Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Energy Coach”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

27 records · Page 2

EHS Health Assessment & Health Action Plan Report (CY 2020)

Sandia National Laboratories (SNL) Employee Health Services (EHS) program believes that good health is essential to getting the most out of life, which is why we offer a variety of worksite wellness programs that put employees in control of their own health. These programs are based on current research and strategies that are proven to minimize risk and decrease the impact of illness through early detection and treatment. Services includes Health Assessments, the Virgin Pulse (VP) online wellness platform, and Health Action Plans (HAP) which include one-on-one education, organizational health initiatives, a video library, an events calendar, onsite fitness facilities, and group fitness classes. Participation in these programs help employees and their spouses earn funding for their Health Reimbursement Accounts (HRAs). The EHS Health Action Plan (HAP) initiative targets the key health risks identified through the 8-15-80 model by engaging employees to change their own healthcare story. EHS identified the most prevalent of the health risks amongst our population through Health Risk Assessment (HRA) and used that data to build Health Action Plans (HAPs). The 2020 Health Action Plans addressed improving upon inadequate sleep, lack of energy, stress, weight, physical inactivity, cardiometabolic issues (hypertension, high cholesterol, diabetes), low back pain, allergies, asthma, digestive health, tobacco use, and living well to maintaining low risk for those individuals who do not have a chronic condition to manage. These plans connect employees with our onsite registered dietitians, fitness professionals, health coaches, physical therapists, and physicians as appropriate. In addition to addressing the physical aspects of health, the plans also emphasized pre/post-assessments to encourage building behavioral and emotional skills that promote health and facilitate lifestyle changes over a minimum of three months. Just one risk reduction or behavior change can make an impact on the health of the participant’s Division as well as Sandia’s overall risk levels and ultimately its healthcare costs. Sandia employees achieved an Overall Wellness Score of 69 based on the WellSource Health Assessment (the same as last year). A score of 70-100 is considered “Doing Well”, and a score of 40-69 is in the “Caution” category. Overall in CY 2019, Sandia saw a 34% participation rate in Health Action Plan (HAP) programs (up from 33% in CY 2019) with an 89% completion rate (4% lower than CY 2019). Overall, 5,039 (347 more than CY 2019) individuals participated in 8,329 HAPs, which is 1,005 more than the last calendar year (7,324).

59 BASIC BIOLOGICAL SCIENCES↗

High Performance Teams Enable Mission Success for SRNL - 16363

The accomplishment of the DOE EM mission of cleaning up the radioactive waste generated as a byproduct of the development and maintenance of nuclear materials over the last 60 years is a daunting task. SRNL specializes in working directly with the 'owners' of the cleanup challenges to identify the desired outcome and develop a solution that can be put into practice. 'We put science to work' is not just a 'tag line' rather it is a concise statement of our values and approach to applying science and engineering to the cleanup objectives. The management of radioactive waste poses multi-decade challenges to DOE EM and the Nation. The ability to harness the depth of knowledge, experience, expertise and passion for safely and effectively solving the technical challenges has reached a critical junction. Perhaps too late to be a natural and organic transition the industry finds itself critically devoid of resources to effectively and efficiently keep focused on the highest order task: cleanup. When project managers plan the resources necessary to perform the planned scope they typically are focused on financial, human, and industrial resources that would be beneficial to project execution. The critical shortage we will be evaluating is experienced and skilled leaders, mentors and coaches in the workforce. The production of educated scientists and engineers is a primary focus at all levels of educational institutions with Science Technology Engineering and Mathematics (STEM) focused curricula beginning in elementary school. The need for leaders who are skilled in inspiring organizational creativity, adept in harnessing and focusing individual energy while effectively communicating to the work force and the clientele equally compelling messages, has never been greater, or their absence in the workforce more ominous. Managers trained in the classical management theory (insert references here) are aging out of the workforce. In many cases these managers have not retained close connection to advancements in their primary field of study but rather have succumbed to the administrivia burdens that typify highly regulated work. The current technically trained workforce while interested in the 'perks' of management (i.e. visibility, pay increases, advancing status) are driven to keep close connection to their technical 'roots' as a fall-back plan should they need to change their career path either by choice or necessity. The challenge is how to achieve the productive hum of a finely tuned organizational model that blends executive vision and drive with technical leadership and excellence in execution. If any of these three tenets of a high performance team falters the ability to recover erodes the performance of the team and begins to weaken the cultural foundation essential to sustaining high performance work teams. At SRNL, recognition of the need to adapt the management dynamics and the business model and to harness the energy of the workforce to sustain - and in fact increase - the level of performance is a driving force in the transformation of the organization. Examples of changes in organizations structure, business systems and employee engagement are discussed as they relate to the impact on accomplishing the cleanup mission and fostering the next generation of great leaders and innovators. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EHS Health Assessment & Health Action Plan Report CY 2017

