Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Exploration Ground Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

NASA’s Space Launch System Progress Report

NASA’s Space Launch System (SLS) continues to achieve assembly and testing milestones on its way to the launch of the first human-rated spacecraft to the Moon since the Apollo Program. Major flight hardware for Artemis I (see Fig. 1), formerly known as Exploration Mission 1 (EM-1), is complete, including the liquid and solid main propulsion systems. The Artemis I core stage is fully assembled and engine integration and checkout is underway. Structural testing on the core stage engine and payload sections and intertank are complete. Liquid hydrogen tank structural testing is under way, and liquid oxygen tank structural testing will begin in fall 2019. Major structural components for the second and third flights are also in production; hardware has been fabricated for each element of the Artemis II vehicle. SLS and the Orion crew vehicle along with the Exploration Ground Systems (EGS) launch facilities at Kennedy Space Center are critical to the nation’s plans to return to the Moon to stay in a measured, sustainable fashion. Lunar exploration will expand our understanding of Earth’s formation, serve as a proving ground for technologies for pushing deeper into the solar system, and inspire a new generation. This paper will discuss details of 2018-2019 progress and the work ahead to ready SLS for launch.

Honeycutt, John

Quality Assurance Surveillance Tool Designed for SLS EM-1 Certificate of Flight Readiness

Exploration Mission-1 (EM-1) is an uncrewed mission that is launching on the Space Launch System (SLS) Block 1 vehicle. This is a critical flight test for the agency's human deep space exploration goals. Exploration Ground Systems (EGS) Quality (SA-F2) is responsible for providing Quality Assurance Surveillance Plans (QASPs) for NASA contracts and facilities. A QASP assures products and services are provided to EGS in accordance with the contract requirements. In order to encapsulate the multiple KSC Safety and Mission Assurance surveillance and audit activities that need to be accomplished specifically for EM-1 Certificate of Flight Reediness (CoFR), a QASP tool needed to be implemented. This tool would be able to intuitively track Work Authorization Documents (WADs) under development by Test Operations Support Contract (TOSC), reviewed and accepted WADs, Government Mandatory Inspection Points (GMIPs), Nonconformances (NCs), Material Review Board (MRB) Status, Corrective Actions, Alterations, Deviations, and Waivers for flight hardware and Ground Support Equipment (GSE). This would help ensure that all SLS EM-1 flight hardware and related GSE surveillances and requirements are being recognized and completed with zero constraints identified for the mission.

Morris, Patrick

Moon to Mars (M2M) Cross Program Utilization Payload Safety Process

It is the goal of Moon to Mars (M2M) to establish a single consolidated set of safety requirements and a safety review process for utilization payloads that will cross program vehicle hatches or operate externally on multiple program vehicles during transport or operation that satisfies Exploration Ground Systems (EGS), Orion, EVA, and Human Surface Mobility Program (EHP), Gateway (GW), and Human Landing System (HLS) programs. This document defines the Cross Program Utilization Payload (xPUP) safety review process for mission effectivity of Artemis III and beyond. This review process will help ensure protection of the overall Moon to Mars integrated system from potential hazards created by cross program payloads that either cross a program vehicle hatch or can interface with more than one M2M lunar exploration program vehicle. The process will identify payload hazards and controls that will protect ground personnel, flight crew, the integrated vehicle, ground equipment, or facilities. This process is also applicable to samples that cross hatches between vehicles including for return to Earth. The xPUP safety review process will be led by one of the M2M programs' integration safety panels, chosen on a per-payload basis. After the lead integration safety panel is determined, the common safety process is established, based on pre-determined criteria, which includes ad-hoc members from other stakeholder programs. Stakeholder programs are those that interface with the utilization payload in any way (e.g., operating on a lunar exploration vehicle or crossing program vehicle hatches). The xPUP will execute this safety review process for flight and ground utilization payload hardware design, its ground support equipment, and landing and recovery in accordance with the applicable safety requirements as specified in M2M-30043: Moon to Mars Cross Program Utilization Payload Safety Requirements. The xPUP safety process will follow the lead integration safety panel’s safety process requirements. Formal agreements will be communicated with the payload developer using the payload integration processes documented in M2M-30037, Artemis Payload Integration Implementation Plan.

