NREL Gearbox Reliability Collaborative Analysis Round Robin: Preprint
The Gearbox Reliability Collaborative is working to determine the causes and loading conditions that result in the premature failure of wind turbine gearboxes.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
The Gearbox Reliability Collaborative is working to determine the causes and loading conditions that result in the premature failure of wind turbine gearboxes.
Wind turbine gearboxes do not achieve their expected design life. The cost of gearbox replacements and rebuilds and the downtime associated with these failures increase the cost of wind energy. In 2007, the U.S. Department of Energy established the National Renewable Energy Laboratory (NREL) Gearbox Reliability Collaborative (GRC). Its goals are to understand the root causes of premature gearbox failures and improve their reliability. To date, the GRC has focused on a 750-kW drivetrain with a three-stage, three-point-mounted gearbox. A nonproprietary version of the gearbox containing CRBs with C3 clearances in the planetary stage was customized. Two of these gearboxes, GB1 and GB2, were manufactured and then tested in the National Wind Technology Center's 2.5-MW dynamometer and in the field. Major GRC findings include the detrimental effect of rotor moments on planetary load sharing and predicted fatigue, and the risk of bearing sliding in low-torque conditions for three-point configuration drivetrains. Based on the knowledge gained from testing and analysis of the original design, the GRC gearbox was redesigned to improve its load-sharing characteristics and predicted fatigue. This new gearbox is named GB3. As shown in Figure 1, its key improvement is the incorporation of preloaded TRBs that support the planet carrier and planets. Roller loads can be optimized and bearing life maximized with a small preload [4]. These preloaded bearings, along with interference-fitted planet pins, improve alignments and load-sharing characteristics. A semi-integrated planet bearing design also increases capacity and eliminates outer race fretting. Romax Technology, with Powertrain Engineers and the Timken Company (Timken), completed the redesign. Timken manufactured and instrumented the planet gears and bearings. Brad Foote Gearing manufactured the other gearing and assembled the gearbox.
This presentation provides updates on the work conducted for the Gearbox Reliability Collaborative on the gearbox reliability database, condition monitoring and operations and maintenance research.
Abstract. This paper presents the state-of-the-art technologies and development trends of wind turbine drivetrains – the system that converts kinetic energy of the wind to electrical energy – in different stages of their life cycle: design, manufacturing, installation, operation, lifetime extension, decommissioning and recycling. Offshore development and digitalization are also a focal point in this study. Drivetrain in this context includes the whole power conversion system: main bearing, shafts, gearbox, generator and power converter. The main aim of this article is to review the drivetrain technology development as well as to identify future challenges and research gaps. The main challenges in drivetrain research identified in this paper include drivetrain dynamic responses in large or floating turbines, aerodynamic and farm control effects, use of rare-earth material in generators, improving reliability through prognostics, and use of advances in digitalization. These challenges illustrate the multidisciplinary aspect of wind turbine drivetrains, which emphasizes the need for more interdisciplinary research and collaboration.
This presentation was given at the 2011 Wind Turbine Reliability Workshop sponsored by Sandia National Laboratories in Albuquerque, NM on August 2-3, 2011. It discusses work for the Gearbox Reliability Collaborative including downtime caused by turbine subsystems, annual failure frequency of turbine subsystems, cost benefits of condition monitoring (CM), the Gearbox Reliability Collaborative's condition monitoring approach and rationale, test setup, and results and observations.
Among the various causes of bearing damage and failure, metal fatigue of the rolling contact surface is the dominant failure mechanism. The fatigue life is associated with the load conditions under which wind turbines operate in the field. Therefore, it is important to understand the long-term distribution of the bearing loads under various environmental conditions. The National Renewable Energy Laboratory's 750-kW Gearbox Reliability Collaborative wind turbine is studied in this work. A decoupled analysis using several computer codes is carried out. The global aero-elastic simulations are performed using HAWC2. The time series of the drivetrain loads and motions from the global dynamic analysis are fed to a drivetrain model in SIMPACK. The time-varying internal pressure distribution along the raceway is obtained analytically. A series of probability distribution functions are then used to fit the long-term statistical distribution at different locations along raceways. The long-term distribution of the bearing raceway loads are estimated under different environmental conditions. Finally, the bearing fatigue lives are calculated.
