NLR Engage™: A Calliope Web Environment for Collaborative Energy Systems Modeling and Planning [SWR-20-16]

NLR Engage™ is a free, open-access energy system planning tool that allows multiple users/stakeholders to develop and collaborate on capacity expansion models. The tool, developed at the National Laboratory of the Rockies (NLR), provides a collaborative and easy-to-use interface built on Calliope, a multi-scale energy systems modeling framework. Visit the NLR hosted webtool at https://engage.nlr.gov/en/login/?next=/en/

Harris, Tom↗

Southcentral/Upper-West Combined Heat and Power Technical Assistance Partnership

This Final Technical Report describes the successful completion of all project tasks under award DE-EE0008272, plus three additional deliverables, all completed within the original budget. Our objective was to position CHP as a key driver of American competitiveness, the strategic use of domestic energy resources, and enhanced energy resilience. This vision was pursued through sustained collaboration with a broad range of public and private stakeholders, including manufacturers, commercial and institutional facilities, state and federal agencies, and associations of end-users, among others.

03 NATURAL GAS↗

Engaging the Regulatory Community to Aid Environmental Consenting/Permitting Processes for Marine Renewable Energy

Regulators involved in consenting/permitting marine renewable energy (MRE) have faced multiple challenges due to relatively new, unfamiliar technologies and uncertainty surrounding potential environmental impacts. This has resulted in slow progress for the MRE industry, including long consenting timeframes and extensive and expensive monitoring requirements, which increase financial risk for investors. OES-Environmental has surveyed regulators internationally to understand their key knowledge gaps and perspectives to support the development of the MRE industry. From the results of these surveys a data transferability process and a risk retirement pathway have been developed to assess consenting and monitoring requirements in proportion to risk. A tool for discovering existing data sets by using an online matrix has been developed, along with training materials, regulatory guidance documents, and a strategic outreach plan to engage regulators and advisers. his engagement and the application of these products should lead to a better understanding of the environmental effects of marine energy, and more efficient consenting processes.

16 TIDAL AND WAVE POWER↗

Strategies and Good Practices to Support Robust Stakeholder Engagement in Multi-Sector Energy Transition Planning

This document discusses strategies and good practices to facilitate diverse stakeholder engagement and inclusive decision-making within the context of complex energy system modernization studies and multi-sector energy transition planning, drawing upon the knowledge and expertise of numerous USAID, NREL, and other DOE laboratory practitioners with international and domestic energy planning experience. Examples of multi-sector energy transition analyses from the United States are included in this document to draw out relevant lessons learned and experience for the USAID-NREL Partnership - strategies and good practices will be updated over time as new insights emerge through collaboration with international partners and stakeholders. Considerations included within this document can also be used to support stakeholder engagement at the sector level (e.g., for power, transport, buildings), in addition to integrated approaches.

ENERGY PLANNING, POLICY, AND ECONOMY↗

CICE Consortium Progress Report, June 2018 - December 2019

The CICE Consortium accomplished a number of major upgrades to our sea ice model code, scripts and testing infrastructure, while strengthening our visibility in the international modeling community. We released CICE versions 6.0.0, 6.0.1, 6.0.2 and 6.1.0, all of which include updated releases of Icepack. Major new capabilities include a floe size distribution, new coupling infrastructure, improvements to all of CICE’s dynamics options, a new atmospheric data set for historical simulations, overhauled documentation, and more robust and flexible scripts for running and testing the code. Several key testing processes were automated this year. In addition, the team is actively engaged in planning our first user workshop and tutorial in February 2020. In addition to overseeing modifications to the Consortium’s resources and code releases, management tasks included meeting with and updating the Consortium’s Sponsors group in October 2018, prioritizing tasks by mapping them onto potential release targets, and rescuing early CICE releases (version 1 through 3.14) from a disappearing LANL archive.

