Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DOLLARS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

NASA plans for space-processing experiments on sounding rockets

Planning for sounding rocket space processing experiments in the second half of 1975 is reported. Currently operational sounding rocket systems are capable of carrying payloads containing more than 50 kg of experimental apparatus on trajectories including between 5 and 10 min of coasting flight above 100 km altitude. When equipped with stabilization systems to nullify angular velocities in their rotational degrees of freedom, these vehicles can provide an environment in which accelerations are less than 1 mm/sec per 2. The cost of flight operations to implement a rocket experiment program will be of the order of 2000 dollars per kg of discretionary payload, and within the next two years newly operational systems are expected to reduce the cost to about 700 dollars per kg.

Bredt, J. H.↗

Microeconomic analysis of military aircraft bearing restoration

The risk and cost of a bearing restoration by grinding program was analyzed. A microeconomic impact analysis was performed. The annual cost savings to U.S. Army aviation is approximately $950,000.00 for three engines and three transmissions. The capital value over an indefinite life is approximately ten million dollars. The annual cost savings for U.S. Air Force engines are approximately $313,000.00 with a capital value of approximately 3.1 million dollars.

Hein, G. F.↗

Microeconomic analysis of military aircraft bearing restoration

The risk and cost of a bearing restoration by grinding program was analyzed. A microeconomic impact analysis was performed. The annual cost savings to U.S. Army aviation is approximately $950,000.00 for three engines and three transmissions. The capital value over an indefinite life is approximately ten million dollars. The annual cost savings for U.S. Air Force engines is approximately $313,000.00 with a capital value of approximately 3.1 million dollars. The program will result in the government obtaining bearings at lower costs at equivalent reliability. The bearing industry can recover lost profits during a period of reduced demand and higher costs.

Hein, G. F.↗

Cost of photovoltaic energy systems as determined by balance-of-system costs

The effect of the balance-of-system (BOS), i.e., the total system less the modules, on photo-voltaic energy system costs is discussed for multikilowatt, flat-plate systems. Present BOS costs are in the range of 10 to 16 dollars per peak watt (1978 dollars). BOS costs represent approximately 50% of total system cost. The possibility of future BOS cost reduction is examined. It is concluded that, given the nature of BOS costs and the lack of comprehensive national effort focussed on cost reduction, it is unlikely that BOS costs will decline greatly in the next several years. This prognosis is contrasted with the expectations of the Department of Energy National Photovoltaic Program goals and pending legislation in the Congress which require a BOS cost reduction of an order of magnitude or more by the mid-1980s.

Rosenblum, L.↗

An assessment of the risk arising from electrical effects associated with the release of carbon fibers from general aviation aircraft fires

A Poisson type model was developed and exercised to estimate the risk of economic losses through 1993 due to potential electric effects of carbon fibers released from United States general aviation aircraft in the aftermath of a fire. Of the expected 354 annual general aviation aircraft accidents with fire projected for 1993, approximately 88 could involve carbon fibers. The average annual loss was estimated to be about $250 (1977 dollars) and the likelihood of exceeding $107,000 (1977 dollars) in annual loss in any one year was estimated to be at most one in ten thousand.

Rosenfield, D.↗

An assessment of the risk arising from electrical effects associated with carbon fibers released from commercial aircraft fires

The risks associated with electrical effects arising from carbon fibers released from commercial aviation aircraft fires were estimated for 1993. The expected annual losses were estimated to be about $470 (1977 dollars) in 1993. The chances of total losses from electrical effects exceeding $100,000 (1977 dollars) in 1993 were established to be about one in ten thousand.

Kalelkar, A. S.↗

A study of the economic benefits of meteorological satellite data

Satellite data, while most useful in data poor areas, serves to fine tune forecasts in data rich areas. It consequently has a resulting significant economic benefit because, as previously stated, even one improved forecast per client per year can save each client thousands of dollars. Multiply this by several hundred clients and the dollar savings are sizeable. The great educational value which experience with satellite data gives undoubtedly leads to improved forecasts. Any type of future satellite data delivery system should take into account the needs and facilities of the user community to make it most useful.

Suchman, D.↗

Large wind-turbine projects in the United States wind energy program

The technological development of large, horizontal-axis wind turbines (100 kW-2500 kW) is surveyed with attention to prototype projects managed by NASA. Technical feasibility has been demonstrated in utility service for systems with a rated power of up to 200 kW and a rotor diameter of 125 ft (Mod-OA). Current designs of large wind turbines such as the 2500 kW Mod-2 are projected to be cost competitive for utility applications when produced in quantity, with capital costs of 600 to 700 dollars per kW (in 1977 dollars).