payloads

NASA’s Space Launch System: Exploration Mission-1 Hardware Nears Completion

The Space Launch System (SLS) Program completed several significant production milestones in 2018 for the launch vehicle’s first mission (Fig. 1) and is poised for greater accomplishments in 2019. With manufacturing and hardware installation finished, Boeing completed the core stage forward join and shipped the liquid hydrogen tank structural test article to Marshall Space Flight Center for testing. The core stage aft join and LOX tank STA are expected to be completed in 2019 on the way to final stage integration. The four EM-1 engines are poised for stage integration in 2019. The Launch Vehicle Stage Adapter completed outfitting at Marshall and will be shipped to Kennedy Space Center in 2019. All solid rocket motor segments for the EM-1 boosters are cast, inspected and ready for shipment to KSC. The upper stage, the Interim Cryogenic Propulsion Stage (ICPS), and the Orion Stage Adapter (OSA), where 13 6U CubeSats will ride to deep space on EM-1, were completed and delivered to Exploration Ground Systems at KSC in 2017 and 2018, respectively. The Program continues to work toward first launch of the nation’s new super heavy lift deep space capability in fiscal 2020. SLS is designed, engineered and tested to launch the most challenging exploration missions, minimizing risk and providing the greatest opportunity for mission success. This paper will discuss the technical and programmatic successes and challenges of the past year and look ahead to plans for 2019.

Honeycutt, John

Payload Utilization in NASA's Space Launch System

A revitalized National Space Council has directed NASA to return to the moon, with a series of preparatory missions paving the way for eventual human exploration. NASA's new deep space exploration system -- the heavy-lift Space Launch System (SLS), the Orion crew spacecraft and revitalized launch facilities at Kennedy Space Center -- will enable NASA and its commercial and international partners to meet these goals for human deep space exploration. SLS will be the most capable launch vehicle for these efforts, with an initial Block 1 capability of at least 26 metric tons (t) to trans-lunar injection (TLI). A more powerful Block 1B, available in crew and cargo configurations, with have the power to loft more than 37 t to TLI; the ultimate Block 2 variant will lift more than 45 t to TLI. For payload utilization, the Block 1 vehicle will carry 13 6U CubeSats as secondary payloads while the Block 1B crew vehicle will provide as much volume as the space shuttle payload bay in a Universal Stage Adapter (USA). Block 1B cargo vehicles will offer 8.4 m fairings in 19.1 m and 27.4 m lengths, with enough volume to accommodate habitat modules and landers. For missions beyond the Earth-moon system, SLS offers greater characteristic energy (C3), enabling faster transit or heavier payloads to the outer planets. The first mission of SLS and Orion, launching no earlier than December 2019, will send Orion into lunar distant retrograde orbit (DRO) on an approximately 25-day shakedown cruise known as Exploration Mission-1 (EM-1), enabling NASA to verify and validate new systems before sending astronauts to deep space on the next exploration mission. The SLS program and its prime contractors have made significant progress toward first launch, with several major components of the vehicle completed and delivered to the Exploration Ground Systems (EGS) Program at Kennedy Space Center. Major forward work includes integrating tanks, engines and other major sections into the EM-1 core stage at Michoud Assembly Facility and then shipping the entire core stage assembly to Stennis Space Center. There, it will be installed in the refurbished B-2 test stand for a series of integrated stage tests culminating in a green run hotfire test. The Program's Spacecraft Payload Integration and Evolution (SPIE) Office, responsible for the in-space stage, adapters and payload interfaces, has largely completed its effort on the Block 1 vehicle and is supporting manufacture of the first Block 1B vehicle. This paper will provide an overview of the Block 1 vehicle, its expected capabilities, secondary payload accommodations and manufacturing status, including structural testing and the challenges of developing a new launch vehicle. A lookahead to the Block 1B vehicle and the payload utilization opportunities it will provide in the 2020s will also be discussed, including the unique capabilities of the vehicle.

