An Assessment of Energy Potential at Non-Powered Dams in the United States

The United States has produced clean, renewable electricity from hydropower for more than 100 years, but hydropower-producing facilities represent only a fraction of the infrastructure development that has taken place on the nation’s waterways. In contrast to the roughly 2,500 dams that provide 78 gigawatts (GW) 1 of conventional and 22 GW of pumped-storage hydropower, the United States has more than 80,000 non-powered dams (NPDs)—dams that do not produce electricity—providing a variety of services ranging from water supply to inland navigation. Importantly, many of the monetary costs and environmental impacts of dam construction have already been incurred at NPDs, so adding power to the existing dam structure can often be achieved at lower cost, with less risk, and in a shorter timeframe than development requiring new dam construction. The abundance, cost, and environmental favorability of NPDs, combined with the reliability and predictability of hydropower, make these dams a highly attractive source for expanding the nation’s renewable energy supply. To better characterize this unique national resource, the U.S. Department of Energy (DOE) Wind and Water Power Program has undertaken a national-scale analysis of U.S. dams to determine the ability of NPDs to provide hydroelectric power. DOE’s Oak Ridge National Laboratory (ORNL), with input from DOE’s Idaho National Laboratory, quantified the potential capacity and generation available from adding power production capability to U.S. NPDs. Of the more than 80,000 NPDs throughout the U.S., 54,391 dams were analyzed, with remaining dams eliminated from consideration due to erroneous geographic information, or erroneous flow or drainage area attributes that could not be resolved and corrected through independent investigation of maps and records. Anecdotal information suggests that these dams with missing or erroneous information are likely to be relatively small or have low potential to produce hydroelectric energy. Dams with a reported height of less than five feet were also excluded from analysis. A thorough quality control and review process ensured that the 54,391 remaining NPDs were analyzed and characterized as accurately as possible. Figure ES-1 demonstrates the spatial and capacity potential distribution of the nation’s NPDs. Electric generating capacities included in the report were calculated using the assumption that all water passing a facility would be available for conversion into electrical energy and that hydraulic head at the facility would remain constant. The analysis did not consider the economic feasibility of developing each unpowered facility. The assessment provides preliminary information for stakeholders (such as developers, municipal planners, and policymakers), who can further evaluate the potential to increase hydropower production at NPD sites. Developers could use the information provided in this assessment to focus on more detailed analysis of sites that demonstrate a reasonable potential for being developed. Adding power to U.S. NPDs has the potential to add up to 12 GW (12,000 megawatts or MW) of new renewable capacity—a potential equivalent to increasing the size of the existing conventional hydropower fleet by 15%. A majority of this potential is concentrated in just 100 NPDs, which could contribute approximately 8 GW of clean, reliable hydropower; the top 10 facilities alone could add up to 3 GW of new hydropower. Eighty-one of the 100 top NPDs are U.S. Army Corps of Engineers (USACE) facilities, many of which, including all of the top 10, are navigation locks on the Ohio River, Mississippi River, Alabama River, and Arkansas River, as well as their major tributaries. This study also shows that dams owned by the U.S. Bureau of Reclamation hold the potential to add approximately 260 MW of capacity; the Bureau has also engaged in an effort to conduct a more detailed evaluation of its own facilities.

13 HYDRO ENERGY↗

Compliance Monitoring of Yearling and Subyearling Chinook Salmon and Juvenile Steelhead Survival and Passage at John Day Dam, 2012