The (EHS) Health Action Plan initiative targets the key health risks identified through the 8-15-80 model by engaging employees to change their own healthcare story. (EHS) identified the most prevalent of the health risks amongst our population through Health Risk Assessment (HRA) and used that data to build Health Action Plans. Our 2017 Health Action Plans addressed inadequate sleep, increasing energy, stress, weight management, physical inactivity, hypertension, dyslipidemia, managing and preventing diabetes, managing low back pain, allergies & asthma, digestive health, tobacco use, and living well or maintaining low risk for those individuals who do not have a chronic condition to manage. These plans connect employees with our onsite registered dietitians, fitness professionals, health coaches, physical therapists and physicians as appropriate. In addition to addressing the physical aspects of health, the plans also emphasized pre/post-assessments to encourage building behavioral and emotional skills that promote health and facilitate lifestyle changes over a minimum of three months - just one risk reduction or behavior change to make an impact on their Division as well as Sandia's overall risk levels and ultimately healthcare costs.

99 GENERAL AND MISCELLANEOUS↗

EHS Health Assessment & Health Action Plan Report CY 2017

The (EHS) Health Action Plan initiative targets the key health risks identified through the 8-15-80 model by engaging employees to change their own healthcare story. (EHS) identified the most prevalent of the health risks amongst our population through Health Risk Assessment (HRA) and used that data to build Health Action Plans. Our 2017 Health Action Plans addressed inadequate sleep, increasing energy, stress, weight management, physical inactivity, hypertension, dyslipidemia, managing and preventing diabetes, managing low back pain, allergies & asthma, digestive health, tobacco use, and living well or maintaining low risk for those individuals who do not have a chronic condition to manage. These plans connect employees with our onsite registered dietitians, fitness professionals, health coaches, physical therapists and physicians as appropriate. In addition to addressing the physical aspects of health, the plans also emphasized pre/post-assessments to encourage building behavioral and emotional skills that promote health and facilitate lifestyle changes over a minimum of three months - just one risk reduction or behavior change to make an impact on their Division as well as Sandia's overall risk levels and ultimately healthcare costs.

