Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ESMO”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

26 records · Page 2

Aqua/Aura Updated Inclination Adjust Maneuver Performance Prediction Model

This presentation will discuss the updated Inclination Adjust Maneuver (IAM) performance prediction model that was developed for Aqua and Aura following the 2017 IAM series. This updated model uses statistical regression methods to identify potential long-term trends in maneuver parameters, yielding improved predictions when re-planning past maneuvers. The presentation has been reviewed and approved by Eric Moyer, ESMO Deputy Project Manager.

adjust↗

Total and Spectral Solar Irradiance Sensor (TSIS) Project Status

TSIS-1 studies the Sun's energy input to Earth and how solar variability affects climate. TSIS-1 will measure both the total amount of light that falls on Earth, known as the total solar irradiance (TSI), and how that light is distributed among ultraviolet, visible and infrared wavelengths, called solar spectral irradiance (SSI). TSIS-1 will provide the most accurate measurements of sunlight and continue the long-term climate data record. TSIS-1 includes two instruments: the Total Irradiance Monitor (TIM) and the Spectral Irradiance Monitor (SIM), integrated into a single payload on the International Space Station (ISS). The TSIS-1 TIM and SIM instruments are upgraded versions of the two instruments that are flying on the Solar Radiation and Climate Experiment (SORCE) mission launched in January 2003. NASA Goddard's TSIS project responsibilities include project management, system engineering, safety and mission assurance, and engineering oversight for TSIS-1. TSIS-1 was installed on the International Space Station in December 2017. At the end of the 90-day commissioning phase, responsibility for TSIS-1 operations transitions to the Earth Science Mission Operations (ESMO) project at Goddard for its 5-year operations. NASA contracts with the University of Colorado Laboratory for Atmospheric and Space Physics (LASP) for the design, development and testing of TSIS-1, support for ISS integration, science operations of the TSIS-1 instrument, data processing, data evaluation, calibration and delivery to the Goddard Earth Science Data and Information Services Center (GES DISC).

TSIS↗

Mission Status for Earth Science Constellation MOWG Meeting @ Sioux Falls SD EOS Aura

This presentation provides mission operations status for the Earth Observing System (EOS) Aura satellite for the past six-months (December 2017 through May 2018). It only contains information that is of interest to the International Earth Science Constellation (ESC) Mission Operations Working Group (MOWG) member missions. It will be presented at the bi-annual MOWG Meeting at the USGS EROS Data Center in Sioux Falls, South Dakota on Wednesday, June 12, 2018. These meetings have been occurring twice a year since the MOWG was formed in 2003. The presentation has been reviewed and approved by Eric Moyer, ESMO Deputy Project Manager Technical.

Aura satellite↗

Mission Operations Working Group (MOWG) Report to the OMI Science Team

This PowerPoint presentation will discuss Aura's current spacecraft and OMI insturment status, highlight anyperformance trends and impacts to OMI operations, identify any operational changes and express concerns or potential process improvements. Reviewed by Eric Moyer, ESMO Deputy Project Manager.

Aura Mission Status↗

Mission Operations Working Group (MOWG) Report to the Aura Science Team

This PowerPoint presentation will discuss Aura's current spacecraft and instrument status, highlight any performance trends and impacts to operations, identify any operational changes and express concerns or potential process improvements. Reviewed by Eric Moyer, ESMO Deputy Project Manager.

Fisher, Dominic M.↗

Constellation Coordination System (CCS) Status

This presentation will discuss the operational status update of the Constellation Coordination System (CCS) Release 7.0 and the development status of CCS Release 7.1.

Satellite Constellation↗

The Earth Observing System (EOS) Ground System: Leveraging an Existing Operational Ground System Infrastructure to Support New Missions

The Earth Observer System (EOS) was officially established in 1990 and went operational in December 1999 with the launch of its flagship spacecraft Terra. Aqua followed in 2002 and Aura in 2004. All three spacecraft are still operational and producing valuable scientific data. While all are beyond their original design lifetime, they are expected to remain viable well into the 2020s. The EOS Ground System is a multi-mission system based at NASA Goddard Space Flight Center that supports science and spacecraft operations for these three missions. Over its operational lifetime to date, the EOS Ground System has evolved as needed to accommodate mission requirements. With an eye towards the future, several updates are currently being deployed. Subsystem interconnects are being upgraded to reduce data latency and improve system performance. End-of-life hardware and operating systems are being replaced to mitigate security concerns and eliminate vendor support gaps. Subsystem hardware is being consolidated through the migration to Virtual Machine based platforms. While mission operations autonomy was not a design goal of the original system concept, there is an active effort to apply state-of-the-art products from the Goddard Mission Services Evolution Center (GMSEC) to facilitate automation where possible within the existing heritage architecture. This presentation will provide background information on the EOS ground system architecture and evolution, discuss latest improvements, and conclude with the results of a recent effort that investigated how the current system could accommodate a proposed new earth science mission.

Earth Science Mission Operations (ESMO)↗

Constellation Coordination System (CCS) Status

This presentation will be given at the Mission Operations Working Group meeting June 13-15, 2017 to discuss the Constellation Coordination System status.

Constellation coordination system↗