Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ELECTRICAL FAULTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Results of an electrical power system fault study (CDDF)

This report gives the results of an electrical power system fault study which has been conducted over the last 2 and one-half years. First, the results of the literature search into electrical power system faults in space and terrestrial power system applications are reported. A description of the intended implementations of the power system faults into the Large Autonomous Spacecraft Electrical Power System (LASEPS) breadboard is then presented. Then, the actual implementation of the faults into the breadboard is discussed along with a discussion describing the LASEPS breadboard. Finally, the results of the injected faults and breadboard failures are discussed.

Dugal-Whitehead, N. R.↗

Identification of high performance and component technology for space electrical power systems for use beyond the year 2000

Addressed are some of the space electrical power system technologies that should be developed for the U.S. space program to remain competitive in the 21st century. A brief historical overview of some U.S. manned/unmanned spacecraft power systems is discussed to establish the fact that electrical systems are and will continue to become more sophisticated as the power levels appoach those on the ground. Adaptive/Expert power systems that can function in an extraterrestrial environment will be required to take an appropriate action during electrical faults so that the impact is minimal. Manhours can be reduced significantly by relinquishing tedious routine system component maintenance to the adaptive/expert system. By cataloging component signatures over time this system can set a flag for a premature component failure and thus possibly avoid a major fault. High frequency operation is important if the electrical power system mass is to be cut significantly. High power semiconductor or vacuum switching components will be required to meet future power demands. System mass tradeoffs have been investigated in terms of operating at high temperature, efficiency, voltage regulation, and system reliability. High temperature semiconductors will be required. Silicon carbide materials will operate at a temperature around 1000 K and the diamond material up to 1300 K. The driver for elevated temperature operation is that radiator mass is reduced significantly because of inverse temperature to the fourth power.

Maisel, James E.↗

Results of an electrical power system fault study

NASA-Marshall conducted a study of electrical power system faults with a view to the development of AI control systems for a spacecraft power system breadboard. The results of this study have been applied to a multichannel high voltage dc spacecraft power system, the Large Autonomous Spacecraft Electrical Power System (LASEPS) breadboard. Some of the faults encountered in testing LASEPS included the shorting of a bus an a falloff in battery cell capacity.

Dugal-Whitehead, Norma R.↗

A PC based time domain reflectometer for space station cable fault isolation

Significant problems are faced by astronauts on orbit in the Space Station when trying to locate electrical faults in multi-segment avionics and communication cables. These problems necessitate the development of an automated portable device that will detect and locate cable faults using the pulse-echo technique known as Time Domain Reflectometry. A breadboard time domain reflectometer (TDR) circuit board was designed and developed at the NASA-JSC. The TDR board works in conjunction with a GRiD lap-top computer to automate the fault detection and isolation process. A software program was written to automatically display the nature and location of any possible faults. The breadboard system can isolate open circuit and short circuit faults within two feet in a typical space station cable configuration. Follow-on efforts planned for 1994 will produce a compact, portable prototype Space Station TDR capable of automated switching in multi-conductor cables for high fidelity evaluation. This device has many possible commercial applications, including commercial and military aircraft avionics, cable TV, telephone, communication, information and computer network systems. This paper describes the principle of time domain reflectometry and the methodology for on-orbit avionics utility distribution system repair, utilizing the newly developed device called the Space Station Time Domain Reflectometer (SSTDR).

Pham, Michael↗

Cooperative fault management for resilient integration of renewable energy

Cooperative fault management (CFM) is designed herein to control different types of renewable energy resources cooperatively during electrical faults. This paper studies systems with a high penetration of photovoltaic (PV) energy and wind energy. First, CFM leverages power converters of PV farms to boost the ride-through capability of nearby doubly-fed induction generators (DFIGs). By controlling PV farms’ output voltages to change smoothly during both fault initiation and fault clearance, the widely used crowbar in DFIGs is less likely to be activated. Crowbar activation adversely makes DFIGs lose controllability and absorb reactive power. The second contribution is the development of a software-defined CFM controller and a controller in-the-loop demonstration of the real-time performance of this optimization-based CFM. CFM capitalizes on distributed optimization formulation to enable flexibility, plug-and-play, and privacy-preserving. Computation time, however, is a major concern for optimization-based dynamics control. Here, real-time controller-in-the-loop simulation results show optimization-based CFM can output reference values around 60 ms and is quick enough for dynamic control.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A design approach for ultrareliable real-time systems

