Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DRILLING RIGS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Deep Borehole Field Test Specifications

This report documents conceptual design development for the Deep Borehole Field Test (DBFT), mainly the test packages (not containing waste) and the system for demonstrating emplacement and retrieval of those packages in the Field Test Borehole (FTB). For the DBFT to have demonstration value, it must be based on conceptualization of a deep borehole disposal (DBD) system for specific waste forms. This document therefore describes a current reference DBD concept, and analyzes key design options for disposal, to guide selection of options for the DBFT. The most important of these options is the emplacement mode, i.e. whether packages are emplaced using a wireline or a string of drill pipe (with a drill rig). This choice is analyzed using cost and risk models, in Sections 5 and 6. Other emplacement mode options are also identified and discussed. The reference DBD concept and the analysis of waste packaging and emplacement options, are used to develop requirements and assumptions for the DBFT and to recommend DBFT specifications. Design issues are identified, and priorities are developed for further conceptual design development and additional engineering analysis, anticipating future design activities. Conceptual design development is part of a process that proceeds in three stages: 1) conceptual design including feasibility studies; 2) preliminary design that includes technical and cost information necessary for final design; and 3) final design sufficient for fabrication or construction. The DBFT engineering demonstration will follow such an evolution. Whereas design evolution typically begins with bench-scale and pilot-scale investigations proceeding to conceptual, preliminary, and final designs, the DBFT can proceed directly to design because of extensive previous work and published literature on scientific drilling, characterization methods, waste packaging and handling, industrial deep-hole drilling and construction, and downhole operations. Hence it is anticipated that this report will lead to completion of conceptual design, then preliminary and final design, fabrication and testing, and demonstration of waste emplacement in a deep borehole.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Floodplain Assessment for the Middle Los Alamos Canyon Aggregate Area Investigations in Technical Area 02 at Los Alamos National Laboratory

The proposed action being assessed in this document occurs in TA-02 in the bottom of Los Alamos Canyon. The DOE proposes to conduct soil sampling at AOC 02-011 (d), AOC 02- 011(a)(ii), and SWMU 02-005, and excavate soils in AOC 02-011(a)(ii) as part of a corrective actions effort. Additional shallow surface soil samples (soil grab samples) will be collected throughout the TA-02 area, including within the floodplain, to perform ecotoxicology studies (Figures 1 and 2). The excavation boundaries in AOC 02-011(a)(ii) are slightly within the delineated 100-year floodplain. The project will use a variety of techniques for soil sampling and remediation efforts to include hand/digging, standard hand auger/sampling, excavation using machinery such as backhoe and front end loader and small drill rig. Heavy equipment will traverse the floodplain and spoils piles will be staged in the floodplain within developed or previously disturbed areas (e.g., existing paved roads and parking areas). The project will utilize and maintain appropriate best management practices (BMPs) to contain excavated materials, and all pollutants, including oil from machinery/vehicles. The project will stabilize disturbed areas as appropriate at the end of the project.

54 ENVIRONMENTAL SCIENCES↗

Benchmarking of Wellhead Safety Zone Criteria for Underground Gas Storage Facilities

Underground natural gas storage facilities are a vital part of the U. S. national infrastructure. However, the concept of hazard zones from fires and explosions at these facilities is not nearly as well defined as it is for natural gas transmission pipelines. This report will take a safety area predicted for underground gas storage facilities called the Wellhead Safety Zone or WSZ and benchmark it against the observed damage zone from the drill rig accident near Rama, Louisiana on November 15, 2007. When combined with earlier accidents, this new benchmark indicates the WSZ formula gives an accurate indication of the hazard radius from underground gas storage facility accidents over a wide range of casing sizes and pressures.

03 NATURAL GAS↗

Quick-Connect, Self-Alining Latch

Sturdy latch tolerates 10 degrees of angular mismatch in joining structural elements. Hexagonal passive plate nests in active plate, guided by capture plates and alinement keys and grooves. Center hole in both active and passive plates is 1 meter in diameter. Latch has possible uses a pipe joint, connector for parts of portable structures, and fitting for marine risers on offshore drilling rigs.

Burns, G. C.↗

Mars surface science requirements and plan

The requirements for obtaining geological, geochemical, geophysical, and meteorological data on the surface of Mars associated with manned landings were analyzed. Specific instruments were identified and their mass and power requirements estimated. A total of 1 to 5 metric tons, not including masses of drill rigs and surface vehicles, will need to be landed. Power associated only with the scientific instruments is estimated to be 1 to 2 kWe. Requirements for surface rover vehicles were defined and typical exploration traverses during which instruments will be positioned and rock and subsurface core samples obtained were suggested.

