Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Economic dispatch”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Use of Digital Real-Time Simulation and Optimization to Identify Maximum Real Power Injection on the Banshee Distribution Network: Preprint

This study investigates the hosting capacity of the Banshee Distribution Network by optimizing the real power injection at carefully selected Distributed Energy Resource (DER) locations. The analysis is conducted within the framework of power system operational constraints, including bus voltage ranges, thermal line ratings, and transformer loading limits. A Python-based Genetic Algorithm (GA), implemented using the PyGAD library, is employed to iteratively identify the optimal power injection configuration that maximizes network utilization while preserving system reliability. The methodology integrates a real-time simulation environment using the Real-Time Digital Simulator (RTDS), allowing high-fidelity evaluation of power flow and voltage behavior under each proposed injection scenario. By coupling the optimization algorithm with real-time simulation feedback, this approach ensures that both static and dynamic constraints are enforced during the evaluation process. The GA leverages evolutionary operators such as selection, crossover, and mutation to navigate the nonlinear search space efficiently. The results of the study delineate the feasible hosting capacity at three targeted buses, reflecting maximum real power levels that can be injected without causing voltage violations, transformer overloading, or line congestion. These findings provide a decision- support tool for distribution planners and utilities aiming to integrate higher penetrations of DERs in existing infrastructure. Additionally, the work lays the foundation for extending such optimization techniques to multi-objective formulations, including economic dispatch and reactive power coordination, in future studies.

24 POWER TRANSMISSION AND DISTRIBUTION

Techno-Economic Viability of Flexible Dispatch of Unconventional Geothermal Systems

Flexible geothermal operations could boost project returns through the allocation of improved power purchase agreements and/or exploitation of power price arbitrage opportunities. In this study, we investigated the techno-economic feasibility of variable flow rate control and time-of-day pricing in closed-loop geothermal systems. We considered U-shaped multilateral system configurations and modeled a variety of technical system parameters. These designs were simulated using a slender-body theory (SBT) model for transient heat transfer and fluid flow. This subsurface model was integrated into the flexible geothermal economic model (FGEM) tool to evaluate the overall flexible geothermal system techno-economics. Future hourly ambient temperature conditions were based on the Sup3rCC dataset. Published datasets were used for future hourly wholesale electricity prices. We analyzed four operating strategies: 1) baseload operation, 2) seasonal dispatch (high flow rate during summer and nominal flow rate during the rest of the year), 3) net generation maximization by varying flow rate to maximize net power output, and 4) revenue maximization by varying flow rate to maximize revenue. We ran all four scenarios for a multiloop configuration with 12 lateral passes, 7-km vertical depth and 87-km total drilling length. Furthermore, we assumed a 60 degrees C/km geothermal gradient and ambient temperature and wholesale electricity prices for New Mexico as a typical state location. The nominal flow rate was set to 80 kg/s. When considering drilling costs of $1,000/m and a discount rate of 7%, the generation maximization scenario resulted in the lowest levelized cost of electricity (LCOE) of ~$150/MWh. When considering project return on investment (ROI), defined as lifetime net income divided by upfront capital costs, all flexible operation scenarios performed better than the base case scenario. The highest ROI of 80% was obtained with the revenue maximization scenario. With drilling costs of $200/m and a discount rate of 5%, the generation maximization scenario resulted in LCOE of $49/MWh.

flexible geothermal

Iterative methods in GPU-resident linear solvers for nonlinear constrained optimization

Linear solvers are major computational bottlenecks in a wide range of decision support and optimization computations. The challenges become even more pronounced on heterogeneous hardware, where traditional sparse numerical linear algebra methods are often inefficient. For example, methods for solving ill-conditioned linear systems have relied on conditional branching, which degrades performance on hardware accelerators such as graphical processing units (GPUs). To improve the efficiency of solving ill-conditioned systems, our computational strategy separates computations that are efficient on GPUs from those that need to run on traditional central processing units (CPUs). Our strategy maximizes the reuse of expensive CPU computations. Iterative methods, which thus far have not been broadly used for ill-conditioned linear systems, play an important role in our approach. In particular, we extend ideas from Arioli et al., (2007) to implement iterative refinement using inexact LU factors and flexible generalized minimal residual (FGMRES), with the aim of efficient performance on GPUs. In conclusion, we focus on solutions that are effective within broader application contexts, and discuss how early performance tests could be improved to be more predictive of the performance in a realistic environment.