54 ENVIRONMENTAL SCIENCES↗

RSVP - Flu Like Illness and Respiratory Syndromes COVID-19 Syndromic Reporting Tool Prototype

Individuals infected with SARS-CoV-2, the virus that causes COVID-19, may be infectious between 1-3 days prior to symptom onset. People may delay seeking medical care after symptom development due to multiple determinants of health seeking behavior like availability of testing, accessibility of providers, and ability to pay. Therefore, understanding symptoms in the general public is important to better predict and inform resource management plans and engage in reopening. As the influenza season looms, the ability to differentiate between clinical presentation of COVID-19 and seasonal influenza will also be important to health providers and public health response efforts. This project has developed an algorithm that when used with captured syndromic trends can help provide both differentiation to various influenza-like illnesses (ILI) as well as provide public health decision makers a better understanding regarding spatial and temporal trends. This effort has also developed a web-based tool to allow for the capturing of generalized syndromic trends and provide both spatial and temporal outputs on these trends. This page left blank

59 BASIC BIOLOGICAL SCIENCES↗

Waste Management Project Success - Regulatory Assurance Systems - 20118

Waste management (WM) and remediation projects are essential within a restorative environmental culture. Despite years of experience, challenges and obstacles associated with efficient and effective WM project execution remain. Although some obstacles are project specific, a common challenge is navigating the regulatory landscape from planning through execution, particularly with first of a kind (FOAK) and first in a while (FIAW) projects. The absence of a comprehensive regulatory assurance strategy places significant hurdles in the path of project success. To clear a path for the successful execution of increasingly complex WM projects, this paper focuses on development of a comprehensive regulatory assurance strategy and implementation plan that effectively engages stakeholders, agencies, and performers to produce project plans that fully and cost effectively integrate applicable regulatory requirements. The most reliable way to align regulatory processes and decisions needed for mission success is through a regulatory assurance system. This system establishes a healthy interface with regulatory decision makers, to work in a collaborative manner, to create a common vision for regulatory decisions on an agreed upon schedule. A regulatory assurance system consists of several elements. Although the mission may vary from cleanup to site closure to nuclear component production, the elements of a regulatory assurance system remain essentially constant and must include: 1) identifying a common vision or end state, 2) developing a long-term, integrated strategy and schedule, 3) establishing a regulatory partnering team consisting of key decision-makers, 4) regular and frequent communication with decision-makers, 5) ensuring consistent surveillance for early identification of issues and changes that may impact the project, 6) quick resolution of emerging issues to prevent schedule impact, 7) identifying core compliance functions, 8) periodically assessing progress of the project as it relates to regulatory assurance and, 9) providing constructive feedback to improve the process. A regulatory assurance system provides a living, multi-faceted approach to planning, visioning, communicating and tracking to avoid surprises and ensure smooth and timely progress to the project. The overall success measures will be whether the system produces common sense regulatory decisions supporting the vision on time without appeal. Effective regulatory frameworks rarely happen on their own. Balanced, common-sense regulatory decisions stem from teams that are trained to work together to achieve shared goals. In this paper, particular attention is placed on the importance of starting with a shared vision for a regulatory assurance and execution strategy that leverages experience to establish optimal approaches. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving Transparency in Electric Distribution System Planning to Support Affordability [Slides]

This resource identifies opportunities for communities to participate in the distribution system planning process to achieve their energy goals, including affordability. It begins with background information on the distribution system and distribution system planning, and then focuses on topical areas where communities could focus their engagement (e.g., non-wires alternatives, DER forecast, scenario analysis). The report concludes with illustrative examples of how communities have engaged in distribution system planning. The appendix provides procedural guidance on engagement in utility planning processes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

What to expect when you're expecting engagement: Delivering procedural justice in large-scale solar energy deployment

Community engagement in the planning process to build large-scale solar (LSS) projects can win local support and advance procedural justice. However, an understanding of community engagement in current LSS development is lacking. Using responses from a U.S. nationwide survey (n = 979) of residential neighbors living within 3 miles (4.8 km) of completed LSS projects (i.e. “solar neighbors”) and project details from the U.S. Large-Scale Solar Photovoltaic Database (USPVDB), this study seeks to answer the following questions: How are solar neighbors' perceptions of community engagement associated with their attitudes toward their LSS projects? How do solar neighbors' perceptions of community engagement compare to their expectations? And, how do neighbors explain what they perceived about the planning process? We answer these questions using mixed methods, including regression modeling, a new gap analysis technique, and qualitative coding. We find that higher perceived engagement is associated with more positive attitudes toward the project, even when controlling for respondents who acted in opposition. Supporters and opponents alike expect more engagement than they perceived and information about projects both before construction and after operation is lacking. Awareness and engagement expectations increase at certain project size and proximity thresholds. However, most neighbors expect the public to offer input during engagement, but not make decisions. We contextualize these findings with explanatory comments from respondents.

