Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Energy arbitrage”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

26 records · Page 2

Exploring the Future Energy Value of Long-Duration Energy Storage

Long-duration energy storage is commonly viewed as a key technology for providing flexibility to the grid and broader energy systems over a multidecadal time frame. However, prior work has typically used present-day grid infrastructures to characterize the relationship between the duration and arbitrage value of storage in electricity markets. This study leverages established National Renewable Energy Laboratory grid planning and operations tools, analysis, and data to execute a price-taker model of an energy storage system for several 8760 h price series representative of current and future contiguous United States grid infrastructures with varying shares of variable renewable energy (VRE). We find that the total value of energy storage typically increases with VRE shares, but any increase in the relative value of longer storage durations over time depends on the region and grid mix. Some regions see incremental value increasing notably, up to 20–40 h in 2050, while others do not. The negative effect of lower roundtrip efficiency on value is also found to be scenario-dependent, with the energy value in higher VRE scenarios being less sensitive to roundtrip efficiency and more supportive of longer storage durations. Long-duration storage value and deployment potential are a function of evolving electricity sector infrastructure, markets, and policy, making it critical to consistently revisit potential long-duration storage contributions to the grid.

14 SOLAR ENERGY

Africa Battery Energy Storage Systems (BESS) Capacity Building Utility-Scale Storage: BESS Valuation, Tariffs, and Remuneration [Slides]

Utility-scale Battery Energy Storage Systems (BESS) are key to enhancing grid reliability, integrating renewable energy, and providing operational flexibility. Designing effective valuation, remuneration, and tariff frameworks is essential to ensure both system benefits and financial viability for developers. This presentation outlines a structured methodology for evaluating BESS projects, covering policy and legal considerations, cost and revenue analysis, benchmarking, financial sensitivity, and risk assessment, while ensuring alignment with public interest. It also explores valuation of multiple storage services - bulk energy, ancillary services, and infrastructure support - and monetization strategies through capacity payments, energy tariffs, tolling, arbitrage, and non-wires alternative payments. Technical factors, including round-trip efficiency, degradation, and storage duration, are integrated into financial and operational modeling to quantify both system-wide and project-level benefits. Through case studies and simulation-based approaches, this framework provides regulators, utilities, and developers with practical guidance for tariff design, payment structures, and investment decisions, maximizing the economic and societal value of BESS deployment.

25 ENERGY STORAGE

West Africa Battery Energy Storage Systems (BESS) Capacity Building - Discussion of BESS Tariffs: Payment Structures and Case Studies [Slides]

Battery Energy Storage Systems (BESS) are emerging as critical assets for enhancing grid reliability, integrating renewable energy, and enabling system flexibility. Yet, the regulatory and financial frameworks that determine how BESS projects are compensated vary widely across jurisdictions. This presentation explores international case studies - from Honduras, Costa Rica, Chile, South Africa, Mexico, and Brazil - to illustrate how tariff design and payment structures are evolving to support large-scale BESS deployment. The cases highlight a range of ownership and revenue models, including cost-of-service mechanisms, energy and capacity payments, and market-based arbitrage, as well as hybrid approaches under development. The discussion will examine key challenges such as defining remuneration for ancillary services, addressing double charging, and accounting for efficiency losses and degradation over time. By comparing experiences across markets, the presentation identifies emerging best practices for valuing BESS and designing tariffs that align technical performance with economic incentives, providing insights for regulators, utilities, and policymakers pursuing storage integration.

25 ENERGY STORAGE

Bill Savings vs. Backup Power: Evaluating operational tradeoffs for home solar+storage systems [Slides]

This study explores tradeoffs between the use of home solar+storage systems for backup power versus day-to-day utility bill savings. The study focuses specifically on the “reserve setting” available with most home battery storage systems, which allow the customer to maintain some minimum level of storage in reserve in case of an unforeseen power interruption. The more capacity that is held in reserve, the greater the customer’s ability to ride-through possible power interruptions, but less capacity is then available to manage utility bills on a day-to-day basis. This study evaluates this operational tradeoff across a diverse set of locations and residential electricity tariff structures, relying on Berkeley Lab’s PRESTO model to stochastically simulate power interruption events, and exploring a range of sensitivities, including variations in customer value of lost load (VoLL), interruption frequency, and other key drivers. The results show that, in most circumstances, the opportunity cost of holding storage capacity in reserve, in terms of foregone bill saving, tends to outweigh any gains in reliability value associated with mitigated power interruptions. This finding is robust across tariff structures and across most of the sensitivities considered, including those related to rate level, customer load level, and storage sizing. There are a limited set of circumstances where raising the reserve setting improves the overall customer value (comprised of bill savings plus reliability value). Specifically, that exception occurs when all of the following conditions apply: (a) the customer resides in a location with exceptionally poor reliability, (b) the customer has exceptionally high VoLL; (c) the customer is on a net billing rate or on a TOU rate that allows grid discharging but not grid charging; and (d), depending on the location, the price arbitrage differential on that rate is relatively small. In all other circumstances analyzed, total customer value declines with reserve level.

14 SOLAR ENERGY

Hydrogen underground storage for grid electricity storage: An optimization study on techno-economic analysis

Here, this study performs a techno-economic analysis of hydrogen underground storage systems for grid electricity storage, evaluating their economic viability at the plant scale using dynamic optimization. It explores the feasibility of various system configurations and revenue models in the context of volatile electricity prices and the necessity for multiple revenue streams. The hypothesis tested is that large-scale hydrogen storage, despite its low round-trip efficiency, can be economically viable with the right mix of revenue streams. This study uses scenario-based analysis to assess the impacts of different system configurations, including engaging in time-shifting arbitrage, ancillary service markets and blending hydrogen with natural gas. Results indicate potential annual net cash flows of up to $\$$1.5 million from ancillary services integration and $\$$5.2 million from natural gas blending, contingent on specific system sizes. The study concludes that hydrogen underground storage for grid electricity storage can be profitable, and emphasizes that proper system design and precise electricity price forecasting are crucial for optimizing system performance and economic returns. This research sets the stage for further investigations into the scalability of hydrogen storage systems and their broader implications for grid electricity storage and energy market dynamics.

