Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Environmental policy.”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

National Environmental Policy Act Hazards Assessment for the TREAT Alternative

This document provides an assessment of hazards as required by the National Environmental Policy Act for the alternative of restarting the reactor at the Transient Reactor Test (TREAT) facility by the Resumption of Transient Testing Program. Potential hazards have been identified and screening level calculations have been conducted to provide estimates of unmitigated dose consequences that could be incurred through this alternative. Consequences considered include those related to use of the TREAT Reactor, experiment assembly handling, and combined events involving both the reactor and experiments. In addition, potential safety structures, systems, and components for processes associated with operating TREAT and onsite handling of nuclear fuels and experiments are listed. If this alternative is selected, a safety basis will be prepared in accordance with 10 CFR 830, “Nuclear Safety Management,” Subpart B, “Safety Basis Requirements.”

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

National Environmental Policy Act Hazards Assessment for the TREAT Alternative

This document provides an assessment of hazards as required by the National Environmental Policy Act for the alternative of restarting the reactor at the Transient Reactor Test (TREAT) facility by the Resumption of Transient Testing Program. Potential hazards have been identified and screening level calculations have been conducted to provide estimates of unmitigated dose consequences that could be incurred through this alternative. Consequences considered include those related to use of the TREAT Reactor, experiment assembly handling, and combined events involving both the reactor and experiments. In addition, potential safety structures, systems, and components for processes associated with operating TREAT and onsite handling of nuclear fuels and experiments are listed. If this alternative is selected, a safety basis will be prepared in accordance with 10 CFR 830, “Nuclear Safety Management,” Subpart B, “Safety Basis Requirements.”

99 GENERAL AND MISCELLANEOUS↗

Chemical and Cement Components 2021 Inventory Estimates for Additional Panels National Environmental Policy Act Analysis

This standard analysis report provides the estimates for the chemical (oxyanions and complexing agents) and cement components with a data collection cut-off date of December 31, 2021. These estimates will be included in a response to an inventory data request developed for the U.S. Department of Energy (DOE) performance assessment (PA) for the National Environmental Policy Act (NEPA) analysis on additional panels for the Waste Isolation Pilot Plant (WIPP).

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Effectiveness of environmental policies at OAO Koks

OAO Koks has introduced a comprehensive program for more stable plant operation and reduced environmental impact in the period 2004 2010. Methods of group relining of the coking-furnace chambers and hot repair of coke furnaces with complete relining of the heating walls have been adopted. Water-protection measures include the construction of an additional water-circulation cycle for the chemical shops, completion of the first stage of wastewater treatment, and reconstruction of the biochemical processing system for phenolic and oily water. A mobile environmental station has been acquired for air-quality monitoring.

01 COAL, LIGNITE, AND PEAT↗

Geothermal Induced Seismicity National Environmental Policy Act Review

In 2016, the U.S. Bureau of Land Management (BLM) contracted with the National Renewable Energy Laboratory (NREL) to assist the BLM in developing and building upon tools to better understand and evaluate induced seismicity caused by geothermal projects. This review of NEPA documents for four geothermal injection or EGS projects reveals the variety of approaches to analyzing and mitigating induced seismicity. With the exception of the Geysers, where induced seismicity has been observed and monitored for an extended period of time due to large volumes of water being piped in to recharge the hydrothermal reservoir, induced seismicity caused by geothermal projects is a relative new area of study. As this review highlights, determining the level of mitigation required for induced seismic events has varied based on project location, when the review took place, whether the project utilized the International Energy Agency or DOE IS protocols, and the federal agency conducting the review. While the NEPA reviews were relatively consistent for seismic monitoring and historical evaluation of seismic events near the project location, the requirements for public outreach and mitigation for induced seismic events once stimulation has begun varied considerably between the four projects. Not all of the projects were required to notify specific community groups or local government entities before beginning the project, and only one of the reviews specifically stated the project proponent would hold meetings with the public to answer questions or address concerns.

15 GEOTHERMAL ENERGY↗

Integrated capacity planning for electricity generation: A fuzzy environmental policy analysis approach

This study proposes an integrated model for capacity planning in electricity generation. It utilizes a multiple-criteria linear programming to incorporate cost and environmental objectives into the planning. To treat the uncertainties embedded in definition of model parameters, the concept of decision-maker degree of optimism will be used. Optimization of the model provides different planning scenarios. To determine the best compromise plan, a post-optimization assessment based on fuzzy set theory concepts is developed. The proposed methodology is employed for a medium-term capacity planning in Canada's electricity generation sector. The results approve a major capacity growth for natural gas facilities accompanied by retirement of most coal-burning facilities.