Creech, Stephen D.

NASA's Space Launch System: Deep Space Access for CubeSats

NASA is embarking on a new generation of missions to the Moon, known as the Artemis program. The Agency’s new super heavy-lift launch vehicle, the Space Launch System (SLS), is a critical enabling capability for these efforts, which will serve as a proving ground for future crewed expeditions to Mars. SLS is designed to return astronauts to the Moon in the Orion spacecraft and to launch more mass and provide more volume for critical payloads than commercially available vehicles, giving NASA a unique asset for deep space exploration. When performance margin and volume is available, as it is on the first flight, Artemis I (previously Exploration Mission-1), SLS can offer CubeSats access to deep space, beyond Earth’s orbit. The Artemis I flight has 13 6U (14 kg) CubeSats manifested, and the Program is currently accepting proposals for 6U and 12U payloads for the Artemis II flight through the agency’s CubeSat Launch Initiative (CSLI) program. Proposals from U.S.-based payload developers to fly on Artemis II will be accepted through CSLI until November 4, 2019. When ridesharing on SLS deep space missions, CubeSats must demonstrate they will not interfere with primary mission objectives. The 13 Artemis I CubeSats that hail from industry, academia, NASA and its international partners represent an array of exciting deep space science investigations and technology demonstrations that may help inform future Artemis missions. The initial SLS Block 1 vehicle for the Artemis I flight is fully manufactured; several elements are complete and have been delivered to the Exploration Ground Systems (EGS) Program at Kennedy Space Center (KSC), which has responsibility for integrating and launching the SLS and Orion stack. Completed elements of the Artemis I vehicle include the Orion Stage Adapter (OSA), which houses the 13 Artemis I CubeSats. With the Artemis I flight hardware and software nearing completion, work is in progress for the second Block 1 launcher, designated for the crewed Artemis II flight. Hardware is being manufactured for every element of the Artemis II vehicle. In this paper, the author will review the status of the Artemis I vehicle and the payloads manifested for the initial flight. Information on the Secondary Payload Deployment System (SPDS) that the SLS Program provides to payload developers will also be included.

Creech, Stephen D.

NASA's Space Launch System Moves into Testing and Integration

NASA's Space Launch System (SLS) has moved from design and manufacturing into testing and integration for its first flight as early as December 2019. In 2017, the NASA/industry team completed manufacturing of all major structural elements for the launch vehicle for Exploration Mission-I (EM-1 ). That work included shipping the first major flight hardware element to the launch site. The team processed all four RS-25 engines for stage integration, cast all 10 booster flight motor segments, and manufactured all five major sections of the core stage. The program also completed major structural work on the B-2 test stand at Stennis Space Center, which will be used for the core stage "green run" test; delivered the core stage and engine simulators used for training; and much of the transportation equipment for the core stage. Engineers completed structural testing on the upper stage/payload section of the vehicle as well as the engine section test article. In 2018, the program will deliver the Orion Stage Adapter (OSA) to Exploration Ground Systems (EGS) at KSC and send the test articles for the core stage liquid hydrogen tank, liquid oxygen tank, and intertank to NASA's Marshall Space Flight center for structural testing. Additionally, workers will begin the challenging process of integrating the major sections of the 212-foot EM-1 core stage. This work is focused on the initial Block 1 variant of SLS, capable of launching more than 70 metric tons (t) to low Earth orbit (LEO). However, work concurrently is underway on the Block lB variant, which will enable 105 t to LEO and more than 37t to trans-lunar injection (TLI). Block lB will be the workhorse vehicle of NASA's lunar exploration plans. As the needs of the nation's deep space exploration program grow, SLS performance is designed to evolve to a payload mass of 130 t to LEO and up to 45t to TLI. The advantages of this mass - as well as volume- are critical to the entire exploration architecture for deep space exploration. They translate to greater capability, greater infrastructure and operational simplicity, less overall mission risk, and opportunities to accomplish unprecedented exploration and discovery. This paper will discuss SLS progress to date and planned future work.