99 GENERAL AND MISCELLANEOUS↗

Investigation of Non-Nuclear Plowshare and Vela Uniform Sites - 20447

The Plowshare Program was initiated by the Atomic Energy Commission, a predecessor agency to the US Department of Energy (DOE), to investigate peaceful uses of nuclear devices. 'Vela Uniform,' part of the broader Project Vela, was designed to use nuclear and other explosions to increase the capability of the United States to detect nuclear tests through seismicity. There were underground nuclear tests conducted off the Nevada National Security Site (NNSS) as part of the Plowshare Program (e.g., the Gnome-Coach, New Mexico, Site) and the Vela Uniform Program (e.g., Project Shoal, Nevada, Site) at which the DOE Office of Legacy Management (LM) has been conducting long-term surveillance and maintenance since fiscal year (FY) 2006. There are many additional locations, particularly for the Plowshare Program, that were considered for nuclear tests or used for non-nuclear tests off the NNSS. Some were only named on paper, but at 30 sites, field work such as drilling test wells and conducting tests using conventional explosives was done. A Plowshare nuclear explosion had been proposed at Project Chariot but was canceled in 1962. In 1992, the discovery of soils contaminated with radionuclides from tracer experiments led to a cleanup by the DOE Office of Environmental Management (EM) of the Project Chariot, Alaska, Site, which was completed in 1994. Following the cleanup of the Project Chariot site, EM was concerned that there might be environmental liabilities at other Plowshare or Vela Uniform sites where field investigations were done, even if the nuclear test was never conducted. The EM Program at the Nevada Site Office began examining records and visiting selected locations that were evaluated for Plowshare and Vela Uniform non-nuclear tests. In total, 161 Plowshare and 14 Vela Uniform sites or proposed projects were identified. The Desert Research Institute (DRI) created summaries of the work carried out at these sites and developed a collection of unclassified documents for them. Preliminary investigations had been conducted at these sites by both LM and EM since the early 2000's. In 2016, in preparation for accepting responsibility for the sites, LM started a program to determine if there were any environmental or safety liabilities associated with them. In 2019, LM formally accepted responsibility for these sites off the NNSS where non-nuclear explosive tests were conducted or where underground nuclear tests were proposed as part of the Plowshare and Vela Uniform programs but were never conducted. LM responsibilities will include maintaining institutional knowledge of the sites, responding to public inquiries, and addressing any concerns at each site. To minimize risk associated with site management, LM has archived all historical records compiled by DRI and has performed limited investigations at sites identified by the prior studies as having a higher potential liability. Preserving records related to site operations reduces the risk of doing unnecessary site investigations in the future caused by the loss of institutional knowledge. During the investigations, some maintenance needs were identified and will be addressed by the end of FY 2021. At the end of FY 2021, investigations, maintenance, and archiving activities will be complete. Remnants of test activities found at sites include craters, mud pits, debris, and open boreholes. Open boreholes are being plugged and abandoned in accordance with state regulatory standards. Other issues are being addressed in accordance with land owner requests and preferences as well as state regulations. Archiving activities include the development of project summaries identifying key operational details and current condition to allow site managers to be easily briefed. The LM experience at non-nuclear Plowshare and Vela Uniform sites applies to other programs where there is the potential for liability associated with the non-nuclear aspects of nuclear programs. This may include support activities or early phases of planned nuclear projects. Preserving institutional knowledge enables land managers to adequately address any concerns associated with operations and lowers risk. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FleetREDI Insight: Intrastate Coach Bus Dataset

Capturing real-world data is critical to improving efficiency and supporting technology advancements in commercial vehicles. FleetREDI’s insights provide detailed duty cycle information and highlight unique aspects of the given dataset. Each insight delivers a quick look at the collected data by summarizing the operation and identifying key findings of the initial analysis. This FleetREDI insight explores coach buses operating in Colorado. Coach buses are a primary mover for intrastate transit and are primarily used for longer trips with more comfortable seats and a restroom. All Aboard America! Holdings Inc. offers various fixed-service and charter routes across Colorado on its Bustang fleet out of its depot in Golden, Colorado. NLR installed logging devices and collected operational data on nine 40-foot Bustang motorcoaches operating on fixed routes from May through August 2022. Using NLR’s FleetREDI data platform, this dataset provides a summary of daily operation to help understand duty cycle characteristics. This includes daily distance, fuel use, and estimated engine-produced energy consumption for nine motorcoaches that operated more than 33,000 miles. These vehicles primarily operated on Interstate 25 and Interstate 70. ![FleetREDI interstate bus](FleetREDI-interstate-bus.jpg)

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evaluation of American Indian Science and Engineering Society Intertribal Middle School Science and Math Bowl Project

