Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Failure mode and effect analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Bio-project “derisking” through development of systematic methodologies and frameworks for risk assessment

One of the primary hindrances to producing a viable, sustainable domestic biomass industry for renewable biofuels, bio-products and bio-power is the lack of understanding and quantification of the risks associated with both the biomass supply chain and preprocessing and conversion technologies. Currently a consistent method for assessing, comparing, and quantifying risks in biomass supply chains does not exist, creating a major investment barrier to bioenergy projects in the U.S. The lack of a standardized approach has resulted in bioenergy stakeholders independently using inconsistent approaches and evaluation criteria, leading to unreliable and incomparable assessments of risks and financing barriers to bio-project development. Along with the challenges of inconsistent risk assessment for supply chain risk, technology specific risks based on variability in biomass properties are not fully understood and can pose significant unforeseen challenges for bioenergy projects. In many cases these properties have not yet been identified and the impacts on the proposed technology and products unquantified. This is particularly challenging for emerging preprocessing and conversion technologies. Without a firm understanding of the preprocessing/conversion technology-specific critical properties, the risk of a proposed bio-project cannot be fully evaluated. To address inconsistent risk evaluation in the biomass supply chain supporting project financing, a Biomass Supply Chain Risk Standards (BSCRS) framework was developed. The BSCRS framework includes a comprehensive list of known and perceived risks (Risk Indicators) to the supply chain developed through 100’s of interviews with bioenergy industry experts spanning from feedstock growers and suppliers to representatives from the financial sector. These risks have been organized into a manageable hierarchy of Risk Categories and Risk Factors that can be practically assessed. This BSCRS framework also provides mitigation strategies for multiple Risk Indicators from best available industry practices and research findings. Additionally, a risk quantification methodology for each Risk Factor, Risk Category, and the bio-project as a whole was developed to enable capital markets to assess feedstock risk more efficiently and more accurately. Multiple case studies representing existing bio-projects have been used to evaluate and verify the BSCRS framework and scoring methodology. To address technological risk along with the supply chain risk captured in the developed BSCRS framework, this work also focuses on development of a systematic criticality assessment tool using well-accepted, quantitative risk analysis methods to evaluate bioenergy feedstock critical properties impacting system unit operations. The proposed Failure Mode and Effect Analysis (FMEA) approach uses a team of subject area experts (SAEs) for each targeted unit operation within a system. Collectively, the team will develop and use a quantitative scoring system to assess the material attributes, process parameters, and quality attributes for key unit operations that have already been identified. The FMEA process generates Risk Priority Numbers (RPNs) for the various failures and predominant causes for each material/process unit/product combination resulting in a semi-quantitative, standardized methodology for assessing technological risk and biomass properties contributing to that risk.