Honeycutt, John

NASA’s Space Launch System: Progress Toward Launch

The Space Launch System (SLS), NASA’s cornerstone launch capability for a new generation of deep space exploration, has begun assembly at Kennedy Space Center (KSC) in preparation for launch in 2021. SLS will provide an unparalleled launch capability for human and robotic deep space exploration missions. Its proven propulsion system, upgrade path to more powerful vehicles, and high-volume payload fairings make it the foundation for ambitious and demanding as part of the Artemis program. Artemis is NASA’s 21st-century plan to put boots on the Moon and to perform sustainable, long-term science in deep space, with eyes toward sending explorers to Mars. The initial SLS vehicle to fly, Block 1 in the crew configuration – with the new Orion spacecraft – is scheduled to lift off from revitalized launch facilities at KSC in 2021 for an uncrewed test flight known as Artemis I. Manufacturing is complete on the vehicle and all elements have been delivered to the Exploration Ground Systems (EGS) Program, except the core stage. The program’s all-new development, the core stage is currently in the midst of a “Green Run” test campaign at Stennis Space Center (SSC). Eight progressively more challenging tests in the Green Run series will culminate in a hot-fire of four flight-proven liquid hydrogen/liquid oxygen (LH2/LOX) RS25 engines. Following the Green Run hotfiring, the core stage will ship to KSC. Already at KSC, aft sections of the fivesegment solid rocket boosters are being assembled. Previously delivered elements, including the upper stage, are undergoing final checkouts in preparation for stacking. An exciting 2021 will include such milestones as stacking SLS and Orion in KSC’s Vehicle Assembly Building (VAB), modal testing, roll out to Launch Pad 39B, Wet Dress Rehearsal (WDR), and launch. Teams across the country are preparing for launch by finalizing procedures, defining launch constraints and flight rules, training console operators, performing simulations, and more. With the SLS Block 1 vehicle for Artemis I nearing integration and launch, the second Block 1 vehicle in the crew configuration, which will carry astronauts on an Artemis II hybrid lunar flyby mission, has several elements manufactured. In fact, the solid rocket motor segments and RS-25 engines are complete. Those program elements are processing hardware for the third flight and working toward manufacturing the second SLS variant to fly, Block 1B, which will onramp a powerful new upper stage, the Exploration Upper Stage (EUS).

John Honeycutt

Payload Accommodations in NASA's Space Launch System, Block 1 and Beyond

As part of NASA's new deep space exploration system, the Space Launch System (SLS) will provide the United States with guaranteed access to deep space and an unparalleled capability for launching primary and co-manifested payloads beyond Earth's orbit. Planned missions for the new SLS family of vehicles include launching the Orion spacecraft and elements of the new Gateway astronaut-tended outpost to lunar orbit and sending robotic probes deep into the solar system, such as to Jupiter's moon Europa. If mission parameters allow, secondary payloads in 6U, 12U or larger sizes will also have rideshare opportunities, providing CubeSats with access to deep space. The SLS vehicle will evolve into progressively more powerful variants with fairings in several sizes available to meet an array of mission needs. Superior mass, volume and characteristic energy (C3) enable sending larger, heavier payloads to a variety of destinations. Several elements of the Block 1 vehicle for the first mission, Exploration Mission-1 (EM-1) are complete and have been delivered to the Exploration Ground Systems (EGS) Program at Kennedy Space Center (KSC), which has responsibility for integrating and launching the vehicle. Contractors are already at work manufacturing the second Block 1 vehicle and incorporating numerous lessons learned in manufacturing America's first super heavy-lift deep space rocket since the Apollo Program's Saturn V enabled humankind to take a giant leap forward.