14 SOLAR ENERGY↗

Advanced Guide to Understanding Power System Model Results for Long-Term Resource Plans

This guide is for public utility commission staff, state energy office staff, and other stakeholders who review model results for utility integrated resource plans (IRPs). It builds on the "Beginner's Guide to Understanding Power System Model Results for Long-Term Resource Plans," and delves into more advanced topics that were not included or not fully covered in the beginner's guide. The topics included here are evolving and may or may not be important to the resource plan you are evaluating. Due to limitations in resources, it's also not possible to give the highest level of detail or attention to every topic within a plan. An important part of planning for an uncertain future involves deciding which topics deserve the most focus and resources. It's all about prioritizing efforts where they will have the most impact or be most beneficial despite uncertainties ahead. As with the beginner's guide, we intend for this guide to help improve decision-making in the electricity planning process by strengthening understanding and dialogue between electricity system planners and relevant stakeholders. The following information is designed to allow you to better engage in the planning process by evaluating results, asking questions, and thinking through what is most important. We allocate significant discussion in the guide to electricity demand evolution, demand-side resources, and resource adequacy. These topics have garnered increasing attention, hence their prominence in this guide. Other topics are also presented, but their incorporation into the planning process might vary based on interest and relevance. The absence of certain topics doesn't diminish their importance; rather, it reflects the reality that in planning, trade-offs necessitate prioritizing certain aspects over others.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

State Strategies for Valuing Distributed Energy Resources in Cost-Effective Locations

The deployment of Distributed Energy Resources (DERs), small-scale electricity generation sources or controllable loads connected to the distribution system or a facility served by the distribution system, can have wide-ranging and positive impacts for the electricity grid. Interconnecting a DER in a high-value location on the grid can unlock benefits beyond those that accrue to the off-taker or asset owner. When DERs are deployed optimally, not only can the individual consumer benefit, but the local utility, the electricity system, and other ratepayers can benefit as well. By engaging in locational DER planning, states can help protect their communities and ratepayers and can help ensure the reliability and resilience of the electricity system. This report explores states' role in better integrating locational value into DER siting and development. It first outlines some of the benefits that can be achieved through the deployment of DERs in high-value locations. It then looks at state policy and regulatory roles and the tools states can use to influence the location of DER development. The report next examines the challenges of locational DER planning, with a particular focus on the challenges that states face in influencing the location of DER development. It highlights three case studies from states that engaged in locational DER planning through the Multistate Initiative to Develop Solar in Locations that Provide Benefits to the Grid and then presents several lessons learned from these efforts. The final section of this report summarizes some recent publications related to locational value of DERs in the form of an abbreviated literature review.

14 SOLAR ENERGY↗

Hydrogen Sustainable Infrastructure Guidelines (H2SIG)

Infrastructure interacts with major global challenges inclusive of climate change, resilience, equity and social justice, environmental protection and biodiversity, public health, and economic recovery. This effort directly addresses how to apply sustainability assessments to the unique aspects of hydrogen (H2) infrastructure projects using the Envision® sustainability framework developed by the Institute for Sustainable Infrastructure (ISI). Envision is a flexible system of criteria and performance objectives to aid decision makers and help project teams identify sustainable approaches during planning, design and construction of infrastructure projects that will continue throughout the project’s operations, maintenance, and end-of-life phases. The goal of this work is to support those interested in conducting sustainability assessments for hydrogen infrastructure projects. Through this work the team has developed hydrogen-specific guidelines and best practices to assist project developers, investors and regulators in straightforward application of the Envision framework to systematically enhance clarity and increase objectivity across hydrogen projects. Subject matter experts from 20 different organizations (industry, non-profits, municipalities, emissions regulators, national labs) were engaged through 7 focus groups to discuss the H2-prioritized Envision requirements and elements to be included in the guidelines. In addition to these guidelines, the team conducted case studies as a way of demonstrating and informing the guidelines and providing examples or ideas for implementing sustainability in future projects. Through this study, the authors found that hydrogen infrastructure projects can incorporate many sustainable practices including reducing GHG emissions affecting climate change, reducing air pollutant emissions affecting the health of communities, synergistically handling waste byproducts, integrating into existing infrastructure, incorporating renewable energy, and addressing equity and environmental justice. Additionally, hydrogen infrastructure projects could benefit from 2-way communication engagement and collaborative planning with stakeholders, educational awareness of hydrogen technology, tracking and reporting on water use and water quality, and including monetized environmental and social benefits in life-cycle cost estimates. This document is the final technical report for the Hydrogen Sustainability Assessment Methods for Project Development project. While the main focus of the report is to provide guidelines for applying sustainability to hydrogen infrastructure, there are sections within the appendix providing completed project tasks and methodology.