The purpose of this compliance study was to estimate dam passage survival of yearling and subyearling Chinook salmon and steelhead smolts at John Day Dam during the spring and summer outmigrations in 2012. Under the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp), dam passage survival should be greater than or equal to 0.96 for spring migrants and greater than or equal to 0.93 for summer migrants, estimated with a standard error (SE) less than or equal to 0.015. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 3 km downstream of the dam, as well as the forebay residence time, tailrace egress time, spill passage efficiency (SPE), and fish passage efficiency (FPE), as required in the Columbia Basin Fish Accords (Fish Accords). A virtual/paired-release design was used to estimate dam passage survival at John Day Dam. The approach included releases of smolts, tagged with acoustic micro-transmitters, above John Day Dam that contributed to the formation of a virtual release at the face of John Day Dam. A survival estimate from this release was adjusted by a paired release below John Day Dam. A total of 3376 yearling Chinook salmon, 5726 subyearling Chinook salmon, and 3239 steelhead smolts were used in the virtual releases. Sample sizes for the below-dam paired releases (R2 and R3, respectively) were 997 and 995 for yearling Chinook salmon smolts, 986 and 983 for subyearling Chinook salmon smolts, and 1000 and 1000 for steelhead smolts. The Juvenile Salmon Acoustic Telemetry System (JSATS) tags were manufactured by Advanced Telemetry Systems. Model SS300 tags, weighing 0.304 g in air, were surgically implanted in yearling and subyearling Chinook salmon, and Model SS130 tag, weighing 0.438 g in air, were surgically implanted in juvenile steelhead for this investigation. The intent of the spring study was to estimate dam passage survival during both 30% and 40% spill conditions. The two spill conditions were to be systematically performed in alternating 2-day test intervals over the course of the spring outmigration. High flow conditions in 2012 interrupted the spill study. Dam passage survival was therefore estimated season-wide regardless of spill conditions.

Skalski, J. R.↗

Evaluation of the Biological Effects of the Northwest Power Conservation Council's Mainstem Amendment on the Fisheries Upstream and Downstream of Libby Dam, Montana, 2007-2008 Annual Report.

A new project began in 2005 to monitor the biological and physical effects of improved operations of Hungry Horse and Libby Dams, Montana, called for by the Northwest Power and Conservation Council (NPCC) Mainstem Amendment. This operating strategy was designed to benefit resident fish impacted by hydropower and flood control operations. Under the new operating guidelines, July through September reservoir drafts will be limited to 10 feet from full pool during the highest 80% of water supply years and 20 feet from full pool during the lowest 20% of water supply (drought) years. Limits were also established on how rapidly discharge from the dams can be increased or decreased depending on the season. The NPCC also directed the federal agencies that operate Libby and Hungry Horse Dams to implement a new flood control strategy (VARQ) and directed Montana Fish, Wildlife & Parks to evaluate biological responses to this operating strategy. The Mainstem Amendment operating strategy has not been fully implemented at the Montana dams as of June 2008 but the strategy will be implemented in 2009. This report highlights the monitoring methods used to monitor the effects of the Mainstem Amendment operations on fishes, habitat, and aquatic invertebrates upstream and downstream of Libby Dam. We also present initial assessments of data and the effects of various operating strategies on physical and biological components of the systems upstream and downstream of Libby Dam. Annual electrofishing surveys in the Kootenai River and selected tributaries, along with gill net surveys in the reservoir, are being used to quantify the impacts of dam operations on fish populations upstream and downstream of Libby Dam. Scales and otoliths are being used to determine the age structure and growth of focal species. Annual population estimates and tagging experiments provide estimates of survival and growth in the mainstem Kootenai River and selected tributaries. Radio telemetry will be used to validate an existing Instream Flow Incremental Methodology (IFIM) model developed for the Kootenai River and will also be used to assess the effect of changes in discharge on fish movements and habitat use downstream of Libby Dam. Passive integrated transponder (PIT) tags will be injected into rainbow, bull, and cutthroat trout throughout the mainstem Kootenai River and selected tributaries to provide information on growth, survival, and migration patterns in relation to abiotic and biotic variables. Model simulations (RIVBIO) are used to calculate the effects of dam operations on the wetted perimeter and benthic biomass in the Kootenai River below Libby Dam. Additional models (IFIM) will also be used to evaluate the impacts of dam operations on the amount of available habitat for different life stages of rainbow and bull trout in the Kootenai River.