Schorr, Andrew A.

NASA's Space Launch System Begins Integration, Stacking in Preparation for Artemis I Launch

The Artemis era of human lunar exploration is nearing take-off as NASA’s new super heavy-lift launch vehicle, the Space Launch System (SLS), begins stack-ing and integration operations in mid-2020 at Kennedy Space Center (KSC) in Florida. With a planned upgrade path to progressively more powerful vehicles and availability in crew and cargo configurations, SLS provides a unique and flexible launch solution to send crew, large-scale infrastructure and robotic probes to deep space. The SLS Block 1 vehicle, the initial variant to fly, is optimized for lunar missions with a proven propulsion system consisting of four liquid hydrogen (LH2)/liquid oxygen (LOX)-fed RS-25 engines and twin five-segment solid rocket boosters (SRBs). The Block 1 vehicle can also be outfitted with an industry-standard 5 m-class payload fairing (the “cargo” configuration) and will launch at least 27 metric tons (t) of mass to trans-lunar injection (TLI). SLS is the backbone of NASA’s Artemis program, which will return the agency’s human spaceflight program to the Moon for the first time since 1972. For the Artemis I mission, SLS will send an uncrewed Orion spacecraft to TLI, where it will enter a distant retrograde lunar orbit and fly 38,000 nmi past the Moon – farther than any spacecraft built for humans has ever traveled. The SLS Block 1 vehicle for Artemis I completed manufacturing in 2019. Several elements, including the upper stage, have been delivered to the Exploration Ground Systems (EGS) program at KSC and are being prepped for integration and stack-ing. The five-segment solid rocket boosters – the largest and most powerful ever built for flight – are also complete. The booster motor segments for the Artemis I flight are scheduled to ship from prime contractor Northrop Grumman’s Utah facilities and begin stacking and integration at KSC in June 2020. The SLS core stage is the largest rocket stage NASA has ever built in terms of volume and height, and includes the avionics and the tanks that feed cryogenic propellant to the four RS-25s (formerly Space Shuttle Main Engines [SSMEs]). They have been modified with an updated controller and nozzle insulation to protect them from the hotter launch environment. The SLS core stage is currently being test-ed at NASA’s Stennis Space Center (SSC) in a series of “green run” tests to verify it meets design and performance requirements. Following the green run test series, which is scheduled to culminate with a full-duration hot-fire of the four RS-25 engines, the core stage will ship to KSC and be stacked between the sol-id rocket boosters in the Vehicle Assembly Building (VAB). Integration of the vehicle will continue with the upper stage, known as the Interim Cryogenic Propulsion Stage (ICPS) and the Launch Vehicle Stage Adapter (LVSA) on the core stage. Another adapter, the Orion Stage Adapter (OSA), connects SLS to Orion and provides housing for 13 6U CubeSat payloads manifested on Artemis I. The CubeSats will be released in deep space after Orion separates from the vehicle, and the flight marks the first ride share opportunity for independent small-sats to deep space. The second major SLS variant to come online, Block 1B, replaces the single-engine ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS). This more powerful upper stage, along with other vehicle up-grades, will enable the Block 1B vehicle to launch 38-42 t to TLI, depending on crew or cargo configuration. The final evolution of the vehicle, Block 2, will onramp evolved solid rocket boosters to increase mass to TLI to 43-46 t, de-pending on crew or cargo configuration. The Block 1B/Block 2 vehicles can be outfitted with an 8.4 m-diameter payload fairing in 19.1 m or 27.4 m lengths, to provide unprecedented volume for payloads. With the initial Block 1 vehicle completely manufactured and the core stage in final testing before shipping to KSC, the SLS Program and its industry partners have made significant progress manufacturing subsequent vehicles. For the second Block 1 vehicle, the solid rocket motor segments are complete, as are the RS-25 engines with controllers. All five major components of the Artemis II core stage – the forward skirt, LOX and LH2 tanks, intertank and engine section – are manufactured and technicians are installing subsystems at NASA’s rocket factory, Michoud Assembly Facility. The RL-10 engine for the Artemis II ICPS is complete and panels have been machined for its LH2 tank. In addition, panels are machined for the vehicle’s two adapters, with welding scheduled to begin in summer 2020. Flight hard-ware is also in production for the third SLS vehicle, with several booster motor segments cast. The pace of development on the EUS has increased, with the goal to complete Critical Design Review (CDR) in December 2020. Several EUS test rings have been machined at Michoud. The EUS is designed to exe-cute a variety of missions – human spaceflight, deployment of deep-space infra-structure, or high-C3 missions to the outer solar system – with crew and cargo configurations available beginning in the mid-2020s. The near-term goal for the nation’s powerful new space exploration asset, however, is to launch the Arte-mis program, and send the first woman and the next man to the lunar surface. At the Astrodynamics Specialist Conference, the SLS program will update the community on the progress of the initial Block 1 vehicle in final green run test-ing, integration and stacking. In addition, this paper will provide an update to the community on the manufacturing status of subsequent Block 1 and Block 1B vehicles.

