Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FERC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

A Decision Support System to Compile Environmental Mitigations from Hydropower Licensing Documents

The process of deciphering, extracting, and compiling information from texts dense with domain-specific terminology and technical jargon is a challenging endeavor. It demands considerable expertise and deep knowledge in the respective field, resulting in a labor-intensive process when executed by humans. Furthermore, the task of identifying multiple class labels in extensive texts presents a challenge due to intra- and inter-reader variability, making the process time-consuming and costly.We’re introducing a user-friendly graphical interface, fortified with a BERT model-powered decision support system. This advanced system aims to augment efficiency, curtail data collection time, and sustain high precision in data acquisition. It is instrumental in deciphering and synthesizing intricate texts teeming with a spectrum of expressions, even within similar mitigation categories. Such tasks traditionally demand substantial human effort and specialized knowledge in the domain.Our system is specifically engineered for the task of extracting environmental mitigation information to promote sustainable hydropower development from licenses issued by the Federal Energy Regulatory Commission (FERC). These license documents are comprehensive, each containing over 15,000 words and requiring the identification of 135 different class labels. We anticipate that our system will boost reading speed, improve the consistency of classification outputs among readers, and contribute to the development of a robust scientific database of environmental mitigations associated with the 2,000+ non-federal hydropower facilities licensed by FERC in the United States.

Yoon, Hong-Jun [ORNL] (ORCID:0000000254505878)↗

What Role Do Aggregators Play in Power System Security and Resilience?

Barriers to the participation of distributed energy resources (DERs) in wholesale electricity markets have limited the use of DERs for power system security and resilience. In September 2020, the Federal Energy Regulatory Commission (FERC) approved an order to reduce these barriers. FERC Order No. 2222 enables the participation of DER aggregators in wholesale electricity markets. DERs include renewable generation and technologies that support the integration of renewable generation by increasing grid flexibility and resilience. Requiring wholesale energy markets to allow DER aggregator participation provides a path for DERs to become competitive in these markets. As the contribution from aggregated DERs continues to increase, the aggregator's role in supporting grid security and resilience will become more critical. This paper reviews work that demonstrates how DER aggregators can provide resilience support through technical capabilities, operational strategies, and secure communication architectures. Socioeconomic influences and impacts of aggregators, including implications for social resilience, are presented. In surveying the current state-of-the-art across different but interconnected topics, we illustrate how aggregators can be power system participants that enhance grid security. There is no one-size-fits-all approach to enhancing resilience in a power grid that includes a growing cohort of DER aggregators, but there are many options for aggregators to contribute to a more resilient and secure power grid.

aggregator↗

Commercial Building Planning and Retrofitting Strategy for Grid Services

The increasing integration of distributed energy resources (DERs) plays an important role in improving energy consumption efficiency. In September 2020, the Federal Energy Regulatory Commission (FERC) approved Order 2222 which opens wholesale electricity markets to small capacity DERs. The benefit of this new FERC Order 2222 is that DERs, such as rooftop solar panels and batteries, will be able to participate in regional electricity markets and provide grid services. Meanwhile, the planning and operation strategies of DERs are facing new challenges to account for the impact of the wholesale market with numerous uncertainty factors. Therefore, in this paper, we propose a new planning and retrofitting model for long-term commercial buildings that considers both DER investment and market participation. Specifically, we explore the capability of implementing DERs for grid services. The effectiveness of the proposed model is validated using real-world data. Simulation results also validate that participating in grid services can significantly increase revenues through appropriate building energy management and shorten the payback period of DER investments.