08 HYDROGEN↗

Planning Roadmap for DER Integration in India: Industry Best Practices and Resource Guide

Ensuring safe, reliable, cost-effective DER integration at scale requires holistic planning, broad stakeholder engagement, and should address key development areas such as standards adoption, equipment testing and certification, interoperability and cybersecurity, interconnection procedures, and advanced forecasting and DER management. Each of these areas currently represent significant challenges for utilities, regulators, OEMs, developers, and even consumers worldwide. India has already seen significant growth of DERs and has announced targets for substantial growth yet to come, with the potential for DERs to make up a non-negligible portion of the country's overall generation capacity. As such, it is of critical importance that Indian stakeholders consider the potential impacts of wide-spread adoption of DERs and take preemptive action related to the five development areas listed here, among others. India should consider strategies including the adoption of key DER standards related to interconnection, testing, and cybersecurity; enabling effective and secure communication channels for DER interoperability; testing and certifying DER equipment in accredited testing laboratories; building robust, streamlined interconnection procedures; and revamping legacy system planning structures to incorporate DERs in a holistic planning framework.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Adaptive management of large-scale ecosystem restoration: increasing certainty of habitat outcomes in the Columbia River Estuary, U.S.A.

Ecological restoration programs in dynamic coastal environments can benefit from adaptive management, including an iterative process for identifying and addressing critical uncertainties. We highlight key developments under the three pillars that have increased the rate of restoration by the Columbia Estuary Ecosystem Restoration Program (CEERP) over 20 years: science, coordination, and management. We show how such programs can be institutionalized to ensure that estuary ecosystems are better understood, conserved, and restored. The principal conservation effort under CEERP is to reconnect historical floodplain wetlands to the mainstem. The program also supports other restoration actions that demonstrate a high potential to benefit ecosystem function and endangered salmon populations, however, there is greater uncertainty regarding these less-utilized techniques. Through adaptive management, we address both technical uncertainty regarding benefits to the environmental resource and programmatic uncertainty pertaining to decision-making. Here, we examine three periods of CEERP growth to establish how complementary research and restoration actions have improved program outcomes over time. We highlight the tools and processes that were developed and integrated into the program to refine program strategy, improve project design, and maximize ecological benefits. CEERP supported 77 restoration projects and reconnected over 7,000 acres of floodplain habitat to the lower Columbia River between 2004 and 2021. Building on these successes, we outline current plans to better engage landowners and local communities, solicit new project types, and maintain enough flexibility within the program to adapt to new priorities.

54 ENVIRONMENTAL SCIENCES↗

The CanBikeCO Mini Pilot: Preliminary Results and Lessons Learned

In fall 2020, the Colorado Energy Office, as part of the State of Colorado’s “Can Do Colorado” initiative, initiated a project aimed at encouraging energy-efficient transportation during the COVID-19 pandemic. The initial mini-pilot provided e-bikes to 13 low-income households under an individual ownership model. This report assesses the impact of providing this additional mobility option on the travel behavior of participants. It also outlines the lessons learned from deploying a continuous monitoring platform to track the travel behavior. These lessons will influence the evaluation component for the full pilot, which will cover multiple geographic regions, starting in summer 2021, and run for 2 years. The continuous data collection was enabled by a customized version of the open-source e-mission platform, called CanBikeCO, configured with a behavioral gamification feature. The Colorado Energy Office used this system to collect a unique data set consisting of 3 months of partially automated travel diaries, combining sensed and surveyed data and linked with demographic information, from 12 participants. The data collection process worked well overall: users generally liked the app, appreciated the game, and did not complain about battery life. The long tracking period introduced behavioral challenges in user engagement, which we plan to address using repeated patterns and automated status checks for the full pilot. The analysis results, based on the subset of trips with user-reported labels (68%), indicate that the e-bike was the dominant commute mode share (31%), in sharp contrast to the census bicycle commute mode share (<1%). E-bike trips primarily replaced single-occupancy vehicle (SOV) trips (28%), followed closely by walking (24%) and regular bike (20%). The nonmotorized mode replacement corresponds to lower travel time and increased productivity enabled by the program. The emissions impact analysis of the program, computed using trip-level energy intensity factors, indicates savings of 1,367 lbs. of CO 2 . Although the results are strongly positive, the narrow demographic profile of study participants, their limited mobility alternatives, and nonuniform labeling indicate caution in broader interpretation. These preliminary results do suggest that such programs, supported by real-time education and support from program managers, can simultaneously meet equity and sustainability goals. The planned full pilot, addressing the data collection challenges and broadening the geographic scope, will provide additional insights into the generality of this approach.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Transmission Cost Allocation Practices