97 MATHEMATICS AND COMPUTING

Multi-parametric analysis for mixed integer linear programming: An application to transmission upgrade and congestion management

Upgrading the capacity of existing transmission lines is essential for meeting the growing energy demands, facilitating the integration of renewable energy, and ensuring the security of the transmission system. This study focuses on the selection of lines whose capacities and by how much should be expanded from the perspective of the Independent System Operators (ISOs) to minimize the total system cost. We employ advanced multi-parametric programming and an enhanced branch-and-bound algorithm to address complex mixed-integer linear programming (MILP) problems, considering multi-period time constraints and physical limitations of generators and transmission lines. To characterize the various decisions in transmission expansion, we model the increased capacity of existing lines as parameters within a specified range. This study first relaxes the binary variables to continuous variables and applies the Lagrange method and Karush-Kuhn-Tucker (KKT) conditions to obtain optimal solutions and identify critical regions associated with active and inactive constraints. Moreover, we extend the traditional branch-and-bound (B&B) method by determining the problem’s upper and lower bounds at each node of the B&B decision tree, helping to manage computational challenges in large-scale MILP problems. Here, we compare the difference between the upper and lower bounds to obtain an approximate optimal solution within the decision-makers’ tolerable error range. In addition, the first derivative of the objective function on the parameters of each line is used to inform the selection of lines for easing congestion and maximizing social welfare. Finally, the capacity upgrades are selected by weighing the reductions in system costs against the expense of upgrading line capacities. The findings are supported by numerical simulations and provide transmission-line planners with decision-making guidance.

24 POWER TRANSMISSION AND DISTRIBUTION

Bidding Curve Design for Hybrid Power Plants with Uncertain Solar Forecast

This paper presents a novel bidding curve design algorithm tailored for hybrid power plants (HPPs) to participate in the wholesale electricity market. Utilizing forecasts for photovoltaic (PV) generation and available battery power, our algorithm strategically computes the bidding curve to maximize HPP profit while adeptly managing the inherent uncertainty associated with PV power generation. In addition, the introduction of the penalty cost in HPP bidding curves provides the system operator a tool to effectively manage the system-level uncertainty that caused by HPPs. Numerical analysis through Monte Carlo simulations confirms that our bidding curve methodology outperforms the benchmark across various scenarios.

bidding curve

Interregional Transmission Operational Coordination (IRTOC)

This report presents a modeling and evaluation framework developed through the Inter-Regional Transmission Operational Coordination (IRTOC) project to study market-to-market (M2M) congestion management across day-ahead and real-time markets. The framework extends the Sienna platform through Sienna Decomposition, a multi-stage evaluation architecture that enables flexible representation of multiple regions and systematic assessment of alternative market coordination designs. Additional modeling capabilities include reserve deliverability constraints, High-Voltage Direct Current (HVDC) optimization for Alternating Current (AC) congestion management, and several real-time distributed coordination algorithms. Case studies using the RTS-GMLC test system and a large-scale Eastern Interconnection model demonstrate that the framework can evaluate alternative coordination structures and quantify their economic and operational impacts. The proposed framework provides a scalable platform for analyzing inter-regional coordination strategies in large-scale electricity markets.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Bidding Curve Design for Hybrid Power Plants with Uncertain Solar Forecast: Preprint

This paper presents a novel bidding curve design algorithm tailored for hybrid power plants (HPPs) to participate in the wholesale electricity market. Utilizing forecasts for photovoltaic (PV) generation and available battery power, our algorithm strategically computes the bidding curve to maximize HPP profit while adeptly managing the inherent uncertainty associated with PV power generation. In addition, the introduction of the penalty cost in HPP bidding curves provides the system operator a tool to effectively manage the system-level uncertainty that caused by HPPs. Numerical analysis through Monte Carlo simulations confirms that our bidding curve methodology outperforms the benchmark across various scenarios.

bidding curve

Multi-objective sizing and dispatch for building thermal and battery storage towards economic and environmental synergy