A design approach developed over the past few years to formalize redundancy management and validation is described. Redundant elements are partitioned into individual fault-containment regions (FCRs). An FCR is a collection of components that operates correctly regardless of any arbitrary logical or electrical fault outside the region. Conversely, a fault in an FCR cannot cause hardware outside the region to fail. The outputs of all channels are required to agree bit-for-bit under no-fault conditions (exact bitwise consensus). Synchronization, input agreement, and input validity conditions are discussed. The Advanced Information Processing System (AIPS), which is a fault-tolerant distributed architecture based on this approach, is described. A brief overview of recent applications of these systems and current research is presented.

Lala, Jaynarayan H.↗

Shot 3 Post-Shot Report: Fault Analysis of MK-X Data [Slides]

This presentation constitutes a post-shot report for the MK-X performance on Shot 3 (13 July 2022). It focuses primarily on the analysis of electrical faults which have been a persistent issue in MK-X performance and were a significant focus of the test. The MK-X is a helical flux compression generator (HFCG) that has been manufactured in a novel and very cost-effective way. Shot 3 was the fourth test in a series which began with a low initial-current-level HFCG test coupled to a dummy load (Shot 0) and then a high stress test (Shot 1) coupled to a primitive pulse forming network (PFN). Shot 0 performed close to expectation but Shot 1 had early time losses that could not be explained. As a result, Shots 2 and 3 had dual goals. Each shot looked at MK-X performance relative to the early time losses, and since the amount of current generated on the first two tests was a useful amount, we coupled to a fast R43S Ranchero flux compression generator for Shot 2 to ascertain Ranchero’s performance with higher-than-ever initial current and another PFN load. Then Shot 3 implemented a specific change to the MK-X and coupled to only a low inductance PFN load. The report shows that Shots 1-3 all have qualitatively similar losses and the change made for Shot 3 to explore losses led to even further losses. However, the PFN on shot 3 was low inductance and in spite of the losses, 32 MA was generated. This report discusses the losses seen specifically on Shot 3 and compares the electrical and camera data along with a careful comparison to 3 D MHD modeling.

42 ENGINEERING↗

Engineered Solutions Group's SMR Containment Cable and Electrical Penetration Assembly System

GAIN Project CRADA Number NFE-21-08839, entitled “SMR Containment Cable and EPA System” was initiated by the partnership of Oak Ridge National Laboratory (ORNL) and Engineered Solutions Group (ESG) to test an ESG-designed Electrical Penetration Assembly and Containment Cabling System Qualified for not only legacy LWR designs, but also Small Modular Reactors designs currently being designed by several different suppliers. This project was undertaken to fill the equipment gap of EPA and Cabling Systems that require much more severe environmental requirements than legacy plant applications present due to their smaller containment volumes that result in high energy densities compared to legacy designs. This high energy density results in severe accident environments and more severe normal operating conditions as well. We developed two approaches to qualify Electrical Penetration Assembly (EPA) and Containment Cabling Systems for SMRs and Advanced Reactors. We take into consideration the more severe environmental parameters found with SMR designs. The system will need to meet a qualification test program addressing wear/cyclic aging, potential radiation exposure, thermal aging, vibration aging, thermal cycling, seismic qualification, electrical fault testing (per IEEE 317) and accident simulation. The equipment must meet the requirements of 10CFR50.49, GDC 50 in 10CFR50 Appendix A, and 10CFR50 Appendix J. NRC Regulatory Guides (RGs) identify an acceptable way of meeting regulatory requirements. RGs frequently endorse a standard for meeting these requirements. Specific to this review, equipment would be qualified in accordance with the following IEEE Standards. • IEEE 317-2013 (Electrical Penetration Assemblies), which is endorsed by RG 1.63, Rev. 3, • IEEE 323-2003 and the more current IEC/IEEE 60780-323 (Environmental Qualification of 1E Equipment) which is endorsed by RG 1.89. IEEE 323-2003 is endorsed by RG 1.209, • IEEE 344-2020 (Seismic Qualification. The 2013 version endorsed by RG 1.100, Rev. 4, with exceptions), • IEEE 383-2015 (Electrical Cables) (which is endorsed by RG 1.189 Rev. 4 and the -2003 version endorsed by RG 1.211 rev. 0), • IEEE 572-2019 (Electrical Connectors and Assemblies), which is endorsed by 1.156 Rev 1, and • [IEEE 1202 (endorsed by RG 1.189) would normally be applicable but the advanced cable designs are impervious to this cable flame test.] The primary goal of such a program is to provide an EPA design that can meet the qualification requirements for all legacy light water reactor plants currently operating as well as new plant designs including light water Small Modular Reactors. Thus, these requirements are applicable to plants licensed under 10CFR50 and 10CFR52. Other reactor designs may be evaluated, and this test system and qualification method applied to those applications if the requirements would satisfy the requirements of the intended plant. A secondary benefit of this work is to document some of the history and background in these requirements as there have been recent delays in an SMR licensing process due to NRC Requests for Additional Information in this subject matter area.