The American Indian Science and Engineering Society (AISES) has been funded under a U.S. Department of Energy (DOE) grant (Grant Award No. DE-SC0004058) to host an Intertribal Middle-School Science and Math Bowl (IMSSMB) comprised of teams made up of a majority of American Indian students from Bureau of Indian Education-funded schools and public schools. The intent of the AISES middle school science and math bowl is to increase participation of American Indian students at the DOE-sponsored National Science Bowl. Although national in its recruitment scope, the AISES Intertribal Science and Math Bowl is considered a “regional” science bowl, equivalent to the other 50 regional science bowls which are geographically limited to states. Most regional bowls do not have American Indian student teams competing, hence the AISES bowl is meant to encourage American Indian student teams to increase their science knowledge in order to participate at the national level. The AISES competition brings together teams from various American Indian communities across the nation. Each team is provided with funds for travel to and from the event, as well as for lodging and meals. In 2011 and 2012, there were 10 teams participating; in 2013, the number of teams participating doubled to 20. Each Science and Math Bowl team is comprised of four middle school — grades 6 through 8 — students, one alternate, and a teacher who serves as advisor and coach — although in at least two cases, the coach was not a teacher, but was the Indian Education Coordinator. Each team member must have at least a 3.0 GPA. Furthermore, the majority of students in each team must be comprised of American Indian, Alaska Native or Native Hawaiian students. Under the current DOE grant, AISES sponsored three annual middle school science bowl competitions over the years 2011, 2012 and 2013. The science and math bowls have been held in late March concurrently with the National American Indian Science and Engineering Fair (NAISEF) and EXPO at the Albuquerque, NM Convention Center. Albuquerque is also the home of the AISES national office. The AISES staff also recruits volunteers to assist with implementation of the science and math bowl event. In 2011, there were 7 volunteers; in 2012, 15 volunteers, and in 2013, 19 volunteers. Volunteers are recruited from a variety of local sources, including Sandia Laboratories, Southwest Indian Polytechnic Institute students, Department of Defense, as well as family members of AISES staff. For AISES, the goals of the Intertribal Middle School Science and Math Bowl project are to have more Native students learn science, for them to gain confidence in competing, and to reward their effort in order to motivate them to pursue studies in the sciences and engineering. For DOE, the goals of the project are to get more Native students to compete at the National Science Bowl, held in Washington, DC.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Winning Asset Management Improvement Team: Maintenance Planning and Scheduling in a Highly Regulated Environment

The Y-12 National Complex (Y-12) site has numerous aging facilities that are crucial to the Department of Energy and the national security strategy for the nation. Y-12’s commitment to safety and regulatory compliance is of the highest importance. The commitment to meet the national security mission also creates additional rigor and complexity to the everyday maintenance and planning process. Y-12 is a collection of many facilities, both old and new, nestled between two ridges in Oak Ridge, TN. Y-12 was made with the short-term focus of ending “The Great War” through the creation of the worlds’ first atomic bomb. Almost eighty (80) years have passed since the groundbreaking, with the mission of the site changing from decade to decade. While the mission has changed, the way Y-12 employees continuously meet the challenge has not. The site was created to react and overcome; Y-12 still takes pride in the ability to react and overcome. The difference is the site is no longer ignorant to the need for a better way to manage the aging facilities and infrastructure. Shear willpower and determination was once the way to reach the objectives, but as a wise man once said, “Work smarter, not harder.” The business case for change started within the senior leadership at Y-12. A team of managers sat down and dictated objectives to provide a clear scope for the maintenance planning and scheduling optimization team, to include our Eruditio integrated blended learning coaches. In addition to providing the direction, they also made themselves available for escalation of issues in the event the team ran in to road blocks.

99 GENERAL AND MISCELLANEOUS↗

Los Alamos National Laboratory Ombuds Office Biennial Report FY2017-2018

Visitors contact the Ombuds Office to obtain coaching, explore options, develop strategies, learn about LANL resources, understand formal processes and policies, or request a facilitated discussion/mediation. The number of visitors who contacted the office in FY17 and FY18 was 540 and 555, respectively - the highest annual numbers since FY08. The Ombuds Office supports professional workplace communication and conflict management skills through individual consultations, presentations, the resource library, and special events. Courses are regularly scheduled and available to the LANL workforce. Annually, an average of ~1950 participants attended Ombuds courses, workshops, and talks in FY17-18. The total number of individuals who attended presentations in FY17-18, both internal and external to LANL, was 4005. Staff continue to present annually at the International Ombudsman Association Conferences and New Mexico Alternative Dispute Resolution Symposiums. In this reporting period, the Laboratory Ombudsman was recruited to present communication and negotiation skills courses for several universities and prestigious national science and engineering organizations. The mission of the Ombuds Office is to enhance communication and mitigate conflict. Staff provide expertise, feedback and resources to employees, leaders and organizations in order to strengthen conflict and communication capabilities. A related function of the office is to identify and report trends, without breaching confidentiality or anonymity. Trends and concerns may be raised around policies and procedures - including potential future issues – or concerning unhealthy patterns within an organization. The underpinnings of Organizational Ombuds work at LANL are provided by the International Ombudsman Association (IOA) Standards of Practice, (IOA Standards of Practice, 2009; Code of Ethics, 2007). The four IOA tenets are neutrality/impartiality, independence, confidentiality and informality.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