09 BIOMASS FUELS↗

The Corrective Maintenance Paradigm Shift at Hanford's Tank Farms - 20077

Hanford's Tank Farms facilities have been used to safely store waste for over 70 years, with the first single-shell tanks being constructed in 1943. Tank Farm facilities consist of 149 single-shell tanks, 28 double-shell tanks, an evaporator facility, and wastewater treatment facilities. Tank Farm facilities are aging, with a tremendous corrective maintenance burden on the Tank Farm contractor. The mission of Tank Farm facilities is soon changing from waste storage to waste staging for the Hanford Waste Treatment and Immobilization Plant (WTP). WTP operations will demand a significant increase in Tank Farm facility operations, in which corrective maintenance outage windows will shrink drastically. This realization has forced the Tank Farm contractor to consider a paradigm shift in Tank Farm facilities Maintenance planning, and the use of reliability Engineering tools. The Tank Farm Production Operations Engineering Cognizant System Engineering (CSE) organization has led the way in motivating this paradigm shift. This shift has been realized through the use of: 1) technical exchange with other Department of Energy (DOE) contractors to develop improvements in the CSE program, 2) a shift from the use of lagging to leading system health indicators, and 3) a Plant Health Committee to unite Engineering, Operations, and Maintenance personnel toward a productive maintenance strategy. The CSE organization has held several technical exchanges with other DOE contractors to discuss CSE concepts, and how to better maintain aging infrastructure. The technical exchange with other contractors has greatly reduced the time required to make improvements in the Tank Farm CSE program. Other DOE contractors have already faced issues surrounding aging infrastructure, and have vast experience in improving the reliability and usable life of structures and components in nuclear facilities. The past CSE program used lagging health indicators to determine the health of systems. The key lagging indicator used to determine system health was availability, which is the percentage of time that a facility was ready for operation compared to the time the facility was demanded for operation. Availability was a good indicator of health in the waste storage mission of Tank Farms, where safe storage was the most important function of the facility, and where maintenance outage windows were typically long-duration. In current and future operations, outage windows are reducing, resulting in the need for much more reliable systems. Systems that have had high availability may suddenly become inoperable due to a failed component or sub-system. In several instances, the use of availability as an indicator of system health failed to predict system/equipment failure before its occurrence. In discussions with other DOE contractors, a set of reliability tools, including leading indicators of health, has been implemented in the CSE program. This primarily involves the use of failure modes and effects analysis and the study of equipment failure to develop system monitoring plans that focus on trending data to detect oncoming equipment failure ahead of time. In addition, the use of a Plant Health Committee has added significantly to the paradigm shift from a corrective maintenance philosophy to the use of predictive and preventive maintenance. The Plant Health Committee is a chartered team consisting of Engineering, Operations, and Maintenance personnel. CSEs use this forum to present the results of their performance monitoring, including the presentation of health via leading health indicators. The most positive aspect of this committee is the communication that it creates within these critical organizations. The Operations and Maintenance organization benefit from focusing maintenance on the reliability-centered focus provided by Engineering. Engineering benefits from the operational experience of the Operations organization and from the failure data that can be provided by Maintenance personnel. The continued use of the Plant Health Committee is expected to further decrease maintenance outage times, in better support of oncoming 24/7 operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PacWave South SeaRAY k2 Risk Registers

The SeaRAY is a deployable power system for maritime sensors, monitoring equipment, communications, unmanned underwater vehicles, and other similar payloads. This project is to design, deliver, and test a prototype low-power WEC that lowers the total cost of ownership and provides robust, new capabilities for customers in the maritime environment. Failure Modes, Effects, and Criticality Analysis (FMECA) is conducted to systematically identify all potential failure modes and their effects on the system, and to analyze the criticality of each risk based on the likelihood of the event and the severity of the impact. Actions may then be recommended to mitigate the criticality of a risk, either by reducing the likelihood of the risk or the severity of its impact. Risk assessment is executed iteratively as an integral part of the design process. By incorporating risk assessment early in the development cycle, mitigation of risk can be achieved cost effectively. The actions recommended to mitigate risk may be subsequently executed, and as the design progresses the risk assessment is reviewed and revised. Review of the risk assessment is integrated into structured design reviews, ensuring that critical risks are comprehended and that the Project will not progress to e.g. fabrication while intolerable risks remain. The risk assessment process results in the population and maintenance of Risk Registers (RRs). Each major system (and as needed, subsystem) will have a distinct RR. This allows each system or subsystem to be assessed individually, rendering the RRs to a manageable size for review.

16 TIDAL AND WAVE POWER↗

Hazard and risk analysis framework for nuclear power plant–based integrated energy systems