The role of building thermal and battery storage is pivotal in advancing smart cities and achieving sustainability goals through effective energy management. Despite their significance, there are several limitations in the sizing approach and value stream analysis with various objectives for their widespread adoption in buildings. This work proposes a flexible and scalable multi-objective optimization framework for optimal sizing and dispatch of building thermal and battery storage, addressing conflicting objectives simultaneously using mixed-integer linear programming. The weighted-sum method is adapted, combining multiple objectives into a single function. The two-stage procedure iterates over different weights, generating optimal solutions and forming the Pareto front. Case studies are performed to assess the energy, economic, and environmental benefits of building energy storage systems for a large office building in three climate locations. The results demonstrate that the proposed framework efficiently determines optimal sizing and dispatch strategies, addressing the balance between economic viability and emission reduction. The dynamic relationship between time-of-use energy charges and emission factors leads to significantly different strategies based on whether economic or environmental concerns are prioritized. This research enhances our understanding of the benefits of TES and BES systems in buildings, providing valuable guidance to stakeholders.

25 ENERGY STORAGE

Feasible Actuator Range Modifier (FARM), a Tool Aiding the Solution of Unit Dispatch Problems for Advanced Energy Systems

Integrated energy systems (IESs) seek to minimize power generating costs in future power grids through the coupling of different energy technologies. To accommodate fluctuations in load demand due to the penetration of renewable energy sources, flexible operation capabilities must be fully exploited, and even power plants that are traditionally considered as base-load units need to be operated according to unconventional paradigms. Thermomechanical loads induced by frequent power adjustments can accelerate the wear and tear. If a unit is flexibly operated without respecting limits on materials, the risk of failures of expensive components will eventually increase, nullifying the additional profits ensured by flexible operation. In addition to the bounds on power variations (explicit constraints),the solution of the unit dispatch problem needs to meet the limits on the variation of key process variables, including temperature, pressure and flow rate (implicit constraints).The FARM (Feasible Actuator Range Modifier) module was developed to enable existing optimization algorithms to identify solutions to the unit dispatch problem that are both economically favorable and technologically sustainable. Thanks to the iterative dispatcher–validator scheme, FARM permits addressing all the imposed constraints without excessively increasing the computational costs. In this work, the algorithms constituting the module are described, and the performance was assessed by solving the unit dispatch problem for an IES composed of three units, i.e., balance of plant, gas turbine, and high-temperature steam electrolysis. Finally, the FARM module provides dedicated tools for visualizing the response of the constrained variables of interest during operational transients and a tool aiding the operator at making decisions. These techniques might represent the first step towards the deployment of an ecological interface design (EID) for IES units.

47 OTHER INSTRUMENTATION

Co-optimization of nuclear reactor flexible power operation and maintenance scheduling

As flexible power operation of nuclear power plants becomes more attractive due to the reduction in fossil-fueled dispatchable generation on energy grids, finding optimal power production strategies that balance revenue generation with operational concerns becomes more complex. This article presents a general framework to aid operators in designing economically optimal long term dispatch strategies for nuclear power plants. The principal novelty is the linking of estimated system remaining useable life (RUL) to strategic operational decisions. It is shown that, depending on the relationship between the fixed costs from maintenance and the associated lost revenue from an outage, it can be economically optimal in the long term to delay a maintenance outage and not perform this alongside refueling. For a given relationship between power ramping and degradation, optimal strategies were found that discouraged load following in some situations while minimizing unnecessary maintenance. It is shown that heavy load following can cause maintenance and refueling outages to diverge due to their inverse relationships with respect to load following, potentially leading to a significant loss in capacity factor. As a result, this general framework can be applied to specific reactor dispatch allowing operators to adapt operational strategies as future grid conditions change.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS

Expanding market opportunities: cogeneration strategies for integrated PWR and thermal energy storage systems