Steve Creech

Feasibility Study of SDAS Instrumentation's Ability to Identify Mobile Launcher (ML)/Crawler-Transporter (CT) Modes During Rollout Operations

The Space Launch System (SLS) and its Mobile Launcher (ML) will be transported to the launch pad via the Crawler-Transporter (CT) system. Rollout (i.e., transportation) loads produce structural loads on the integrated SLS/Orion Multi-Purpose Crew Vehicle (MPCV) launch vehicle which are of a concern with respect to fatigue. As part of the risk reduction process and in addition to the modal building block test approach that has been adopted by the SLS Program, acceleration data will be obtained during rollout for use in modal parameter estimation. There are several occurrences where the ML/CT will be transported either into the Vertical Assembly Building (VAB) or to the launch pad and back without the SLS stack as part of the Kennedy Space Center (KSC) Exploration Ground Systems (EGS) Integrated Test and Checkout (ITCO). NASA KSC EGS has instrumentation installed on both the ML and CT to record data during rollout, at the launch pad, and during liftoff. The EGS instrumentation on the ML, which includes accelerometers, is referred to as the Sensor Data Acquisition System (SDAS). The EGS instrumentation on the CT, which also includes accelerometers, is referred to as the CT Data Acquisition System (CTDAS). The forces and accelerations applied to the ML and CT during a rollout event will be higher than any of the planned building block modal tests. This can be very beneficial in helping identify nonlinear behavior in the structure. Developing modal parameters from the same test hardware in multiple boundary conditions and under multiple levels of excitation is a key step in developing a well correlated FEM. The purpose of this study was three fold. First, determine the target modes of the ML/CT in its rollout configuration. Second, determine if the test degrees of freedom (DOF) corresponding to the layout of the SDAS/CTDAS accelerometers (i.e. position and orientation) is sufficient to identify the target modes. Third, determine if the Generic Rollout Forcing Functions (GRFF's) is sufficient for identifying the ML/CT target modes accounting for variations in CT speed, modal damping, and sensor/ambient background noise levels. The finding from the first part of this study identified 28 target modes of the ML/CT rollout configuration based upon Modal Effective Mass Fractions (MEFF) and engineering judgement. The finding from the second part of this study showed that the SDAS/CTDAS accelerometers (i.e. position and orientation) are able to identify a sufficient number of the target modes to support model correlation of the ML/CT FEM. The finding from the third part of this study confirms the GRFFs sufficiently excite the ML/CT such that varying quantities of the defined target modes should be able to be extracted when utilizing an Experimental Modal Analysis (EMA) Multi-Input Multi-Output (MIMO) analysis approach. An EMA analysis approach was used because Operational Modal Analysis (OMA) tools were not available and the GRFFs were sufficiently uncorrelated. Two key findings from this third part of the study are that the CT speed does not show a significant impact on the ability to extract the modal parameters and that keeping the ambient background noise observed at each accelerometer location at or below 30 µgrms is essential to the success of this approach.

