehicle consisted of an ET, which was designated as ET-49/LWT-42; three SSME's, which were serial numbers 2024, 2012, and 2017 in positions 1, 2, and 3, respectively; and two SRB's, which were designated BI-055. The lightweight RSRM's that were installed in each SRB were designated 360L028A for the left SRB, and 360L028B for the right SRB. The primary objective of this flight was to successfully deploy the Department of Defense 1 (DOD-1) payload. The secondary objectives of this flight were to perform the operations required by the Glow Experiment/Cryogenic Heat Pipe Experiment Payload (GCP); the Hand-Held, Earth-Oriented, Real-Time, Cooperative, User-Friendly, Location-Targeting and Environmental System (HERCULES); the Space Tissue Loss (STL); the Battlefield Laser Acquisition Sensor Test (BLAST); the Radiation Monitoring Equipment-III (RME-III); the Microcapsules in Space-1 (MIS-1); the Visual Function Tester-2 (VFT-2); the Cosmic Radiation Effects and Activation Monitor (CREAM); the Clouds Logic to Optimize Use of Defense Systems-1A (CLOUDS-1A); the Fluids Acquisition and Resupply Experiment (FARE); and the Orbital Debris Radar Calibration Spheres (ODERACS). In addition to presenting a summary of subsystem performance, this report also discusses each Orbiter, ET, SSME, SRB, and RSRM in-flight anomaly in the applicable section of the report. Listed in the discussion of each anomaly is the officially assigned tracking number as published by each Project Office in their respective Problem Tracking List. All times given in this report are in Greenwich mean time (G.m.t.) as well as mission elapsed time (MET).

Fricke, Robert W., Jr.↗

Tank Pressure Control Experiment on the Space Shuttle

The tank pressure control experiment is a demonstration of NASA intent to develop new technology for low-gravity management of the cryogenic fluids that will be required for future space systems. The experiment will use freon as the test fluid to measure the effects of jet-induced fluid mixing on storage tank pressure and will produce data on low-gravity mixing processes critical to the design of on-orbit cryogenic storage and resupply systems. Basic data on fluid motion and thermodynamics in low gravity is limited, but such data is critical to the development of space transfer vehicles and spacecraft resupply facilities. An in-space experiment is needed to obtain reliable data on fluid mixing and pressure control because none of the available microgravity test facilities provide a low enough gravity level for a sufficient duration to duplicate in-space flow patterns and thermal processes. Normal gravity tests do not represent the fluid behavior properly; drop-tower tests are limited in length of time available; aircraft low-gravity tests cannot provide the steady near-zero gravity level and long duration needed to study the subtle processes expected in space.

Source record↗

Orbital Spacecraft Consumables Resupply System (OSCRS). Volume 2: Study results

The objective was to establish an earth storable fluids tanker concept which satisfies the initial resupply requirements for the Gamma Ray Observatory (GRO) for reasonable front end (design, development, verification) cost while providing growth potential for foreseeable future earth storable resupply mission requirements. The achievement of these objectives becomes possible with the development of a modularized tanker concept which is a hybrid of a dedicated GRO tanker and a generic earth storable propellant tanker.

Source record↗

Propellant resupply of orbiting spacecraft

The technology to transfer safely and easily fluids in microgravity is necessary to extend the duration of future space missions. The absence of gravity in space causes fluids to behave much differently than on Earth, making propellant resupply extremely difficult. The Gamma Ray Observatory (GRO) is one of the satellites being designed for refueling. The GRO's thrusters are fueled by the monopropellant hydrazine that as a vapor is unstable above 200 F. This has a major impact on refueling system design and operation. A system using high pressure gas and flexible diaphragms to transfer propellant from a supply vehicle to the GRO was proposed and designed. A ground-based system utilizing the transfer technique of ullage recompression was built to investigate the process.

Bloznalis, P. J.↗

Electrochemical Orbital Energy Storage (ECOES) technology program

The versatility and flexibility of a regenerative fuel cell power and energy storage system is considered. The principal elements of a Regenerative Fuel Cell System combine the fuel cell and electrolysis cell with a photovoltaic solar cell array, along with fluid storage and transfer equipment. The power output of the array (for LEO) must be roughly triple the load requirements of the vehicle since the electrolyzers must receive about double the fuel cell output power in order to regenerate the reactants (2/3 of the array power) while 1/3 of the array power supplies the vehicle base load. The working fluids are essentially recycled indefinitely. Any resupply requirements necessitated by leakage or inefficient reclamation is water - an ideal material to handle and transport. Any variation in energy storage capacity impacts only the fluid storage portion, and the system is insensitive to use of reserve reactant capacity.