20 FOSSIL-FUELED POWER PLANTS↗

Building Envelope Characteristics in Cold Climates

Prescriptive guidelines for thermal insulation in the design of buildings in cold climates have traditionally been derived by a holistic consideration of climatic factors, energy policy, environmental policy, and economics. The differences in thermal barrier requirements in buildings across the arctic and subarctic regions of the world are influenced as much by the differing priorities of the governing bodies that set these requirements as by actual physical demands and conditions. Usually, national requirements for building envelope characteristics such as thermal insulation values, building envelope airtightness, vapor permeability, building mass, and detailing are based on economics, durability, and environmental considerations. Consideration of thermal energy system resilience provides a new paradigm through which to view the optimization of these parameters. The paper describes specifics of construction in cold climates; summarizes best practice requirements for the building envelope characteristics for buildings located in cold and arctic climate of the United States, Canada, and Scandinavian countries; provides some details illustrating how to implement these requirements; and compares the effects of different levels of building envelope efficiency and building mass on indoor air temperature decay when heat supply is interrupted. The paper also presents results from experts' discussions during the consultation forum "Thermal Energy Systems Resilience in Cold/Arctic Climates" (ERDC 2020) and research conducted under the IEA EBC Annex 73, the Environmental Security Technology Certification Program (ESTCP) Project "Technologies Integration to Achieve Resilient, Low-Energy Military Installations," and U.S. Army Program project 633734T1500 under Military Engineering Technology Demonstration. The paper complements the Cold-Climate Design Guide (ASHRAE 2015) with a focus on the resilience of thermal energy systems.

Arctic↗

Reliability and Decarbonization Resource Adequacy and Resilience

The Electric Power Transformation: 2023 MEGA Symposium has a focus on the transition of the energy generation industry to cleaner and climate resilient electric power that can remain cost-effective and reliable. Electric power energy issues abound as the world and the industry address environmental policy challenges—climate change, air quality, waste and water policy, environmental justice, and Environmental Social Governance —and various technology issues related to energy production and delivery, including the latest cutting-edge options. This presentation discusses reliability and decarbonization of the power sector with a focus on resource adequacy and resilience.

Balash, Peter↗

Calendar Year 2013 Annual Site Environmental Report for Sandia National Laboratories, Albuquerque, New Mexico

Sandia National Laboratories, New Mexico is a government-owned/contractor-operated facility. Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, manages and operates the laboratory for the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA). The DOE/NNSA, Sandia Field Office administers the contract and oversees contractor operations at the site. This annual report summarizes data and the compliance status of Sandia Corporation’s sustainability, environmental protection, and monitoring programs through December 31, 2013. Major environmental programs include air quality, water quality, groundwater protection, terrestrial surveillance, waste management, pollution prevention, environmental restoration, oil and chemical spill prevention, and implementation of the National Environmental Policy Act. Environmental monitoring and surveillance programs are required by DOE Order 231.1B, Environment, Safety, and Health Reporting (DOE 2012).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Effects Assessment for Proposed Offshore Wind Farm off the Coast of Grays Harbor, Washington