Employing integrated energy systems (IESs) with nuclear power plants (NPPs) can improve NPP utilization by leveraging dedicated thermal and electric power delivery, but it may also increase operational safety risks. This paper presents a framework to identify and quantify hazards and risks for such IESs. The framework combines accidentology to review past industrial accidents with failure modes and effects analysis (FMEA) to identify potential future incidents. Hydrogen explosion and toxic chemical release hazards are of particular concern. Explosion consequences are quantified using the Bauwens-Dorofeev (Bauwens) and trinitrotoluene equivalent mass (TNT-EM) methods, while chemical release consequences are computed using the Gaussian atmospheric dispersion method. Operational disturbances from direct electrical and thermal integration that may affect NPP safety are modeled using probabilistic risk analysis (PRA). Hazards and risks are then evaluated for regulatory compliance. The framework is applied to IESs comprising pressurized or boiling water reactors supplying three levels of thermal and electrical power to industrial customers. Case studies include high-temperature steam electrolysis hydrogen plants of varying capacities and a synthetic fuel production plant. Sensitivity analysis examines piping component failures in the PRA model as a precursor to cost estimation for thermal extraction line design. Additionally, Fussel-Vessely (FV) and risk increase importance (RII) measures identify risk-informed design improvements for the thermal extraction system. FMEA highlights hazards such as loss of offsite power, prompt loss of electrical load, loss of thermal output, and immediate steam diversion, in addition to hydrogen explosions and toxic chemical releases. Both Bauwens and TNT-EM methods suggest maintaining several hundred meters of separation between the NPP and hydrogen facility to mitigate explosion risks. PRA results show a maximum initiating event frequency increase of 1.15% and an overall risk increase of 0.28%. Importance measure analysis identifies upstream pipe leak isolation components as critical. Evaluating the results against safety regulations, it is concluded that hazards and risks can be managed to comply with regulations through risk-informed thermal and electrical connection designs, component selection, maintenance programs, and safe separation distances between NPPs and integrated industrial facilities.

08 - HYDROGEN↗

Liquid hydrogen storage system for heavy duty trucks: Configuration, performance, cost, and safety

In this work, we investigate the potential of liquid hydrogen storage (LH 2 ) on-board Class-8 heavy duty trucks to resolve many of the range, weight, volume, refueling time and cost issues associated with 350 or 700-bar compressed H 2 storage in Type-3 or Type-4 composite tanks. We present and discuss conceptual storage system configurations capable of supplying H 2 to fuel cells at 5-bar with or without on-board LH 2 pumps. Structural aspects of storing LH 2 in double walled, vacuum insulated, and low-pressure Type-1 tanks are investigated. Structural materials and insulation methods are discussed for service at cryogenic temperatures and mitigation of heat leak to prevent LH 2 boiloff. Failure modes of the liner and shell are identified and analyzed using the regulatory codes and detailed finite element (FE) methods. The conceptual systems are subjected to a Failure modes and effects analysis (FMEA) and a safety, codes, and standards (SCS) review to rank failures and identify safety gaps. The results indicate that the conceptual systems can reach 19.6% usable gravimetric capacity, 40.9 g-H 2 /L usable volumetric capacity and $174-183/kg-H 2 cost (2016 USD) when manufactured 100,000 systems annually.

08 HYDROGEN↗

Nuclear Reactor Heat Extraction for Synthetic Fuel Plants

This report looks at the viability and best approach when producing synthetic fuels using heat and power supplied by advanced nuclear energy systems. The report looks at a low temperature integration pathway with four types of advanced reactors: a pressurized water reactor (PWR), an advanced light water reactor (A-LWR), a sodium fast reactor (SFR), and a high-temperature gas-cooled reactor (HTGR). A failure modes and effects analysis (FMEA) of the coupling system between the nuclear plant and the synthetic fuel systems is performed with the goal of identifying the reliability of such a thermal delivery system. Furthermore, a high temperature pathway is investigated for synfuel coupling to determine if this is more efficient and more cost effective as a coupling approach.