building energy management↗

Onshore U.S. Carbon Pipeline Deployment: Siting, Safety, and Regulation

Carbon capture, utilization, and storage (CCUS) technology has significant potential to reduce greenhouse gas (GHG) emissions and mitigate the impact of climate change, particularly in hard to decarbonize industrial and commercial sectors. CCUS involves capturing carbon dioxide (CO 2 ) from industrial processes or power generation and utilizing it for other purposes, such as enhanced oil recovery (EOR), or storing the captured CO 2 underground. CCUS technology can reduce the environmental impact of continued fossil fuel use while smoothing the transition to a low-carbon economy. CCUS can create new economic opportunities, such as the development of new industries and job creation, and can enhance energy security by diversifying energy sources. For these reasons, enabling CCUS has become a key objective of the Biden-Harris administration’s clean energy policy and has received bipartisan support. Despite its environmental and economic potential, CCUS faces multiple barriers to widespread deployment. One of the main challenges is the high cost and technical difficulty of implementing and operating large-scale CCUS infrastructure. CCUS remains a relatively expensive way to reduce carbon emissions (e.g., compared to solar photovoltaic technology’s displacement of coal generation). Additionally, financial incentives and supportive policies like those enacted to support solar photovoltaic development, especially at the state level, are inconsistent or nonexistent, which can discourage investment in CCUS projects. There are also technical challenges associated with safe and secure underground CO 2 storage and the development of new carbon utilization technologies. Public opposition to various aspects of CCUS technologies, ranging from concerns that CCUS will extend reliance on fossil fuels to CCUS infrastructure being sited in disadvantaged communities, is a growing challenge. This paper focuses on another significant barrier to broad CCUS deployment: the need for considerable expansion of the dedicated land-based CO 2 pipeline network in the United States to meet CCUS goals and the unique regulatory challenges to its development. To reach carbon emissions targets in the United States by 2050, CCUS technology will need to be supported by tens of thousands of miles of CO 2 pipelines. Estimates range from a minimum of roughly 29,000 pipeline miles (according to a 2020 Great Plains Institute study) to 66,000 pipeline miles (as per a 2021 Princeton University–led study). As of October 2022, however, the U.S. Department of Transportation (U.S. DOT) reports fewer than 5,400 miles of U.S. pipelines carrying CO 2 . This deficit—and what it means for the prospect of moving substantially larger quantities of CO 2 from source to use or storage—threatens to stifle the development of CCUS projects and technologies identified as an important tool to meet emissions targets. The current regulatory landscape facing CO 2 pipeline development can best be described as uncertain. At the federal level, the U.S. DOT Pipeline and Hazardous Materials Safety Administration (PHMSA) oversees safety regulation of pipelines transporting hazardous materials, including CO 2 upon commencement of operation. However, PHMSA’s definition of CO 2 as “a fluid consisting of more than 90 percent CO 2 molecules compressed to a supercritical state” has not been updated since its 1991 addition to the Federal Register. Because CO 2 can be transported in a gaseous, liquid, or supercritical state (indeed, the physical state of CO 2 can fluctuate within a single pipeline due to environmental changes), doubts persist about the extent of PHMSA’s purview—and raise questions about what, if anything, states should do to address this apparent gap. PHMSA has begun a major revision of its existing rules, but the agency does not expect a first draft before 2024. Economic oversight of CO 2 pipelines is even less clear. The Federal Energy Regulatory Commission (FERC) and Surface Transportation Board (STB)—which regulate the rates of interstate oil/natural gas and non-energy pipelines, respectively—have both declined jurisdiction over interstate CO 2 pipelines. This presumably leaves economic regulation to state and/or local governments, but few if any states have the laws or resources in place to oversee just and reasonable rates. Further, the interstate nature of CO 2 pipeline development creates questions around how different states should align their rate-making decisions. Onshore U.S. Carbon Pipeline Deployment: Siting, Safety, and Regulation Currently, regulatory responsibilities regarding CO 2 pipeline siting and permitting fall to state and local governments. The variety of laws and regulations across the country, however, creates a maze of requirements for pipeline developers to navigate. To secure necessary permits, most states require pipeline companies to be “common carriers” that provide transport service to the public at uniform rates. However, the specific definition of that term varies. Some states require clear evidence that a pipeline services the public, while others automatically deem any pipeline company transporting energy products or hazardous materials to be a “common carrier”—with little consideration for accessibility to third parties. Other states have eschewed common-carrier terminology entirely, placing private and publicly accessible pipelines on equal footing. Much like the variation in common-carrier requirements, laws governing eminent domain authority to secure rights-of-way (ROW) to commence construction on a planned pipeline route differ by state. Several states have no laws or rules governing CO 2 pipelines. In addition to creating questions about whether long-standing rules for other pipelines (e.g., natural gas or petroleum products) apply to CO 2 , this policy vacuum leaves local governments as the sole authority over sections of pipe within their boundaries. With dozens of counties along a given route, the probability of inconsistent regulation of the same pipeline is significant. Even in states with CO 2 pipeline laws in place, local regulatory attempts to address rising concerns over pipeline routing and safety have triggered lawsuits by pipeline companies seeking to delimit areas of federal, state, and local government responsibility. Meanwhile, legislators across the country have introduced bills to restrict the application of eminent domain to CO 2 pipeline projects, which could threaten a key means of securing ROW that companies cannot secure through negotiation with landowners. Taken separately, any of these regulatory issues—the narrow federal definition of CO 2 , FERC’s and STB’s decisions that CO 2 pipelines are not within their jurisdiction, and the considerable variation in state and local governments’ laws regulating CO 2 pipeline technologies—are extremely difficult to resolve. Adding the required scale of CO 2 pipeline expansion and the currently identified narrow window of time in which to reach climate target goals, the task becomes even more difficult—and raises a host of urgent questions for regulators. How should CO 2 be defined in federal regulations to ensure consistent safety standards across the country? What is the potential impact radius of a CO 2 pipeline rupture, and how should that inform local emergency response? In the absence of centralized federal oversight, what should state legislatures do to increase alignment for interstate CO 2 pipeline projects? This paper intends to serve as a primer for regulators and stakeholders who seek to better understand the regulatory challenges and opportunities facing this critical infrastructure.

