Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Facility Construction”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Development of the Advanced Regolith Ground Operations (ARGO) Test Bed – A Robotic Excavation and Construction Test Facility with Simulated Lunar Environments

NASA’s Artemis Program is working towards developing a sustained presence on the Moon and eventually Mars. To achieve this goal, robotic excavation, site preparation and construction technologies are under development to establish the capability to construct infrastructure such as launch/landing pads and radiation protection shelters. Technologies must be proven in simulated Lunar conditions prior to surface demonstration missions. To that end, the Relevant Additive Construction Technology (REACT) Announcement of Collaboration Opportunities (ACO) project with AI Space Factory and the NASA Kennedy Space Center’s (KSC) Granular Mechanics and Regolith Operations Laboratory (a.k.a. Swamp Works) has developed the Advanced Regolith Ground Operations (ARGO) Test Bed. ARGO includes a ~1.5m x 1.5m x 1.2m (~5x5x4ft) vacuum chamber, cryogenically cooled thermal shroud, 3-axis robotic positioning system, and regolith bin. For the REACT project, a pellet extruder, feed hopper, and heated 600mm x 600mm (23.6x23.6in) build plate have been installed on ARGO to advance the Technology Readiness Level (TRL) of regolith-polymer composite Fused Deposition Modeling (FDM) additive construction systems, processes, and materials. This paper will focus on the design and operational characteristics of the ARGO Test Bed with pellet extruder.

regolith↗

Development of the Advanced Regolith Ground Operations (ARGO) Test Bed: A Robotic Excavation and Construction Test Facility with Simulated Lunar Environments

NASA’s Artemis Program is working towards developing a sustained presence on the Moon and eventually Mars. To achieve this goal, robotic excavation, site preparation and construction technologies are under development to establish the capability to construct infrastructure such as launch/landing pads and radiation protection shelters. Technologies must be proven in simulated Lunar conditions prior to surface demonstration missions. To that end, the Relevant Additive Construction Technology (REACT) Announcement of Collaboration Opportunities (ACO) project with AI Space Factory and the NASA Kennedy Space Center’s (KSC) Granular Mechanics and Regolith Operations Laboratory (a.k.a. Swamp Works) has developed the Advanced Regolith Ground Operations (ARGO) Test Bed. ARGO includes a ~1.5m x 1.5m x 1.2m (~5x5x4ft) vacuum chamber, cryogenically cooled thermal shroud, 3-axis robotic positioning system, and regolith bin. For the REACT project, a pellet extruder, feed hopper, and heated 600mm x 600mm (23.6x23.6in) build plate have been installed on ARGO to advance the Technology Readiness Level (TRL) of regolith-polymer composite Fused Deposition Modeling (FDM) additive construction systems, processes, and materials. This paper will focus on the design and operational characteristics of the ARGO Test Bed with pellet extruder.

regolith↗

NASA Construction of Facilities Validation Processes - Total Building Commissioning (TBCx)

Key Atributes include: Total Quality Management (TQM) System that looks at all phases of a project. A team process that spans boundaries. A Commissioning Authority to lead the process. Commissioning requirements in contracts. Independent design review to verify compliance with Facility Project Requirements (FPR). Formal written Commissioning Plan with Documented Results. Functional performance testing (FPT) against the requirements document.

Hoover, Jay C.↗

A near term space demonstration program for large structures

For applications involving an employment of ultralarge structures in space, it would be necessary to have some form of space fabrication and assembly in connection with launch vehicle payload and volume limitations. The findings of a recently completed NASA sponsored study related to an orbital construction demonstration are reported. It is shown how a relatively small construction facility which is assembled in three shuttle flights can substantially advance space construction know-how and provide the nation with a permanent shuttle tended facility that can further advance large structures technologies and provide a construction capability for deployment of large structural systems envisioned for the late 1980s. The large structures applications identified are related to communications, navigation, earth observation, energy systems, radio astronomy, illumination, space colonization, and space construction.

Nathan, C. A.↗

An inventory of aeronautical ground research facilities. Volume 4: Engineering flight simulation facilities

The general purpose capabilities of government and industry in the area of real time engineering flight simulation are discussed. The information covers computer equipment, visual systems, crew stations, and motion systems, along with brief statements of facility capabilities. Facility construction and typical operational costs are included where available. The facilities provide for economical and safe solutions to vehicle design, performance, control, and flying qualities problems of manned and unmanned flight systems.