10 - SYNTHETIC FUELS↗

Recommended Actions to Improve Adapter Safety

With the rapid advancement and acceleration in the electric vehicle (EV) industry within the United States, major automakers and EV charging companies are increasingly adopting the North American Charging Standard (NACS) connector style, now officially known as J3400. This shift is expected to enhance charging infrastructure, providing a better customer experience by making it easier for all EV drivers to access a wider network of direct-current (DC) fast chargers (DCFCs). However, the adoption of the J3400 standard presents challenges for many EVs already on the roads and some currently coming off production lines that are equipped with the Combined Charging System (CCS) connector, which this report will refer to as the North American standard, CCS1. These vehicles will need adapters to use new or existing J3400 infrastructure. During this transition, several issues have emerged. Firstly, there is a need to standardize the new connector type to ensure it is interoperable, safe, and reliable. Second, existing CCS EV drivers need a way to access the J3400 network, which will require electric vehicle supply equipment (EVSE) or sites with both connector types, driver-provided adapters to physically convert from CCS to J3400, or EVSE with retained adapters designed for use with the EVSE. Third, adapter standards will need to be written to specify how they will be designed and what evaluations will be needed to ensure safe and reliable performance. To address these challenges, adapters that support different types of charging connectors will be essential. These adapters will play a crucial role in supporting the transition and ensuring continued service for legacy EVs with CCS inlets as the J3400 standard becomes the predominant one in the United States. Consequently, the National Charging Experience (ChargeX) Consortium has investigated and performed a teardown analysis on the different adapter versions on the market. The aim is to create a failure mode and effects analysis (FMEA) on what are expected to be the most common adapter types used in this transition. In order to support this work, we executed an FMEA exercise with the main goal of identifying gaps in the existing adapters' performance and conformance to the most common safety requirements of high-power and high-voltage devices. This effort focused on adapters provided by the driver, as these may present the highest safety and reliability risks. The recommendations made here apply to both retained and driver-provided adapters.

25 ENERGY STORAGE↗

Data requirements for improving the Quantitative Risk Assessment of liquid hydrogen storage systems

Quantitative Risk Assessment (QRA) supports the development of risk-informed safety codes and standards which are employed to enable the safe deployment of hydrogen technologies essential to decarbonize the transportation sector. System reliability data is a necessary input for rigorous QRA. Here, the lack of reliability data for bulk liquid hydrogen (LH 2 ) storage systems located on site at fueling stations limits the use of QRAs. In turn, this hinders the ability to develop the necessary safety codes and standards that enable worldwide deployment of these stations. Through a QRA-based analysis of a LH 2 storage system, this work focuses on identifying relevant scenario and probability data currently available and ascertaining future data collection requirements regarding risks specific to liquid hydrogen releases. The work developed consists of the analysis of a general bulk LH 2 storage system design located at a hydrogen fueling station. Failure Mode and Effect Analysis (FMEA) and traditional QRA modeling tools such as Event Sequence Diagrams (ESD) and Fault Tree Analysis (FTA) are employed to identify, rank, and model risk scenarios related to the release of LH 2 . Based on this analysis, scenario and reliability data needs to add LH 2 -related components to QRA are identified with the purpose of improving the future safety and risk assessment of these systems.

08 HYDROGEN↗

Automated Controller Hardware-In-The-Loop Testbed for EV Charger Resilience Analysis

This paper focuses on the development of a tool that includes an automated testbed with controls, protection, and communications integrated into a real-time system to provide a platform to generate data sets for failure modes and effects analysis. This tool establishes a value for automation of data generation for different scenarios and addresses the gap of nonexistent field data for different applications and use cases. The features of this tool can further be expanded to include multiple power electronics models, communication protocols, and scaled system architectures. This general framework was evaluated for a DC fast charger system use case to provide quantitative solution for resiliency.