42 ENGINEERING↗

Digital Grid Twin–Direct Communication Scheme Test Bed for Assessing Relay-to-Relay Radio Antenna and Optical Fiber Performance and Misoperations

This study introduces a novel “Digital Grid Twin–Direct Communication Scheme” test bed. This advanced platform evaluates point-to-point communication between transmitter and receiver relays with optical fiber and radio omnidirectional antenna systems, implemented at the Advanced Protection lab in the Grid Research Innovation and Development Center at Oak Ridge National Laboratory. The increased diversity of energy sources has led to more protective relay misoperations. In North America, microgrid protection schemes now use point-to-point communication along distribution lines between relays to implement advanced logic in nonradial grids that include both high- and low-inertia generators. This trend challenges utilities to minimize misoperations while ensuring rapid fault clearance and accurate selectivity coordination between primary and backup relays. This study assesses relay-to-relay communication schemes by introducing an advanced testing platform based on a digital grid twin protection test bed using a synchronized time source system. The platform evaluates the communication system using radio antennas or optical fiber links by integrating protective relays that operate breakers within the digital twin and record relay events and communication signals. In the experiments, transmitter and receiver relays were configured with inverse time overcurrent and breaker trip detection logic to assess the total time of the communication protection schemes based on the sum of the relay protection element operating time, radio latency, propagation delay, baud rate delay, and relay processing time. These delays were derived from recorded relay events and communication signals from the interface of a real-time simulator set as a digital grid twin. The test bed successfully simulated various electrical faults along a distribution line while ensuring effective and reliable point-to-point communication between transmitter and receiver relays. The radio antenna communication system exhibited latency because of the radio. This latency depends on the baud rate setting and type of radio application; in general, the higher the baud rate, the lower the radio latency. The measured radio latency (for Mirrored Bits with an encryption card at 9,600 bps) was about 9–10 ms. Additionally, calculated propagation delay per mile for radio antennas and optical fiber was 5.36 µs/mi and 8.04 µs/mi, respectively. Optical fiber communication did not demonstrate radio latency. Instead, the protection element operating time depends mainly on the protection logic function set in the relay, and the relay processing time depends on the processing rate of the relay in samples per power system cycle.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impact assessment of geomagnetic induced current neutral blocking devices with power electronics sources on distance relay for 230 kV transmission lines

Electrical grids increased the integration of power electronics sources onto transmission lines. In addition, recent reports show a significant rise in geomagnetic storms occurring in 2024. These geomagnetic storms can affect transmission lines by inducing electrical currents within them, potentially causing power outages due to overloaded power transformers. Geomagnetic induced current neutral blocking devices (GIC-NBDs) are capacitors on the ground of wye power transformers, to avoid damage caused by geomagnetic storms. The integration of distance relays and transmission lines with power electronics sources and GIC-NBDs needs to be studied to observe if GIC-NBDs and power electronics sources could adversely affect operation of the electrical grid. In this analysis, the effect of 2 MW power electronics sources and GIC-NBDs on distance relays is assessed for different 230 kV transmission line lengths in radial and nonradial power systems. The simulations measured the apparent impedances, with different electrical faults. Results for a typical 2,650 μF GIC-NBD application were presented on impedance plots, and the distance relay model operations were assessed. In conclusion, the tests for radial and nonradial power systems showed the behavior of the distance elements and source impedance ratios, assessing the effect of power electronics sources and GIC-NBDs on 230 kV transmission lines.