42 ENGINEERING↗

Third-Party Aggregation Rulemaking in MISO and SPP Footprints

The report highlights key considerations for retail regulators in the footprints of the Southwest Power Pool (SPP) or Midcontinent Independent System Operator (MISO) in states that previously opted out of allowing third-party aggregation participation under FERC Order 719 and that may want to explore reversing the decision due to a changing policy environment under new FERC orders (i.e., 2222) and/or tightening resource adequacy constraints. Through a document review and a series of 27 interviews with regulators, aggregators, and other industry professionals, this document provides a high-level policy overview of the retail regulator’s role in a selection of processes, rules, and regulations to better understand how states have treated and/or integrated aggregators into wholesale markets. The report summarizes findings in two sections: General Findings and Specific Policy Findings. The General Findings offer high level takeaways such as the fact that 17 of the 20 states in MISO and SPP footprints opted out of third party aggregations following Order 719. Additionally, there is only one state that is fully restructured in the MISO and SPP footprints whereas the rest are vertically integrated, and the majority of third-party aggregations in the U.S. take place in restructured states outside of these footprints. Even so, third-party aggregations do take place in MISO and SPP albeit in small numbers and in an ad hoc regulatory environment. The specific policy findings delve deeper into specific examples of state actions on the topics of jurisdiction, registration and licensing, data governance, dual participation, and dispute resolution. Tables in each category organize state actions into Tiers I-III, which roughly correspond to the possible level of involvement or possible change necessary by state regulators and/or legislators to implement these actions. The tier level does not indicate any value judgement, as each state has respective regulatory limitations and each decision comes with various tradeoffs. One main tradeoff is between simplicity and quick implementation versus comprehensive and prolonged implementation. In many cases, actions in Tier I could be implemented without significant changes by relying on the use of existing processes for an aggregator context. On the other hand, many actions in Tier III are more narrowly designed to address aggregators specifically, but often require more significant changes including the involvement of additional parties through stakeholder engagement or legislative action. In some cases, these tiers are discrete. However, state regulators may also choose to progress through these various tiers sequentially as they phase in aggregators while learning from their experience. With the ability to stack bulk system level services, distributed energy resource aggregations in MISO and SPP could provide various private benefits (e.g., increased value streams to the owner) as well as societally beneficial grid services (e.g., peaking capacity, ancillary services, and other services that increase the grid’s overall operational efficiency). In deciding how to best to enable these benefits, states and retail regulators must weigh various tradeoffs if considering reversing a previous opt out.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Empirical Indicators of Transmission Value in the Southeast United States