Presented at Pennsylvania State University on September 15, 2014.
This report describes the Gearbox Reliability Collaborative's work at NREL to increase the reliability of wind turbine gearboxes.
Failures in gearbox bearings have been a primary source of reliability issues for wind turbine drivetrains, leading to costly downtime and unplanned maintenance. The most common failure mode is attributed to so-called white-etching cracks (WECs). This mode of failure can occur at 5%-20% of the predicted design life and has been observed in many other industries, bearing locations, bearing types, bearing parts, and steel types. The main drivers for the creation of WECs in steel specimens have been identified and verified by material testing. In a full-scale wind turbine gearbox, however, the conditions leading to WECs, the process by which this failure culminates, and the reasons for their apparent prevalence are all still highly debated. In a collaborative project, Flender Corporation, SKF and the National Renewable Energy Laboratory have instrumented a commercial drivetrain, installed it in a wind turbine, and operated the turbine for over a year. In this report, these measurements are used to validate two different modelling approaches for bearing sliding, one analytical dynamic model and one multi-body model. Once validated, these models can then be used to evaluate the roller slip losses or cumulative frictional energy that are each considered as potential driving factors for wind turbine gearbox bearing failures by WEC.
The Gearbox Reliability Collaborative (GRC) investigates root causes of wind turbine gearbox premature failures and validates design assumptions that affect gearbox reliability using a combined testing and modeling approach. Knowledge gained from the testing and modeling of the GRC gearboxes builds an understanding of how the selected loads and events translate into internal responses ofthree-point mounted gearboxes. This paper presents some testing and modeling results of the GRC research during Phase 1 and 2. Non-torque loads from the rotor including shaft bending and thrust, traditionally assumed to be uncoupled with gearbox, affect gear and bearing loads and resulting gearbox responses. Bearing clearance increases bearing loads and causes cyclic loading, which couldcontribute to a reduced bearing life. Including flexibilities of key drivetrain subcomponents is important in order to reproduce the measured gearbox response during the tests using modeling approaches.
The Gearbox Reliability Collaborative (GRC) has conducted extensive field and dynamometer test campaigns on two heavily instrumented wind turbine gearboxes. In this paper, data from the planetary stage is used to evaluate the accuracy and computation time of numerical models of the gearbox. First, planet-bearing load and motion data is analyzed to characterize planetary stage behavior indifferent environments and to derive requirements for gearbox models and life calculations. Second, a set of models are constructed that represent different levels of fidelity. Simulations of the test conditions are compared to the test data and the computational cost of the models are compared. The test data suggests that the planet-bearing life calculations should be made separately for eachbearing on a row due to unequal load distribution. It also shows that tilting of the gear axes is related to planet load share. The modeling study concluded that fully flexible models were needed to predict planet-bearing loading in some cases, although less complex models were able to achieve good correlation in the field-loading case. Significant differences in planet load share were found insimulation and were dependent on the scope of the model and the bearing stiffness model used.
