Lessons Learned in Building the Ares Projects

Since being established in 2005, the Ares Projects at Marshall Space Flight Center have been making steady progress designing, building, testing, and flying the next generation of exploration launch vehicles. Ares is committed to rebuilding crucial capabilities from the Apollo era that made the first human flights to the Moon possible, as well as incorporating the latest in computer technology and changes in management philosophy. One example of an Apollo-era practice has been giving NASA overall authority over vehicle integration activities, giving civil service engineers hands-on experience in developing rocket hardware. This knowledge and experience help make the agency a "smart buyer" of products and services. More modern practices have been added to the management tool belt to improve efficiency, cost effectiveness, and institutional knowledge, including knowledge management/capture to gain better insight into design and decision making; earned value management, where Ares won a NASA award for its practice and implementation; designing for operability; and Lean Six Sigma applications to identify and eliminate wasted time and effort. While it is important to learn technical lessons like how to fly and control unique rockets like the Ares I-X flight test vehicle, the Ares management team also has been learning important lessons about how to manage large, long-term projects.

Sumrall, John Phil↗

Managing Complex Space Missions Like the James Webb Space Telescope

Program Management Summary; Organizational structure is established. Roles and responsibilities are well defined: a) All major contracts are in place. b) All foreign partners are in place, operating under signed Memoranda of Understanding (MOUs). c) Partners include GSFC, NGST, Ball, ITT, ATK, STScI, ESA, CSA, UAz, LM, JPL, MSFC, ARC, JSC, etc. All enabling technologies are at Technical Readiness Level-6. Earned Value Management is being applied to all major contracts consistent with Agency guidance. Schedules are baselined and the project critical path is understood/managed. Budget with reserves established. Liens and threats system in use. Formal Configuration Management (CM) processes are in place. Project-level schedules are maintained within the CM system. Formal Risk Management processes are in place. Requirements are stable and flowed down. Project metrics are established and tracked monthly: a) Includes technical as well as cost and schedule metrics. b) Changes as well as trends are reported each month.

Sabelhaus, Phil↗

Earned Value-Added

Earned value management [EVM] ...either you swear by it, or swear at it. Either way, there s no getting around the fact that EVM can be one of the most efficient and insightful methods of synthesizing cost, schedule, and technical status information into a single set of program health metrics. Is there a way of implementing EVM that allows a program to reap its early warning benefits while avoiding the pitfalls that make it infamous to its detractors? That s the question recently faced by the International Space Station [ISS] program.

Jansen, Michael↗

Earned Value - Added

Earned value management (EVM)... can be one of the most insightful methods of synthesizing cost, schedule, and technical status information into a single set of program health metrics.

Jansen, Michael↗

NASA EVM Overview and Case Study

The presentation gives an overview of the National Aeronautics and Space Administration (NASA) Earned Value Management (EVM) structure. We briefly talk about the current EVM high-level policies within NASA and the EVM governing structure. It touches on the roles and responsibilities of EVM Focal Points within the Agency. We will also discuss the approach that MSFC followed in implementing EVM and better data analysis within the Habitat Holding Racks (HHR) Project. We will address the approach used at the Marshall Space Flight Center (MSFC) to effectively equip and support MSFC projects in applying a sound EVM and data analysis process. In addition, we will show metrics associated with the HHR project before and after the implementation of EVM on the project. We will discuss the monthly report, using sample data, that the project manager used each month to assess the performance of the project. The data received from EVM helped create a solid method for assessing the project s performance. The use of EVM data analysis can be an effective and efficient tool in today s environment with increasing workloads and downsizing workforces. EVM provides project managers with information that can be used in the decision making process.

Kerby, Jerald G.↗

Integrated Baseline Review (IBR) Handbook

The purpose of this handbook is intended to be a how-to guide to prepare for, conduct, and close-out an Integrated Baseline Review (IBR). It discusses the steps that should be considered, describes roles and responsibilities, tips for tailoring the IBR based on risk, cost, and need for management insight, and provides lessons learned from past IBRs. Appendices contain example documentation typically used in connection with an IBR. Note that these appendices are examples only, and should be tailored to meet the needs of individual projects and contracts. Following the guidance in this handbook will help customers and suppliers preparing for an IBR understand the expectations of the IBR, and ensure that the IBR meets the requirements for both in-house and contract efforts.