We assess the economic viability of nuclear cogeneration by investigating three different modes—fixed dispatch, fully flexible dispatch, and flexible dispatch with minimum heat supply requirements. The analysis focuses on an existing pressurized water reactor (PWR) integrated with thermal energy storage (TES). Heat production costs are estimated under these modes for two U.S. electricity markets: the Electric Reliability Council of Texas (ERCOT) and the Pennsylvania–New Jersey–Maryland Interconnection (PJM). A sensitivity analysis examines profitability at varying heat market prices. Results indicate that fixed heat dispatch inflates heat production costs, often rendering projects economically feasible only at higher heat price levels. Fully-flexible dispatch lowers heat production costs by an average of 43 % compared to fixed dispatch. However, the current 30 % thermal dispatch limit may be insufficient to serve high baseline industrial demands cost‐effectively; higher maximum dispatch rates could enhance project economics. Markets with higher and more volatile electricity prices (e.g., ERCOT) offer greater total energy sales potential (i.e., heat and electricity), but also increase opportunity costs when heat production scheduling restrictions are imposed. In contrast, lower-price, less volatile markets (e.g., PJM) experience smaller impacts from such constraints and provide greater flexibility in accommodating varying cogeneration modes. In conclusion, these findings provide a framework to guide nuclear plant operators in aligning cogeneration strategies with industrial process requirements and electricity market conditions.

22 - GENERAL STUDIES OF NUCLEAR REACTORS

Nine Canyon Long-Duration Energy Storage: A Feasibility Study

The Nine Canyon Long Duration Energy Storage (LDES) Feasibility Study explores the technical and economic viability of deploying advanced energy storage technologies at Energy Northwest's (EN) Nine Canyon (9C) Wind Project site in Benton County, Washington. Supported by the Washington State Department of Commerce and the U.S. Department of Energy’s Office of Electricity under its LDES Voucher Program, the study represents a collaborative effort between EN, Pacific Northwest National Laboratory (PNNL), and ARES North America. At the core of this effort is the development of a generalized techno-economic modeling framework and evaluation tool designed to assess the value proposition of LDES projects across a variety of contexts. The modeling tool is technology-agnostic and accommodates user-defined parameters such as rated power, energy duration, round-trip efficiency, capital and operational costs, and dispatch constraints. It also integrates economic inputs, including market prices, energy revenue structures, and financing parameters to evaluate performance through key metrics. The tool provides utilities with a transparent, adaptable platform to support decision-making, investment prioritization, and portfolio planning for various storage technologies. To guide scenario design and interpretation, the study first surveyed the LDES technology landscape, including lithium-ion batteries, flow batteries, non-hydro gravity storage, and thermo-mechanical systems, comparing cost trajectories, technical performance, safety and hazards, materials sourcing and recyclability, and spatial/siting considerations. This literature-grounded review highlights technology trade-offs and reinforces the need to align technology choice with site characteristics, use cases, and project objectives. A companion chapter examines ownership structures (EN ownership, third-party ownership, shared models) and offtake options (energy marketing, capacity/energy PPAs, time-of-use PPAs, block-delivery PPAs, and tolling), where PPAs (power purchase agreements) represent contractual arrangements for buying and selling electricity. The chapter also highlights implications for risk allocation, capital access, operational control, and revenue certainty. The study also evaluates supervisory control and data acquisition (SCADA) and transmission interconnection pathways, options include upgrading the existing SCADA or deploying a dedicated LDES controller, with attention to protection schemes, data telemetry, cybersecurity, and regulatory coordination with BPA. In addition, an ARES-specific geotechnical and hydrology assessment presented in the appendix screens multiple corridors for slope stability, bearing capacity, cut-and-fill magnitude, and stormwater behavior.

25 ENERGY STORAGE

Next-Generation Energy Technologies for Connected and Automated On-Road Vehicles (NEXTCAR) - Predictive Data-Driven Vehicle Dynamics and Powertrain Control: from ECU to the Cloud (Final Scientific/Technical Report)

This project developed and demonstrated a predictive, data-driven vehicle control system designed to improve energy efficiency and driving performance. The team created intelligent self-driving car technology that optimizes fuel and electricity use by proactively planning vehicle actions. By combining Level 4 autonomous driving capabilities with vehicle-to-everything (V2X) connectivity, the system enables vehicles to adjust speed and change lanes in response to traffic signals, surrounding vehicles, and road conditions, reducing unnecessary stops and delays. In testing, the system improved vehicle fuel economy by more than 30% and reduced travel time by approximately 10%, compared to a conventional adaptive cruise control baseline. These results demonstrate the technical effectiveness of using predictive, V2X-enabled strategies, such as traffic light timing and surrounding traffic awareness, to inform real-time vehicle powertrain control and driving behavior. Additionally, a supporting cloud platform was developed to provide dispatch and route recommendations as well as to log vehicle data, demonstrating the economic feasibility of this approach at the fleet level. By optimizing dispatching and routing operations, this technology enables electric fleet operators to use their vehicles more efficiently and reduce reliance on diesel backups, lowering both operating costs and energy consumption. Overall, this project’s technology advances the future of clean, energy-efficient transportation, enabling vehicles and fleets to reduce energy waste, cut costs, and lower emissions through intelligent automation and connectivity.