Starke, Michael↗

Liquid Hydrogen Heavy-Duty Vehicle Safety Review and Refueling Facility Design

Liquid hydrogen (LH 2 ) used as a fuel onboard a heavy-duty vehicle can result in increased storage capacity and faster refueling relative to compressed gas. However, there are concerns about hydrogen losses from boil-off, potential safety issues, gaps in codes and standards for cryogenic hydrogen fuel, and technical challenges with LH 2 systems for widespread transportation applications. A failure modes and effects analysis (FMEA), a safety codes and standards review, and a design review of the onboard liquid hydrogen system for a heavy-duty vehicle identified some of these potential safety issues and gaps in the codes and standards. The FMEA identified some medium and low risk failure points of the conceptual design, and the design review identified how carefully pressure relief needs to be considered for LH 2 systems. In addition, a conceptual design for a LH 2 refueling station was developed. Rough capital costs for the refueling station design were $\$1 million$ and the layout occupied approximately 13,000 ft 2 . These results can be used to inform future designs and analyses for LH 2 heavy-duty vehicles.

08 HYDROGEN↗

Analyzing Potential Failures and Effects in a Pilot-Scale Biomass Preprocessing Facility for Improved Reliability

This study demonstrates a failure identification methodology applied to a preprocessing facility generating conversion-ready feedstocks from biomass meeting conversion process critical quality attribute (CQA) specifications. Failure Modes and Effects Analysis (FMEA) was used as an industrially relevant risk analysis approach to evaluate a logging residue preprocessing system to prepare feedstock for pyrolysis conversion. Risk evaluations considered both system-level and operation unit-level assessments considering process efficiency, product quality, cost, sustainability, and safety. Key outputs included estimations of semi-quantitative risk scores for each failure, identification of the failure impacts, identification of failure causes associated with material attributes and process parameters, ranking success rates of failure detection methods, and speculation of potential mitigation strategies for decreasing failure risk scores. Results showed that deviations from moisture specifications had cascading consequences for other CQAs along with process safety implications. Failures linked to fixed carbon specifications carried the highest risk scores for product quality and process efficiency impacts. As increased throughput can be inversely related to meeting product quality specifications; achieving throughput and other material-based CQAs simultaneously will likely require system optimization or prioritization based on system economics. Ultimately, this work successfully demonstrates FMEA as a risk analysis approach for other bioenergy process systems.

09 BIOMASS FUELS↗

Setting Priorities for Photovoltaic Reliability Research Using Criticality Analysis

A forward-looking research opportunity number (RON) is defined for photovoltaic reliability researchers. The RON enables researchers to prioritize their efforts toward the highest impact. For a given degradation mode, the RON is based on three factors: the effect on levelized cost of electricity, the susceptibility of future module products, and the maturity of accelerated tests that can detect and quantify the mode. Reporting bias is avoided because the RON does not rely on polls. The RON is derived for three example cases: light and elevated temperature degradation, backsheet cracking, and antireflective coating abrasion. Finally, these examples demonstrate that targeted research has reduced the risk for these modes over the last several years.

14 SOLAR ENERGY↗

Adapting Traditional Hazards Analysis Methods to Address Cyber Risks

Traditional hazards analysis (HA) methods, originally developed to address physical and operational risks, often fall short when it comes to identifying and mitigating cyber threats. These cyber threats pose unique and evolving risks to critical infrastructure and industrial control systems (ICS). This report explores the integration of Cyber-Informed Engineering (CIE) principles into existing HA methods to enhance their ability to address cyber-induced risks. CIE provides organizations with a practical, cost-effective approach to closing the gap between traditional HA methods and the need for cyber risk mitigation. By leveraging existing safety processes and controls, CIE allows users to examine and mitigate cyber vulnerabilities without overhauling existing HA methods. This report identifies areas where HA and CIE naturally align and where their approaches diverge. It emphasizes how CIE principles can be used to adapt HA methods, broadening their scope to include cyber risks and enabling the mitigation of cyber- induced impacts alongside traditional hazards and failure scenarios. This report examines how CIE can be applied across various HA methods—such as Hazard and Operability Studies (HAZOP), Probabilistic Risk Assessment (PRA), Failure Modes and Effects Analysis (FMEA), Systems-Theoretic Process Analysis (STPA), Hazard and Consequence Analysis for Digital Systems (HAZCADS), and Layers of Protection Analysis (LOPA). It provides strategies for integrating CIE to strengthen the identification, assessment, and mitigation of cyber-induced risks. The findings offer a structured entry point for organizations to embed CIE concepts into hazards and safety analyses, as well as broader engineering processes, ultimately supporting the design and operation of a more resilient infrastructure.