Pirrello, C. J.↗

Genesis lunar outpost criteria and design

This design study--the third in the space architecture series--focused on the requirements of an early stage lunar outpost. The driving assumptions of the scenario was that the base would serve as a research facility and technology testbed for future Mars missions, a habitat supporting 12 persons for durations of up to 20 months, and would sustain the following five experimental facilities: Lunar surface mining and production analysis facility, construction technology and materials testbed, closed environmental life support system (CELSS) test facility, lunar farside observatory, and human factors and environment-behavior research facility. Based upon the criteria set forth in a previous programming document, three preliminary lunar base designs were developed. Each of the three schemes studied a different construction method and configuration. The designs were then evaluated in terms of environmental response, human habitability, transportability, constructability, construction dependability and resilience, and their suitability in carrying out the desired scientific research. The positive points of each scheme were then further developed by the entire project team, resulting in one integrated lunar outpost design.

Hansmann, Timothy↗

The Wallops Flight Facility Model for an Integrated Federal/Commercial Launch Range

Historically, the federal government has been the predominant purchaser of space launches in the United States. The government met its needs through purchase of hardware and services. It also provided the infrastructure necessary to conduct launch operations through federal launch ranges, both military and NASA. Under this model, the government had the complete ownership, responsibility, liability, and expense for launch activities. As the commercial space sector grew, there emerged a corresponding growth in demand for launch range services. However, the expense and complexity of activities has thus far deterred a rapid rise in the establishment of purely commercial launch sites. In this context, purely commercial is defined as "without benefit of capabilities provided by the federal government." Consistent with the Commercial Space Launch Act, in recent years NASA and the Air Force have supported commercial launches from government launch ranges on a cost-reimbursable, non-interference basis. In this mode the commercial launch service providers contract with the government to provide services including use of facilities, tracking and data services, and range safety. As the commercial market projections began to show significant opportunities for economic development, several states established spaceports to provide the services necessary to meet these projected commercial needs. In 1997, NASA agreed to the establishment of the Virginia Space Flight Center (VSFC) at the Wallops Flight Facility. Under this arrangement, NASA agreed to allow Virginia Commercial Space Flight Authority (VCSFA) to construct facilities on NASA property and agreed to provide services in accordance with the Space Act of 1958 and the Commercial Space Launch Act of 1984 (as amended) to support VSFC launch customers. The relationship between NASA and VCSFA, however, has evolved beyond a customer supplier relationship. A partnership relationship has emerged which pairs the strengths of the established NASA test range and the state-sponsored, commercial launch facility provider, in an attempt to satisfy the needs for flexible, low-cost access to space. Furthermore, the future of the NASA/Wallops Test Range is closely linked with the success of VCSFA in promoting commercial launches from Wallops. This paper will describe the changing paradigm of the federal launch range and the unique aspects of the NASA/Wallops Facility relationship with VCSFA. Discussion will include institutional cost-sharing, business development and marketing, joint educational programs, and strategic planning.

Underwood, Bruce E.↗

Integrate FARM with PID controllers: IES Simulation Ecosystem Control System Development

The FARM (Feasible Actuator Range Modifier) software module is a component of the RAVEN-based FORCE framework for analysis of Integrated Energy Systems (IES). FARM was designed to support the HERON software module in the solution of the optimal dispatch problem for IES units. As the result of HERON-FARM dispatch simulation, the set-point trajectories are optimized to meet constraints on both the production variables (i.e., the variables to be optimized such as the electrical power, the hydrogen production rate, etc.) and the process variables tied to the service life of equipment (e.g., steam flowrate, vessel pressure, turbine firing temperature, etc.) at a coarse time resolution (every 10 or 100 seconds) over long time horizons (several days or weeks). In case the operational constraints need to be met at finer time resolution, the computational burden of HERON-FARM would linearly increase with the sampling rate, and sub-optimal solutions might be obtained. System responses characterized by overshoots and damped oscillations temporarily violating the imposed constraints might occur during abrupt power transients. In this report, a hierarchical control system architecture for the operation of the Dynamic Energy Technology and Integration Laboratory (DETAIL) facility constructed at INL was proposed. First, the preliminary studies on the proposed control strategy for operating the facility and the designed PI controllers were reviewed. In particular, the current approach for generating the set-point trajectories was studied, and its limits were identified. To this aim, the inclusion of a Supervisory Control layer embedding a modified version of the FARM algorithm for preserving the system safe operation over both long and real-time horizons was proposed. In this way, FARM would be applied twice, i.e., the original version (“FARM Validator”) aiding the solution of the power dispatch problem, and the modified version (“FARM Supervisory” coordinating the PI controllers to address the real-time control tasks. Despite the kernel of the two modules is the same algorithm, their roles, tasks, and capabilities are quite different. A detailed description of the role of FARM at addressing low-level control tasks is provided, along with tentative operational procedures for training the models embedded into the algorithm by using the collected experimental data.

42 ENGINEERING↗

Solar simulator test facility

Discusses facility constructed at Marshall Space Flight Center to evaluate performance of solar energy collectors under simulated outdoor conditions. Facility simulates sunfall properties such as radiation intensity, spectrum, collimation, uniformity, and direction.