Thomas, R. L.↗

SPS cost methodology and sensitivities

A total solar power satellite is defined and costs for such a program estimated. The program is assumed to consist of a number of phases from initial research to the completed production unit. Each phase represents an increasing commitment of resources as confidence in the ultimate success of the program grows. The total cost of the program through the first full-scale unit is estimated to be slightly over 100 billion dollars. The subsequent units are estimated to cost an average of 11.5 billion dollars per unit.

Piland, R. O.↗

Comparative values of advanced space solar cells

A methodology for deriving a first order dollar value estimate for advanced solar cells which consists of defining scenarios for solar array production and launch to orbit and the associated costs for typical spacecraft, determining that portion affected by cell design and performance and determining the attributable cost differences is presented. Break even values are calculated for a variety of cells; confirming that efficiency and related effects of radiation resistance and temperature coefficient are major factors; array tare mass, packaging and packing factor are important; but cell mass is of lesser significance. Associated dollar values provide a means of comparison.

Slifer, L. W., Jr.↗

Langley's views on NEMS

The views of the Langley Research Center regarding the NASA Equipment Management System (EMS) are discussed. One of Langley's greatest concerns is with the reconciliation between NEMS and the General Ledger. Langley's accounting system tracks cost data to the penny level. NEMS deals in whole dollar amounts. Therefore, Langley has no way of reconciling the two. The only approach that is acceptable to Langley, unless requirements for reconciliation are changed, is for the NEMS files and the reports involved in the process be at the penny level. All other NEMS reports can remain whole dollars. Also to reconcile, Langley needs data to show the difference between the previous cost and the new cost for the month. On an input record, the adjustment amount is added to the cost and recorded as total amount. The adjusted cost is not captured. In order to establish a control between the prior months and the current month, a new field needs to be added to capture the adjusted cost (debits And credits). Langley has not reconciled the Equipment account with the General Ledger since February 1984. Problems with NEMS regular production runs cause concern. Production at Langley is run on the second and/or third shift. If a run(s) terminates and/or abends in a particular module, Langley must wait until the next day to resolve NEMS problems after consultation with Headquarters personnel. For a successful installation, Langley must have a good data base to convert to NEMS and users and the data processing staff must work together.

George, J. W.↗

Low cost solar array project. Experimental process system development unit for producing semiconductor-grade silicon using the silane-to-silicon process

Technical activities are reported in the design of process, facilities, and equipment for producing silicon at a rate and price comensurate with production goals for low cost solar cell modules. The silane-silicone process has potential for providing high purity poly-silicon on a commercial scale at a price of fourteen dollars per kilogram by 1986, (1980 dollars). Commercial process, economic analysis, process support research and development, and quality control are discussed.

Source record↗

Flat-plate solar array progress and plans

The Flat-Plate Solar Array Project (FSA), sponsored by the U.S. Department of Energy (DOE) and managed by the Jet Propulsion Laboratory (JPL), has achieved progress in a broad range of technical activities since that reported at the Fourth European Communities Conference. A particularly important analysis has been completed recently which confirms the adoption into practice by the U.S. Photovoltaic (PV Industry, of all the low-cost module technology elements proposed at the 16th Project Integration Meeting for a $2.80/Wp (1980 U.S. Dollars) design approach in the fall of 1980. This work presents along with a projection, using the same techniques, for what is believed to be a very credible ribbon-based module design for less that $0.55/Wp (1980 U.S. Dollars). Other areas to be reported upon include low-cost Si feedstock refinement; ribbon growth; process sequence development for cells; environmental isolation; engineering science investigations; and module testing progress.

Callaghan, W. T.↗

Long-lived space observatories for astronomy and astrophysics

NASA's plan to build and launch a fleet of long-lived space observatories that include the Hubble Space Telescope (HST), the Gamma Ray Observatory (GRO), the Advanced X Ray Astrophysics Observatory (AXAF), and the Space Infrared Telescope Facility (SIRTF) are discussed. These facilities are expected to have a profound impact on the sciences of astronomy and astrophysics. The long-lived observatories will provide new insights about astronomical and astrophysical problems that range from the presence of planets orbiting nearby stars to the large-scale distribution and evolution of matter in the universe. An important concern to NASA and the scientific community is the operation and maintenance cost of the four observatories described above. The HST cost about $1.3 billion (1984 dollars) to build and is estimated to require $160 million (1986 dollars) a year to operate and maintain. If HST is operated for 20 years, the accumulated costs will be considerably more than those required for its construction. Therefore, it is essential to plan carefully for observatory operations and maintenance before a long-lived facility is constructed. The primary goal of this report is to help NASA develop guidelines for the operations and management of these future observatories so as to achieve the best possible scientific results for the resources available. Eight recommendations are given.