IBR↗

Integrated Baseline Review (IBR) Handbook

The purpose of this handbook is intended to be a how-to guide to prepare for, conduct, and close-out an Integrated Baseline Review (IBR). It discusses the steps that should be considered, describes roles and responsibilities, tips for tailoring the IBR based on risk, cost, and need for management insight, and provides lessons learned from past IBRs. Appendices contain example documentation typically used in connection with an IBR. Note that these appendices are examples only, and should be tailored to meet the needs of individual projects and contracts. Following the guidance in this handbook will help customers and suppliers preparing for an IBR understand the expectations of the IBR, and ensure that the IBR meets the requirements for both in-house and contract efforts.

Project↗

Integrated Baseline Review (IBR) Handbook

The purpose of this handbook is intended to be a how-to guide to prepare for, conduct, and close-out an Integrated Baseline Review (IBR). It discusses the steps that should be considered, describes roles and responsibilities, tips for tailoring the IBR based on risk, cost, and need for management insight, and provides lessons learned from past IBRs. Appendices contain example documentation typically used in connection with an IBR. Note that these appendices are examples only, and should be tailored to meet the needs of individual projects and contracts.

Project↗

Going South: Analysis of an Historic Project Engineering Failure

NASA's successful conduct of the Apollo Program greatly enhanced the prestige of the United States and remains broadly accepted as America's gift to all Mankind. NASA's accomplishments continue to amaze the world. With the Vision for Space Exploration (VSE) Americans once again tasked NASA to carry out a project that is expected to provide inspiration and economic stimulus to the United States and to the world. In preparation NASA has thoroughly examined space program precedents. There is, however, another precedent which has not been examined in this context but whose scope and environment in many ways parallel the VSE. This project was initiated by a team that had, ten years before, successfully completed an effort that, at a cost of $173 billion (in 2008 dollars), had pushed the envelope of technology, brought economic growth, established their country as the world leader in engineering, and been broadly accepted as that country's gift to all Mankind. The new project was again inspired by popular desire to enhance national prestige and make yet another major contribution to Humanity. This effort was predicted to require eight years and $156 billion (2008 dollars). However, after nine years and expenditures of 96% beyond the baseline, the project collapsed amid bankruptcy, political scandal, and criminal prosecution. This paper applies current project management metrics, such as earned value analysis, to review the strategic decisions in this historic failure and describe its ultimate collapse. Key mistakes are identified, and lessons are drawn which may prove useful in guiding the VSE.

Scott, John H.↗

Issues in NASA Program and Project Management. Special Report: 1997 Conference. Project Management Now and in the New Millennium

Topics Considered Include: NASA's Shared Experiences Program; Core Issues for the Future of the Agency; National Space Policy Strategic Management; ISO 9000 and NASA; New Acquisition Initiatives; Full Cost Initiative; PM Career Development; PM Project Database; NASA Fast Track Studies; Fast Track Projects; Earned Value Concept; Value-Added Metrics; Saturn Corporation Lessons Learned; Project Manager Credibility.

Hoffman, Edward J.↗

Thoughts on Earned Value Assessments

This slide presentation reviews the concepts of Earned Value reporting and Earned Value Metrics (EVM) and the implementation for the Constellation Program. EVM is used to manage both the contract and civil service workforce, and used as a measure of contractor costs and performance. The Program EVM is not as useful for Level of Effort tasking, for either contractor, or civil service employees. Some issues and concerns in reference to EVM and the process for the use of EVM for Mission assurance are reviewed,

Pido, Kelle↗

Project resources planning and control

This report contains instructional guidelines for the resources planning and control of research and development (R&D) projects managed by NASA's Langley Research Center (LaRC). Although written to serve primarily as a practical guide and reference for those LaRC personnel who perform resources planning, analysis, control, and reporting functions, it should also be meaningful to other NASA personnel who are directly or indirectly involved in or affected by these functions, especially project technical managers whose responsibilities include resources management. Certain sections should help Contractor personnel to better understand what resources information must usually be submitted on LaRC projects and what use is made of such information. The Project Manager of a large R&D project typicaly receives support from an Analyst in the area of resources management. The Analyst provides assistance in four functional areas: Planning, Analysis/Control, Administration, and Reporting. Each of these functions are discussed in detail. Examples of techniques used effectively on LaRC projects have been included where applicable. A considerable amount of information has been included on the use of Performance Measurement (Earned Value) Systems for contract cost control and reporting as little information is currently available on this subject in NASA publications.

