Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DER Interconnection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Real-time evaluation of cybersecurity threats to DER inverter grid-support functions

In this project we aim to contribute to the understanding of the type and severity of potential cybersecurity attacks to the grid-support functionalities of DER systems interconnected to the AC distribution grid via inverters. Our preliminary work focused on developing a small-scale testbed allowing to study cybersecurity threats to an isolated photovoltaic-battery system using a real-time simulator (Typhoon HIL602+) with a real DNP3 communication connection over TCP/IP, allowing for safe and efficient monitoring and manipulation of data traffic between the simulated hardware and supervisory control and data acquisition (SCADA) system. In this project we propose to expand upon this development by utilizing a) a recently acquired NovaCor RTDS (Real Rime digital Simulator) to emulate the DER-inverter-grid topology including main grid-support functions as defined by IEEE Std. 1547-2018, and b) an industrial control and automation device to enable realistic evaluation of control functions and utilization of communication protocols for real-time data transmission.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Key Insights: Interconnecting Behind-the-Meter Microgrids

This technical brief explores the interconnection challenges and evolving standards associated with behind-the-meter (BTM), facility-scale microgrids. It clarifies key functions related to customer microgrids and backup systems while addressing critical questions regarding certification coverage, operational impacts, customer relationships, and testing requirements for BTM microgrid systems. The document emphasizes the need for updated standards and additional witness testing to ensure safe and effective microgrid operation as well as improved grid integration and compliance with power quality standards.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Voices from Rural Electric Cooperatives: A Call for a DER Integration Playbook for Rural and Agricultural Income & Savings from Renewable Energy (RAISE)

Rural-serving electric utilities (RSEUs)—including electric cooperatives, municipal systems, and small investor-owned utilities—are essential players in the evolving energy landscape. These community-focused entities are increasingly being asked to consider distributed energy resources (DERs) such as rooftop and ground-mounted solar, wind, battery storage, smart water heaters, and demand response programs (NRECA 2025; Lenhart et al. 2020). Yet the path to DER adoption is far from straightforward in the rural context. This report is based on in-depth interviews with managers of rural electric cooperatives across the United States. These conversations offer a grounded, unvarnished look at how DERs are perceived, what barriers exist, and what conditions might enable integration and adoption. While the utilities interviewed vary in geography, size, and DER experience, several clear and common themes emerged across electric cooperatives such that the report recommends the development of a DER Integration Runbook to help utilities assess readiness, define local use cases, engage stakeholders, pilot projects, and iterate, expanding over time.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Interconnection of Distributed Energy Resources in the Indian Context: IEEE 1547-2018 Adaptation for Locally-Appropriate Grid Code Development

The rapid growth of distributed energy resources (DERs) in India and ambitious renewable energy goals set forth by the Indian government have created the need for appropriate distribution interconnection standards to ensure continued system stability, reliability, and resilience. Existing DER interconnection codes in India, at the time of publishing this report, lack many of the critical grid support functionalities for DERs which may protect bulk system stability, such as event ride-through provisions, frequency droop control, or appropriate trip thresholds given the increasing importance of distributed generation. The formal adoption of IEEE 1547-2018 by the Bureau of Indian Standards (BIS) marks a significant step towards achieving appropriate interconnection of DERs, though the implementation of such a standard must be accompanied with careful consideration of the current codes, regulations, and operation of the Indian power system. Studies on the performance of the functionalities within 1547-2018, which properly incorporate local operating conditions, can inform decisions related to the adoption and adaptation of the clauses present in the standard. This report outlines several of these key considerations for stakeholders and provides analyses illustrating the performance of grid support functionalities on typical Indian distribution feeders.