13 HYDRO ENERGY↗

How Does Flow Alteration Propagate Across a Large, Highly Regulated Basin? Dam Attributes, Network Context, and Implications for Biodiversity

Abstract Large dams are a leading cause of river ecosystem degradation. Although dams have cumulative effects as water flows downstream in a river network, most flow alteration research has focused on local impacts of single dams. Here we examined the highly regulated Colorado River Basin (CRB) to understand how flow alteration propagates in river networks, as influenced by the location and characteristics of dams as well as the structure of the river network—including the presence of tributaries. We used a spatial Markov network model informed by 117 upstream‐downstream pairs of monthly flow series (2003–2017) to estimate flow alteration from 84 intermediate‐to‐large dams representing >83% of the total storage in the CRB. Using Least Absolute Shrinkage and Selection Operator regression, we then investigated how flow alteration was influenced by local dam properties (e.g., purpose, storage capacity) and network‐level attributes (e.g., position, upstream cumulative storage). Flow alteration was highly variable across the network, but tended to accumulate downstream and remained high in the main stem. Dam impacts were explained by network‐level attributes (63%) more than by local dam properties (37%), underscoring the need to consider network context when assessing dam impacts. High‐impact dams were often located in sub‐watersheds with high levels of native fish biodiversity, fish imperilment, or species requiring seasonal flows that are no longer present. These three biodiversity dimensions, as well as the amount of dam‐free downstream habitat, indicate potential to restore river ecosystems via controlled flow releases. Our methods are transferrable and could guide screening for dam reoperation in other highly regulated basins.

54 ENVIRONMENTAL SCIENCES↗

Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011

The purpose of this compliance study was to estimate dam passage survival of yearling Chinook salmon and steelhead smolts at Bonneville Dam during spring 2011. Under the 2008 Federal Columbia River Power System Biological Opinion (BiOp), dam passage survival should be greater than or equal to 0.96 and estimated with a standard error (SE) less than or equal to 0.015. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 1 km below the dam, as well as the forebay residence time, tailrace egress, and spill passage efficiency, as required in the Columbia Basin Fish Accords. A virtual/paired-release design was used to estimate dam passage survival at Bonneville Dam. The approach included releases of acoustic-tagged smolts above Bonneville Dam that contributed to the formation of a virtual release at the face of the dam. A survival estimate from this release was adjusted by a paired release below Bonneville Dam. A total of 7692 yearling Chinook salmon and 7766 steelhead smolts were tagged and released during the study. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation. The high flows during spring 2011 disrupted planned 100 kcfs spill operations at Bonneville Dam. Therefore, dam passage survival was estimated for the early part of the study (i.e., 30 April–13 May) when spill was about 100 kcfs and for the entire season, which included much higher spill levels from 18–31 May 2011.

Skalski, J. R.↗

Evaluation of Foster Dam Juvenile Fish Passage, 2018 (Final Report)

This report presents the results of a fish passage study conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers Portland District (USACE) at Foster Dam (herein, Foster) during the spring (March–June) and fall (October–December) of 2018. The goal of this study was to provide biologists, engineers, resource managers, and regional decision-makers with information about passage of juvenile Chinook salmon and juvenile steelhead (or appropriate surrogates) through specific routes at Foster. The results of this study are intended to help facilitate decision-making regarding long-term measures for enhancing salmonid passage at Foster. Radio telemetry (RT) methods were instituted at low winter reservoir forebay elevation (low pool, 613 ft mean sea level (msl); spring 2018 and fall 2018) and high summer reservoir forebay elevation (high pool, 635 ft msl; late spring and early summer 2018) to accomplish the following objectives: I. Estimate the following passage metrics under typical operations (i.e., baseline conditions): a. Overall dam-passage survival and survival specific to each route of dam passage, calculated using two different methods: i. Cormack-Jolly-Seber (CJS) estimate: Probability of survival from dam passage to detection at the Primary Array, 19 river kilometers (rkm) downstream of Foster. ii. Virtual Release/Dead Fish Correction (ViRDCt) estimate: Corrects the bias that occurs from misidentifying fish that did not survive dam-passage as alive at the tailrace Egress Array, allowing an estimate of survival from dam passage to this array, 2.5 rkm downstream of Foster. b. Route distribution (passage proportions by route; also known as “passage efficiencies”). c. Efficiency metrics i. Dam-passage efficiency (DPE), the proportion of total fish passing the dam relative to the number of total fish detected in the near forebay of the dam and therefore available to pass. ii. Fish passage efficiency (FPE), the proportion of fish passing via a non-turbine route, relative to the number of total fish in the near forebay and available to pass. iii. Fish weir efficiency (FWE) and spill bay efficiency (SBE), the proportion of fish passing the weir or spill bays, respectively, relative to the total number of fish passing the dam. d. Reservoir residency time (time elapsed between release into reservoir and dam passage) and travel times through the system. II. Estimate efficiency and effectiveness of the new fish weir, compared to the turbines and the spillway. III. Under alternative operations, compare passage through each route (turbines, weir, spillway) using a block/treatment (on/off) design similar to the 2015 and 2016 studies. IV. Estimate efficiency of the new fish weir operating at a low level of discharge (< 500 cfs) and a high level of discharge (= 500 cfs), as well as dam passage survival at each weir discharge level. V. Evaluate survival and behavior of hatchery summer steelhead to wild surrogate winter steelhead for potential use of summer steelhead as a surrogate species winter steelhead. VI. Evaluate juvenile passage rates in the auxiliary water supply (AWS), forebay water supply (FWS), and hatchery water supply (HWS).