Concurrent differences in energy price between different parts of the electric grid are a key indicator of the value of additional transmission. In areas without a wholesale electricity market, such as the Southeast, an alternative indicator to price is the Federal Energy Regulatory Commission’s (FERC) system lambda data. This economic metric represents the minimized marginal production costs of thermal generators, including fuel and other variable operation and maintenance expenses. Balancing Authorities report a single system lambda for their entire balancing area. Most Southeastern lambdas exhibit sufficient price variation to support a transmission valuation analysis, although incomplete accounting of congestion costs or scarcity rents during peak load hours may underestimate the true value of transmission capacity. With transmission value defined as the annual average hourly absolute price difference between two regions and FERC’s system lambda data used as a price proxy, we find the following results in the Southeast region during 2012-2023 (reported in $\$2024$/MWh): Intra‐regional findings: Annual averages historically span $\$2$–$\$28$/MWh and average $\$12$/MWh in SERTP and span $\$4$–$\$19$/MWh and average $\$9$/MWh in FRCC, disregarding transmission value driven by anomalous data. The ranges of transmission value reported here are large, spanning an order of magnitude in some cases. Much of this variation is driven by year-to-year changes, with 2022 having a particularly high intra-regional transmission value due to elevated natural gas prices. Inter‐regional corridors: Annual average transmission values across three broader regions range from $\$6$ to $\$28$/MWh with a long-term average of $\$11$/MWh. Much of the transmission value is concentrated in a small portion of hours. Across all regions, severe weather—particularly polar vortex events in January 2018, February 2021, and December 2022—drives the largest price spreads. Seasonal patterns also emerge, with summer afternoons and fall mornings contributing consistently to transmission value, as for example between MISO and SOCO in 2023.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Bulk Power System Flow Control

On July 28, 2023, the Federal Energy Regulatory Commission (FERC) issued Order Number 2023, targeting an improved generation-interconnection process in the United States. FERC Order No. 2023 requires transmission providers to evaluate transmission technologies, other than network expansion, that could provide system improvements and help expand bulk-power system capacity. Transmission providers must consider technologies that would fall under the category of Grid Enhancing Technologies (GETs), which provide capacity-expansion options other than conventional transmission expansion.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

Flow Forecasting on New England’s Great River Hydro (CRADA 549) (Final Report)

Great River Hydro (GRH) is New England's largest conventional hydropower generator and operates sustainable hydropower systems in Vermont, New Hampshire, and Massachusetts. Several of GRH’s hydropower projects on the Connecticut River are largely constrained to operate as run-of-river; however, though a new FERC license they have opportunity in the form of flex hours where they are allowed to deviate operations to capture favorable market conditions or emergency operations. To maximize value from these new operations, GRH is considering new sources of forecasted inflow. Pacific Northwest National Laboratory (PNNL) is evaluating the quality of two commercial inflow forecasts for GRH under DOE Water Power Technology Office’s Notice of Opportunity for Technical Assistance: Improving Hydropower’s Value through Informed Decision Making. This project will provide an unbiased evaluation of the accuracy of inflow forecasts available through commercial vendors. GRH will use this information to support their decision on which inflow forecast to use under their new FERC license and to assess the overall value of the available inflow forecasting tools and practices. In this talk we will discuss details of the near real-time forecast evaluation process, the metrics involved in the evaluation, and some preliminary results. In addition, we’ll touch on the second phase of the project which involves evaluating scheduling strategies that identify windows of opportunity to change operations in ways that increase profit through participation in day ahead and real time markets.