This technical brief summarizes approaches to allocating costs of transmission facilities between generators and loads, jurisdictions, and customer classes, and based on project drivers. The brief also discusses planning approaches, stakeholder engagement, considerations for using counterfactuals for cost allocation, and Federal Energy Regulatory Commission and court decisions on cost allocation proposals.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Towards Net Zero: Modeling Approach to the Right-Sized Facilities

As the concentration of greenhouse gases (GHGs) in the atmosphere increases, the concerns about carbon emissions are growing. Several net-zero initiatives are taking place around the globe to achieve a balance between the GHGs put into the atmosphere and those taken out. While most efforts present a sectorized approach, this paper describes the importance of integrating information across different sectors for effective modeling of carbon emissions and holistic reduction opportunity analysis. Using the Idaho National Laboratory (INL) campus as a test case, this work provides a web-based tool for INL stakeholders to use when engaging in strategic planning to achieve carbon emissions reduction. This net-zero engineering support tool (NEST) uses historical data as foundational information for applying the modeling framework. Prediction of CO 2 emissions throughout project completion integrates various approaches and schedules aimed at energy conservation, fleet decarbonization, and other GHG reduction activities. Using NEST, stakeholders can visualize carbon emissions, electricity consumption, and costs for decision making when planning the pathway for reaching carbon net zero. The INL’s initiative to transition into an EV fleet was used to demonstrate the developed framework and the advantages of using NEST. It was shown that electrifying different fossil-fueled campus vehicles before 2030 with aggressive replacement schedules require high annual capital expenditure (CAPEX), which may not be available. The tool allows decision makers to test different replacement schedules and prioritize those that yield CAPEX below a certain threshold while meeting target milestones. While the demonstration focused on vehicle electrification, the developed framework lays the foundation for further quantitative analysis of other GHG reduction activities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The CanBikeCO Mini Pilot: Procedure and Preliminary Results

In fall 2020, the Colorado Energy Office, as part of the State of Colorado's "Can Do Colorado" initiative, initiated a project aimed at encouraging energy-efficient transportation during the COVID-19 pandemic. The initial mini-pilot provided e-bikes to 13 low-income households under an individual ownership model. This report assesses the impact of providing this additional mobility option on the travel behavior of participants. It also outlines the lessons learned from deploying a continuous monitoring platform to track the travel behavior. These lessons will influence the evaluation component for the full pilot, which will cover multiple geographic regions, start in summer 2021, and run for 2 years. The continuous data collection was enabled by a customized version of the open-source e-mission platform, called CanBikeCO, configured with a behavioral gamification feature. The Colorado Energy Office used this system to collect a unique data set consisting of 3 months of partially automated travel diaries, combining sensed and surveyed data and linked with demographic information, from 12 participants. The data collection process worked well overall: users generally liked the app, appreciated the game, and did not complain about battery life. The long tracking period introduced behavioral challenges in user engagement, which we plan to address using repeated patterns and automated status checks for the full pilot. The analysis results, based on the subset of trips with user-reported labels (68%), indicate that the e-bike was the dominant commute mode share (31%), in sharp contrast to the census bicycle commute mode share (<1%). E-bike trips primarily replaced single-occupancy vehicle (SOV) trips (28%), followed closely by walking (24%) and regular bike (20%). The non-motorized mode replacement corresponds to lower travel time and increased productivity enabled by the program. The emissions impact analysis of the program, computed using trip-level energy intensity factors, indicates savings of 1,367 lbs. of CO2. Although the results are strongly positive, the narrow demographic profile of study participants, their limited mobility alternatives, and nonuniform labeling indicate caution in broader interpretation. These preliminary results do suggest that such programs, supported by real-time education and support from program managers, can simultaneously meet equity and sustainability goals. The planned full pilot, addressing the data collection challenges and broadening the geographic scope, will provide additional insights into the generality of this approach.

ADVANCED PROPULSION SYSTEMS↗