Mcbryar, H.↗

ECLSS evolution: Advanced instrumentation interface requirements. Volume 3: Appendix C

An Advanced ECLSS (Environmental Control and Life Support System) Technology Interfaces Database was developed primarily to provide ECLSS analysts with a centralized and portable source of ECLSS technologies interface requirements data. The database contains 20 technologies which were previously identified in the MDSSC ECLSS Technologies database. The primary interfaces of interest in this database are fluid, electrical, data/control interfaces, and resupply requirements. Each record contains fields describing the function and operation of the technology. Fields include: an interface diagram, description applicable design points and operating ranges, and an explaination of data, as required. A complete set of data was entered for six of the twenty components including Solid Amine Water Desorbed (SAWD), Thermoelectric Integrated Membrane Evaporation System (TIMES), Electrochemical Carbon Dioxide Concentrator (EDC), Solid Polymer Electrolysis (SPE), Static Feed Electrolysis (SFE), and BOSCH. Additional data was collected for Reverse Osmosis Water Reclaimation-Potable (ROWRP), Reverse Osmosis Water Reclaimation-Hygiene (ROWRH), Static Feed Solid Polymer Electrolyte (SFSPE), Trace Contaminant Control System (TCCS), and Multifiltration Water Reclamation - Hygiene (MFWRH). A summary of the database contents is presented in this report.

Source record↗

RRM3 Fluid Management Device

The current development progress of the fluid management device (FMD) for the Robotic Resupply Mission 3 (RRM3) cryogen source Dewar is described. RRM3 is an on-orbit cryogenic transfer experiment payload for the International Space Station. The fluid management device is a key component of the source Dewar to ensure the ullage bubble is located away from the outlet during transfer. The FMD also facilitates demonstration of radio frequency mass gauging within the source Dewar. The preliminary design of the RRM3 FMD is a number of concentric cones of Mylar which maximizes the volume of liquid in contact with the FMD in the source Dewar. This paper describes the design of the fluid management device and progress of hardware development

cryogenic fluids↗

Status of the US Space Station ECLSS and internal TCS

The U.S. Space Station includes many elements and systems. Responsibility for these have been delegated to four NASA centers via a work packaging concept. Marshall Space Flight Center (MSFC) is responsible for work package one (WPOI) which includes the habitation, laboratory modules, the logistic carrier elements, as well as the environmental control and life support system (ECLSS), the internal thermal control system (ITCS), and the internal audio and video systems. Current status of the ECLSS and internal thermal are the subjects of this paper. The ECLSS is composed of six subsystem groups: the temperature humidity control, the atmosphere control and supply, the air revitalization, water reclamation and management, fecal waste management, and the fire detection and suppression subsystems. The internal TCS consists of all WP01 elements of passive and active thermal measures. The ECLSS and ITCS provide services for the permanently orbiting pressurized modules as well as the pressurized and unpressurized logistics carriers. The logistics carriers are used as ground-to-station ferries for both resupply and initial delivery of selected new equipment and later replacement items. Equipment, which cannot be subjected to the rigors of the space environment, will be carried in the pressurized logistic carrier; while an unpressurized carrier is used to resupply other commodities, such as external fluid consumables. The laboratory module houses the equipment for both payloads and subsystem maintenance and repair. The habitation module is dedicated to providing living and sleeping quarters including a galley, sleeping provisions, hygiene facilities, medical services as well as services for exercise and relaxation. The four nodes that join the two modules at their ends also house electronics as well as work stations and outside viewing cupolas. The airlocks, one providing an emergency hyperbaric chamber capability, are also attached. This assembly constitutes the U.S. provided portion of the initial station. Additional international modules and docking provisions for future attached pressurized payload as well as dual logistic module and growth capabilities are also provided. The primary heat rejection mechanism is achieved via a central set of radiators provided by another work package. The interface with the central TCS at the module heat exchangers defines the active control interface boundary of the ITCS with the central TCS. All internal cooling of the permanent orbital elements are provided via internal active fluid loops within the elements utilizing water as the transport media. Cabin and equipment cooling are provided by forced air flow and cold plate heat sinks. A special active cooling loop is provided in the laboratory module to accommodate experiments and other payloads. Coatings and insulation are used in conjunction with the active components to passively limit heat losses/gains. The most challenging ECLSS new technology issues relate to oxygen and water recovery. Closure of the oxygen loop requires the use of new regenerative CO 2 removal and concentration techniques, CO 2 reduction to convert the CO 2 to water with a waste by-product, and the electrolysis of water to produce breathing oxygen for water recovery. For water recovery three separate loops are currently planned. One loop provides potable water by utilizing a combination of recovered condensate and CO 2 reduction water. A second loop purifies hygiene water from waste from the showers, clothes washer, hygiene/hand wash stations and a dishwasher. The third loop provides hygiene water by the reclamation and purification of urine water. This paper outlines the basic services provided by the ECLSS and ITCS and describes the ECLSS functional distribution throughout the pressurized assembly.

R. Humphries↗

On-orbit cryogenic fluid transfer

A number of future NASA and DOD missions have been identified that will require, or could benefit from resupply of cryogenic liquids in orbit. The most promising approach for accomplishing cryogenic fluid transfer in the weightlessness environment of space is to use the thermodynamic filling technique. This approach involves initially reducing the receiver tank temperature by using several charge hold vent cycles followed by filling the tank without venting. Martin Marietta Denver Aerospace, under contract to the NASA Lewis Research Center, is currently developing analytical models to describe the on orbit cryogenic fluid transfer process. A detailed design of a shuttle attached experimental facility, which will provide the data necessary to verify the analytical models, is also being performed.

Aydelott, J. C.↗