13 HYDRO ENERGY↗

U.S. Hydropower Relicensing and License Surrender Data and Metadata, 2026

The U.S. Hydropower Relicensing and License Surrender Database (2026) provides a comprehensive, nationwide snapshot (as of December 31, 2025) of hydropower projects across the United States that are undergoing Federal Energy Regulatory Commission (FERC) relicensing or license surrender processes. Compiled by Oak Ridge National Laboratory, the dataset includes detailed project-level attributes such as geographic location, ownership type, waterway, project type (hydropower or pumped storage), regulatory milestones (e.g., Notice of Intent, application dates, FERC issuance dates), licensing process type (ILP, TLP, ALP), operational characteristics, capacity changes, settlement agreements, construction or turbine‑generator investments, and project status categories spanning relicensing, surrenders, exemptions, and terminations. Together, the relicensing and surrender records offer a detailed view of regulatory trends, infrastructure transitions, dam removals, and economic drivers influencing the evolution of the U.S. hydropower fleet.

Johnson, Megan [ORNL] (ORCID:0000000290141741)↗

US Hydropower & Environmental Mitigations: A 1998-2023 inventory of mitigation measures inside licensing documents

Federal Energy Regulatory Commission (FERC) license documents mandate environmental mitigation requirements to reduce potential environmental damage caused by non-federal hydropower facilities. This StoryMap showcases a dataset that leveraged Natural Language Processing (NLP) to inventory environmental mitigations from 465 FERC licenses that were issued from 1998-2023 (Ruggles et al, 2025). Users can explore trends in mitigation requirements over time and space with interactive maps and are presented with a demonstration use case.

Ruggles, Thomas A. [Oak Ridge National Laboratory ↗

What Role Do Aggregators Play in Power System Security and Resilience? Preprint

Barriers to the participation of distributed energy resources (DERs) in wholesale electricity markets have limited the use of DERs for power system security and resilience. In September 2020, the Federal Energy Regulatory Commission (FERC) approved an order to reduce these barriers. FERC Order No. 2222 enables the participation of DER aggregators in wholesale electricity markets. DERs include renewable generation and technologies that support the integration of renewable generation by increasing grid flexibility and resilience. Requiring wholesale energy markets to allow DER aggregator participation provides a path for DERs to become competitive in these markets. As the contribution from aggregated DERs continues to increase, the aggregator's role in supporting grid security and resilience will become more critical. This paper reviews work that demonstrates how DER aggregators can provide resilience support through technical capabilities, operational strategies, and secure communication architectures. Socioeconomic influences and impacts of aggregators, including implications for social resilience, are presented. There is no one-size-fits-all approach to enhancing resilience in a power grid that includes a growing cohort of DER aggregators, but there are many options for aggregators to contribute to a more resilient and secure power grid.

aggregator↗

Modeling distributed energy resource aggregations in security constrained unit commitment and economic dispatch