42 ENGINEERING↗

Adapting Traditional Hazards Analysis Methods to Address Cyber Risks

Traditional hazards analysis (HA) methods, originally developed to address physical and operational risks, often fall short when it comes to identifying and mitigating cyber threats. These cyber threats pose unique and evolving risks to critical infrastructure and industrial control systems (ICS). This report explores the integration of Cyber-Informed Engineering (CIE) principles into existing HA methods to enhance their ability to address cyber-induced risks. CIE provides organizations with a practical, cost-effective approach to closing the gap between traditional HA methods and the need for cyber risk mitigation. By leveraging existing safety processes and controls, CIE allows users to examine and mitigate cyber vulnerabilities without overhauling existing HA methods. This report identifies areas where HA and CIE naturally align and where their approaches diverge. It emphasizes how CIE principles can be used to adapt HA methods, broadening their scope to include cyber risks and enabling the mitigation of cyber- induced impacts alongside traditional hazards and failure scenarios. This report examines how CIE can be applied across various HA methods—such as Hazard and Operability Studies (HAZOP), Probabilistic Risk Assessment (PRA), Failure Modes and Effects Analysis (FMEA), Systems-Theoretic Process Analysis (STPA), Hazard and Consequence Analysis for Digital Systems (HAZCADS), and Layers of Protection Analysis (LOPA). It provides strategies for integrating CIE to strengthen the identification, assessment, and mitigation of cyber-induced risks. The findings offer a structured entry point for organizations to embed CIE concepts into hazards and safety analyses, as well as broader engineering processes, ultimately supporting the design and operation of a more resilient infrastructure.

42 - ENGINEERING↗

U-50Zr Microstructure and Property Assessment for LWR Applications

This project provides an initial assessment and research recommendations of U-50 wt.%Zr (U-50Zr) for its use as a light water reactor (LWR) fuel. This work based on the outcome of a recently funded exercise on the failure mode effects and analysis (FMEA) and the phenomena identification and ranking table (PIRT) to investigate high level nuclear fuel qualification metrics as derived by the United States Nuclear Regulatory Commission.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Hazards and Probabilistic Risk Assessments of Advanced Nuclear Reactors Coupled with Industrial Facilities

This report provides a roadmap and tool kit for site specific risk assessments across a broad range of industrial customers co-located with advanced nuclear power plants (ANPP) that are not currently built and operating in the U.S. This report builds upon the body of work sponsored by the Department of Energy (DOE) Integrated Energy Systems Pathway that has produced industrial requirements studies and techno-economic assessments on the topics of feasibility of ANPP supported industrial processes. This report also leverages the DOE Light Water Reactor Sustainability (LWRS) program that has presented hazards assessment and generic probabilistic risk assessments (PRAs) for the addition of a heat extraction system (HES) to light-water reactors (LWRs) co-located with hydrogen production facilities. Many of the hazard assessments and risk assessments performed for the LWRS report are agnostic to whether the nuclear reactor is an ANPP or were adapted to the ANPP focus. The report performs hazards assessments to include industrial facilities: an oil refinery, a methanol plant, a synthetic fuel (synfuel) plant, the production of synthetic gas (syngas) as part of the methanol and synfuel plants, wood pulp and paper mills, and hydrogen production. Hydrogen production facilities are assessed in depth through prior reports in the LWRS program and the results are leveraged in this report. All these facilities are specified through industrial process and requirements research performed by national laboratories, universities, and interaction with industry. Many of the processes used in this report are pre-conceptual designs to use for decarbonization of the current technology facilities. A process of failure modes and effects analysis (what can go wrong) and accidentology (what has historically gone wrong) was used to determine the hazards presented to the nuclear power plant by the addition of the HES and the industrial customer. Chemical properties of feedstocks and products are summarized as part of the hazards assessment. Example analysis procedures are provided for each of the hazard types identified. These deterministic analyses can be used to assess adherence to licensing criteria. They can also be used to meet other safety goals like protection of the public, workers, or industrial facility equipment. A modular high temperature gas-cooled reactor (MHTGR) PRA only existing on paper was modeled and verified in modern PRA software. This will provide a tool for representative ANPP probabilistic analyses for future research.