Winkel, James P.

Operational Modal Analysis of the Artemis I Dynamic Rollout Test and Wet Dress Rehearsal

NASA has developed an expendable heavy lift launch vehicle capability, the Space Launch System (SLS), to support lunar and deep space exploration. The uncrewed Artemis I was the first flight of this new launch vehicle and tested critical systems for the upcoming crewed Artemis II flight to the moon. Accelerations were recorded at a multitude of locations on Artemis, the Mobile Launcher (ML), and the Crawler Transporter (CT)during the rollout of Artemis I from the Vehicle Assembly Building (VAB) to Launch Pad 39B March 2022 and is referred to as the Artemis I Dynamic Rollout Test (DRT). While Artemis I was at Launch Pad 39B, the Wet Dress Rehearsal (WDR) was performed to demonstrate launch readiness and acceleration measurements were also recorded. Finally, Artemis I rolled back from Launch Pad 39B to the VAB in April 2022, where acceleration measurements were also recorded and is referred to as the rollback portion of DRT. Because the forces during rollout and at the launch pad acting on Artemis I, the ML, and the CT are not directly measurable, Operational Modal Analysis (OMA) techniques, instead of traditional Experimental Modal Analysis (EMA) techniques, were used to identify modal characteristics. The OMA analysis of DRT and WDR directly builds upon the lessons learned from the OMA analysis of an earlier rollout of the ML from the VAB. DRT and WDR dynamic characteristics will be used to support SLS Integrated Modal Test finite element model correlation efforts and Exploration Ground System ML and CT finite element model verification and validation, which are part of the Building Block approach the Space Launch System program has implemented. The dynamic characteristics extracted from DRT as well as the rollout acceleration time histories themselves will be used in the development of generic rollout forcing functions that will provide refined estimates of the Artemis IV rollout forces, which will have the heavier and larger SLS Block 1B launch vehicle and Mobile Launcher 2 (ML-2). This paper briefly describes Artemis I, the ML, and the CT physical characteristics, DRT rollout/rollback and WDR data collection, the challenges in implementing OMA techniques due in part to the CT harmonics, and how these challenges were overcome to obtain the Artemis I DRT configuration and WDR configuration modal characteristics.

Apollo

Operational Modal Analysis of the Artemis I Dynamic Rollout Test and Wet Dress Rehearsal

NASA has developed an expendable heavy lift launch vehicle capability, the Space Launch System (SLS), to support lunar and deep space exploration. The uncrewed Artemis I was the first flight of this new launch vehicle and tested critical systems for the upcoming crewed Artemis II flight to the moon. Accelerations were recorded at a multitude of locations on Artemis, the Mobile Launcher (ML), and the Crawler Transporter (CT)during the rollout of Artemis I from the Vehicle Assembly Building (VAB) to Launch Pad 39B March 2022 and is referred to as the Artemis I Dynamic Rollout Test (DRT). While Artemis I was at Launch Pad 39B, the Wet Dress Rehearsal (WDR) was performed to demonstrate launch readiness and acceleration measurements were also recorded. Finally, Artemis I rolled back from Launch Pad 39B to the VAB in April 2022, where acceleration measurements were also recorded and is referred to as the rollback portion of DRT. Because the forces during rollout and at the launch pad acting on Artemis I, the ML, and the CT are not directly measurable, Operational Modal Analysis (OMA) techniques, instead of traditional Experimental Modal Analysis (EMA) techniques, were used to identify modal characteristics. The OMA analysis of DRT and WDR directly builds upon the lessons learned from the OMA analysis of an earlier rollout of the ML from the VAB. DRT and WDR dynamic characteristics will be used to support SLS Integrated Modal Test finite element model correlation efforts and Exploration Ground System ML and CT finite element model verification and validation, which are part of the Building Block approach the Space Launch System program has implemented. The dynamic characteristics extracted from DRT as well as the rollout acceleration time histories themselves will be used in the development of generic rollout forcing functions that will provide refined estimates of the Artemis IV rollout forces, which will have the heavier and larger SLS Block 1B launch vehicle and Mobile Launcher 2 (ML-2). This paper briefly describes Artemis I, the ML, and the CT physical characteristics, DRT rollout/rollback and WDR data collection, the challenges in implementing OMA techniques due in part to the CT harmonics, and how these challenges were overcome to obtain the Artemis I DRT configuration and WDR configuration modal characteristics.