The Federal Energy Regulatory Commission (FERC) recently issued Order 2222, which requires all wholesale electricity markets in the US to allow distributed energy resources (DERs) to participate in the market as aggregated resources. These DER aggregations may be composed of many individual resources that are offered and dispatched by the market as a single entity. We present here a model of a distributed energy resource aggregator (DERA) that is scheduled by a market operator’s security constrained unit commitment (SCUC) and security constrained economic dispatch (SCED). The DERA model includes constraints for battery energy storage systems (BESSs), demand response resources (DRRs), and a simple distributed energy resource (DER). This paper describes a model for each resource type and presents two methods for the DERA to generate market offer curves: a profit-maximizing optimization to compute cost curves and a direct cost algorithm to determine dispatch costs for each resource and combine into cost curves. Once all participating DERAs are scheduled in SCUC/SCED, the model is then modified to dispatch individual DERs to maximize profit or minimize schedule deviation of the DERAs. A simulation of a representative day illustrates the DERA offers, the scheduled generation, and the DERA dispatch. Findings show the potential for unavoidable schedule deviations due to internal DER constraints and due to economic incentives to deviate from the SCUC/SCED schedules. This highlights the importance of DERA offer construction on market efficiency and system reliability. Novel aspects of our approach include: (1) We consider the asymmetry of price incentives impacting DERAs from the wholesale market compared to those impacting consumers from the retail market, as imposed by current regulations and laws. (2) We model aggregate consumer response through statistically parameterizable utility functions rather than a potentially impractical approach of modeling each individual consumer. (3) We show how to use the DERA operational dispatch model to create offers into the wholesale electricity market. (4) We show how DERAs may fail to meet their scheduled dispatch because the market offer format may not permit them to fully express their operational features such as intertemporal costs and constraints to the market.

aggregations↗

Harnessing Virtual Power Plants Reliably: Enabling tools for increased observability, controllability, operation, and aggregation of distributed energy resources

Harnessing virtual power plants enhances the integration of distributed energy resources into utility grids for a sustainable energy future. Virtual power plants (VPPs) aggregate DERs to enhance resource adequacy and reduce emissions. U.S. utilities are exploring various technologies to manage DERs effectively. FERC Order 2222 allows DERs to participate in both wholesale and retail markets. Enhancing observability and controllability of behind-the-meter (BTM) DERs is essential for reliable grid operations. A hierarchical control architecture can improve coordination among residential energy resources. Field tests showed nearly 20% energy savings and 30% peak power reduction during grid events. Effective management of DERs requires enhanced situational awareness to prevent grid congestion. Integrating DER management systems (DERMS) with existing planning tools can improve operational security. Near-real-time grid models can validate optimal resource set points against resource uncertainty. Traditional uninterruptible power supplies (UPS) can be upgraded to support grid services and become part of VPPs. Upgrading UPS systems can reduce costs by 75% and unlock significant battery capacity. New battery management systems and grid-aware controllers are essential for optimizing UPS performance. Continued research and development are necessary to address challenges in integrating DERs into utility grids. Encouraging customer participation in pilot programs is vital for the evolution of VPPs. Here, the shift towards price-responsive DERs and VPPs is expected to enhance energy distribution efficiency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrated System Planning: Emerging Software Requirements in the Power Industry

Power system planning software remains fragmented across organizational boundaries, with specialized tools for capacity expansion, production cost modeling, power flow, and dynamic analysis operating on incompatible data models and assumptions. This article argues that the fragmentation is not merely a technical problem but a predictable consequence of Conway's law: software architectures mirror the departmental structures within which they are developed. Regulatory milestones like Federal Energy Regulatory Commission (FERC) Order 888 formalized these divisions, but the roots trace back to the distinct engineering disciplines-mechanical, chemical, and electrical-that staffed generation and transmission planning departments in vertically integrated utilities. As the industry moves toward integrated system planning (ISP) that coordinates generation, transmission, and distribution investment decisions, the software ecosystem must evolve accordingly. We identify five categories of software requirements to enable this transition: coherent data inputs decoupled from individual applications, unified and extensible data schemas, modular component representations that support multiple abstraction levels, lifecycle management of planning datasets, and well-defined application programming interface (API) contracts that separate data exchange from algorithmic control. We examine how these requirements interact with three common workflow patterns-serial gate clearing, sequential multiapplication, and convergence oriented-and discuss the interface design principles each demands. We then outline a vision for platform-based planning architectures where specialized analytical services compose through standardized interfaces and where artificial intelligence (AI)/machine learning (ML) tools augment decision support within a disciplined software infrastructure. The practices proposed here offer a path from today's siloed tool collections toward collaborative planning ecosystems capable of handling the complexity of modern power system transformation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transmission Data-Driven User-Defined Model for Inverter-based and Conventional Power Plants