33 ADVANCED PROPULSION SYSTEMS

Microreactor-liquid metal battery system in energy markets: An evaluation of potential costs, technology, and policy impacts

Microreactors represent an emerging innovation in the nuclear industry; yet have been overshadowed by their high capital costs. With the Inflation Reduction Act of 2022 (IRA), new opportunities have emerged to improve the economics of microreactor systems. This work examines liquid metal batteries (LMB) as a value-adding technology as part of microreactor-LMB systems within three U.S. electricity markets: ERCOT, PJM, and MISO. Our investigation considers key uncertainties: the cost of microreactors, the performance of LMBs, and the eligible tax credit levels. To this end, we use a dispatch optimization to trace not only the changes in system economics but also to provide a granular picture of energy delivery within the systems. We find that even with favorable costs for microreactors, significant regional variations in the project sizing and returns exist across the markets. Our heuristic method identifies their non-electric application potentials beyond electricity and technical requirements to maximize returns. The results suggest that 12–39 % of reactor heat could be cost-effectively diverted to produce more valuable by-products in U.S. markets. Including the impacts of tax credits, we establish the outcomes of each provision with varying rates. Coupling an LMB to a microreactor consistently improves the net present value of a microreactor compared to its standalone operation. In conclusion, for reasonable assumed conditions, we quantify a heterogeneous impact of round-trip efficiency (RTE) and extended LMB service life across the three markets—a one-year extension in LMB service life is roughly equivalent to a 2.11 % improvement in RTE for ERCOT, 1.16 % for PJM, and 1.04 % for MISO.

22 - GENERAL STUDIES OF NUCLEAR REACTORS

Techno-Economic Assessments of Second-Life Batteries for Electric Vehicle Charging Stations

When electric vehicle (EV) batteries degrade below a certain capacity, they may no longer be suitable for automotive use but can be repurposed as second-life batteries (SLBs) for other applications, such as EV charging stations. When integrated with photovoltaic (PV) systems, SLB can store surplus solar energy, reducing reliance on the grid and lowering operational costs. This paper presents a novel techno-economic assessment framework for deploying SLBs in combination with PV in grid-connected EV charging stations. The proposed framework integrates the value proposition, charging station operation, optimal dispatch strategies, battery degradation modeling, input data requirements, and detailed procedures for generating key economic performance metrics. Insightful analyses are performed to assess the performance of SLBs in comparison to new batteries across various cost scenarios. The results indicate that SLBs become financially attractive when their cost is 40% or lower than new batteries.

energy storage

Enhancing Building Energy Efficiency through Advanced Sizing and Dispatch Methods for Energy Storage

Energy storage and electrification of buildings hold great potential for future decarbonization. However, there are several technical and economic barriers that prevent large-scale adoption and integration of energy storage in buildings. These barriers include integration with building control systems, high capital costs, and the necessity to identify and quantify value streams for different stakeholders. To overcome these obstacles, it is crucial to develop advanced sizing and dispatch methods to assist planning and operational decision-making for integrating energy storage in buildings. This work develops simple and flexible optimal sizing and dispatch framework for thermal energy storage (TES) and battery energy storage (BES) systems in large-scale office building. The optimal sizes of TES, BES, as well as other building assets are determined in a joint manner instead of sequentially to avoid sub-optimal solutions. The interaction between the sizing at the planning stage and hourly or sub-hourly dispatch at the operating stage is explicitly modeled. The solution is determined considering both capital costs in optimal sizing and operational benefits in optimal dispatch. Comprehensive assessments are performed using simulation studies to quantify potential energy, economic, and emission benefits by different utility tariffs and climate locations, to improve our understanding of the techno-economic performance of different TES and BES systems, and to identify barriers for adopting energy storage for buildings. Finally, the proposed framework will provide guidance to a broad range of stakeholders to properly design energy storage in buildings and maximizes potential benefits, thereby advancing affordable building energy storage deployment and helping us accelerating the transition towards a cleaner and more equitable energy economy.