1547↗

A Guide to Updating Interconnection Rules and Incorporating IEEE Standard 1547

The intent of this paper is to support local authorities in adopting the most current technical requirements for interconnecting distributed energy resources (DERs) to the electric distribution system as specified in the Institute of Electrical and Electronics Engineers Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces (IEEE Std 1547-2018). To create interconnection rules that successfully address policy goals, market trends, and technical requirements, state regulators need to be well informed of DER integration considerations. Interconnection processes and technical issues often overlap; the two are not easily segregated, and they are often considered and evaluated concurrently within the context of interconnection rulemaking. Accordingly, this paper addresses both the technical issues and related process considerations. A lack of uniform and transparent procedures for addressing interconnection rule changes can result in implementation issues or inefficiencies, such as unclear, lengthy, and complicated interconnection rules that can increase distributed generation "soft costs" (i.e., non-hardware costs). This can further delay the deployment of DERs and jeopardize time-constrained national and state policy goals, such as renewable energy targets, or limit participation in emerging techno-economic trends. Additionally, misconstructed interconnection rules are at risk of becoming mired in stakeholder conflicts. This guide addresses the concerns of electric service regulators from both the process and technical standpoints by presenting a structured, step-by-step approach to developing and updating existing interconnection rules. In this document, the process of developing and updating interconnection rules is subdivided into three steps: (1) determining the context (stakeholders and major drivers); (2) developing the rule, including updating technical requirements; and (3) maintaining and revising the rule over time.

14 SOLAR ENERGY↗

Securing Inverter Communication: Proactive Intrusion Detection and Mitigation System to Tap, Analyze, and Act

The electric grid has undergone rapid, revolutionary changes in recent years; from the addition of advanced smart technologies to the growing penetration of distributed energy resources (DERs) to increased interconnectivity and communications. However, these added communications, access interfaces, and third-party software to enable autonomous control schemes and interconnectivity also expand the attack surface of the grid. To address the gap of DER cybersecurity and secure the grid-edge to motivate a holistic, defense-in-depth approach, a proactive intrusion detection and mitigation system (PIDMS) device was developed to secure PV smart inverter communications. The PIDMS was developed as a distributed, flexible bump-in-the-wire (BITW) solution for protecting PV smart inverter communications. Both cyber (network traffic) and physical (power system measurements) are processed using network intrusion monitoring tools and custom machinelearning algorithms for deep packet analysis and cyber-physical event correlation. The PIDMS not only detects abnormal events but also deploys mitigations to limit or eliminate system impact; the PIDMS communicates with peer PIDMSs at different locations using the MQTT protocol for increased situational awareness and alerting. The details of the PIDMS methodology and prototype development are detailed in this report as well as the evaluation results within a cyber-physical emulation environment and subsequent industry feedback.

14 SOLAR ENERGY↗

Informative Background on the Interoperability Requirements in IEEE Std 1547-2018

The intent of this document is to support local authorities governing interconnection requirements in adopting the most current requirements for interconnecting distributed energy resources (DERs) to the electric distribution system, as specified in the Institute of Electrical and Electronics Engineers Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces (IEEE Std 1547-2018 ). To create interconnection rules that successfully address policy goals, market trends, and technical requirements, electric service regulators need to be well informed of DER integration considerations. Interconnection processes and technical issues often overlap; the two are not easily segregated, and they are often considered and evaluated concurrently within the context of interconnection rulemaking. Accordingly, this document addresses both the technical issues and related process considerations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Systems and methods for detecting and mitigating cyber attacks on power systems comprising distributed energy resources

Extensive deployment of interoperable distributed energy resources (DER) on power systems is increasing the power system cybersecurity attack surface. National and jurisdictional interconnection standards require DER to include a range of autonomous and commanded grid-support functions which can drastically influence power quality, voltage, and the generation-load balance. Investigations of the impact to the power system in scenarios where communications and operations of DER are controlled by an adversary show that each grid-support function exposes the power system to distinct types and magnitudes of risk. The invention provides methods for minimizing the risks to distribution and transmission systems using an engineered control system which detects and mitigates unsafe control commands.

97 MATHEMATICS AND COMPUTING↗

Systems and methods for detecting and mitigating cyber attacks on power systems comprising distributed energy resources

Extensive deployment of interoperable distributed energy resources (DER) on power systems is increasing the power system cybersecurity attack surface. National and jurisdictional interconnection standards require DER to include a range of autonomous and commanded grid-support functions which can drastically influence power quality, voltage, and the generation-load balance. Investigations of the impact to the power system in scenarios where communications and operations of DER are controlled by an adversary show that each grid-support function exposes the power system to distinct types and magnitudes of risk. The invention provides methods for minimizing the risks to distribution and transmission systems using an engineered control system which detects and mitigates unsafe control commands.