The GMLC project is built upon the results of pioneering research funded by the U.S. Department of Energy (DOE) and conducted by the National Renewable Energy Laboratory (NREL)—in collaboration with the Electric Power Research Institute and the University of Colorado—on active power controls (APC) by wind power during 2013–2016. The studies detailed in the first APC by wind power project have shown tremendous promise for the potential for wind power plants to provide APC. The goal of this project was to continue the previous work and develop and validate coordinated controls of APC by wind generation, short-term energy storage, and large industrial motor drives for providing various types of ancillary services to the grid and minimizing loading impacts on wind turbines (e.g., drivetrains), thereby reducing operation-and-maintenance (O&M) costs and subsequently reducing the cost of energy generated by wind power. This work used the $30 million, multiyear DOE investments and the unique characteristics of NREL’s existing National Wind Technology Center test site, including a combination of multimegawatt utility-scale wind turbine generators, a 1-MW/1-MWh battery energy storage system (BESS), industrial variable-frequency motor drives, a 1-MW solar photovoltaic (PV) array, and a 7-MVA controllable grid interface. This combination of technologies allows for the optimization, testing, and demonstration of various types of APC by wind power in coordination with other generation sources (including regenerative loads) and energy storage to allow for enhancing or, in some cases, substituting the APC services by wind power and reducing impacts on wind turbine component life and thus increasing the availability and reliability of the power supply from wind
In November of 2009, Clemson University was awarded a competitive grant from the U.S. Department of Energy to design, build and operate a facility for full-scale, highly accelerated mechanical testing of next-generation wind turbine drivetrain technologies. The primary goal of the project was to design, construct, commission, and operate a state-of-the-art sustainable facility that permits full-scale highly accelerated testing of advanced drivetrain systems for large wind turbines. The secondary goal was to meet the objectives of the American Recovery and Reinvestment Act of 2009, especially in job creation, and provide a positive impact on economically distressed areas in the United States, and preservation and economic recovery in an expeditious manner. The project was executed according to a managed cooperative agreement with the Department of Energy and was an extraordinary success. The resultant new facility is located in North Charleston, SC, providing easy transportation access by rail, road or ship and operates on an open access model such that it is available to the U.S. Wind Industry for research, analysis, and evaluation activities. The 72 m by 97 m facility features two mechanical dynamometer test bays for evaluating the torque and blade dynamic forces experienced by the rotors of wind turbine drivetrains. The dynamometers are rated at 7.5 MW and 15 MW of low speed shaft power and are configured as independent test areas capable of simultaneous operation. All six degrees of freedom, three linear and three rotational, for blade and rotor dynamics are replicated through the combination of a drive motor, speed reduction gearbox and a controllable hydraulic load application unit (LAU). This new LAU setup readily supports accelerated lifetime mechanical testing and load analysis for the entire drivetrain system of the nacelle and easily simulates a wide variety of realistic operating scenarios in a controlled laboratory environment. The development of these two dynamometer test rigs is the first significant achievement for the project. These test rigs embody a new manner of test due to the system configuration and completely new design with a free floating loading hub in the LAU. This project provided the catalyst for the advancement to this new test rig configuration that has been adopted by every significant wind turbine test rig constructed since the inception of this project. There are currently two different vendors supplying these new systems. Catalyzing this new design is the second major success of the project. With the increased market penetration of wind energy over the past decade, many regions and countries have developed specific electrical grid specifications and performance codes for large wind farms to ensure operational reliability and stability. These grid codes provide requirements for interconnection with the grid during low or high voltage phenomena, typically encountered during and after system fault events. Given the installed infrastructure of the Wind Turbine Drivetrain Testing Facility (WTDTF), a natural expansion of facility capability was to include the necessary equipment for performing fault ride-through evaluations of wind turbines to the Low Voltage Ride Through (LVRT) codes. Once the decision was made to expand the scope of the original grant into fault ride-through testing, it was clear that there are several markets, not just wind, which could benefit from this type of test and that simple fault ride-through testing could be extended into a broader scope of electrical testing capabilities. It was at this point that Clemson University was awarded a second grant to build a 15 MW Hardware-In-the-Loop (HIL) Grid Simulator in order to establish world class electrical testing capabilities to compliment the mechanical testing at the WTDTF. This third significant achievement resulted in the 15 MW HIL Grid Simulator as the corner stone of the Duke Energy eGRID Center and is collocated with the WTDTF in the SCE&G Energy Innovation Center at the new Facility in North Charleston, SC, USA. Before the eGRID was completed, it was recognized that the ability to test solar farm equipment was but a small step away thru the addition of enhanced equipment to provide for DC testing. In yet another expansion/success, a 2.5 MW rectifier system was designed and implemented by Clemson staff to enhance the Center’s capabilities. The program required over 250,000 man-hours of on-site construction labor reworking the brownfield facility on the former Navy Base, clearly satisfying one of the major goals of the Reinvestment Act. This was done while winning numerous awards for design and construction of the facility, including the Top US Project for 2014 from the Trade Journal Engineering News Record. The project was a major collaborative developmental activity managed by Clemson University staff that involved the DOE and many partners and organizations.