54 ENVIRONMENTAL SCIENCES↗

Restoring Flow Regimes after Dam Construction and Operation: Evidence from Dynamic Systems Theory

Dams provide a variety of benefits to society, including hydropower generation, flood control, recreation, and water supply for municipal, industrial, and agricultural customers. However, constructing and operating dams for these purposes can negatively impact downstream ecosystems by altering natural flow regimes and interfering with the lifecycles of aquatic and riparian species. Increased concern from environmental interests has put pressure on dam operators to quantify the flow regime changes that have resulted from dam construction and to evaluate how future modifications to dam releases may impact river systems. In this study, we present a method for analyzing the impact of dam operations by reconstructing system trajectories from hydrologic flow time series for different periods of dam operation (pre-dam, post-dam, and post-modification). We apply these methods to flow data from eight rivers in the US to determine the dimensionality of each operating period and to analyze trends based on the primary purpose of dam operation. Hydropower dams operated without flow restrictions exhibit high dimensional, stochastic behavior. However, the system dimensionality is reduced to approximately three variables when ramping restrictions are implemented, or in cases where an afterbay is present to reregulate flows. This low dimensional behavior is more similar to natural flow regimes. For dams operated primarily for flood control or water supply, the flow regimes are typically low dimensional and more deterministic.

13 HYDRO ENERGY↗

In Search of a Cost-Effective Approach for Estimating Dam Passage Survival

Abstract Passage of downstream-migrating fishes through hydropower dams poses a management issue in rivers throughout the world. As such, regulations have been enacted at many locales to understand and limit fish losses by requiring dam passage survival estimation. However, limiting estimates of survival to the dam and immediate tailrace presents a challenge to researchers. In this study, two alternative release–recapture methods were used to estimate dam passage survival of juvenile salmonids through Lower Granite Dam on the Snake River, Washington, in 2018. One approach, the virtual/paired-release (ViPRe) model, was extensively used in the Columbia–Snake River basin at federally operated hydroelectric dams during 2010–2014. This existing approach uses three releases of tagged smolts to isolate dam passage survival, defined as survival from the upstream dam face to the tailrace mixing zone 1–2 km downstream of the dam. An alternative approach, the virtual release/dead-fish correction (ViRDCt) model, uses one live-release group paired with a release of dead tagged fish at the dam to estimate the same survival parameter. The alternative estimation approaches were tested on two spring out-migrating stocks, yearling Chinook Salmon Oncorhynchus tshawytscha and steelhead Oncorhynchus mykiss, and on a summer out-migrating stock of subyearling Chinook Salmon. The alternative estimates for these stocks were all within 1 SE. However, the ViRDCt model produced survival estimates with SEs that were 59% smaller than those of the existing ViPRe model and did so using 42% fewer tagged fish and one less downstream acoustic detection array. Because of the reduced sample size, nearly US$540,000 less in tag costs and 4,000 fewer labor-hours were required to implement the ViRDCt model compared to the ViPRe model. As such, the ViRDCt model represents a cost-effective and precise approach to characterizing dam passage survival.