Johnson, Jay Tillay↗

Supervised Learning for Distribution Secondary Systems Modeling: Improving Solar Interconnection Processes

The current interconnection process and hosting capacity analysis for distributed energy resources (DERs), such as photovoltaics (PV) and battery energy storage systems, are based on analyzing grid network constraints (voltage and thermal) using only medium-voltage distribution network models. This is because most utilities do not have secondary low-voltage system models that connect service transformers and residential customers. This is important because in many cases the main impact of interconnecting DERs could occur on the low-voltage distribution systems. This paper proposes a supervised learning method to approximate local secondary models to improve the interconnection process. The proposed supervised learning method includes a decision tree model that predicts the secondary topology and a logistic regression model that predicts conductor types. The case studies demonstrate the benefits of including secondary low-voltage circuits in the interconnection process. We report the proposed modeling methodology is readily scalable and thus can reduce the cost and effort of PV interconnection for the industry and stakeholders.

14 SOLAR ENERGY↗

Defining a Platform Approach and Market Participation: Data Driven Business Models for Solid State Transformer-Based Synthetic Inertia and Voltage Stability Controls (CRADA Final Report, Project 1, Mod 1)

The primary objective of this project is to determine the incremental value created with the medium voltage solid-state transformer (MV SST) technology to different stakeholders in view of the updated DER grid regulations. This includes studying the benefits of the MV SST technology in a range of use cases for EV and DER penetration including (1) “corridor charging” for EVs and (2) solar plus storage (FERC 2222). The potential customers of this technology include utilities for EV charging, DER installers who must meet utility interconnection requirements, balancing authorities, and DER aggregators. The traditional transformers on the grid could be a limiting factor for the EV-grid integration as the distribution transformers were not designed to handle the dynamic and fluctuating EV charging loads. Thus, the issues such as voltage fluctuations, increased losses and reduced efficiency [1] can negatively impact the grid operation. To address these challenges, transformers with flexibility and adaptability become imperative to meet the evolving energy demands. In this regard, the concept of Medium Voltage Solid-State Transformers.

14 SOLAR ENERGY↗

Planning Roadmap for DER Integration in India: Industry Best Practices and Resource Guide

Ensuring safe, reliable, cost-effective DER integration at scale requires holistic planning, broad stakeholder engagement, and should address key development areas such as standards adoption, equipment testing and certification, interoperability and cybersecurity, interconnection procedures, and advanced forecasting and DER management. Each of these areas currently represent significant challenges for utilities, regulators, OEMs, developers, and even consumers worldwide. India has already seen significant growth of DERs and has announced targets for substantial growth yet to come, with the potential for DERs to make up a non-negligible portion of the country's overall generation capacity. As such, it is of critical importance that Indian stakeholders consider the potential impacts of wide-spread adoption of DERs and take preemptive action related to the five development areas listed here, among others. India should consider strategies including the adoption of key DER standards related to interconnection, testing, and cybersecurity; enabling effective and secure communication channels for DER interoperability; testing and certifying DER equipment in accredited testing laboratories; building robust, streamlined interconnection procedures; and revamping legacy system planning structures to incorporate DERs in a holistic planning framework.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Probabilistic Deliverability Assessment of Distributed Energy Resources via Scenario-Based AC Optimal Power Flow

As electric grids decarbonize and distributed energy resources (DERs) become increasingly prevalent, interconnection assessments must evolve to reflect operational variability and control flexibility. This paper highlights key modeling limitations observed in practice and reviews approaches for modeling uncertainty. It then introduces a Probabilistic Deliverability Assessment (PDA) framework designed to complement and extend existing procedures. The framework integrates scenario-based AC optimal power flow (AC OPF), corrective dispatch, and optional multi-temporal constraints. Together, these form a structured methodology for quantifying DER utilization, deliverability, and reliability under uncertainty in load, generation, and topology. Outputs include interpretable metrics with confidence intervals that inform siting decisions and evaluate compliance with reliability thresholds across sampled operating conditions. A case study on Puerto Rico’s publicly available bulk power system model demonstrates the framework’s application using minimal input data, consistent with current interconnection practice. Across staged fossil generation retirements, the PDA identifies high-value DER sites and regions requiring additional reactive power support. Results are presented through mean dispatch signals, reliability metrics, and geospatial visualizations, demonstrating how the framework provides transparent, data-driven siting recommendations. The framework’s modular design supports incremental adoption within existing workflows, encouraging broader use of AC OPF in interconnection and planning contexts.