10 SYNTHETIC FUELS↗

Hazards and Probabilistic Risk Assessments of a Light-Water Reactor Coupled with Industrial Facilities

This report provides a roadmap and toolkit for site-specific risk assessments across a broad range of industrial customers co-located with nuclear power plants (NPPs). This report builds upon the body of work sponsored by the Department of Energy (DOE) Light-Water Reactor Sustainability (LWRS) Flexible Plant Operation and Generation Pathway that presented hazards assessment and generic probabilistic risk assessments (PRAs) for the addition of a heat extraction system (HES) to light-water reactors co-located with hydrogen production facilities. The report expands the hazards assessments to include other industrial facilities: an oil refinery, a methanol plant, a synthetic fuel (synfuel) plant, the production of synthetic gas (syngas) as part of the methanol and synfuel plants, and wood pulp and paper mills. All these facilities are specified through industrial process and requirements research performed by national laboratories, universities, and interaction with industry. Many of the processes used in this report are pre-conceptual designs to use for decarbonization of the current technology facilities. A process of failure modes and effects analysis (what can go wrong) and accidentology (what has historically gone wrong) was used to determine the hazards presented to the NPP by the addition of the HES and the industrial customer. Chemical properties of feedstocks and products are summarized as part of the hazards assessment. Example analysis procedures are provided for each of the hazard types identified. These deterministic analyses can be used to assess adherence to licensing criteria. They can also be used to meet other safety goals like protection of the public, workers, or industrial facility equipment. The probabilistic analysis consisted of three sizes of HESs modeled in a PRA to assess the impact on the initiating events (IE) and results of the PRA. The PRA results conclude that the resulting increases in IE frequencies are below the limits required for small changes to existing NPPs under 10 CFR 50.59.

08 HYDROGEN↗

Probabilistic Risk Assessment of a Light Water Reactor Coupled with a High-Temperature Electrolysis Hydrogen Production Plant

This paper presents recent updates on the Level 1 Probabilistic Risk Assessment (PRA) of Light Water Reactors (LWRs) coupled with a hydrogen production plant. It provides the overview of past results on the PRA for Pressurized Water Reactors (PWRs) and Boiling Water Reactors (BWRs) coupled to a 1150 MW High Temperature Electrolysis Facility (HTEF), as well as the latest research results for a smaller 100 MW HTEF facility. Differences between the two HTEF designs are listed. Key differences include the amount and quality of diverted LWR steam, complexity of the Heat Extraction System (HES), and the electrical power source for the HTEF plant. A Failure Mode and Effect Analysis (FMEA) was conducted for the new HTEF design, and the LWR PRA models were modified in the SAPHIRE risk assessment tool to account for the newly identified risk contributors. These include the steam loss event at the HES system, the electrical overcurrent event at the HTEF facility and at the transmission line from the LWR plant, and the hydrogen detonation event at the HTEF facility. The coupling of LWRs with a 100 MW HTEF increases the frequency of several initiating events. For the reference PWR, the largest frequency increase is for the steam line break event at 5.5%. While for the reference BWR, the largest frequency increase is for the switchyard-related Loss of Offsite Power (LOOP) event at 0.11%. The overall plant risk increases by 6.56% and 0.03% for PWR and BWR reference plants respectively. It is found that these risk metrics satisfy the safety criteria of both 10 CFR 50.59 and Regulatory Guide 1.174 licensing pathways.

08 HYDROGEN↗