59 BASIC BIOLOGICAL SCIENCES↗

The Preservation of Climate‐Driven Landslide Dams in Western Oregon

Abstract Bedrock landsliding, including the formation of landslide dams, is a predominant geomorphic process in steep landscapes. Clarifying the importance of hydrologic and seismic mechanisms for triggering deep‐seated landslides remains an ongoing effort, and formulation of geomorphic metrics that predict dam preservation is crucial for quantifying secondary landslide hazards. Here, we identify >200 landslide‐dammed lakes in western Oregon and utilize dendrochronology and enhanced 14 C dating (“wiggle matching”) of “ghost forests” to establish slope failure timing at 20 sites. Our dated landslide dataset reveals bedrock landsliding has been common since the last Cascadia Subduction Zone earthquake in January 1700 AD. Our study does not reveal landslides that date to 1700 AD. Rather, we observe temporal clustering of at least four landslides in the winter of 1889/1890 AD, coincident with a series of atmospheric rivers that generated one of the largest regionally recorded floods. We use topographic and field analyses to assess the relation between dam preservation and topographic characteristics of the impounded valleys. In contrast to previous studies, we do not observe systematic scaling between dam size and upstream drainage area, though dam stability indices for our sites correspond with “stable” dams elsewhere. Notably, we observe that dams are preferentially preserved at drainage areas of ∼1.5 to 13 km 2 and valley widths of ∼25 to 80 m, which may reflect the reduced downstream influence of debris flows and the accumulation of mature conifer trees upstream from landslide‐dammed lake outlets. We suggest that wood accumulation upstream of landslide dams tempers large stream discharges, thus inhibiting dam incision.

Struble, William T.↗

Passage Distribution and Federal Columbia River Power System Survival for Steelhead Kelts Tagged Above and at Lower Granite Dam, Year 2

Steelhead (Oncorhynchus mykiss) populations have declined throughout their range in the last century and many populations, including those of the Snake River Basin are listed under the Endangered Species Act of 1973. The reasons for their decline are many and complex, but include habitat loss and degradation, overharvesting, and dam construction. The 2008 Biological Opinion calls for an increase in the abundance of female steelhead through an increase in iteroparity (i.e., repeat spawning) and this can be realized through a combination of reconditioning and in-river survival of migrating kelts. The goal of this study is to provide the data necessary to inform fisheries managers and dam operators of Snake River kelt migration patterns, survival, and routes of dam passage. Steelhead kelts (n = 487) were captured and implanted with acoustic transmitters and passive integrated transponder (PIT)-tags at the Lower Granite Dam (LGR) Juvenile Fish Facility and at weirs located in tributaries of the Snake and Clearwater rivers upstream of LGR. Kelts were monitored as they moved downstream through the Federal Columbia River Power System (FCRPS) by 15 autonomous and 3 cabled acoustic receiver arrays. Cabled receiver arrays deployed on the dam faces allowed for three-dimensional tracking of fish as they approached the dam face and were used to determine the route of dam passage. Overall, 27.3% of the kelts tagged in this study successfully migrated to Martin Bluff (rkm 126, as measured from the mouth of the Columbia River), which is located downstream of all FCRPS dams. Within individual river reaches, survival per kilometer estimates ranged from 0.958 to 0.999; the lowest estimates were observed in the immediate forebay of FCRPS dams. Steelhead kelts tagged in this study passed over the spillway routes (spillway weirs, traditional spill bays) in greater proportions and survived at higher rates compared to the few fish passed through powerhouse routes (turbines and juvenile bypass systems). The results of this study provide information about the route of passage and subsequent survival of steelhead kelts that migrated through the Snake and Columbia rivers from LGR to Bonneville Dam in 2013. These data may be used by fisheries managers and dam operators to identify potential ways to increase the survival of kelts during their seaward migrations.

Colotelo, Alison H.↗

Factors Affecting Route Selection and Survival of Steelhead Kelts at Snake River Dams in 2012 and 2013