Blacic, J. D.↗

Lunar deep drill apparatus

A self contained, mobile drilling and coring system was designed to operate on the Lunar surface and be controlled remotely from earth. The system uses SKITTER (Spatial Kinematic Inertial Translatory Tripod Extremity Robot) as its foundation and produces Lunar core samples two meters long and fifty millimeters in diameter. The drill bit used for this is composed of 30 per carat diamonds in a sintered tungsten carbide matrix. To drill up to 50 m depths, the bit assembly will be attached to a drill string made from 2 m rods which will be carried in racks on SKITTER. Rotary power for drilling will be supplied by a Curvo-Synchronous motor. SKITTER is to support this system through a hexagonal shaped structure which will contain the drill motor and the power supply. A micro-coring drill will be used to remove a preliminary sample 5 mm in diameter and 20 mm long from the side of the core. This whole system is to be controlled from earth. This is carried out by a continuously monitoring PLC onboard the drill rig. A touch screen control console allows the operator on earth to monitor the progress of the operation and intervene if necessary.

Harvey, Jill↗

Internal Wave Study in the South China Sea Using SAR

Recently, the internal wave distribution maps in the China Seas have been compiled from hundreds of ERS-1/2, RADARSAT, and Space Shuttle SAR (Synthetic Aperture Radar) images from 1993 to 1999. Based on internal wave distribution map, most of internal waves in the northeast part of South China Sea were propagating westward. The wave crest can be as long as 200 km with amplitude of 100 m due to strong current from the Kuroshio branching out into the South China Sea. Based on the observations from drilling rigs near DongSha Island by Amoco Production Co., the solitons may be generated in a 4 km wide channel between Batan and Sabtang islands in Luzon Strait. The proposed generation mechanism is similar to the lee wave formation from a shallow topography. Both depression and elevation internal waves have been observed in the same RADARSAT ScanSAR image on May 4, 1998 near DongSha Island. Furthermore, depression and elevation internal waves have also been observed by SAR at the same location on the shelf in April and June, 1993 (in different seasons) respectively. Numerical models have been used to interpret their generation mechanism and evolution processes. Based on the SAR images, near DongSha Island, the westward propagating huge internal solitons are often encountered and diffracted/broken by the coral reefs on the shelf. After passing the island, the diffracted waves will re-merge or interact with each other. It has been observed that after the nonlinear wave-wave interaction, the phase of wave packet is shifted and wavelength is also changed. Examples of mesoscale features observed in SAR images, such as fronts, raincells, bathymetry, ship wakes, and oil spills will be presented. Recent mooring measurements in April 1999 near Dongsha Island, future field test ASIAEX (Asian Seas International Acoustics Experiment) planned for April 2001, and some pretest survey data will be discussed in this paper.

Liu, Antony K.↗

Electronic Nose

Grace Industries, Inc.'s Electronic Nose is a vapor and gas detector, deriving from NASA's electronic circuitry, capable for sensing the presence of accelerants several days after a fire. The device is powered by rechargeable battery and no special training needed to operate. If an accelerant is present, device will emit a beeping sound and trigger a flashing light; the faster the beep rate, the more volatile the accelerant. Its sensitivity can also detect minute traces of accelerants. Unit saves investigators of fire causes time and expense by providing speedy detection of physical evidence for use in court. Device is also useful for detecting hazardous fumes, locating and detecting gas leaks in refineries and on oil drilling rigs.

Source record↗

NASA DEVELOP Students Rev Up Response to Gulf Oil Spill

After the April 20th explosion aboard the Deepwater Horizon drilling rig in the Gulf of Mexico, the world witnessed one of the worst oil spill catastrophes in global history. In an effort to mitigate the disaster, the U.S. government moved quickly to establish a unified command for responding to the spill. Some of the command's most immediate needs were to track the movement of the surface oil slick, establish a baseline measurement of pre-oil coastal ecosystem conditions, and assess potential air quality and water hazards related to the spill. To help address these needs and assist the Federal response to the disaster, NASA deployed several of its airborne and satellite research sensors to collect an unprecedented amount of remotely-sensed data over the Gulf of Mexico region. Although some of these data were shared with the public via the media, much of the NASA data on the disaster was not well known to the Gulf Coast community. The need existed to inform the general public about these datasets and help improve understanding about how NASA's science research was contributing to oil spill response and recovery. With its extensive experience conducting community-oriented remote sensing projects and close ties to organizations around Gulf of Mexico, the NASA DEVELOP National Program stood in a unique position to meet this need.

Jones, Jason B.↗

Stand Alone Electrical Equipment PRL 227a (Formerly PRL 227 LOC3) Confirmatory Sampling Report Addendum