Humphries, W. R.↗

Design of a SMART Valve Testbed for Nuclear Thermal Dispatch

By the year 2050, the United States aims to achieve net-zero carbon emissions. To achieve this target, the licensing of the Light Water Reactor (LWR) fleet has been extended for 20 more years. To stay economically competitive with other power sources such as renewable and fossil-fuel power plants, the U.S. Department of Energy has introduced a plan to modernize the existing LWR fleet and diversify the revenue stream. One of the plans is to dispatch thermal energy to endothermic industrial processes. SMART valves will play an important role in this initiative by efficiently balancing the load by regulating valves in a coordinated manner while monitoring the thermal-hydraulic systems to enhance safety and maintain the integrity of the power plant. This research aims to develop a facility to test the coordinated control algorithm and produce various test results for training the monitoring system. The constructed facility is capable of simulating various operational and accidental scenarios by coordinating all the valves (positions) and pump (flowrate). The facility is developed with an Internet of Things (IoT)-based custom system and a python-based valve position control and coordination mechanism. It has achieved stable sensor outputs, pump control, and coordinated valve regulation in all three valves with minimum obstruction in the system.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Temperature and pressure measurement techniques for an advanced turbine test facility

A high pressure, high-temperature turbine test facility constructed for use in turbine cooling research is described. Several recently developed temperature and pressure measuring techniques are used in this facility. The measurement techniques, their status, previous applications and some results are discussed. Noncontact surface temperature measurements are made by optical methods. Radiation pyrometry principles combined with photoelectric scanning are used for rotating components and infrared photography for stationary components. Contact (direct) temperature and pressure measurements on rotating components are expected to be handled with an 80 channel rotary data package which mounts on and rotates with the turbine shaft at speeds up to 17,500 rpm. The data channels are time-division multiplexed and converted to digital words in the data package. A rotary transformer couples power and digital data to and from the shaft.

Pollack, F. G.↗

Improving the explanation capabilities of advisory systems

A major limitation of current advisory systems (e.g., intelligent tutoring systems and expert systems) is their restricted ability to give explanations. The goal of our research is to develop and evaluate a flexible explanation facility, one that can dynamically generate responses to questions not anticipated by the system's designers and that can tailor these responses to individual users. To achieve this flexibility, we are developing a large knowledge base, a viewpoint construction facility, and a modeling facility. In the long term we plan to build and evaluate advisory systems with flexible explanation facilities for scientists in numerous domains. In the short term, we are focusing on a single complex domain in biological science, and we are working toward two important milestones: (1) building and evaluating an advisory system with a flexible explanation facility for freshman-level students studying biology, and (2) developing general methods and tools for building similar explanation facilities in other domains.

Porter, Bruce↗

Improving the explanation capabilities of advisory systems

A major limitation of current advisory systems (e.g., intelligent tutoring systems and expert systems) is their restricted ability to give explanations. The goal of our research is to develop and evaluate a flexible explanation facility, one that can dynamically generate responses to questions not anticipated by the system's designers and that can tailor these responses to individual users. To achieve this flexibility, we are developing a large knowledge base, a viewpoint construction facility, and a modeling facility. In the long term we plan to build and evaluate advisory systems with flexible explanation facilities for scientists in numerous domains. In the short term, we are focusing on a single complex domain in biological science, and we are working toward two important milestones: (1) building and evaluating an advisory system with a flexible explanation facility for freshman-level students studying biology; and (2) developing general methods and tools for building similar explanation facilities in other domains.

Porter, Bruce↗

A combined spacecraft charging and pulsed X-ray simulation facility

A spacecraft charging simulation facility constructed to investigate the response of satellite materials in a typical geomagnetic substorm environment is described. The conditions simulated include vacuum, solar radiation, and substorm electrons. A nuclear threat environment simulation using a flash X ray generator is combined with the spacecraft charging facility. Results obtained on a solar cell array segment used for a preliminary facility demonstration are presented with a description of the facility.

Face, S. H.↗

Orbital construction demonstration study. Volume 1: Executive summary

A conceptual design and program plan for an Orbital Construction Demonstration Article (OCDA), that can be used for technology growth and verification, and as the construction facility for a variety of large structures is presented. The OCDA design includes a large work platform, a rotating manipulator boom, a 250 kw solar array, and a core module of subsystems with a total mass of 37,093 kg, that can be assembled in three shuttle flights. An analysis of OCDA continued utility potential indicates that a shuttle tended platform with 250 kW of power can effectively be used to construct highly beneficial antenna systems and large demonstration articles that advance solar power satellite technologies. The construction of 100 m parabolic reflectors for use as a radiometer for measuring soil moisture and water salinity was found to be within the capabilities of OCDA concept. With 252 fixed beams for high population centers, and 16 scanning beams for rural areas, the antenna has the potential to significantly improve U.S. space based communications systems. The OCDA, that is slightly increased in size, was found adequate to build a large 2 MW solar array which, when coupled to a transmit antenna, demonstrate power transfer from space to ground.