25 ENERGY STORAGE

Hybridization Assessment of Trybrid Pumped Storage Hydropower System—Part 1: A Case Study of Corral Summit

This report is a part of the deliverables for technical assistance provided to Cat Creek Energy for the Coral Summit Trybrid (Triple Hybrid-Pumped Storage Hydropower, Battery Energy Storage System, and photovoltaic solar energy) energy project. This report explores the operational benefits and challenges of hybridizing an open loop PSH (200MW) located at Mackay, Custer County, Idaho with solar PV (Ground mount 300MW and floating 40MW) and battery (720MWhr). This document reports two activities performed as a part of the hybridization assessment task 1) optimal resource allocation and energy management strategy, and 2) power quality and reliability assessment. From optimal resource allocation and energy management strategy (activity 1), the following key findings can be observed: • Conventional PSH (CPSH) with two reversible pump turbines and separate penstocks can provide required flexibility equivalent to that from two ternary PSH with separate penstock. With single unit CPSH, upper reservoir head cannot be maintained accurately, the variation of water level is rapid and pump mode flexibility is not available. These disadvantages can be overcome by single unit TPSH. However, using two CPSH units with separate penstocks also overcome these disadvantages with the formation of the hydraulic short circuit between two conventional units. • Flooding of the lower reservoir is a severe concern when considering continuous operation for black start. This limits the duration of continuous operation from PSH alone to around 50 hours. Due to the complementary PV and battery action, the duration of continuous operation and smooth power output can be extended. • An optimization problem is framed that maximizes the power output on an hourly basis while minimizing constraint violations and respecting seasonal variations of solar PV and load profiles . Two value streams, arbitrage and baseload generation are served by this profile. It was uncovered that for smooth power output during regular operation, PV curtailment will be required, or the battery capacity needs to be increased above 90MW to accommodate additional PV. From power quality and reliability assessment (activity 2) the following takeaway points can be observed: • The Trybrid, when integrated at the Lost River bus, and limited to 250MW in generation mode and -150MW in the pump mode, causes no violation of voltage or flow.

13 - HYDRO ENERGY

A bilevel multistage stochastic self-scheduling model with indivisibilities for trading in the continuous intraday electricity market

In this paper, we study the profit maximization problem of a virtual power plant trading in the continuous intraday electricity market. Our virtual power plant model is compatible with renewable, and thermal assets, covering a range of virtual power plants currently participating in energy markets. We model the trading problem as a bilevel multistage stochastic program. The upper level of the problem accounts for the profit maximization of the virtual power plant with explicit modeling of the technical constraints of the operational status of the thermal power plant including minimum start-up and shut-down times, ramp-up and ramp-down rates, and minimum generation level. The upper level also decides which continuous and indivisible (fill-or-kill) orders are submitted to the market. The lower-level problem accounts for the clearing of the continuous intraday market, i.e., matching of buy and sell orders. Because of the presence of fill-or-kill orders, the lower-level problem is mixed-integer, which prevents its direct conversion to a single-level problem using duality. In order to solve this challenging problem, we develop a convex-hull extended formulation for the lower-level problem, apply duality theory to obtain a single-level stochastic equivalent formulation, and employ McCormick envelopes to turn the problem into a multistage stochastic mixed-integer linear problem, which we solve using the stochastic dual dynamic integer programming algorithm. We conduct numerical experiments and analyze the optimal trading behavior of a virtual power plant trading in an ideal continuous market without arbitrage.

Bilevel multistage stochastic programming problem

Techno-Economic Viability of Flexible Dispatch of Unconventional Geothermal Systems

Flexible geothermal operations could boost project returns through the allocation of improved power purchase agreements and/or exploitation of power price arbitrage opportunities. In this study, we investigated the techno-economic feasibility of variable flow rate control and time-of-day pricing in closed-loop geothermal systems. We considered U-shaped multilateral system configurations and modeled a variety of technical system parameters. These designs were simulated using a slender-body theory (SBT) model for transient heat transfer and fluid flow. This subsurface model was integrated into the flexible geothermal economic model (FGEM) tool to evaluate the overall flexible geothermal system techno-economics. Future hourly ambient temperature conditions were based on the Sup3rCC dataset. Published datasets were used for future hourly wholesale electricity prices. We analyzed four operating strategies: 1) baseload operation, 2) seasonal dispatch (high flow rate during summer and nominal flow rate during the rest of the year), 3) net generation maximization by varying flow rate to maximize net power output, and 4) revenue maximization by varying flow rate to maximize revenue. We ran all four scenarios for a multiloop configuration with 12 lateral passes, 7-km vertical depth and 87-km total drilling length. Furthermore, we assumed a 60 degrees C/km geothermal gradient and ambient temperature and wholesale electricity prices for New Mexico as a typical state location. The nominal flow rate was set to 80 kg/s. When considering drilling costs of $1,000/m and a discount rate of 7%, the generation maximization scenario resulted in the lowest levelized cost of electricity (LCOE) of ~$150/MWh. When considering project return on investment (ROI), defined as lifetime net income divided by upfront capital costs, all flexible operation scenarios performed better than the base case scenario. The highest ROI of 80% was obtained with the revenue maximization scenario. With drilling costs of $200/m and a discount rate of 5%, the generation maximization scenario resulted in LCOE of $49/MWh.

flexible geothermal