Apollo

Learning Reverse Engineering and Simulation with Design Visualization

The Design Visualization (DV) group supports work at the Kennedy Space Center by utilizing metrology data with Computer-Aided Design (CAD) models and simulations to provide accurate visual representations that aid in decision-making. The capability to measure and simulate objects in real time helps to predict and avoid potential problems before they become expensive in addition to facilitating the planning of operations. I had the opportunity to work on existing and new models and simulations in support of DV and NASA’s Exploration Ground Systems (EGS).

Hemsworth, Paul J.

CAIDA CUI Confirmation for OMRS & LCC SOCRRATES Emulator and iSEE Upgrade, Operations, & Analysis

This internship has focused on providing solutions for the Customer Avionics Interface Development and Analysis (CAIDA) subsystem. The main emulator that has been used during this internship is the Software-Only CEV (Crew Exploration Vehicle) Risk Reduction Analysis and Test Engineering Simulator (SOCRRATES). This emulator uses advanced math and physics methods to simulate specific points in a mission, such as ascent, entry, and orbit. Exploration Ground Systems (EGS) must ensure that all KSC based ground systems can be properly integrated with the flight vehicle software, therefore, the Modeling and Simulation Branch (NE-XM) of the KSC (Kennedy Space Center) Engineering Directorate supports a virtual environment that simulates the interface between ground systems and the flight vehicle. A primary component in assuring that is knowing whether the emulators have incorporated the correct CUIs (Compact Unique Identifiers) into their system, as well as understanding both the static and dynamic responses of the individual CUIs. Also, an effort for verification of Operational Maintenance Requirements Specifications (OMRS) and Launch Commit Criteria (LCC) that are supported by SOCRRATES for the Orion Crew Module were part of the project tasks this semester. This internship also focused on comparing two different simulation Commercial-off-the-shelf (COTS) products and to determine whether or not a COTS package was a viable replacement for the current software that the iSEE (Immersive Simulations and Engineering Environment) lab uses. Upon research and testing, I found that this software was not feasible for the lab. It could not easily load CAD (Computer-Aided Design) or CREO models, give live feedback while the user is in the environment, and was not compatible with a virtual reality headset, all of which are necessary for the lab.

Bundy, Caleb

Evolution of KSC EGS Post Space Shuttle - Success Factors and Lessons Learned

The Human Exploration and Operations Mission Directorate (HEOMD) Knowledge Capture & Transfer (KCT) team conducted video interviews with element managers in the Exploration Ground Systems (EGS) Program Office at Kennedy Space Center (KSC). The immediate goal was to capture a point-in-time profile of challenges, solutions, and lessons learned derived from EGS element development activity from the end of the Space Shuttle Program (SSP) to the present time.

Johnson, Patrick

NASA’s EGS Program Technology Demonstrations and Risk Reduction for Sustainable Surface Operations

This paper discusses NASA’s Exploration Ground Systems (EGS) Program Technology Infusion Strategy and the results from EGS technology demonstration projects, including Integrated Health Management capabilities for Condition Based and Predictive Maintenance, conservation of cryogenic fluids, and logistics management/commonality of maintenance equipment, tools, and consumables. The paper also discusses how technologies and capabilities implemented for ground systems (i.e. automated/autonomous operations and maintenance) can be leveraged to help reduce risk for sustainable lunar surface operations.

Launch Processing