In 2012 and 2013, Pacific Northwest National Laboratory conducted a study that summarized the passage proportions and route-specific survival rates of steelhead kelts that passed through Federal Columbia River Power System (FCRPS) dams. To accomplish this, a total of 811 steelhead kelts were tagged with Juvenile Salmon Acoustic Telemetry System (JSATS) transmitters. Acoustic receivers, both autonomous and cabled, were deployed throughout the FCRPS to monitor the downstream movements of tagged-kelts. Kelts were also tagged with Passive Integrated Transponder tags to monitor passage through juvenile bypass systems and detect returning fish. The current study evaluated data collected in 2012 and 2013 to identify individual, behavioral, environmental and dam operation variables that were related to passage and survival of steelhead kelts that passed through FCRPS dams. Bayesian model averaging of multivariable logistic regression models was used to identify the environmental, temporal, operational, individual, and behavioral variables that had the highest probability of influencing the route of passage and the route-specific survival probabilities for kelts that passed Lower Granite (LGR), Little Goose (LGS), and Lower Monumental (LMN) dams in 2012 and 2013. The posterior probabilities of the best models for predicting route of passage ranged from 0.106 for traditional spill at LMN to 0.720 for turbine passage at LGS. Generally, the behavior (depth and near-dam searching activity) of kelts in the forebay appeared to have the greatest influence on their route of passage. Shallower-migrating kelts had a higher probability of passing via the weir and deeper-migrating kelts had a higher probability of passing via the JBS and turbines than other routes. Kelts that displayed a higher level of near-dam searching activity had a higher probability of passing via the spillway weir and those that did less near-dam searching had a higher probability of passing via the JBS and turbines. The side of the river in which kelts approached the dam and dam operations also affected route of passage. Dam operations and the size and condition of kelts were found to have the greatest effect on route-specific survival probabilities for fish that passed via the spillway at LGS. That is, longer kelts and those in fair condition had a lower probability of survival for fish that passed via the spillway weir. The survival of spillway weir- and deep-spill passed kelts was positively correlated with the percent of the total discharge that passed through turbine unit 4. Too few kelts passed through the traditional spill, JBS, and turbine units to evaluate survival through these routes. The information gathered in this study describes Snake River steelhead kelt passage behavior, rates, and distributions through the FCRPS as well as provide information to biologists and engineers about the dam operations and abiotic conditions that are related to passage and survival of steelhead kelts.

13 HYDRO ENERGY↗

Passage Distribution and Federal Columbia River Power System Survival for Steelhead Kelts Tagged Above and at Lower Granite Dam, Year 2 (Rev. 1)

Steelhead (Oncorhynchus mykiss) populations have declined throughout their range in the last century and many populations, including those of the Snake River Basin are listed under the Endangered Species Act of 1973. The reasons for their decline are many and complex, but include habitat loss and degradation, overharvesting, and dam construction. The 2008 Biological Opinion calls for an increase in the abundance of female steelhead through an increase in iteroparity (i.e., repeat spawning) and this can be realized through a combination of reconditioning and in-river survival of migrating kelts. The goal of this study is to provide the data necessary to inform fisheries managers and dam operators of Snake River kelt migration patterns, survival, and routes of dam passage. Steelhead kelts (n = 487) were captured and implanted with acoustic transmitters and passive integrated transponder (PIT)-tags at the Lower Granite Dam (LGR) Juvenile Fish Facility and at weirs located in tributaries of the Snake and Clearwater rivers upstream of LGR. Kelts were monitored as they moved downstream through the Federal Columbia River Power System (FCRPS) by 15 autonomous and 3 cabled acoustic receiver arrays. Cabled receiver arrays deployed on the dam faces allowed for three-dimensional tracking of fish as they approached the dam face and were used to determine the route of dam passage. Overall, 27.3% of the kelts tagged in this study successfully migrated to Martin Bluff (rkm 126, as measured from the mouth of the Columbia River), which is located downstream of all FCRPS dams. Within individual river reaches, survival per kilometer estimates ranged from 0.958 to 0.999; the lowest estimates were observed in the immediate forebay of FCRPS dams. Steelhead kelts tagged in this study passed over the spillway routes (spillway weirs, traditional spill bays) in greater proportions and survived at higher rates compared to the few fish passed through powerhouse routes (turbines and juvenile bypass systems). The results of this study provide information about the route of passage and subsequent survival of steelhead kelts that migrated through the Snake and Columbia rivers from LGR to Bonneville Dam in 2013. These data may be used by fisheries managers and dam operators to identify potential ways to increase the survival of kelts during their seaward migrations.

