Hanford Composite Analysis Special Studies FY2025 - Groundwater Flow Simulation for use in a Comparison of Simulated Concentrations in the Saturated Zone Estimated by the Plateau-to-River Model Versions 8.3 and 9.1
In order to meet the requirements of U.S. Department of Energy (DOE) in DOE O 435.1, Radioactive Waste Management, a composite analysis (CA) must be completed for the Central Plateau at the Hanford Site. The CA requires estimates of fate and transport of radionuclides in the groundwater from multiple sources within the modeling domain. This Environmental Calculation File (ECF) details the application of the Plateau-to-River (P2R) Model (CP-57037, Rev. 3, Model Package Report for the P2R Model: Version 9.1) to predict the flow of groundwater on the Central Plateau for the 10,000-year simulation to support a special analysis associated with the Hanford Site CA. The simulated flow field will support the simulation of fate and transport of contaminants for comparison to the results obtained as part of the CA to evaluate impact of the updated version of the P2R Model.