Yu, Mingyung

Simulation Results of a Thermal Power Dispatch System from a Generic Pressurized Water Reactor in Normal and Abnormal Operating Conditions

Amid economic pressures in the U.S. electricity market, nuclear utilities are exploring new revenue streams, including hydrogen production. A generic pressurized water reactor simulator was modified to incorporate a novel design for a TPD system coupled to a hydrogen production plant. Standard malfunctions were included in the simulation design, including steam line breaks at various system locations and flow interruptions in the hydrogen plant due to multiple faults, reflecting anticipated operational challenges. It is imperative that the TPD system operation has a minimal effect on the reactor power, primary coolant system, and turbine system operation and performance. Due to the specific design and application of this TPD system, with the proposed turbine control system changes, the overall impact on the existing plant systems is low. Normal TPD operating scenarios resulted in minor effects on the existing plant systems: reactor power changes by at most 0.2%, and gross generator output changes by 20.5 MWe from 100 MWt of TPD. The most severe malfunction analyzed in this work is a full TPD steam line break downstream of the extraction location, which results in an increase in reactor power of about 0.5%. The gross generator output decreases by 36 MWe, a total decrease of 60 MWe from the full power steady state (FPSS) condition. These results indicate that an industrial hydrogen production plant could be coupled thermally to a nuclear power plant with limited effects on the existing system operation and safety.

08 HYDROGEN

Stakeholder-guided holistic, Adaptive Framework for enhancing community Energy Resilience (SAFER) (Final Technical Report)

The Stakeholder-guided holistic, Adaptive Framework for enhancing community Energy Resilience (SAFER) project advances resilience science and engineering by addressing challenges in rural Kansas communities where aging infrastructure, extreme weather, and socioeconomic disparities heighten vulnerability to energy disruptions. Traditional approaches often focus on technical performance while overlooking community concerns and priorities. SAFER responds by integrating community perspectives with advanced analytical frameworks to create a holistic model for measuring and improving resilience. Project objectives included developing novel resilience metrics, advancing modeling frameworks that capture interdependencies across infrastructures, and embedding community-centric indicators directly into planning processes for distributed energy resources. The key technical innovations included the creation of self-organizing map (SOM)-based indices for objective resilience quantification, hetero-functional graph theory (HFGT) models linking power, water, transportation, and community assets, and graph neural network (GNN) tools for identifying critical nodes in complex systems. Community-centric energy planning was demonstrated through optimal siting and sizing of (photovoltaic) PV and battery storage, ensuring resilience enhancements also addressed energy burden and energy insecurity. SAFER engaged community partners in Dodge City and Ford County through surveys, focus groups, and workshops, generating more than 600 responses that established baseline measures of energy burden, financial insecurity, and willingness-to-pay to avoid outages. This data, organized in terms of a community capitals framework, informed the development of weighted reliability indices that better reflect community costs than traditional utility metrics. SAFER’s GNN-based critical node identification framework identified expert-labelled critical nodes with over 99% accuracy, while also uncovering additional functionalities essential for proactive resilience planning. The project’s models demonstrated that optimal PV and storage deployment could improve resilience indices by over 11 percent, with dispatch strategies further enhancing outcomes, confirming both the technical effectiveness and economic feasibility of these approaches. Through its combined emphasis on rigorous modeling, community-focused planning, and community engagement, SAFER advances the state of resilience research while delivering direct benefits to rural communities. The project provides tools, guidelines, and resilience heatmaps that help utilities, local governments, and residents better anticipate disruptions, prioritize investments, and strengthen the capacity to withstand and recover from energy-related hazards. Furthermore, the developed HFG and GNN frameworks are designed for transferability, allowing them to be adapted for resilience planning in other communities with minimal retraining. This inductive learning capability provides a scalable pathway to extend the SAFER project’s impact. Thus, creating a foundation for a nationally applicable model of infrastructure resilience. Additionally, the HFG can also be extended to include other FEMA community lifelines.

14 SOLAR ENERGY