Sibbers, C. W.↗

Valuing the Future Electric Grid: A Bid-Based Approach

Energy storage resources (ESRs) and other zero marginal cost (ZMC) resources have unique characteristics that are not fully captured in today’s electricity planning and operations modeling tools. Because the modeling assumptions used in these tools are simplified approximations of how operations and investment decisions occur in the real-world, accurately representing cost and operational characteristics are key for determining how these resources impact price formation. Questions such as—Where should we build new transmission? Will a small modular reactor earn enough revenue to participate in the future electric grid? Is retrofitting a coal plant with carbon capture technology economically feasible?—all require accurate electricity prices, which aren’t available from today’s electricity planning and operations modeling tools. As an example, production cost models (PCMs) are heavily utilized tools that determine the cost and reliability of the electric system. However, as PCMs were developed to help thermal generators manage their fuel inventories, production cost modeling is largely based on fuel prices. Because ESRs do not incur fuel costs, they are often modeled as ZMC resources. In reality, ESRs incur opportunity costs as well as technology-specific (degradation) costs that are non-trivial to calculate but are important for price formation. In this research, we identify options to incorporate more realistic opportunity and degradation costs in ESR bidding algorithms. Expanding available bidding assumptions allows energy system modelers to develop more accurate economic valuations for ESRs, leading to more accurate price formation from leading energy system modeling tools.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Students Solving Problems for ISS and Beyond: Inspiring the Next-Generation

Students Solving Problems for ISS and Beyond: Inspiring the Next-Generation Session Title: Students Solving Problems for ISS and Beyond: Inspiring the Next-Generation Session Description: NASA High school students United with NASA to Create Hardware (HUNCH) mission is to empower and inspire students through a Project-Based Learning program where 7-12 grade students learn 21st century skills and can launch their careers through participation in the design and fabrication of real-world valued products for NASA. With six different tracks consisting of Design & Prototype, Culinary Challenge, Softgoods, Precision Machining, Software, and Video Challenge, students are given the opportunity to create solutions for the International Space Station (ISS), the Moon, and beyond. Many projects are requested by the Crew to help ease living conditions, giving students the opportunity to make an impact on the lives of Astronauts. Other projects come directly from NASA and its partners. Join our session to learn how NASA is working with teachers across the country to mentor the next generation of scientists and engineers to solve some of NASA’s greatest challenges. Learning Outcomes: 1. Describe the NASA HUNCH Program, including the program objectives, goals, and strategic partnerships for middle school and high school outreach and advocacy efforts. 2. Identify the innovative strategies NASA is using to work with middle and high school students to solve real-world problems 3. Use the knowledge gained to inspire the next generation of scientists and engineers Session Track: Advocacy & Outreach Specialized Focus Area: Women in Government and Military Learning Level: Foundational Session Format: Listen & Learn Speaker Qualifications: 1. Deboshri Sadhukhan • Current Job Title: Deputy Project Manager • Topic Experience (years of experience related to proposed topic): 1-5 years • Biography: Deboshri Sadhukhan is an engineer for NASA Glenn Research Center (GRC). She has worked on numerous projects — from International Space Station (ISS) fluid technologies, to Orion European Service Module propulsion, to planetary science missions and other game-changing technologies. Her roles have ranged from Project Manager to System Safety Lead. She currently serves as a GRC Regional Mentor for the High school students United with NASA to Create Hardware (HUNCH) program. She also serves as Deputy Project Manager for an ISS payload and Safety & Mission Assurance Lead for a Radioisotope Power Systems project. In these roles, she oversees each phase of a project from beginning to end and provides leadership to increase the reliability, maintainability and system safety of hardware and personnel throughout the system life cycle. She holds a Bachelor of Science in Electrical Engineering from The University of Akron. 2. Nancy Hall • Current Job Title: Project Manager • Topic Experience: 20+ years • Biography: Nancy Rabel Hall earned a B.S. degree in Space Sciences from Florida Institute of Technology and a M.S. degree in Mechanical Engineering from the University of Toledo. She has been at NASA Glenn for over 30 years. She has led several International Space Station experiments that studied how the behavior of fluids and fluid systems behave differently in microgravity as compared to here on Earth. She is also the High school students United with NASA to Create Hardware (HUNCH) project manager, a program that allows students to design and fabricate hardware and softgoods for NASA as well as participate in a culinary and video challenge. She enjoys talking to the public and students about the work being done at NASA as well as showing students how math and science can be fun. She is an amateur radio operator, enjoys playing golf, and reading science fiction and fantasy books.

HUNCH↗