Distance relays↗

Quantum sensing for emerging energy technologies

The ability to exploit quantum phenomena has enabled sensing technologies with detection limits below the classical limit. Sensors with applications in energy discovery, production, transportation, and consumption can be enhanced through quantum or hybrid quantum-classical sensors. Here, in this Review, we provide an overview of commercial and emerging quantum sensor platforms and their opportunity areas specific to advanced energy technologies. Key examples include: power grid-enhancing-technologies, where quantum magnetometers can detect powerline and transformer faults; electric vehicle-to-grid applications, where chip-scale atomic clocks can enable grid synchronization; and carbon capture and storage, where quantum gravimeters and single-photo LiDAR can detect microscopic leaks. Quantum sensor deployment requires further research into miniaturization and ruggedization for field deployment, cost-reduction, and workforce development. The maturation of clean energy technologies and quantum sensors provide opportunities for synergy, with the integration of quantum sensors into advanced energy technologies maximizing their security, reliability, and efficiency.

critical metals↗

Impact of Geomagnetic Induced Current Neutral Blocking Devices on Distance Relays in Sub-transmission Networks with IBR

Geomagnetically induced currents (GICs) can flow through transmission lines during geomagnetic disturbances, such as solar flares or coronal mass ejections. These currents can cause problems like transformer saturation and equipment damage. The most common method of mitigating GICs involves installing GIC neutral blocking devices (NBDs) in transformer neutrals. However, the wide application of capacitive GIC blocking devices may have unintended adverse effects on other devices, such as distance protection relays. As the number of inverter-based resources being connected to the transmission and sub-transmission systems increases, the likelihood of a sub-transmission line protected by a distance relay connected to a transformer with NBDs is increasing. Therefore, distance relays fed by IBRs and transmission lines with GIC-NBDs must be studied. This paper studies the effect of GIC-NBDs on a 69kV sub-transmission line of various lengths fed by a 25 MVA IBR and synchronous source. This work focused on the behavior of the GIC-NBDs using the measured apparent phase-to-ground and phase-to-phase impedance calculated by the relay and the source impedance ratio (SIR) during various electrical faults.

Patel, Trupal R [Sandia National Laboratories (SNL↗

Managing Wildfire Risk and Promoting Equity through Optimal Configuration of Networked Microgrids

As climate change increases the risk of large-scale wildfires, wildfire ignitions from electric power lines are a growing concern. To mitigate the wildfire ignition risk, many electric utilities de-energize power lines to prevent electric faults and failures. These preemptive power shutoffs are effective in reducing ignitions, but they could result in wide-scale power outages. Advanced technology, such as networked microgrids, can help reduce the size of the resulting power outages; however, even microgrid technology might not be sufficient to supply power to everyone, thus forcing hard questions about how to prioritize the provision of power among customers. In this paper, we present an optimization problem that configures networked microgrids to manage wildfire risk while maximizing the power served to customers; however, rather than simply maximizing the amount of power served in kilowatts, our formulation also considers the ability of customers to cope with power outages, as measured by social vulnerability, and it discourages the disconnection of particularly vulnerable customer groups. To test our model, we leverage a synthetic but realistic distribution feeder, along with publicly available social vulnerability indices and satellite-based wildfire risk map data, to quantify the parameters in our optimal decision-making model. Our case study results demonstrate the benefits of networked microgrids in limiting load shed and promoting equity during scenarios with high wildfire risk.

distribution systems↗

Outdoor Test Bed Performance of a Power Line Sensor Using a Real-Time Event Simulator

This report summarizes the design and application of an outdoor power line sensor testbed (OPLST) with a real-time simulator and power meter to compare a potential transformer (PT) and current transformer (CT) versus an advanced line-post sensor. The OPLST was created to validate advanced medium-voltage (20/34.5 kV) outdoor power line sensors used in electrical distribution systems. Electrical utilities have installed metering and relay-protection transformers like PTs and CTs for several decades. The PTs/CTs are iron core measurement transformers based on the electromagnetic induction principle and provide reliable data in normal grid operation. However, new outdoor power line sensors (OPLS) using other technologies like voltage divider, Rogowski coil and optical principles have become available and may have favorable performance and costs compared to PTs/CTs. Therefore, the importance of testing these technologies with the PT/CT, to compare the measured phase voltage/current at different power grid scenarios is crucial to understand the performance of these new OPLS. For this study a G&W Electric Model CVS-36-O power line sensor was chosen as the OPLS to test with voltage/current signals. An OPAL-RT Technologies Model OP4510 real-time simulator and Schweitzer Engineering Laboratories Model SEL-735 power meter were installed with the 20/34.5 kV OPLST to compare the measured transient events collected from an advanced OPLS and the PT/CT. This system is installed at the Distributed Energy Communications and Control (DECC) lab, Oak Ridge National Laboratory (ORNL). The simulator generated different power grid scenarios (electrical faults, capacitor bank operation, service restoration, etc.), and its analog-output signals were connected to the voltage/current amplifiers that feed the 20/34.5 kV aerial cable loop through the PT/CT devices. Additional PT/CT devices were also wired with the medium voltage aerial cable loop to measure the phase current/voltage signals and server as references. After each test, common format for transient data exchange (COMTRADE) files were collected from the SEL-735 power meter and used to compare the performance of the OPLS with the PT/CT. The behavior of analog signals, harmonic components, total harmonic distortion and crest factors were assessed and found favorable for the G&W sensor as compared to the reference PT/CT.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Monitoring of Photovoltaic (PV) Performance and Degradation: Integrated Renewable Energy Systems (IRES) - PV Monitoring Task