Grays Harbor Wind LLC (GHW) is proposing to develop a floating offshore wind farm offshore of west Grays Harbor County, Washington (Grays Harbor). The proposed GHW Offshore Wind Project (Project) would entail construction, installation and operation of a 1,000-megawatt (MW) offshore wind farm consisting of approximately 75 floating units, each containing a floating foundation and wind turbine generator (WTG). The Project location is approximately 25 miles (21.7 nautical miles [nmi]) offshore west of Grays Harbor, at waters depths of 360 to 700 feet. The Pacific Northwest National Laboratory (PNNL) was contracted by Herrera Environmental Consultants, Inc. on behalf of GHW to carry out this preliminary scoping study to evaluate baseline conditions and potential effects on fish and marine mammals from development and operation of a floating offshore wind farm installed within a designated area off the coast of Washington1. Floating offshore wind units installed in an ocean environment as part of the Project would interact with marine wildlife. This Study report provides an initial data aggregation and analysis, using publicly available data, of the Project effects, both negative and positive, on the marine environment. The scope of this assessment is limited by the fact that the Project development is presently at the conceptual level. Data on marine organisms were aggregated and evaluated; however seabirds were evaluated by Herrera Environmental Consulting and, along with bats, were not included in the scope of this study. Significant additional work is necessary to characterize ocean, seafloor, and environmental conditions; select appropriate floating offshore wind technologies; identify construction methods and locations; and assess facility locations, including electrical interconnection. Data aggregation and analysis of seabirds and bats is also needed. Evaluation of the full range of potential environmental effects would be conducted following an award of a lease from the Bureau of Ocean Energy Management (BOEM) as part of the leasing, National Environmental Policy Act (NEPA)/State Environmental Policy Act (SEPA) environmental review and permitting processes. While this initial data aggregation and analysis uses best available public scientific information and current assumptions about the Project configuration, the effects discussed herein are based on the status of review to-date and may change as Project-specific details are developed.

17 WIND ENERGY↗

Impact assessment and policy learning in the European Commission

Governance for sustainable development requires policy coherence and Environmental Policy Integration, which are being hindered by difficulties coordinating the two separate impact assessment processes being conducted in the European Commission. One of them, the Commission-wide Impact Assessment process, looks primarily at EU-internal impacts, whereas the other one, Sustainability Impact Assessment (SIA) in DG Trade, looks outward to other countries and intergovernmental organizations. Ideally, the two processes should complement one another, especially as the two are set to continue being done in parallel. The paper uses a case study of the reform of the European sugar regime under a World Trade Organization ruling to demonstrate how the two impact assessment processes could better complement one another. Feedback from the experience had with existing trade agreements could then promote policy learning and inform the negotiations on new agreements. The number of new bilateral and Regional Trade Agreements is expected to continue rising, thus increasing the importance of the Commission-wide Impact Assessment process required for them.

54 ENVIRONMENTAL SCIENCES↗

Affordable Development and Qualification Strategy for Nuclear Thermal Propulsion

Nuclear Thermal Propulsion (NTP) is a concept which uses a nuclear reactor to heat a propellant to high temperatures without combustion and can achieve significantly greater specific impulse than chemical engines. NTP has been considered many times for human and cargo missions beyond low earth orbit. A lot of development and technical maturation of NTP components took place during the Rover/NERVA program of the 60's and early 70's. Other NTP programs and studies followed attempting to further mature the NTP concept and identify a champion customer willing to devote the funds and support the development schedule to a demonstration mission. Budgetary constraints require the use of an affordable development and qualification strategy that takes into account all the previous work performed on NTP to construct an existing database, and include lessons learned and past guidelines followed. Current guidelines and standards NASA uses for human rating chemical rocket engines is referenced. The long lead items for NTP development involve the fuel elements of the reactor and ground testing the engine system, subsystem, and components. Other considerations which greatly impact the development plans includes the National Space Policy, National Environmental Policy Act, Presidential Directive/National Security Council Memorandum #25 (Scientific or Technological Experiments with Possible Large-Scale Adverse Environmental Effects and Launch of Nuclear Systems into Space), and Safeguards and Security. Ground testing will utilize non-nuclear test capabilities to help down select components and subsystems before testing in a nuclear environment to save time and cost. Existing test facilities with minor modifications will be considered to the maximum extent practical. New facilities will be designed to meet minimum requirements. Engine and test facility requirements are based on the driving mission requirements with added factors of safety for better assurance and reliability. Emphasis will be placed on small engines, since the smaller the NTP engine, the easier it is to transport, assemble/disassemble, and filter the exhaust during tests. A new ground test concept using underground bore holes (modeled after the underground nuclear test program) to filter the NTP engine exhaust is being considered. The NTP engine system design, development, test, and evaluation plan includes many engine components and subsystems, which are very similar to those used in chemical engines, and can be developed in conjunction with them Other less mature NTP engine components and subsystems (e.g., reactor) will be thoroughly analyzed and tested to acceptable levels recommended by the referenced standards and guidelines. The affordable development strategy also considers a prototype flight test, as a final step in the development process. Preliminary development schedule estimates show that an aggressive development schedule (without much margin) will be required to be flight ready for a 2033 human mission to Mars.

Gerrish, Harold P., Jr.↗