13 HYDRO ENERGY↗

Cleaning up the big muddy: A meta-synthesis of the research on the social impact of dams

Scholars have been exploring the social impacts of dams for over 50 years, but a lack of systematic approaches has resulted in many research gaps remaining. This paper presents the first systematic review of the literature on the social impacts of dams. For this purpose, we built a sample of 217 articles published in the past 25 years via key word searches, expert consultations and bibliography reviews. All articles were assessed against an aggregate matrix framework on the social impact of dams, which combines 27 existing frameworks. We find that existing literature is highly biased with regard to: perspective (45% negative versus 5% positive); dam size (large dams are overrepresented); spatial focus (on the resettlement area); and temporal focus (5–10 years ex-post resettlement). Additionally, there is bias in terms of whose views are included, with those of dam developers rarely examined by scholars. These gaps need to be addressed in future research to advance our knowledge on the social impact of dams to support more transparency in the trade-offs being made in dam development decisions. - Highlights: • Very first systematic review of the research on dams' social impact • Biases in the literature identified, e. g. large dams over-studied, too much focus solely on resettlement area impacts • Implications of these biases for understanding of the topic are discussed.

13 HYDRO ENERGY↗

Monitoring and Evaluation of Smolt Migration in the Columbia Basin : Volume XV : Evaluation of the 2007 Predictions of the Run-Timing of Wild and Hatchery-Reared Salmon and Steelhead Smolts to Rock Island, Lower Granite, McNary, John Day, and Bonneville Dams using Program RealTime.

Program RealTime provided monitoring and forecasting of the 2007 inseason outmigrations via the internet for 26 PIT-tagged stocks of wild ESU Chinook salmon and steelhead to Lower Granite and/or McNary dams, one PIT-tagged hatchery-reared ESU of sockeye salmon to Lower Granite Dam, one PIT-tagged wild stock of sockeye salmon to McNary Dam, and 20 passage-indexed runs-at-large, five each to Rock Island, McNary, John Day, and Bonneville dams. Nineteen stocks are of wild yearling Chinook salmon which were captured, PIT-tagged, and released at sites above Lower Granite Dam in 2007 and have at least one year's historical migration data previous to the 2007 migration. These stocks originate in 19 tributaries of the Salmon, Grande Ronde and Clearwater Rivers, all tributaries to the Snake River, and are subsequently detected through tag identification and monitored at Lower Granite Dam. Seven wild PIT-tagged runs-at-large of Snake or Upper Columbia River ESU salmon and steelhead were monitored at McNary Dam. Three wild PIT-tagged runs-at-large were monitored at Lower Granite Dam, consisting of the yearling and subyearling Chinook salmon and the steelhead runs. The hatchery-reared PIT-tagged sockeye salmon stock from Redfish Lake was monitored outmigrating through Lower Granite Dam. Passage-indexed stocks (stocks monitored by FPC passage indices) included combined wild and hatchery runs-at-large of subyearling and yearling Chinook, coho, and sockeye salmon, and steelhead forecasted to Rock Island, McNary, John Day, and Bonneville dams.

13 HYDRO ENERGY↗

Temporary Restoration of Bull Trout Passage at Albeni Falls Dam

This study was designed to monitor movements of bull trout that were provided passage above Albeni Falls Dam, Pend Oreille River. Electrofishing and angling were used to collect bull trout below the dam. Tissue samples were collected from each bull trout and sent to the U. S. Fish and Wildlife Service Abernathy Fish Technology Center Conservation Genetics Lab, Washington. The DNA extracted from tissue samples were compared to a catalog of bull trout population DNA from the Priest River drainage, Lake Pend Oreille tributaries, and the Clark Fork drainage to determine the most probable tributary of origin. A combined acoustic radio or radio tag was implanted in each fish prior to being transported and released above the dam. Bull trout relocated above the dam were able to volitionally migrate into their natal tributary, drop back downstream, or migrate upstream to the next dam. A combination of stationary radio receiving stations and tracking via aircraft, boat, and vehicle were used to monitor the movement of tagged fish to determine if the spawning tributary it selected matched the tributary assigned from the genetic analysis. Seven bull trout were captured during electrofishing surveys in 2008. Of these seven, four were tagged and relocated above the dam. Two were tagged and left below the dam as part of a study monitoring movements below the dam. One was immature and too small at the time of capture to implant a tracking tag. All four fish released above the dam passed by stationary receivers stations leading into Lake Pend Oreille and no fish dropped back below the dam. One of the radio tags was recovered in the tributary corresponding with the results of the genetic test. Another fish was located in the vicinity of its assigned tributary, which was impassable due to low water discharge at its mouth. Two fish have not been located since entering the lake. Of these fish, one was immature and not expected to enter its natal tributary in the fall of 2008. The other fish was large enough to be mature, but at the time of capture its sex was unable to be determined, indicating it may not have been mature at the time of capture. These fish are expected to enter their natal tributaries in early summer or fall of 2009.

