Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ESPCS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Energy Savings Performance Contracts (ESPC): Frequently Asked Questions

An ESPC is a working relationship between a Federal agency and an energy service company (ESCO). The ESCO conducts a comprehensive energy audit for the Federal facility and identifies improvements to save energy. The following sections present a number of frequently asked questions from ESPC end-users and stakeholders.

Energy, Savings, Performance, Contracts, ESPC, Que↗

FEMP ESPC Project Development Resource Guide

Guide charts the Federal Energy Management Program process for providing project development support to agencies developing energy savings performance contract (ESPC) projects using the U.S. Department of Energy (DOE) indefinite-delivery, indefinite-quantity (IDIQ) ESPC. Within that process, the guide outlines: (1) the resources that Project Facilitators (PFs) and Federal Project Executives (FPEs) are required to use in their lead role in the delivery of project development services, and (2) minimum requirements for project documentation.

ESPCs↗

ESPC ESA Training Series: Site-Specific/Stand-Alone Contract Vehicle

This webinar provides instructions and resources for financing distributed energy projects (e.g., on–site renewable energy, storage, and combined heat and power) using an energy savings performance contract (ESPC) energy sales agreement (ESA) through the site–specific/stand–alone contract vehicle. The site–specific/stand–alone contract vehicle is a procurement process using a request for proposal (RFP). Topics covered during the webinar include forming a strong project team, validating the feasibility of the distributed energy project at a site, acquisition planning, RFP development, procurement, proposal evaluation and contract award, and the construction and performance period. This webinar also provides an overview of the resources available in the ESPC ESA Toolkit, such as checklists and templates.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Electrification in an ESPC: Flatirons Campus Electrification

Overview of the steps taken to electrify the Flatirons Campus. Begins with a review of the current equipment in the facilities, NREL's approach to net zero emissions, and our work with an ESPC. Discusses approach to doing electrification with an ESPC. Summary of the equipment being considered for electrification of the four buildings at Flatirons Campus.

building↗

Reported Energy and Cost Savings from the DOE ESPC Program: FY 2012

The objective of this work was to determine the realization rate of energy and cost savings from the Department of Energy’s Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 142 Measurement and Verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year. Because the quality of the reports varied, it was not possible to determine all of these parameters for each project.

Slattery, Bob S.↗

Reported Energy and Cost Savings from the DOE ESPC Program: FY 2016

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. In formation was extracted from 172 measurement and verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Reported Energy and Cost Savings from the DOE ESPC Program: FY 2019

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Indefinite Delivery Indefinite Quantity (IDIQ) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal facilities. In formation was extracted from 187 measurement and verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2020

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Indefinite Delivery Indefinite Quantity (IDIQ) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal facilities. In formation was extracted from 195 measurement and verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY2021

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 201 measurement and verification (M&V) reports covering 193 projects to determine reported, estimated, and guaranteed cost savings and the associated reported and estimated energy savings for the previous contract performance year. This report covers projects that had a performance year ending in fiscal year 2021, between October 1, 2020 and September 30, 2021, and had an M&V report issued. Additionally, the annual cost to perform M&V was extracted from the individual project Task Order (TO) Schedules.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2022

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 190 measurement and verification (M&V) reports covering 182 projects to determine reported, estimated, and guaranteed cost savings and the associated reported and estimated energy savings for the previous contract performance year. This report covers projects that had a performance year ending in fiscal year 2021, between October 1, 2021 and September 30, 2022, and had an M&V report issued. Additionally, the annual cost to perform M&V was extracted from the individual project Task Order (TO) Schedules.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2023

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 201 measurement and verification (M&V) reports covering 191 projects to determine reported, estimated, and guaranteed cost savings and the associated reported and estimated energy savings for the previous contract performance year. This report covers projects that had a performance year ending in fiscal year 2023, between October 1, 2022 and September 30, 2023, and had an M&V report issued. Additionally, the annual cost to perform M&V was extracted from the individual project Task Order (TO) Schedules.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

NASA Glenn Research Center Experience Using DOE Midwest Region Super ESPC

The energy crisis of 1973 prompted the Federal Government and private industry to look into alternative methods to save energy. At the same time the constant reduction of operations and maintenance funds during the last 5 years forced Glenn Research Center (GRC) to look for alternative funding sources to meet the mandate to reduce energy consumption. The Super Energy Savings Performance Contract (ESPC) was chosen as a viable source of facility improvement funding that can create larger project scope and help replace aging, inefficient equipment. This paper describes Glenn's participation in the Department of Energy (DOE) Super ESPC program. This program provided Glenn cost savings in the performance of energy audits, preparation of documents, evaluation of proposals, and selection of energy service company (ESCO).

Zala, Laszlo F.↗

ESPC ESA Case Study: Energy Affordability at the Drug Enforcement Administration

The U.S. Drug Enforcement Administration (DEA) El Paso Intelligence Center (EPIC), located on Fort Bliss in El Paso, TX, installed 2.5 MW DC of photovoltaics (PV). This project was an energy sales agreement energy conservation measure (ESA ECM) using the U.S. Department of Energy (DOE) energy savings performance contract (ESPC) ENABLE contract vehicle. The project represents an economical clean-energy solution that provides excellent construction and other trades-related jobs, and provides information that will help future ESPC ESA projects provide cost savings to the government.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Savings Performance Contracts (ESPC): FEMP Assistance

An ESPC is a working relationship between a Federal agency and an energy service company (ESCO). The ESCO conducts a comprehensive energy audit for the Federal facility and identifies improvements to save energy. In consultation with the Federal agency, the ESCO designs and constructs a project that meets the agency’s needs and arranges the necessary funding. The ESCO guarantees the improvements will generate energy cost savings sufficient to pay for the project over the term of the contract. After the contract ends, all additional cost savings accrue to the agency.

Energy, Savings, Contracts, ESPC, FEMP, Assistance↗

ESPC ESA Overview and Requirements

This webinar is the first of a series that provides information, best practices, and resources for implementing energy savings performance contract (ESPC) energy sales agreement (ESA) projects.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

ESPC ESA Training Series: Photovoltaic (PV) Project Considerations

This training covers technical, economic and other photovoltaic (PV) project considerations. Technical topics include cost-effectiveness, resilience, cybersecurity, and electrical considerations. In addition, other topics, such as compatibility with agency mission, site plans, coordination with the serving utility, the National Environmental Policy Act, and agency approval requirements. Considerations specific to third-party owned/third-party financed PV projects are also covered, as well as available resources and templates for project development. The training also includes a recap of the first session in the Energy Savings Performance Contracts Energy Sales Agreements (ESPC ESA) Webinar Series.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