HydroGeoLogic, Inc. (HGL) prepared this Confirmatory Sampling Report Addendum (CSRA) for the National Aeronautics and Space Administration (NASA), Kennedy Space Center (KSC), Florida. PRL 227a Location of Concern (LOC) 3 is located on 10th Street, west of the former Vertical Processing Facility (M7-1469), SWMU 077. The Load Break Switches (LBS) were installed in 1986 and are suspected to have formerly contained dielectric fluid that contained polychlorinated biphenyls (PCBs). The LBS were replaced in 1993 with new LBSs that do not contain PCBs. The LBS are located on a concrete pad surrounded by grass that is mowed and maintained. A total of 330 soil samples were collected between June 2020 and December 2022 from 88 locations at depths ranging from 0-0.5 to 19-20 ft bls. In general, soil samples collected from depths less than 5 ft were collected via hand auger and samples collected beyond 5 ft bls were collected using a direct-push technology drill rig. Soil samples collected from greater than 5 ft bls to 20 ft bls were collected to confirm PCBs were not present at depth in the aquifer matrix. Delineation samples were collected using an approximately 20 ft horizontal spacing. PCB impacted soil has been completely delineated to the State of Florida residential soil cleanup target level (SCTL) at PRL 227a horizontally and vertically. PCB concentrations have been identified above the residential and industrial SCTL as well as concentrations greater than or equal to 50 ppm requiring coordination with EPA and disposal at a facility authorized under TSCA. Based upon the CSRA sampling, an interim measure is recommended to remove PCB impacted soil above the residential SCTL. The total volume of PCB impacted soil to be removed is 591.6 cubic yards. This includes approximately 9.3 cubic yards of soil with PCB concentrations greater than or equal to 50 ppm. An interim measure work plan is included as an attachment to this report.

electrical equipment↗

RePED 250: A Revolutionary, High-Drilling Rate, High-T Geothermal Drilling System and Companion Power Electronics

Project partner, Tetra has demonstrated developed an electro-crushing technology, a repetitive, pulsed electric drill (RePED), capable of crushing hard rock in tension and at high speeds. In this project, NREL, TPL, and Tetra are upgrading the RePED drilling system for operation in 250 degree C environments, and demonstrating its effectiveness drilling hard rock. The RePED drilling system is being designed to function with most of the elements of a conventional drilling system (e.g., drill pipe, steering tools, measurement-while-drilling (MWD) systems, mud systems), so no specialized rigs or drill pipe are required.

geothermal↗

Blind shaft development

The article discusses how Shaft Drillers International (SDI) is breaking new ground in shaft development and ground stabilization. Techniques of blind shaft drilling and raise bore shaft development developed by SDI are briefly explained. An associated company, Coastal Drilling East, deals with all types of ground improvement such as pre-grouting work for shafts, grouting of poor soil and water leaks into the mine. 3 photos.

01 COAL, LIGNITE, AND PEAT↗

Utah FORGE: Well 16A(78)-32 Drilling Data

This dataset includes survey data, drilling data, daily reports, summaries of daily operations, and rig photos from the drilling of Utah FORGE well 16A(78)-32, which is a highly deviated deep well. It was completed 60 days ahead of schedule. Rig move in began 10/22/2020 and drilling commenced on 10/30/2020, and total depth was reached on 12/18/2020. Drilling was followed by a diagnostic fracture injection test (DFIT), logging, and circulating casing. The rig was released on 1/12/2021. The upper part of the well was drilled vertically through approximately 4,700 feet of sediments before penetrating into high strength, crystalline granite. The well was deviated at a 65 degree angle from vertical after reaching a depth of 6,000 ft. This angle was maintained for the remainder of the well's trajectory. The well ultimately reached a true vertical depth of 8,559 feet, and a total measured depth of 10,987 feet. Preliminary measurements indicate temperatures at the "toe" of the well will exceed 442 degrees F (228 degrees C). Approximately 74 ft of core of the granitic and metamorphic rocks that will form the FORGE reservoir was also recovered.

15 GEOTHERMAL ENERGY↗

Optimizing Geothermal Drilling: Oil and Gas Technology Transfer

There is a significant amount of financial risk associated with geothermal drilling. This study of drilling operations seeks opportunities to improve upon current practices and technologies. The scope of this study included analyzing 21 geothermal wells and 21 oil and gas wells. The goal was to determine a 'Perfect Well' using historical data to compare the best oil and gas well to the best geothermal well. Unfortunately, limitations encountered in the study included missing data (bit records, mud information, etc.) and poor data collection practices An online software database was used to format drilling data to IADC coded daily drilling reports and generate figures for analysis. Six major issues have been found in geothermal drilling operations. These problems include lost circulation, rig/ equipment selection, cementing, penetration rate, drilling program, and time management. As a result of these issues, geothermal drilling averaged 56.4 days longer than drilling comparable oil and gas wells in the wells in this study. Roughly $13.9 million was spent on non-productive time in the 21 geothermal wells, compared with only $1.3 million in the oil and gas wells, assuming a cost of $50,000 per day. Comparable events such as drilling the same sized hole, tripping in/out, cementing, and running the same size casing took substantially less time in the oil and gas wells. Geothermal wells were drilled using older and/or less advanced technology to depths less than 10,000 feet, while oil and gas wells reached 12,500 feet faster with purpose built rigs. A new approach is now underway that will optimize drilling programs throughout the drilling industry using Mechanical Specific Energy (MSE) as a tool to realize efficient drilling processes. Potential improvements for current geothermal operations are: the use of electronic records, real time services, and official glossary terms to describe rig operations, and advanced drilling rigs/technology.

15 GEOTHERMAL ENERGY↗

Glass Buttes Well 52-33 Core Log

Core log from Glass Buttes Well 52-33, drilled by Geodrill Rig 6 in 2014 to a depth of 3000 feet. Logged at 500 ft intervals.

15 GEOTHERMAL ENERGY↗