13 HYDRO ENERGY↗

Compliance Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at The Dalles Dam, Spring 2010

The purpose of this compliance study was to estimate dam passage survival of yearling Chinook salmon and steelhead smolts at The Dalles Dam during spring 2010. Under the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp), dam passage survival should be greater than or equal to 0.96 and estimated with a standard error (SE) less than or equal 0.015. The study also estimated smolt passage survival from the forebay boat-restricted zone (BRZ) to the tailrace BRZ at The Dalles Dam, as well as the forebay residence time, tailrace egress, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A virtual/paired-release design was used to estimate dam passage survival at The Dalles Dam. The approach included releases of acoustic-tagged smolts above John Day Dam that contributed to the formation of a virtual release at the face of The Dalles Dam. A survival estimate from this release was adjusted by a paired release below The Dalles Dam. A total of 4,298 yearling Chinook salmon and 4,309 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation. The dam passage survival results are summarized as follows: Yearling Chinook Salmon 0.9641 (SE = 0.0096) and Steelhead 0.9535 (SE = 0.0097).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Methods for Assessing Opportunities for Ring Dam Pumped Storage Hydropower

There is growing interest in new pumped storage hydropower (PSH) deployment to provide a range of grid flexibility, reliability, and resiliency services under an evolving and uncertain future power sector. The National Laboratory of the Rockies develops open PSH resource assessment and cost modeling tools to help evaluate PSH deployment opportunities, and this report describes expansions to those tools to consider an additional PSH system configuration - ring-dam reservoirs built on flat topographical features that are constructed from roller-compacted concrete material. This reservoir type is common among current PSH proposals and requires new methods to identify sites with this reservoir geometry throughout the United States and characterize the associated dam cost. Cost characterization for ring dam reservoirs required collecting historical dam cost data for earthen, rockfill, and roller-compacted concrete dams and regressing equations that relate costs between alternative materials. The ring dam site identification algorithm follows a 5-step procedure to identify circular geometry reservoirs. Once ring dam reservoirs are identified, they are then paired with potential dry-gully reservoirs, and the full set of potential paired reservoirs is cost-optimized to produce a least-cost set of potential PSH sites with no overlapping reservoirs. The resulting analysis found 1,663 ring-dam to dry-gully systems in the contiguous United States that are lower cost than any overlapping dry-gully to dry-gully systems, 29 in Alaska, and none in Hawaii or Puerto Rico. These systems constitute 1.5 TW of capacity in the contiguous United States and nearly 29 GW in Alaska, demonstrating that under suitable topography and head, ring-dam systems can provide cost-effective PSH opportunities. The greatest density of these opportunities are found in the intermountain west where there are mesas and flat land at bases of mountain ranges, but continued work could incorporate additional site characteristics or consider more complex reservoir shapes to find additional PSH deployment opportunities.

13 HYDRO ENERGY↗

Using causal maps to support ex-post assessment of social impacts of dams

- Highlights: • We defend the usefulness of causal maps (CM) for ex-post impact assessment of dams. • Political decisions are presented as unavoidable technical measures. • CM enable the identification of multiple causes involved in the dam impacts. • An alternative management of the dams is shown from the precise tracking of the causes. • Participatory CM better the quality of information and the governance of the research. This paper presents the results of an ex-post assessment of two important dams in Brazil. The study follows the principles of Social Impact Management, which offer a suitable framework for analyzing the complex social transformations triggered by hydroelectric dams. In the implementation of this approach, participative causal maps were used to identify the ex-post social impacts of the Porto Primavera and Rosana dams on the community of Porto Rico, located along the High Paraná River. We found that in the operation of dams there are intermediate causes of a political nature, stemming from decisions based on values and interests not determined by neutral, exclusively technical reasons; and this insight opens up an area of action for managing the negative impacts of dams.

54 ENVIRONMENTAL SCIENCES↗