The Integrated Renewable Energy System (IRES) testbed demonstration at the Pacific Northwest National Laboratory (PNNL) Sequim campus includes development of a suite of capabilities for tracking the performance of photovoltaic (PV) renewable energy components located on a floating platform (floating PV) and on a shoreline building rooftop. The marine environment represents potentially harsh and corrosive conditions for PV modules. Compared to terrestrial PV, potential concerns for offshore PV arising from high humidity and occasional contact with saltwater, marine wildlife, and aquaculture. These environmental factors can reduce electricity generation efficiency and increase the risk of electrical faults, polymer insulation or jacketing degradation and hydrolysis of the PV cell encapsulant materials. Offshore PV modules may also be exposed to lower temperatures and buoyant and vibrating motions with a floating platform. It is not clear how the long-term performance of floating PV will be affected by these factors. To understand expected energy generation through solar cells on a floating platform, monitoring of the performance of PV modules in the marine environment is needed. This report outlines a plan for long-term testing of IRES PV components utilizing resources of the PNNL Material Aging and Detection (MAaD) Science team and the Marine and Coastal Research Laboratory (MCRL). Equipment applicable for onsite testing and real-time monitoring of the PV performance associated with environmental conditions including temperature, solar irradiance, shading and soiling is included. In case of performance loss, equipment for fault detection, failure analysis, material testing, and further troubleshooting are also available. Through establishment of this capabilities, the enabling IRES project sets the stage for future research to advance off-shore and near-shore energy options for businesses and communities.

14 SOLAR ENERGY↗

Medium Voltage Testbed for Comparing Advanced Power Line Sensors vs. Transformers with Electrical Grid Events

Electrical utilities have relied upon potential transformers (PTs) and current transformers (CTs) for very accurate metering and to provide reliable signals for protective relays. These devices measure phase voltages and currents and are commissioned by electrical engineers. PTs/CTs can detect and react to various electrical anomalies that could adversely affect electrical grid operations. Less expensive alternative sensing technologies offer the possibility of wider deployment, particularly in grids that employ distributed energy resources. In this work, the performance of an advanced medium-voltage sensor is compared with that of a reference PT and a CT and experimentally evaluated for different power grid scenarios on an advanced outdoor power line sensor testbed at the U.S. Department of Energy’s Oak Ridge National Laboratory. The sensor is based on a capacitive divider for voltage monitoring and a Rogowski coil with an integrator for current monitoring. This study simulated a power grid model based on a utility circuit at the Riverside EPB of Chattanooga. The simulation circuit was created with MATLAB/Simulink software and was integrated into an RT-LAB project to run with the OP4510 real-time simulator at the OPLST. During the tests, the real-time simulations were run for 40 s, and the signal to record the test event with the power meter was set at 30 s for the event-trigger circuit. The advanced outdoor power line sensor testbed has a real-time simulator that is used to generate transient scenarios (e.g., electrical faults, capacitor bank operation, and service restoration), while the analog signals are recorded by the same high-resolution power meter. The behaviors of analog signals, harmonic components, total harmonic distortion, and crest factors are assessed for this power line sensor and compared with those of the reference PT/CT because of the absence of testing standards for advanced outdoor power line sensors. The results showed that this OPLS technology responded identically to the PT and CT under all conditions.

Piesciorovsky, Emilio [ORNL]↗