Engineering PapersSearch

SEARCH · Engineering Papers

Results for “FSA Program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

21 records · Page 2

Flat-plate module efficiency versus cost tradeoffs

The Five Year Research Plan energy cost methodology and in depth analyses based on the extensive data that are relevant to PV systems are used to facilitate the accomplishment of the $0.15/kWh energy cost goal. An equation is given for the five year energy cost methodology. The allocation guidelines are designed to be consistent with flat solar array (FSA) milestones for module cost, module efficiency, and the programmatic goal for energy cost. They are research targets that appear to be achievable, given prior accomplishments and planned activities in the areas of low cost silicon purification, low cost sheet material, high efficiency cell processing, low cost, long life encapsulants, and automated fabrication method. Extensive sensitivity analysis work has been performed that shows that these guidelines represent an efficient way to meet the intent of the DOE program.

Aster, R. W.

Flat-plate solar array project. Volume 4: High-efficiency solar cells

The High Efficiency Solar Cell Task was assigned the objective of understanding and developing high efficiency solar cell devices that would meet the cost and performance goals of the Flat Plate Solar Array (FSA) Project. The need for research dealing with high efficiency devices was considered important because of the role efficiency plays in reducing price per watt of generated energy. The R&D efforts conducted during the 1982 to 1986 period are summarized to provide understanding and control of energy conversion losses associated with crystalline silicon solar cells. New levels of conversion efficiency were demonstrated. Major contributions were made both to the understanding and reduction of bulk and surface losses in solar cells. For example, oxides, nitrides, and polysilicon were all shown to be potentially useful surface passivants. Improvements in measurement techniques were made and Auger coefficients and spectral absorption data were obtained for unique types of silicon sheets. New modelling software was developed including a program to optimize a device design based on input characteristics of a cell.

Leipold, M.

Long-Term Groundwater Monitoring Report Industrial Area Kennedy Space Center, Florida

This report presents the 2023 groundwater sampling results from the National Aeronautics and Space Administration (NASA) Industrial Area (IA) Long-Term Monitoring (LTM) activities. Due to the project contract ending in 2023, this report presents one year of LTM activities instead of the two-year timeframe presented in previous reports. The NASA IA LTM Program includes the following 12 sites: - Ransom Road Landfill (RRLF) – Solid Waste Management Unit (SWMU) 003 - Building M7-0505 Treatment Tank Area (M505) – SWMU 039 - Operations and Checkout Building (O&C) – SWMU 076 - Vertical Processing Facility (VPF) – SWMU 077 - Environmental Health Facility (EHF) – SWMU 079 - Kennedy Athletic, Recreation, and Social Park 1 (KARS Park 1) – SWMU 084 - Engineering Development Laboratory (EDL) – SWMU 085 - Launch Equipment Test Facility (LETF) – SWMU 091 - Mobil Service Station (MOBIL) – SWMU 093 - General Services Administration Seized Property (GSSP) – SWMU 095 - Space Station Processing Facility (SSPF) – SWMU 098 - Fuel Storage Area #1 Underground Storage Tank [Building 1044] (FSA1) – Potential Release Location (PRL) 157 Sampling events for the IA LTM Program are conducted seasonally during the dry and wet seasons, which occur in May and November, respectively. The sites in the NASA IA LTM Program are sampled on annual, biennial, or 5-year sampling frequencies based on historical trends. The current sampling frequencies for the NASA IA LTM sites are as follows: - FSA1 is sampled annually, alternating between wet and dry seasons. - GSSP is sampled annually during the wet season. - Seven sites are sampled biennially, alternating between the wet and dry seasons (RRLF, M505, O&C, VPF, LETF, MOBIL, and SSPF). - EHF and EDL are sampled biennially during the wet season. - KARS Park 1 is sampled once every 5 years.

remediation