Savage, Blair D.↗

Development of a funding, cost, and spending model for satellite projects

The need for a predictive budget/funging model is obvious. The current models used by the Resource Analysis Office (RAO) are used to predict the total costs of satellite projects. An effort to extend the modeling capabilities from total budget analysis to total budget and budget outlays over time analysis was conducted. A statistical based and data driven methodology was used to derive and develop the model. Th budget data for the last 18 GSFC-sponsored satellite projects were analyzed and used to build a funding model which would describe the historical spending patterns. This raw data consisted of dollars spent in that specific year and their 1989 dollar equivalent. This data was converted to the standard format used by the RAO group and placed in a database. A simple statistical analysis was performed to calculate the gross statistics associated with project length and project cost ant the conditional statistics on project length and project cost. The modeling approach used is derived form the theory of embedded statistics which states that properly analyzed data will produce the underlying generating function. The process of funding large scale projects over extended periods of time is described by Life Cycle Cost Models (LCCM). The data was analyzed to find a model in the generic form of a LCCM. The model developed is based on a Weibull function whose parameters are found by both nonlinear optimization and nonlinear regression. In order to use this model it is necessary to transform the problem from a dollar/time space to a percentage of total budget/time space. This transformation is equivalent to moving to a probability space. By using the basic rules of probability, the validity of both the optimization and the regression steps are insured. This statistically significant model is then integrated and inverted. The resulting output represents a project schedule which relates the amount of money spent to the percentage of project completion.

Johnson, Jesse P.↗

Potential of derived lunar volatiles for life support

The lunar regolith contains small quantities of solar wind implanted volatile compounds that have vital, basic uses for maintaining life support systems of lunar or space settlements. Recent proposals to utilize the helium-3 isotope (He-3) derived from the lunar regolith as a fuel for fusion reactors would result in the availability of large quantities of other lunar volatile compounds. The quantities obtained would provide the annual life support replacement requirements of 1150 to 23,000 inhabitants per ton of He-3 recovered, depending on the volatile compound. Utilization of the lunar volatile compounds for life support depends on the costs, in terms of materials and energy, associated with their extraction from the lunar regolith as compared to the delivery costs of these compounds from Earth resources. Considering today's conservative estimated transportation costs ($10,000 dollars per kilogram) and regolith mining costs ($5 dollars per ton), the life support replacement requirements could be more economically supplied by recovering the lunar volatile compounds than transporting these materials from Earth resources, even before He-3 will be utilized as a fusion fuel. In addition, availability of lunar volatile compounds could have a significant cost impact on maintaining the life support systems of the space station and a Mars base.

Bula, R. J.↗

A model for the cost of doing a cost estimate

A model for estimating the cost required to do a cost estimate for Deep Space Network (DSN) projects that range from $0.1 to $100 million is presented. The cost of the cost estimate in thousands of dollars, C(sub E), is found to be approximately given by C(sub E) = K((C(sub p))(sup 0.35)) where C(sub p) is the cost of the project being estimated in millions of dollars and K is a constant depending on the accuracy of the estimate. For an order-of-magnitude estimate, K = 24; for a budget estimate, K = 60; and for a definitive estimate, K = 115. That is, for a specific project, the cost of doing a budget estimate is about 2.5 times as much as that for an order-of-magnitude estimate, and a definitive estimate costs about twice as much as a budget estimate. Use of this model should help provide the level of resources required for doing cost estimates and, as a result, provide insights towards more accurate estimates with less potential for cost overruns.

Remer, D. S.↗

The cost of doing a cost estimate

A model for estimating the cost required to do a cost estimate for Deep Space Network (DSN) projects that range from $0.1 to $100 million is presented. The cost of the cost estimate in thousands of dollars, C(sub E), is found to be approximately given by C(sub E) = K(/C(sub p)/(sup 0.35)) where C(sub p) is the cost of the project being estimated in millions of dollars and K is a constant depending on the accuracy of the estimate. For an order-of-magnitude estimate, K = 24; for a budget estimate, K = 60; and for a definitive estimate, K = 115. That is, for a specific project, the cost of doing a budget estimate is about 2.5 times as much as that for an order-of-magnitude estimate, and a definitive estimate costs about twice as much as a budget estimate. Use of this model should help provide the level of resources required for doing cost estimates and, as a result, provide insights towards more accurate estimates with less potential for cost overruns.

Remer, Donald S.↗