Recent events in Odessa [1], [2] have shed light on the complexities of integrating large Inverter-Based Resource (IBR) plants with the transmission system, prompting NERC to stress continuous performance monitoring by transmission operators. Challenges such as plant control updates, IBR model revisions, Phase-locked loop loss of synchronism, and protection events have been identified, underscoring the need for enhanced monitoring protocols by regulatory bodies. The recent FERC 901 order underscores the importance of accurate data exchange regarding IBRs for reliability studies. However, limited access to IBR plant-related data hampers effective decision-making for transmission operators (TOP). This paper proposes a method for constructing data-driven User-Defined dynamic Models (UDM) for power plants for validating multiple-event data using field measurements from interconnection bus locations. The problem is formulated as a power plant model identification problem and a multi-task learning approach under partial input observability assumptions is proposed in this work. This approach aims to predict aggregated responses of conventional and IBR power plants during various dynamic physical events which is useful for planning studies under diverse disturbance conditions. Ultimately, this methodology emphasizes the importance of plant visibility to operators in addressing power system challenges, facilitating improved planning and operational studies.

Mahapatra, Kaveri [BATTELLE (PACIFIC NW LAB)]↗

Special Section on Local and Distributed Electricity Markets

Driven by the goals of clean energy and zero carbon emissions, the power industry is undergoing significant transformations. The rapid growth of diverse distributed energy resources (DERs) at grid edge such as rooftop photovoltaics (PVs) and electric vehicles is transforming the traditional centralized power grid management to a decentralized, bottom-up, and localized control paradigm. Establishing local and distribution-level electricity markets provides an effective solution to managing large amounts of small-scale DERs. New regulations such as the recent FERC Order 2222 in the U.S. open the door to DERs in the wholesale markets. Through coordinating the local and distribution-level markets with the transmission-level wholesale market, the DERs and prosumers can trade energy and flexibility locally with each other and meanwhile provide energy, flexibility and ancillary services to the bulk power grid. During this transition, there are many new technical challenges to address, calling for innovative ideas and interdisciplinary research in this promising direction. Advanced information and communication technologies (ICT) are needed, as a key enabler, for the development and practical implementation of local and distribution electricity markets. Research into local and distribution markets is strongly interdisciplinary, involving the state of the art in power engineering, economics, and digital/information technology. A broad spectrum of contributors from universities, industry, research laboratories and policy makers is sought to develop and present solutions and technologies that will facilitate and advance practical applications and implementations of local and distribution-level electricity markets to uncover the values of DERs.

distributed energy resources↗

Marine Energy Environmental Toolkit for Permitting and Licensing

The permitting and licensing process for marine energy in the U.S. could take up to 7 years for even small demonstrations or pilot studies despite existing resources like Tethys, MarineCadstre, and the FERC E-Library. The goal of the Marine Energy Environmental Toolkit Project was to increase regulators, developers, and marine energy innovators’ understanding of potential environmental effects of marine energy conversion devices deployments and provide information to make efficient and effective determinations during permitting and licensing; develop a one-stop shop for existing environmental, spatial, regulatory, and scientific data that allows users to access disparate sources of data through a series of tags and spatial queries. The Toolkit (marineenergy.app) builds upon prior U.S. Department of Energy (DOE) Water Power Technologies Office (WPTO) investments by pulling from WPTO-funded and outside resources to facilitate the permitting and licensing process, inform technology developers of required permits, and disseminate the latest knowledge of the environmental effects of these devices to regulators, developers, and marine energy innovators and stakeholders.

16 TIDAL AND WAVE POWER↗