14 SOLAR ENERGY↗

Use of Operating Agreements and Energy Storage to Reduce Photovoltaic Interconnection Costs: Technical and Economic Analysis

This report presents an analytical methodology to identify alternative options to manage interconnection costs and streamline interconnection timelines for distribution system-connected photovoltaic (PV) systems not co-located with load. Specifically, the report details the methodology and results of an analysis that: 1. Identifies potential grid violations that would be induced by a PV system requesting interconnection to a distribution circuit; 2. Identifies multiple technically viable options for mitigating the potential violations, including infrastructure upgrades, downsizing the PV system size, curtailment of PV, and addition of battery energy storage; 3. Defines the required technical operating parameters of the system in order to mitigate all potential violations (the "Operating Envelope"); 4. Compares the economics of each option, from the PV developer's perspective. The analysis supports the ongoing evolution of interconnection standards for combined PV and energy storage systems by providing a methodology to define allowable maximum export limits during each hour. The methodology presented could be used by utilities as part of the interconnection study process, to inform negotiations with DER developers and the drafting of mutually acceptable interconnection agreements. The resulting technical operating parameters could be included as part of the interconnection service agreement (ISA) between the system owner and the utility company. The companion report to this analysis, Gill et al. (2022), details the envisioned framework for the implementation of the technical operating parameters.

14 SOLAR ENERGY↗

Real-Time Testbed for Studying Cyberattacks and Defense in DER-integrated Smart Inverter Systems

In this paper, we propose a Hardware-in-the-Loop (HIL) simulation testbed suitable for the implementation and testing of realistic cyberattacks on grid-tied smart inverter systems integrated with Distributed Energy Resources (DER) that use the Distributed Network Protocol-3 (DNP3) protocol for communications between grid components. Specifically, our testbed combines a Real-Time Digital Simulator (RTDS) NovaCor device, outfitted with GNETx2 network interface cards, a gridtied DER topology implemented via the RTDS software package RSCAD, and a custom virtual network that emulates a man in the middle attacker. The Man-in-the-Middle (MITM) attacker captures DNP3 traffic and falsifies telemetry data in DNP3 packets to trigger unwarranted commands from a DNP3 controller that exploit smart inverter grid support functions. We choose DNP3 and implement grid support functions according to the IEEE Std. 1547-2018 mandated for the interconnection and interoperability of DER power systems with associated power components. Furthermore, we develop a protocol payload agnostic attack detection framework that leverages the round-trip time (RTT) anomalies between DNP3 requests and responses and can detect the presence of attacks without having to analyze the payload’s contents, while balancing trade-offs between false alarm counts, missed detections, and time to detection. To facilitate further research, we publicly release benign and attack network traffic exchanged between various sensors, controllers, and actuators in our grid-tied inverter testbed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Least-cost Optimal Distribution Grid Expansion (LODGE): Utility Pilots

The Least-cost Optimal Distribution Grid Expansion (LODGE) model provides the optimal portfolio of distribution system upgrades—e.g., voltage regulators, feeder reconductoring, transformer upgrades and non-wires alternatives (NWA), such as strategic siting of storage and distributed generation—to interconnect distributed energy resources (DERs) and enable load growth. It can be used to assess grid infrastructure costs and explore policy and regulatory solutions for distribution planning and DER valuation.In 2025, Berkeley Lab conducted three pilot analyses to validate LODGE results with empirical utility data before the model’s first release in 2026. The pilots, done with utilities in Washington, Colorado, and New Mexico, provide examples that illustrate how the model works, what it can do, and the value of the analysis.

Heleno, Miguel↗

A Review on Protection Challenges of Transmission Lines Connected to Inverter-Based Resources

Utilities, university researchers, research institutes, and relay manufacturers have performed studies to investigate different aspects of high IBR penetration. Almost all studies support 1) creating international and national standards to regulate the IBRs, 2) revising engineering tools to address shortcomings, and 3) adjusting the protective relay settings to resolve protection problems. This paper summarizes the studies and research conducted in recent years to quantify the impact of IBR penetration on transmission line protection and to identify potential solutions to improve the dependability and reliability of grid protection systems.

14 SOLAR ENERGY↗