Source record↗

Cockpit weather information needs

The primary objective is to develop an advanced pilot weather interface for the flight deck and to measure its utilization and effectiveness in pilot reroute decision processes, weather situation awareness, and weather monitoring. Identical graphical weather displays for the dispatcher, air traffic control (ATC), and pilot crew should also enhance the dialogue capabilities for reroute decisions. By utilizing a broadcast data link for surface observations, forecasts, radar summaries, lightning strikes, and weather alerts, onboard weather computing facilities construct graphical displays, historical weather displays, color textual displays, and other tools to assist the pilot crew. Since the weather data is continually being received and stored by the airborne system, the pilot crew has instantaneous access to the latest information. This information is color coded to distinguish degrees of category for surface observations, ceiling and visibilities, and ground radar summaries. Automatic weather monitoring and pilot crew alerting is accomplished by the airborne computing facilities. When a new weather information is received, the displays are instantaneously changed to reflect the new information. Also, when a new surface or special observation for the intended destination is received, the pilot crew is informed so that information can be studied at the pilot's discretion. The pilot crew is also immediately alerted when a severe weather notice, AIRMET or SIGMET, is received. The cockpit weather display shares a multicolor eight inch cathode ray tube and overlaid touch panel with a pilot crew data link interface. Touch sensitive buttons and areas are used for pilot selection of graphical and data link displays. Time critical ATC messages are presented in a small window that overlays other displays so that immediate pilot alerting and action can be taken. Predeparture and reroute clearances are displayed on the graphical weather system so pilot review of weather along the route can be accomplished prior to pilot acceptance of the clearance. An ongoing multiphase test series is planned for testing and modifying the graphical weather system. Preliminary data shows that the nine test subjects considered the graphical presentation to be much better than their current weather information source for situation awareness, flight safety, and reroute decision making.

Scanlon, Charles H.↗

Pathways to Colonization

The steps required for space colonization are many to grow from our current 3-person International Space Station, now under construction, to an infrastructure that can support hundreds and eventually thousands of people in space. This paper will summarize the author's findings from numerous studies and workshops on related subjects and identify some of the critical next steps toward space colonization. Findings will be drawn from the author s previous work on space colony design, space infrastructure workshops, and various studies that addressed space policy. In conclusion, this paper will note that significant progress has been made on space facility construction through the International Space Station program, and that significant efforts are needed in the development of new reusable Earth to Orbit transportation systems. The next key steps will include reusable in space transportation systems supported by in space propellant depots, the continued development of inflatable habitat and space elevator technologies, and the resolution of policy issues that will establish a future vision for space development.

Smitherman, David V., Jr.↗

Development of far infrared detection techniques

This grant supports the development of a variety of advanced far infrared detection techniques that will be used in future NASA missions such as the Space Infrared Telescope Facility (SIRTF). These studies span the wavelength region of 30-200 microns and include development of focal planes and electronics that would utilize them. Efforts reported here represent collaborations among the University of Arizona's Steward Observatory; Lawrence Berkeley Laboratories (LBL); and the University of California at Berkeley. The overall goal of this program is to demonstrate extremely high performance detectors for low background applications between 30-200 microns. For the 40-120 micron region, the program is developing a 32x32 filled detector array. Previous work has demonstrated the required performance with a Z-Plane array architecture; we are now upgrading construction facilities and techniques to increase yields and reliability. We have completed the initial tradeoff analysis for the interconnects between the detectors and and readouts. We found satisfactory performance for both Flex-Cable and Tape Automated Bonding (TAB) devices, but analysis showed that an all-sapphire device would not meet our requirements. In addition, the effort continued to develop readouts that can operate close to the detector element temperature; success would substantially improve the manufacturability of the arrays. For the 100-200 micron range, previous work has demonstrated good performance with individual detector elements of stressed Ge:Ga; current efforts are to increase the quantum efficiency of these devices. Work continues to discover how to construct an alternate type of long wave detector, Ge:B Blocked Impurity Band devices. Following descoping of SIRTF, we are closing out the bolometer and refrigerator development. We documented the optical designs and approaches developed previously to meet the specific requirements of these detector types in terms of modulation of the signals for good photometric behavior within the constraints of a compact and self-contained cryogenic instrument. Further study was initiated for the Band 3 optical train, where we have concerns about complexity and the manufacturability of one component.

Rieke, George↗